suny oswego campus-wide lactation room · pdf filesuny oswego campus-wide lactation room...

57
SUNY Oswego Campus-wide Lactation Room Implementation Study REVISED November 29, 2016 Dwyer Architectural 313 East Willow Street Suite 107 Syracuse, NY 13203 (315) 473-1800 Watts Architecture & Engineering 95 Perry Street Suite 300 Buffalo, NY 14203 (716) 206-5100

Upload: vanhanh

Post on 08-Mar-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

     

SUNY Oswego Campus-wide Lactation Room Implementation Study

REVISED November 29, 2016

Dwyer Architectural 313 East Willow Street Suite 107

Syracuse, NY 13203 (315) 473-1800

Watts Architecture & Engineering 95 Perry Street Suite 300

Buffalo, NY 14203 (716) 206-5100

 

 

SUNY Oswego Campus-wide Lactation Room Implementation Study

Dwyer Project # 16-042

Page 1 of 6

I. EXECUTIVE SUMMARY

In an effort to comply with the Affordable Care Act, SUNY Oswego is beginning to designate one Lactation Room in each academic building on campus for faculty, staff, students, and visitor use. A list of proposed locations was provided to Dwyer Architectural and Watts Architecture & Engineering for review. The Design team visited the campus and reviewed each location to meet the Architectural and MEP requirements for an occupied space, as well as AIA/ Affordable Care Act recommendations specific to Lactation Rooms. This report includes Architectural and MEP narratives and sketches outlining required and recommended work for each proposed location and rough order of magnitude costs.

II. ARCHITECTURAL NARRATIVE

A. CODES AND STANDARDS General construction work shall comply with the following references:

1. 2015 International Building Code (Business Occupancy) 2. 2015 International Existing Building Code (Alteration Level 2) 3. 1999 ANSI A117.1 – Handicapped Accessibility Standards as

referenced by the Building Code of New York State. 4. 2000 NFPA – Life Safety 101

a. Specific references for occupied spaces considered include the following: • Size: An occupied space must have a minimum clear

width of 7’-0”x 7’-0”. • Ceiling Height: Code requires a minimum headroom

clearance of 7’6” in new spaces and 7’-0” in existing spaces.

Basis for the design of general room layouts and other criteria outlining the utilization of rooms as lactation spaces:

1. AIA Best Practices, “Lactation Room Design”, February 2008 a. Specific references considered include the following:

• Location: Lactation Rooms should be located in a safe area accessible to all. They should not be located in areas

 

SUNY Oswego Campus-wide Lactation Room Implementation Study

Dwyer Project # 16-042

Page 2 of 6

that would not be suitable for preparation or storage of food.

• Privacy: Lactation Rooms shall have acoustic and visual privacy. Install a lockable door. Walls should be constructed to reach the underside of structure wherever possible to minimize the transmission of sound to adjacent spaces. Carpet is recommended to increase acoustic properties.

• Furnishing: provide a task chair suitable for a workstation. Seat, back, armrest is preferred. Casters are recommended to allow the user freedom of movement when hands are occupied with bottles of milk and pump accessories.

• Table/ counter: provide a table or counter work surface for the pump and bottles to rest adjacent to chair. If a telephone is provided it should be within reach of the work area.

• Accessories: useful accessories include a trashcan, paper towel dispenser, coat rack, and full-length mirror. If several mothers are using the room, a bulletin board outside the door will help secure room use.

A. DEMOLITION AND EXISTING CONDITIONS

1. Most spaces require little demolition. For the purposes of this study,

no hazardous material abatement has been included.

B. GENERAL CONSTRUCTION

1. INTERIOR PARTITIONS

a. Gypsum Board Partitions: 1. One layer 5/8” gypsum drywall type X, typical each

side of 3 5/8” 25 ga. metal studs at 24” OC. 2. 5/8” water resistant GWB at wet areas. 3. Wall system construction shall achieve sound

transmission class (STC) rating of 45 for acoustic privacy. 4. All partitions to have sound batt insulation. 5. All partitions to be taped, finished, and painted. 6. All penetrations and openings to be packed with

sound batt insulation. 7. Solid wood blocking to be fire rated.

 

SUNY Oswego Campus-wide Lactation Room Implementation Study

Dwyer Project # 16-042

Page 3 of 6

2. INTERIOR DOORS AND HARDWARE

a. Typical 7’-0” High Wood Doors: 1. Faces: Door leaf per the SUNY Oswego Campus Design

Standard. 2. AWI Quality Grade: Premium with Grade AA Faces

with transparent finish 3. Construction: 5 plies, glued blocked core 4. Ratings: As required

b. Hollow Metal Frames (Typical): 18 ga. shop primed and field painted. Knock down type at 3’-0” openings or smaller.

c. Hardware: 1. All Hardware to be per SUNY Oswego standards. 2. Locksets with ADA compliant lever latch. 3. Electric strikes or mag-locks on access control doors /

shop installed where applicable.

3. INTERIOR FINISHES

a. Wall Finishes: All walls to be taped and sanded per industry standard, USG level 3 finish.

1. Paint (PNT): a. Products per the SUNY Oswego Campus Design

Standard. b. Three-coat system typical: one primer coat and

two finish coats of latex eggshell paint at all areas except masonry, which shall receive epoxy paint.

b. Floor Finishes:

Floor substrates to be prepped as required to receive new finishes. In compliance with the state building code and ANSI standards, sufficient slip resistance is specified for all flooring.

