I. EXECUTIVE SUMMARY
In an effort to comply with the Affordable Care Act, SUNY Oswego is beginning to designate one Lactation Room in each academic building on campus for faculty, staff, students, and visitor use. A list of proposed locations was provided to Dwyer Architectural and Watts Architecture & Engineering for review. The Design team visited the campus and reviewed each location to meet the Architectural and MEP requirements for an occupied space, as well as AIA/ Affordable Care Act recommendations specific to Lactation Rooms. This report includes Architectural and MEP narratives and sketches outlining required and recommended work for each proposed location and rough order of magnitude costs.
II. ARCHITECTURAL NARRATIVE
A. CODES AND STANDARDS General construction work shall comply with the following references:
1. 2015 International Building Code (Business Occupancy) 2. 2015 International Existing Building Code (Alteration Level 2) 3. 1999 ANSI A117.1 – Handicapped Accessibility Standards as
referenced by the Building Code of New York State. 4. 2000 NFPA – Life Safety 101
a. Specific references for occupied spaces considered include the following: • Size: An occupied space must have a minimum clear
width of 7’-0”x 7’-0”. • Ceiling Height: Code requires a minimum headroom
clearance of 7’6” in new spaces and 7’-0” in existing spaces.
Basis for the design of general room layouts and other criteria outlining the utilization of rooms as lactation spaces:
1. AIA Best Practices, “Lactation Room Design”, February 2008 a. Specific references considered include the following:
• Location: Lactation Rooms should be located in a safe area accessible to all. They should not be located in areas
SUNY Oswego Campus-wide Lactation Room Implementation Study
Dwyer Project # 16-042
Page 2 of 6
that would not be suitable for preparation or storage of food.
• Privacy: Lactation Rooms shall have acoustic and visual privacy. Install a lockable door. Walls should be constructed to reach the underside of structure wherever possible to minimize the transmission of sound to adjacent spaces. Carpet is recommended to increase acoustic properties.
• Furnishing: provide a task chair suitable for a workstation. Seat, back, armrest is preferred. Casters are recommended to allow the user freedom of movement when hands are occupied with bottles of milk and pump accessories.
• Table/ counter: provide a table or counter work surface for the pump and bottles to rest adjacent to chair. If a telephone is provided it should be within reach of the work area.
• Accessories: useful accessories include a trashcan, paper towel dispenser, coat rack, and full-length mirror. If several mothers are using the room, a bulletin board outside the door will help secure room use.
A. DEMOLITION AND EXISTING CONDITIONS
1. Most spaces require little demolition. For the purposes of this study,
no hazardous material abatement has been included.
B. GENERAL CONSTRUCTION
1. INTERIOR PARTITIONS
a. Gypsum Board Partitions: 1. One layer 5/8” gypsum drywall type X, typical each
side of 3 5/8” 25 ga. metal studs at 24” OC. 2. 5/8” water resistant GWB at wet areas. 3. Wall system construction shall achieve sound
transmission class (STC) rating of 45 for acoustic privacy. 4. All partitions to have sound batt insulation. 5. All partitions to be taped, finished, and painted. 6. All penetrations and openings to be packed with
sound batt insulation. 7. Solid wood blocking to be fire rated.
SUNY Oswego Campus-wide Lactation Room Implementation Study
Dwyer Project # 16-042
Page 3 of 6
2. INTERIOR DOORS AND HARDWARE
a. Typical 7’-0” High Wood Doors: 1. Faces: Door leaf per the SUNY Oswego Campus Design
Standard. 2. AWI Quality Grade: Premium with Grade AA Faces
with transparent finish 3. Construction: 5 plies, glued blocked core 4. Ratings: As required
b. Hollow Metal Frames (Typical): 18 ga. shop primed and field painted. Knock down type at 3’-0” openings or smaller.
c. Hardware: 1. All Hardware to be per SUNY Oswego standards. 2. Locksets with ADA compliant lever latch. 3. Electric strikes or mag-locks on access control doors /
shop installed where applicable.