1. Self Leveling Underlayment: The concrete subfloor

where floor tile has been removed to receive: a. Major cracks: Ardex “Ardifix” b. Concrete Primer: Ardex P-51

 

SUNY Oswego Campus-wide Lactation Room Implementation Study

Dwyer Project # 16-042

Page 4 of 6

c. Self Leveling Underlayment: Ardex K-10

2. Vinyl Composition Tile (VCT): SUNY Oswego Campus Design Standard.

3. Carpet Tile (CPT): SUNY Oswego Campus Design Standard

4. Resilient Base (RCB): 4” High

c. Ceilings: 1. Paint existing gypsum wall board (GYP) as required for

new Lactation Rooms. 2. Acoustical Ceiling panels (ACT): USG Sandrift or equal,

2 x 2 mineral fiber panels with suspended ceiling grid.

d. Signage: SUNY Oswego Campus Design Standard III. MEP Narrative In order for the proposed Lactation Room(s) to be an occupied space as defined by the 2015 International Building Code, the room will require lighting with a means for automatic control as well as having the ability to provide a controlled temperature to the space for HVAC requirements. This may require the installation of a thermostat or in some cases ductwork to provide supply and exhaust diffusers. The AIA Best Practices, “Lactation Room Design” identify additional room requirements for comfort of the user including the following:

• Receptacles located in the space for plugging in lactation equipment, charging personal phones, or other electronic equipment

• Telephone/data outlet • GFI receptacle if small refrigerator is provided in the space • Overhead lighting connected to emergency power panel if no windows in

the room or battery pack light for emergency egress. • Additional task lights can be provided for sinks or other work area locations

The lighting in the room could also be dimmable to provide a lower lighting level based on the user(s) preferences. The Code does not require a sink in these spaces, but is recommended by AIA for rinsing of pumping accessories and hand washing.

 

SUNY Oswego Campus-wide Lactation Room Implementation Study

Dwyer Project # 16-042

Page 5 of 6

Summary of MEP Work per room: 1. Commissary:

a. Existing ductwork from existing office to be extended into lactation room

b. New light and switching to be installed c. New receptacles and data outlet d. New smoke detector is required, and fire alarm strobe is

recommended

2. Culkin Hall: a. Existing HVAC to remain b. New light switch to control existing light fixture re-circuited c. Existing outlets to remain. d. New smoke detector is required, and fire alarm strobe is

recommended

3. Funnelle Hall: a. Existing HVAC ductwork to be extended into room with new diffuser b. New smoke detector is required, and fire alarm strobe is

recommended c. New outlet and data outlet d. Reuse existing light fixture and existing lighting circuit with new light

fixture

4. King Hall: a. New light fixture and switch b. New smoke detector is required, and fire alarm strobe is

recommended c. New power/ data outlets

5. Laker Hall:

a. Existing HVAC to be extended into room with new diffuser b. New light and switch c. New power/ data outlets d. New smoke detector is required, and fire alarm strobe is

recommended

6. Lanigan Hall: a. Existing HVAC to be extended into room as required b. New light and switch c. New power/ data outlets

 

SUNY Oswego Campus-wide Lactation Room Implementation Study

Dwyer Project # 16-042

Page 6 of 6

d. New smoke detector is required, and fire alarm strobe is recommended

7. Lee Hall: a. Existing HVAC to be extended into room as required b. New light and switch c. New power/ data outlets d. New smoke detector is required, and fire alarm strobe is

recommended

8. Marano Campus Center: a. New smoke detector is required, and fire alarm strobe is

recommended b. Reuse existing lighting and receptacles, replace one receptacle with

new USB port receptacle

9. Onondaga Hall: a. Existing HVAC to be extended into room with new diffuser b. New light and switch c. New power/ data outlets d. New smoke detector is required, and fire alarm strobe is

recommended

10. Rich Hall: a. New outlet with USB port connected to existing outlet b. New fire alarm strobe is recommended c. Reuse existing light fixtures and switch

MA

IN C

AM

PUS

KEY

PLA

N

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

MA

IN-0

01

CO

MM

ISSA

RY

CEN

TRA

L R

ECEI

VIN

G F

IRST

FLO

OR

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

CO

M-0

01

CENTERALWAREHOUSE

132

OFFICE

130

MAILROOM

132C

CONFERENCE

131

OFFICE

129

OFFICE

128

COPY

127

BULK FOODRECEIVING

119

JANITORCLOSET

122

WOMEN'SLOCKER

126

STORAGEROOM

121

MEN'SLOCKER

123

OVER HEADDOOR

MEN

124

BREAKROOM

132A

MECHROOM

133

MECHROOM

120

STORAGE

112

COOLER#9

116

D I N I N G SERVIC E S

MTG/STAFFROOM

118

FREEZER

117

COOLER#8

115

CORRIDOR

114

FREEZER#1

105

FREEZER#2

106

FREEZER#3

107

FREEZER#4

108

COOLER#7

113

DOUGHNUTROOM

111

FREEZER#6

110

FREEZER#5

109

PREPARED FOODSHIPPING

104

OFFICE

104A

BAKERY

103

FRIDGE

101BAKERY

STORAGE

102

STORAGE

100A

DRY BULKSTORAGE

100ELECTRIC

PANELS ELECTRIC

PANEL

ELECTRIC

PANEL

ELECTRIC

PANEL

FIRESERVICE ROOM

134

WOMEN

125

OVER HEADDOOR

OVER HEADDOOR

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

CO

MM

ISSA

RY

CEN

TRA

L R

ECEI

VIN

G F

IRST

FLO

OR

CO

M-0

02

CENTERALWAREHOUSE

132

OFFICE

130

MAILROOM

132C

CONFERENCE

131

OFFICE

129

OFFICE

128

COPY

127

BULK FOODRECEIVING

119

JANITORCLOSET

122

WOMEN'SLOCKER

126

STORAGEROOM

121

MEN'SLOCKER

123

OVER HEADDOOR

MEN

124

BREAKROOM

132A

MECHROOM

133

MECHROOM

120

STORAGE

112

COOLER#9

116

D I N I N G SERVIC E S

MTG/STAFFROOM

118

FREEZER

117

COOLER#8

115

CORRIDOR

114

FREEZER#1

105

FREEZER#2

106

FREEZER#3

107

FREEZER#4

108

COOLER#7

113

DOUGHNUTROOM

111

FREEZER#6

110

FREEZER#5

109

PREPARED FOODSHIPPING

104

OFFICE

104A

BAKERY

103

FRIDGE

101BAKERY

STORAGE

102

STORAGE

100A

DRY BULKSTORAGE

100ELECTRIC

PANELS ELECTRIC

PANEL

ELECTRIC

PANEL

ELECTRIC

PANEL

FIRESERVICE ROOM

134

WOMEN

125

OVER HEADDOOR

OVER HEADDOOR

LACTATION132E

57 S.F. 15cd

USB

LACTATION132E

57 S.F.

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'XXcd' ASSIGNS INTENSITY

2x2 LIGHTING FIXTURE

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

DRAWING NOTES

1. PROVIDE SUPPLY AND RETURN DIFFUSERS IN CEILING GRID AND

CONNECT DUCTWORK TO EXISTING HVAC SYSTEM.

2. RECEPTACLES TO BE CONNECTED TO 1P 20A CIRCUIT BREAKER

IN NEAREST PANEL.

3. PROVIDE NEW LIGHTING FIXTURE AND CONNECT TO NEARBY

LIGHTING CIRCUIT WITH AVAILABLE CAPACITY. FIXTURE TO BE

CONTROLLED BY NEW LIGHT SWITCH.

4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT

TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES

COMPATIBLE WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

1/4" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

1/4" = 1'-0"2

ELECTRICAL LIGHTING PLAN

CO

MM

IS

AR

Y H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

Commissary Central Receiving First Floor 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 57 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 2,410.00$

10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL 3,910.00$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 2,350.00$

MECHANICAL / ELECTRICAL SUBTOTAL 3,500.00$

SUBTOTAL CONSTRUCTION COST 7,410.00$

GENERAL REQUIREMENTS - 15% -$ DESIGN CONTINGENCY - 5% -$ OVERHEAD AND PROFIT - 15% -$ ESCALATION FOR 4 MONTHS - 3% PER YEAR -$

TOTAL CONSTRUCTION COST 7,410.00$

Page 2 of 2

Commissary Central Receiving First Floor 11/18/2016Dwyer Project No. 16-042DIV. NO.

DESCRIPTION QTY UNIT OF MEASURE

UNIT COST TOTAL

DIV. 8 DOORS & WINDOWS

3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$

DIVISION 8 - TOTAL 1,500.00$

DIV. 9 FINISHES

WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 9' high) 206 S.F. 4.76$ 980.56$

CEILINGS2 x 2 ceilings 57 S.F. 5.00$ 285.00$

FLOORINGVCT 57 SF 2.36$ 134.52$ Rubber base 53 LF 2.92$ 154.76$ Floor Prep 57 SF 4.36$ 248.52$

PAINTS AND COATINGSPaint interior walls 474 SF 1.20$ 568.80$ Paint door frames 1 EA 40.00$ 40.00$

DIVISION 9 - TOTAL 2,410.00$

TOTAL (Base Bid) 3,910.00$

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

DN

N.I.C.

N.I.C.

N.I.C.N.I.C.

UP

37UP

UP

UPUP

UP

DN

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

CU

LKIN

HA

LL: L

OW

ER L

EVEL

CU

L-00

1

DNN.I.C.N.I.C.N.I.C.N.I.C.UP37UPUPUPUPUPDN

5

4

MECHANICAL6

STAIRSTA-W

B9

JCB

WOMENWB

MENMB

MECHANICALSPACE

B7

STAIRSTA-E

MAINTENANCEOFFICE

B2A

STORAGEB2B

BUILDINGMAINTENANCE

2

TOILET

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

CU

LKIN

HA

LL: L

OW

ER L

EVEL

CU

L-00

2

STAFF LOUNGE1

296 S.F.

LACTATION ROOM1A

49 S.F.

15cd

USB

STAFF LOUNGE1

296 S.F.

LACTATION ROOM1A

49 S.F.

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'

ASSIGNS INTENSITY

2x4 LIGHTING FIXTURE

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

DRAWING NOTES

1. PROVIDE DIFFUSER IN CEILING AND CONNECT DUCTWORK TO

EXISTING SYSTEM.

2. PROVIDE ADDITIONAL RECEPTACLES AS REQUIRED AND CONNECT

TO RECEPTACLE CIRCUIT SERVING THE AREA. REPLACE

RECEPTACLE WITH USB RECEPTACLE IN LOCATION SHOWN.

3. RELOCATE EXISTING 2X4 FLUORESCENT LIGHT FIXTURE TO

CENTER OF ROOM. CONTROL LIGHT FROM NEW LIGHT SWITCH AT

LOCATION SHOWN.

4. CONNECT FIRE ALARM SMOKE DETECTOR AND STROBE TO

EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES COMPATIBLE

WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

1/4" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

1/4" = 1'-0"2

ELECTRICAL LIGHTING PLAN

CU

LK

IN

H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

Culkin Hall: Lower Level 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 49 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 122.64$

10 SPECIALTIES 100.00$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL 1,722.64$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 2,085.00$

MECHANICAL / ELECTRICAL SUBTOTAL 3,235.00$

SUBTOTAL CONSTRUCTION COST 4,957.64$

GENERAL REQUIREMENTS - 10% 495.00$ DESIGN CONTINGENCY - 5% 250.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 50.00$

TOTAL CONSTRUCTION COST 5,752.64$

Page 2 of 2

Culkin Hall: Lower Level 11/18/2016Dwyer Project No. 16-042DIV. NO.

DESCRIPTION QTY UNIT OF MEASURE

UNIT COST TOTAL

DIV. 8 DOORS & WINDOWS

3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$

DIVISION 8 - TOTAL 1,500.00$

DIV. 9 FINISHES

WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 8' high) 112 S.F. 4.76$ 533.12$

PAINTS AND COATINGSPaint interior walls (primer + 2 coats) 336 SF 1.20$ 403.20$ Paint door frames 1 EA 40.00$ 40.00$

FLOORINGRubber base 42 LF 2.92$ 122.64$ Patch carpet as required 1 LS 100.00$ 100.00$

TOTAL (Base Bid) 1,722.64$

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

FUN

NEL

LE H

ALL

: BA

SMEN

T LE

VEL

FUN

-001

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

FUN

NEL

LE H

ALL

: BA

SMEN

T LE

VEL

FUN

-002

ELE-V2

ELE-V3

ELE-V1

LOUNGELOU-B

STA-BS

LAUNDRYLAU-B

JSC-BS

MCR-BS

KITCHENKIT-B

RECYCLEROOMRCY-B

FACILITIESSERVICES

JAB-B

STA-BN

ELE-V4ELV-B

RECEIVINGRCV-B

JCL-BCJLW-B JLM-B

LOCKERS LOCKERS

JRW-BRESTROOM

JRW-BRESTROOM

STORAGEJSR-B

STORAGEJSR-BNE

DN

MECHANICALMCR-BC

MECHANICALMCR-BN

TR1-BS

LACTATION ROOM132B

104 S.F.

TRANSFORMER VAULT132B

261 S.F.

15cd

USB

LACTATION ROOM132B

104 S.F.

TRANSFORMER VAULT132B

261 S.F.

ET

R

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'

ASSIGNS INTENSITY

2x4 LIGHTING FIXTURE

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

EXISTING TO REMAINETR

DRAWING NOTES

1. PROVIDE DIFFUSER IN CEILING AND CONNECT DUCTWORK TO

EXISTING SYSTEM.