3. INTERIOR FINISHES
a. Wall Finishes: All walls to be taped and sanded per industry standard, USG level 3 finish.
1. Paint (PNT): a. Products per the SUNY Oswego Campus Design
Standard. b. Three-coat system typical: one primer coat and
two finish coats of latex eggshell paint at all areas except masonry, which shall receive epoxy paint.
b. Floor Finishes:
Floor substrates to be prepped as required to receive new finishes. In compliance with the state building code and ANSI standards, sufficient slip resistance is specified for all flooring.
1. Self Leveling Underlayment: The concrete subfloor
where floor tile has been removed to receive: a. Major cracks: Ardex “Ardifix” b. Concrete Primer: Ardex P-51
SUNY Oswego Campus-wide Lactation Room Implementation Study
Dwyer Project # 16-042
Page 4 of 6
c. Self Leveling Underlayment: Ardex K-10
2. Vinyl Composition Tile (VCT): SUNY Oswego Campus Design Standard.
3. Carpet Tile (CPT): SUNY Oswego Campus Design Standard
4. Resilient Base (RCB): 4” High
c. Ceilings: 1. Paint existing gypsum wall board (GYP) as required for
new Lactation Rooms. 2. Acoustical Ceiling panels (ACT): USG Sandrift or equal,
2 x 2 mineral fiber panels with suspended ceiling grid.
d. Signage: SUNY Oswego Campus Design Standard III. MEP Narrative In order for the proposed Lactation Room(s) to be an occupied space as defined by the 2015 International Building Code, the room will require lighting with a means for automatic control as well as having the ability to provide a controlled temperature to the space for HVAC requirements. This may require the installation of a thermostat or in some cases ductwork to provide supply and exhaust diffusers. The AIA Best Practices, “Lactation Room Design” identify additional room requirements for comfort of the user including the following:
• Receptacles located in the space for plugging in lactation equipment, charging personal phones, or other electronic equipment
• Telephone/data outlet • GFI receptacle if small refrigerator is provided in the space • Overhead lighting connected to emergency power panel if no windows in
the room or battery pack light for emergency egress. • Additional task lights can be provided for sinks or other work area locations
The lighting in the room could also be dimmable to provide a lower lighting level based on the user(s) preferences. The Code does not require a sink in these spaces, but is recommended by AIA for rinsing of pumping accessories and hand washing.
SUNY Oswego Campus-wide Lactation Room Implementation Study
Dwyer Project # 16-042
Page 5 of 6
Summary of MEP Work per room: 1. Commissary:
a. Existing ductwork from existing office to be extended into lactation room
b. New light and switching to be installed c. New receptacles and data outlet d. New smoke detector is required, and fire alarm strobe is
recommended
2. Culkin Hall: a. Existing HVAC to remain b. New light switch to control existing light fixture re-circuited c. Existing outlets to remain. d. New smoke detector is required, and fire alarm strobe is
recommended
3. Funnelle Hall: a. Existing HVAC ductwork to be extended into room with new diffuser b. New smoke detector is required, and fire alarm strobe is
recommended c. New outlet and data outlet d. Reuse existing light fixture and existing lighting circuit with new light
fixture
4. King Hall: a. New light fixture and switch b. New smoke detector is required, and fire alarm strobe is