2. RECEPTACLES TO BE CONNECTED TO 1P 20A CIRCUIT BREAKER

IN NEAREST PANEL WITH AVAILABLE CAPACITY.

3. LIGHTING FIXTURES ARE EXISTING TO REMAIN.

4. CONNECT FIRE ALARM SMOKE DETECTOR AND STROBE TO

EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES COMPATIBLE

WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

1/4" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

1/4" = 1'-0"2

ELECTRICAL LIGHTING PLAN

FU

NN

EL

LE

H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

Funnelle Hall: Basement Level 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 268 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS -$ 9 FINISHES -$

10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL -$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,735.00$

MECHANICAL / ELECTRICAL SUBTOTAL 2,885.00$

SUBTOTAL CONSTRUCTION COST 2,885.00$

GENERAL REQUIREMENTS - 10% 290.00$ DESIGN CONTINGENCY - 5% 145.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 30.00$

TOTAL CONSTRUCTION COST 3,350.00$

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

KIN

G H

ALL

: BA

SEM

ENT

LEVE

L

KN

G-0

01

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

KIN

G H

ALL

: BA

SEM

ENT

LEVE

L

KN

G-0

02

LACTATIONB2A

52 S.F.

15cd

USB

LACTATIONB2A

52 S.F.

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'

ASSIGNS INTENSITY

2x4 LIGHTING FIXTURE

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

DRAWING NOTES

1. PROVIDE DIFFUSER IN DRYWALL CEILING AND CONNECT

DUCTWORK TO EXISTING SYSTEM.

2. PROVIDE ADDITIONAL RECEPTACLES ON NEW WALLS.

RECEPTACLES TO BE CONNECTED TO NEARBY RECEPTACLE

CIRCUIT SERVING THE AREA.

3. RELOCATE EXISTING 2X4 SURFACE MOUNTED FLUORESCENT

LIGHT FIXTURE TO CENTER OF ROOM. RE-WORK LIGHTING

FIXTURE CIRCUITING TO BE CONTROLLED BY NEW WALL SWITCH

SHOWN ON PLAN.

4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT

TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES

COMPATIBLE WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

1/4" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

1/4" = 1'-0"2

ELECTRICAL LIGHTING PLAN

KIN

G H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

King Hall: Basement Level 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 52 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 1,315.00$

10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL 2,815.00$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 2,085.00$

MECHANICAL / ELECTRICAL SUBTOTAL 3,235.00$

SUBTOTAL CONSTRUCTION COST 6,050.00$

GENERAL REQUIREMENTS - 10% 605.00$ DESIGN CONTINGENCY - 5% 305.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 60.00$

TOTAL CONSTRUCTION COST 7,020.00$

Page 2 of 2

King Hall: Basement Level 11/18/2016Dwyer Project No. 16-042DIV. NO.

DESCRIPTION QTY UNIT OF MEASURE

UNIT COST TOTAL

DIV. 8 DOORS & WINDOWS

3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$

DIVISION 8 - TOTAL 1,500.00$

DIV. 9 FINISHES

WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 8' high) 116 S.F. 4.76$ 552.16$ Transluscent film (for existing windows assume 2' high) 15 SF 5.00$ 75.00$

FLOORINGPatch carpet as required 1 LS 100.00$ 100.00$ Rubber base 44 LF 2.92$ 128.48$

PAINTS AND COATINGSPaint interior walls (primer + 2 coats) 348 SF 1.20$ 417.60$ Paint door frames 1 EA 40.00$ 40.00$

DIVISION 9 - TOTAL 1,315.00$

TOTAL (Base Bid) 2,815.00$

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

UP

UP

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

LAK

ER H

ALL

: BA

SEM

ENT

LEVE

L

LKR

-001

UP

MECHANICALROOM

12B

HYDROTHERAPY

9A

OFFICE17E

SPORTSMEDICINE

9

STORAGE9B

LOCKER10F

CLASSROOM11

STORAGE17

OFFICE11A

DRYING10E

WRESTLINGLOCKERS

7D

WEIGHT/FITNESSROOM

17B

BATTINGCAGES

14EQUIPMENTSTORAGE

13

MECHANICALROOM

12

ELEC.ROOM

12A

MECHANICALROOM

13A

STORAGE17D

LOCKER15

WRESTLING16

OFFICE9C

STAIRSTA-BSC

LOCKERS10B

DRYING10C STRETCHING

ROOM18

WRESTLINGSTORAGE

16B

FITNESSROOM

16A

TOILET15B

EQUIPMENTSTORAGE

8

TOILET10D

OFFICE17G

STAIRSTA-BNE

MECHANICALROOM

5

SHOWERS15E

DRYING15D

LOCKERS2E

TOILET15C

LOCKER10A

2G

STORAGE32

TOILET20C

EQUIPSTORAGE

22

EQUIPMENTROOM

6

ELEV.B

ELEVMECH

17J

STORAGE21

SHOWERS2D LOWER PORTION

OF SWIMMING POOL25

SHOWER20D

LOCKER20B

STAIRSTA-BSW

2F

TOILET7L

LOCKERS2B

TOILET7M

WOMENLOCKERROOM

7G

POOLMECHANICAL RM.

19SHOWERS

7K

DRYINGROOM

7H

DRYINGROOM

7I

MENLOCKERROOM

7A

TOILET7E

SHOWERS7J

LOCKERROOM

7B

LOCKERROOM

7F

LOCKERROOM

7C

20A

LOCKERS31

OFFICE23A

OFFICE23

STORAGE17A

STORAGE27

STOR29

STOR28

STAIRSTA-BSE

EQUIPSTORAGE

17F

WEIGHT/FITNESS

ROOM17C

CLOSET17H

UP

STAIRSTA-BNC

TOILET2A

CHLORINEROOM

19A

BLDGMAINT

9E

DRYING15A

TOILET9D

SHOWERS10G

DRYING2C

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

LAK

ER H

ALL

: BA

SEM

ENT

LEVE

L

LKR

-002

LACTATION1A

53 S.F.

MET

AL C

ABIN

ETS

15cd

USB

LACTATION1A

53 S.F.

MET

AL C

ABIN

ETS

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'

ASSIGNS INTENSITY

SUSPENDED LIGHTING FIXTURE

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

DRAWING NOTES

1. PROVIDE HVAC DIFFUSER AND DUCTWORK TO NEW LACTATION

ROOM AND CONNECT DUCTWORK TO EXISTING SYSTEM.

2. RECEPTACLES TO BE CONNECTED TO 1P 20A CIRCUIT BREAKER

IN NEAREST PANEL WITH AVAILABLE CAPACITY.

3. RELOCATE EXISTING FLUORESCENT PENDANT LIGHT FIXTURE

TO CENTER OF ROOM. RE-WORK LIGHTING FIXTURE CIRCUITING

TO BE CONTROLLED BY NEW WALL SWITCH SHOWN ON PLAN.

4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT

TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES

COMPATIBLE WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

1/4" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

1/4" = 1'-0"2

ELECTRICAL LIGHTING PLAN

LA

KE

R H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

Laker Hall: Basement Level 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 53 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 1,880.00$

10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL 3,380.00$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,910.00$

MECHANICAL / ELECTRICAL SUBTOTAL 3,060.00$

SUBTOTAL CONSTRUCTION COST 6,440.00$

GENERAL REQUIREMENTS - 10% 965.00$ DESIGN CONTINGENCY - 5% 320.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 65.00$

TOTAL CONSTRUCTION COST 7,790.00$

Page 2 of 2

Laker Hall: Basement Level 11/18/2016Dwyer Project No. 16-042DIV. NO.

DESCRIPTION QTY UNIT OF MEASURE

UNIT COST TOTAL

DIV. 8 DOORS & WINDOWS

3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$

DIVISION 8 - TOTAL 1,500.00$

DIV. 9 FINISHES

WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 9' high) 130 S.F. 4.76$ 618.80$

FLOORINGVCT 53 SF 2.36$ 125.08$ Rubber base 44 LF 2.92$ 128.48$ Floor Prep 53 SF 4.36$ 231.08$

PAINTS AND COATINGSPaint interior walls 392 SF 1.20$ 470.40$ Paint door frames 1 EA 40.00$ 40.00$

CEILINGS2 x 2 ceilings 53 S.F. 5.00$ 265.00$

DIVISION 9 - TOTAL 1,880.00$

TOTAL (Base Bid) 3,380.00$

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

DN

DN

DN

UP

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

LAN

IGA

N H

ALL

: SEC

ON

D F

LOO

R

LAN

-001

LACTATION100A

126 S.F.

7'-7" V.I.F.

ALIGN NEW PARTITION WITH EXG. WALL

PROVIDE TRANSLUSCENTPRIVACY FILM BELOW EXG

HORIZONTAL MULLION

ALIGN NEW PARTITION WITH EXG. WALL

HEIGHT OF NEW PARTIONS TOEXG CEILING TO REMAIN

ACTUAL DEAD END: 24'-9"

ALLOWABLE DEAD END: 36'-0"

14'-9

1/2"

NEW SURFACE MOUNTED LIGHT FIXTURE

16'-8

" V.I.

F.

NEW DOOR WITH HM FRAME

FINISH SCHEDULE - LACATION ROOM 100A

FLOORS: CPTWALLS: PNTCEILING: EXG TO REMAINBASE: RCB

NOTES: PAINT OUTSIDE OF NEW WALLS TO MATCH EXG ADJACENT

STAIR STAIR

STAIR

STAIR

STA-1NW STA-1NE

STA-1SE

STA-1C

SERVICECLOSET

JC5

LECTUREHALL104

LECTUREHALL103

ONTARIOBAGEL CO.

103A

LECTUREHALL

102

CLASSROOM102A

SERVICECLOSET

JC3

LECTUREHALL

101

MENM3

WOMENW3

SERVICECLOSET

JC2

LECTUREHALL107

CLASSROOM107A

LECTUREHALL106

CLASSROOM106A

LECTUREHALL105

STORAGE108

TOILETR3

ELEVATORELE-1C

DN

DN

DN

CORRIDOR100

CORRIDOR100

CORRIDOR100

CORRIDOR100

CORRIDOR100D

CORRIDOR100A

CORR100B

CORR100CCORRIDOR

100E

STOR111

STOR110

STOR109

RAMP DOWN RAMP DOWN

UP

STAIRSTA-SW240 S.F.

SERVICE CLOSETJC4

115 S.F.

CORRIDORCOR-SW591 S.F.

PROPOSED CONSTRUCTION PLANScale: 1/4" = 1'-0" 1

0 5 10 15 FT

NORTH

PRO

J. N

O: 1

6-04

2

DAT

E IS

SUED

: 11/

18/2

016

SU

NY

OS

WE

GO

CA

MP

US

-WID

E L

AC

TATI

ON

RO

OM

IMP

LEM

EN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 13

126

LAN

IGA

N H

ALL

: SEC

ON

D F

LOO

R

LAN

-002

LACTATION100A

126 S.F.STAIRSTA-SW240 S.F.

15cd

USB

LACTATION100A

126 S.F.STAIRSTA-SW240 S.F.

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'

ASSIGNS INTENSITY

WALL MOUNTED LIGHTING FIXTURE

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

DRAWING NOTES

1. PROVIDE HVAC DIFFUSERS AND DUCTWORK TO NEW LACTATION

ROOM AND CONNECT DUCTWORK TO EXISTING VENTILATION

SYSTEM.