recommended c. New power/ data outlets
5. Laker Hall:
a. Existing HVAC to be extended into room with new diffuser b. New light and switch c. New power/ data outlets d. New smoke detector is required, and fire alarm strobe is
recommended
6. Lanigan Hall: a. Existing HVAC to be extended into room as required b. New light and switch c. New power/ data outlets
SUNY Oswego Campus-wide Lactation Room Implementation Study
Dwyer Project # 16-042
Page 6 of 6
d. New smoke detector is required, and fire alarm strobe is recommended
7. Lee Hall: a. Existing HVAC to be extended into room as required b. New light and switch c. New power/ data outlets d. New smoke detector is required, and fire alarm strobe is
recommended
8. Marano Campus Center: a. New smoke detector is required, and fire alarm strobe is
recommended b. Reuse existing lighting and receptacles, replace one receptacle with
new USB port receptacle
9. Onondaga Hall: a. Existing HVAC to be extended into room with new diffuser b. New light and switch c. New power/ data outlets d. New smoke detector is required, and fire alarm strobe is
recommended
10. Rich Hall: a. New outlet with USB port connected to existing outlet b. New fire alarm strobe is recommended c. Reuse existing light fixtures and switch
MA
IN C
AM
PUS
KEY
PLA
N
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
MA
IN-0
01
CO
MM
ISSA
RY
CEN
TRA
L R
ECEI
VIN
G F
IRST
FLO
OR
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
CO
M-0
01
CENTERALWAREHOUSE
132
OFFICE
130
MAILROOM
132C
CONFERENCE
131
OFFICE
129
OFFICE
128
COPY
127
BULK FOODRECEIVING
119
JANITORCLOSET
122
WOMEN'SLOCKER
126
STORAGEROOM
121
MEN'SLOCKER
123
OVER HEADDOOR
MEN
124
BREAKROOM
132A
MECHROOM
133
MECHROOM
120
STORAGE
112
COOLER#9
116
D I N I N G SERVIC E S
MTG/STAFFROOM
118
FREEZER
117
COOLER#8
115
CORRIDOR
114
FREEZER#1
105
FREEZER#2
106
FREEZER#3
107
FREEZER#4
108
COOLER#7
113
DOUGHNUTROOM
111
FREEZER#6
110
FREEZER#5
109
PREPARED FOODSHIPPING
104
OFFICE
104A
BAKERY
103
FRIDGE
101BAKERY
STORAGE
102
STORAGE
100A
DRY BULKSTORAGE
100ELECTRIC
PANELS ELECTRIC
PANEL
ELECTRIC
PANEL
ELECTRIC
PANEL
FIRESERVICE ROOM
134
WOMEN
125
OVER HEADDOOR
OVER HEADDOOR
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
CO
MM
ISSA
RY
CEN
TRA
L R
ECEI
VIN
G F
IRST
FLO
OR
CO
M-0
02
CENTERALWAREHOUSE
132
OFFICE
130
MAILROOM
132C
CONFERENCE
131
OFFICE
129
OFFICE
128
COPY
127
BULK FOODRECEIVING
119
JANITORCLOSET
122
WOMEN'SLOCKER
126
STORAGEROOM
121
MEN'SLOCKER
123
OVER HEADDOOR
MEN
124
BREAKROOM
132A
MECHROOM
133
MECHROOM
120
STORAGE
112
COOLER#9
116
D I N I N G SERVIC E S
MTG/STAFFROOM
118
FREEZER
117
COOLER#8
115
CORRIDOR
114
FREEZER#1
105
FREEZER#2
106
FREEZER#3
107
FREEZER#4
108
COOLER#7
113
DOUGHNUTROOM
111
FREEZER#6
110
FREEZER#5
109
PREPARED FOODSHIPPING
104
OFFICE
104A
BAKERY
103
FRIDGE
101BAKERY
STORAGE
102
STORAGE
100A
DRY BULKSTORAGE
100ELECTRIC
PANELS ELECTRIC
PANEL
ELECTRIC
PANEL
ELECTRIC
PANEL
FIRESERVICE ROOM
134
WOMEN
125
OVER HEADDOOR
OVER HEADDOOR
LACTATION132E
57 S.F. 15cd
USB
LACTATION132E
57 S.F.
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'XXcd' ASSIGNS INTENSITY
2x2 LIGHTING FIXTURE
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
DRAWING NOTES
1. PROVIDE SUPPLY AND RETURN DIFFUSERS IN CEILING GRID AND
CONNECT DUCTWORK TO EXISTING HVAC SYSTEM.
2. RECEPTACLES TO BE CONNECTED TO 1P 20A CIRCUIT BREAKER
IN NEAREST PANEL.