2. RECEPTACLES TO BE CONNECTED TO 1P 20A CIRCUIT BREAKER

IN NEAREST PANEL WITH AVAILABLE CAPACITY.

3. PROVIDE NEW WALL MOUTNED LIGHTING FIXTURE AND

CONNECT TO NEARBY LIGHTING CIRCUIT. PROVIDE SURFACE

MOUTNED WIREMOLD TO TO SWITH.

4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT

TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES

COMPATIBLE WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

3/16" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

3/16" = 1'-0"2

ELECTRICAL LIGHTING PLAN

LA

NIG

AN

H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

Lanigan Hall: Second Floor 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 126 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 3,545.00$

10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL 5,045.00$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,995.00$

MECHANICAL / ELECTRICAL SUBTOTAL 3,145.00$

SUBTOTAL CONSTRUCTION COST 8,190.00$

GENERAL REQUIREMENTS - 10% 820.00$ DESIGN CONTINGENCY - 5% 410.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 80.00$

TOTAL CONSTRUCTION COST 9,500.00$

Page 2 of 2

Lanigan Hall: Second Floor 11/18/2016Dwyer Project No. 16-042DIV. NO.

DESCRIPTION QTY UNIT OF MEASURE

UNIT COST TOTAL

DIV. 8 DOORS & WINDOWS

3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$

DIVISION 8 - TOTAL 1,500.00$

DIV. 9 FINISHES

WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 19'-4" high) 293 S.F. 4.76$ 1,394.68$ Transluscent film (for existing windows assume 5' high) 73 S.F. 5.00$ 365.00$

FLOORINGCarpet Tile 126 SF 4.45$ 560.70$ Rubber base 32 LF 2.92$ 93.44$

PAINTS AND COATINGSPaint interior walls 908 SF 1.20$ 1,089.60$ Paint door frames 1 EA 40.00$ 40.00$

DIVISION 9 - TOTAL 3,545.00$

TOTAL (Base Bid) 5,045.00$

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

DN

N.I.C.

N.I.C.

N.I.C. N.I.C.

UP

37UP

UP

UPUP

UP

DN

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

LEE

HA

LL: M

EZZA

NIN

E LE

VEL

LEE

-001

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

LEE

HA

LL: M

EZZA

NIN

E LE

VEL

LEE

-002

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

LEE

HA

LL: M

EZZA

NIN

E LE

VEL

LEE

-003

JANITOR CLOSETM1

15 S.F.

LACTATIONM1A

67 S.F.

15cd

USB

JANITOR CLOSETM1

15 S.F.

LACTATIONM1A

67 S.F.

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'

ASSIGNS INTENSITY

1'x1' FLUORESCENT SURFACE MOUNTED LIGHTING FIXTURE

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

DRAWING NOTES

1. PROVIDE HVAC DIFFUSERS AND DUCTWORK TO NEW LACTATION

ROOM AND CONNECT DUCTWORK TO EXISTING VENTILATION

SYSTEM.

2. PROVIDE RECEPTACLES ON NEW WALLS AND CONNECT TO

NEARBY RECEPTACLE CIRCUIT WITH AVAILABLE CAPACITY.

3. PROVIDE WALL MOUNTED LIGHTING FIXTURE AND CONNECT TO

NEARBY LIGHTING CIRCUIT WITH AVAILABLE CAPACITY.

4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT

TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES

COMPATIBLE WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

1/4" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

1/4" = 1'-0"2

ELECTRICAL LIGHTING PLAN

LE

E H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

Lee Hall: Mezzanine Level 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 67 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION 355.00$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 1,395.00$

10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL 3,250.00$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,995.00$

MECHANICAL / ELECTRICAL SUBTOTAL 3,145.00$

SUBTOTAL CONSTRUCTION COST 6,395.00$

GENERAL REQUIREMENTS - 10% 640.00$ DESIGN CONTINGENCY - 5% 320.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 65.00$

TOTAL CONSTRUCTION COST 7,420.00$

Page 2 of 2

Lee Hall: Mezzanine Level 11/18/2016Dwyer Project No. 16-042DIV. NO.

DESCRIPTION QTY UNIT OF MEASURE

UNIT COST TOTAL

DIV. 1 GENERAL REQUIREMENTS

DEMOLITION

Remove existing sauna 42 SF 8.50$ 357.00$

DIVISION 1 - TOTAL 355.00$

DIV. 8 DOORS & WINDOWS

3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$

DIVISION 8 - TOTAL 1,500.00$

DIV. 9 FINISHES

WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 8' high) 67 S.F. 4.76$ 318.92$ Patching existing walls 1 LS 200.00$ 200.00$

FLOORINGPatch CMT floor 1 LS 200.00$ 200.00$ Carpet Tile 67 SF 4.45$ 298.15$ Rubber base 33 LF 2.92$ 96.36$

PAINTS AND COATINGSPaint interior walls 136 SF 1.20$ 163.20$ Paint interior ceilings 67 SF 1.20$ 80.40$ Paint door frames 1 EA 40.00$ 40.00$

DIVISION 9 - TOTAL 1,395.00$

TOTAL (Base Bid) 3,250.00$

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

MA

RA

NO

CA

MPU

S C

ENTE

R: S

ECO

ND

FLO

OR

MA

R-0

01

STOR202A

INSTRUCTIONALCOMPUTER LAB202

STAIRSTA-CW2

CLASSROOM/MEETING ROOM201

SERVERY203

STORAGE201A

CLASSROOM/MEETING ROOM

205

STOR205A

STAIRSTA-CNW2

IT COMPUTER LAB207

WOMEN209B

MEN209D

VEST209A

VEST209C

STOR210A

ELECE210

CLASSROOM210

CLASSROOM208

INSTRUCTIONALCOMPUTER LAB

206

TELECOMROOM

204

CLASSROOM211

CORRIDORC202

OFFICE212F

MTGROOM212G

WORK/KITCHEN

212H

OFFICE212E

OFFICE212D

OFFICE212C

SECRY212B

CHAIRSOFFICE

212A

PHILOSOPHY212

ACADEMICCOMMONS

200N1

CORRIDOR200N

ACADEMICCOMMONS

200N2

STAIRSTA-CSW2

STAIRSTA-CSE2

LOBBY200C

ELEVATORELV-CC2

COFFEECOMMONS

218A

F.A.N.S.218

CORRIDOR200S

VESTIBULEVES-CS

IPACMEETING

ROOM220 OFFICE

222COFFICE

222BOFFICE

222A

ADVISROOM222D

ADVISROOM222E

HONORSRECEPTION

221

ASSIST DIROFFICE

221A

FILES221B

DIROFFICE

221C

INTERDISC-PLINARY

PROGRAMSIPAC222

MEETINGROOM221D

CLASSROOM223 CLASSROOM

225

MEN238A

CLASSROOM232

IPACOFFICE

228

IPACOFFICE

230

WOMEN'SSTUDIES DIR

224

MEETINGROOM

226

MEETINGAREA226A

CORRIDOR200S

ACADEMICCOMMONS

221N3

CORRIDORC202

PHILOSOPHYADJUNCT AREA

240

JANCLOS209

HALL212J

CORRIDORC201

CORRIDORC200

STAIRSTA-ES2

ELEVATORELV-CE2

DNDN

DNUP

DN

DN

UP

DN DN DN

ENTRY TOPENTHOUSESEE DWG 4

TO POUCHER HALL

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

MA

RA

NO

CA

MPU

S C

ENTE

R: S

ECO

ND

FLO

OR

MA

R-0

02

LACTATION235

268 S.F.

WOMEN237A

216 S.F.

MEETING ROOM239

345 S.F.

CLASSROOM231

890 S.F.

15cd

USB

LACTATION235

268 S.F.

WOMEN237A

216 S.F.

MEETING ROOM

345 S.F.

CLASSROOM231

890 S.F.

E

T

R

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'

ASSIGNS INTENSITY

RECESSED FLUORESCENT DOWNLIGHTS

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

ETR EXISTING TO REMAIN

DRAWING NOTES

1. LIGHTING FIXTURES ARE EXISTING TO REMAIN, VERIFY EXACT

LOCATIONS.

2. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT

TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES

COMPATIBLE WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

1/8" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

1/8" = 1'-0"2

ELECTRICAL LIGHTING PLAN

MA

RA

NO

H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

Marano Campus Center: Second Floor 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 268 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 160.00$ 9 FINISHES -$

10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL 160.00$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC -$ 26 ELECTRICAL 840.00$

MECHANICAL / ELECTRICAL SUBTOTAL 840.00$

SUBTOTAL CONSTRUCTION COST 1,000.00$

GENERAL REQUIREMENTS - 10% 100.00$ DESIGN CONTINGENCY - 5% 50.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 10.00$

TOTAL CONSTRUCTION COST 1,160.00$

Page 2 of 2

Marano Campus Center: Second Floor 11/18/2016Dwyer Project No. 16-042DIV. NO.

DESCRIPTION QTY UNIT OF MEASURE

UNIT COST TOTAL

DIV. 8 DOORS & WINDOWS

Transluscent film (for existing windows and sidelight) 32 S.F. 5.00$ 160.00$

DIVISION 8 - TOTAL 160.00$

TOTAL (Base Bid) 160.00$

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

BASEMENT FLOOR PLAN

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

ON

ON

DA

GA

HA

LL: B

ASE

MEN

T LE

VEL

ON

D-0

01

HAL-BCE

WASH

LOUNGELOU-BSE

TELEPHONESERVICE

NYX-B

MECHANICALMCR-B

ELECTRICALELE-B

LOUNGELOU-BC

LAUNDRYLAU-B

STA-BC

KITCHENKIT-B

HAL-BC

HAL-BSWHAL-BNW

HAL-BSE

BASEMENT FLOOR PLAN

DRYDRYDRYDRYDRYDRYDRYDRYDRYDRY

WASH WASH WASH WASH WASH WASH WASH WASH WASH

WASH WASH WASH WASH WASH WASH WASH WASH WASH

DRY DRY DRY DRY DRY DRY DRY DRY

HAL-BNE

STA-BN

STORAGEJST-BC

SERVICESJAB-BN

FACILITIES

JLM-BLOCKER

EMPLOYEE

JLW-BLOCKER

EMPLOYEE

JRW-B

JRM-B

JSC-BSCLOSET

RSS-BSSTOR.

SERVICE

STORAGEJSR-BN

JSR-BNC

JST-BSTORAGE PIA-BNE

PIANO

STO-BNWSTORAGE

DST-BSESTORAGE

TR1-BSWTECH. ROOM

ROOMRCY-BN

RECYCLERPW-BC

RESTROOMRPM-BC

RESTROOM

FIRE ALARMPANEL WITHIN

SPRINKLER CONTROLVALVE WITHIN

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

ON

ON

DA

GA

HA

LL: B

ASE

MEN

T LE

VEL

ON

D-0

02

LACTATIONLAC-BSE

77 S.F.

STORAGEJSR-BSW

15cd

USB

LACTATIONLAC-BSE

77 S.F.

STORAGEJSR-BSW48 S.F.

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'

ASSIGNS INTENSITY

PENDANT MOUNTED LIGHTING FIXTURE

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

EXISTING TO REMAINETR

DRAWING NOTES

1. PROVIDE HVAC DIFFUSERS AND DUCTWORK TO NEW LACTATION

ROOM AND CONNECT DUCTWORK TO EXISTING VENTILATION

SYSTEM.

2. PROVIDE RECEPTACLES ON NEW WALLS AND CONNECT TO

NEARBY RECEPTACLE CIRCUIT WITH AVAILABLE CAPACITY.

3. PROVIDE WALL MOUNTED LIGHTING FIXTURE AND CONNECT TO

NEARBY LIGHTING CIRCUIT WITH AVAILABLE CAPACITY.

4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT

TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES

COMPATIBLE WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

1/4" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

1/4" = 1'-0"2

ELECTRICAL LIGHTING PLAN

ON

ON

DA

GA

H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

Onondaga Hall: Basement Level 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 77 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION 250.00$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS -$ 9 FINISHES 1,485.00$

10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL 1,735.00$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,995.00$

MECHANICAL / ELECTRICAL SUBTOTAL 3,145.00$

SUBTOTAL CONSTRUCTION COST 4,880.00$

GENERAL REQUIREMENTS - 10% 490.00$ DESIGN CONTINGENCY - 5% 245.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 50.00$

TOTAL CONSTRUCTION COST 5,665.00$

Page 2 of 2

Onondaga Hall: Basement Level 11/18/2016Dwyer Project No. 16-042DIV. NO.

DESCRIPTION QTY UNIT OF MEASURE

UNIT COST TOTAL

DIV. 1 GENERAL REQUIREMENTS

DEMOLITION

Remove existing shelving 1 LS 250.00$ 250.00$

DIVISION 1 - TOTAL 250.00$

DIV. 9 FINISHES

WALL CONSTRUCTIONPatch existing walls to remain 1 LS 200.00$ 200.00$

FLOORINGCarpet Tile 77 SF 4.45$ 342.65$ Rubber base 37 LF 2.92$ 108.04$ Floor Prep 111 SF 4.36$ 483.96$

PAINTS AND COATINGSPaint interior walls (primer + 2 coats) 290 SF 1.20$ 348.00$

DIVISION 9 - TOTAL 1,485.00$

TOTAL (Base Bid) 1,735.00$

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

PIT

CRAWLSPACE

STAIR101

STAIR100

ELEV EQUIP131

WOMEN132

MEN133

LOBBY130

VEST129

ELEC ROOM128

ELEC ROOM127

MECH ROOM125

LOBBY126

CONFERENCE104

BUSINESS ANDCOM. RELATIONS

103

FACILITY105

LOCKERS105AJAN

110A

OFFICE106

OFFICE107

OFFICE108

OFFICE109

COPY ROOM110

RECEPTION103A

CORRIDOR112

ELECROOM

113

GENROOM

115

TELECOM114

SPRINKLERROOM

116

STOR117

STAIR111

TRAINING118A

RESOURCE118A

CORRIDOR119

SHOP123

MECHRM VEST

122

SNOWBLOWERROOM

124

DIRECTOROFFICE

140

OFFICE134

OFFICE135

OFFICE136

RECEPTIONOFFICE

138

STORAGE137

OFFICE139

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

RIC

H H

ALL

: LO

WER

LEV

EL

RC

H-0

01

PIT

CRAWLSPACE

STAIR101

STAIR100

ELEV EQUIP131

WOMEN132

MEN133

LOBBY130

VEST129

ELEC ROOM128

ELEC ROOM127

MECH ROOM125

LOBBY126

CONFERENCE104

BUSINESS ANDCOM. RELATIONS

103

FACILITY105

LOCKERS105AJAN

110A

OFFICE106

OFFICE107

OFFICE108

OFFICE109

COPY ROOM110

RECEPTION103A

CORRIDOR112

ELECROOM

113

GENROOM

115

TELECOM114

SPRINKLERROOM

116

STOR117

STAIR111

TRAINING118A

RESOURCE118A

CORRIDOR119

SHOP123

MECHRM VEST

122

SNOWBLOWERROOM

124

DIRECTOROFFICE

140

OFFICE134

OFFICE135

OFFICE136

RECEPTIONOFFICE

138

STORAGE137

OFFICE139

PRO

J. N

O: 1

6-04

2

DA

TE IS

SUED

: 11/

18/2

016

SUN

Y O

SW

EG

OC

AM

PU

S-W

IDE

LAC

TATI

ON

RO

OM

IMPL

EMEN

TATI

ON

STU

DY

Mai

n C

ampu

sO

sweg

o, N

Y 1

3126

RIC

H H

ALL

: LO

WER

LEV

EL

RC

H-0

02

7'-1"

LACTATION121

199 S.F.

15cd

USB

ETR

7'-1"

LACTATION121

199 S.F.ETR

ETR

ETR

DUPLEX RECEPTACLE

AC LIGHTING SWITCH

FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE

UNLESS INDICATED OTHERWISE.

FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'

ASSIGNS INTENSITY

PENDANT MOUNTED LIGHTING FIXTURE

ELECTRICAL SYMBOL LIST

EMERGENCY LIGHT

TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM

DUPLEX RECEPTACLE WITH USB CABLE CONNECTION

IN OUTLET

USB

ETREXISTING TO REMAIN

DRAWING NOTES

1. PROVIDE RECEPTACLES ON WALL AND CONNECT TO NEARBY

RECEPTACLE CIRCUIT WITH AVAILABLE CAPACITY.

2. EXISTING LIGHTS AND SWITCH TO REMAIN.

3. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT

TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES

COMPATIBLE WITH EXISTING SYSTEM.

Dra

win

g T

itle

DA

TE

IS

SU

ED

:

RE

V. N

O.:

11/18/2016

SU

NY

O

SW

EG

O

CA

MP

US

-W

ID

E LA

CT

AT

IO

N R

OO

M IM

PLE

ME

NT

AT

IO

N S

TU

DY

Main C

am

pus

Osw

eg

o, N

Y 1

31

26

PR

OJ. N

O: 16-042

A###

1/4" = 1'-0"1

ELECTRICAL POWER AND FIRE ALARM PLAN

1/4" = 1'-0"2

ELECTRICAL LIGHTING PLAN

RIC

H H

AL

L L

AC

TA

TIO

N R

OO

M

Prepared on 11/18/16

Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study

Rich Hall: Lower Floor 11/18/2016

Dwyer Project No. 16-042 Renovated Area of Work 268 NSFProject Summary

DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS -$ 9 FINISHES -$

10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$

GENERAL CONSTRUCTION SUBTOTAL -$

21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC -$ 26 ELECTRICAL 985.00$

MECHANICAL / ELECTRICAL SUBTOTAL 985.00$

SUBTOTAL CONSTRUCTION COST 985.00$

GENERAL REQUIREMENTS - 10% 100.00$ DESIGN CONTINGENCY - 5% 50.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 10.00$

TOTAL CONSTRUCTION COST 1,145.00$