3. PROVIDE NEW LIGHTING FIXTURE AND CONNECT TO NEARBY
LIGHTING CIRCUIT WITH AVAILABLE CAPACITY. FIXTURE TO BE
CONTROLLED BY NEW LIGHT SWITCH.
4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT
TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES
COMPATIBLE WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
1/4" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
1/4" = 1'-0"2
ELECTRICAL LIGHTING PLAN
CO
MM
IS
AR
Y H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
Commissary Central Receiving First Floor 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 57 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 2,410.00$
10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL 3,910.00$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 2,350.00$
MECHANICAL / ELECTRICAL SUBTOTAL 3,500.00$
SUBTOTAL CONSTRUCTION COST 7,410.00$
GENERAL REQUIREMENTS - 15% -$ DESIGN CONTINGENCY - 5% -$ OVERHEAD AND PROFIT - 15% -$ ESCALATION FOR 4 MONTHS - 3% PER YEAR -$
TOTAL CONSTRUCTION COST 7,410.00$
Page 2 of 2
Commissary Central Receiving First Floor 11/18/2016Dwyer Project No. 16-042DIV. NO.
DESCRIPTION QTY UNIT OF MEASURE
UNIT COST TOTAL
DIV. 8 DOORS & WINDOWS
3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$
DIVISION 8 - TOTAL 1,500.00$
DIV. 9 FINISHES
WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 9' high) 206 S.F. 4.76$ 980.56$
CEILINGS2 x 2 ceilings 57 S.F. 5.00$ 285.00$
FLOORINGVCT 57 SF 2.36$ 134.52$ Rubber base 53 LF 2.92$ 154.76$ Floor Prep 57 SF 4.36$ 248.52$
PAINTS AND COATINGSPaint interior walls 474 SF 1.20$ 568.80$ Paint door frames 1 EA 40.00$ 40.00$
DIVISION 9 - TOTAL 2,410.00$
TOTAL (Base Bid) 3,910.00$
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
DN
N.I.C.
N.I.C.
N.I.C.N.I.C.
UP
37UP
UP
UPUP
UP
DN
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
CU
LKIN
HA
LL: L
OW
ER L
EVEL
CU
L-00
1
DNN.I.C.N.I.C.N.I.C.N.I.C.UP37UPUPUPUPUPDN
5
4
MECHANICAL6
STAIRSTA-W
B9
JCB
WOMENWB
MENMB
MECHANICALSPACE
B7
STAIRSTA-E
MAINTENANCEOFFICE
B2A
STORAGEB2B
BUILDINGMAINTENANCE
2
TOILET
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
CU
LKIN
HA
LL: L
OW
ER L
EVEL
CU
L-00
2
STAFF LOUNGE1
296 S.F.
LACTATION ROOM1A
49 S.F.
15cd
USB
STAFF LOUNGE1
296 S.F.
LACTATION ROOM1A
49 S.F.
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'
ASSIGNS INTENSITY
2x4 LIGHTING FIXTURE
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
DRAWING NOTES
1. PROVIDE DIFFUSER IN CEILING AND CONNECT DUCTWORK TO
EXISTING SYSTEM.
2. PROVIDE ADDITIONAL RECEPTACLES AS REQUIRED AND CONNECT
TO RECEPTACLE CIRCUIT SERVING THE AREA. REPLACE
RECEPTACLE WITH USB RECEPTACLE IN LOCATION SHOWN.
3. RELOCATE EXISTING 2X4 FLUORESCENT LIGHT FIXTURE TO
CENTER OF ROOM. CONTROL LIGHT FROM NEW LIGHT SWITCH AT
LOCATION SHOWN.
4. CONNECT FIRE ALARM SMOKE DETECTOR AND STROBE TO
EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES COMPATIBLE
WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
1/4" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
1/4" = 1'-0"2
ELECTRICAL LIGHTING PLAN
CU
LK
IN
H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
Culkin Hall: Lower Level 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 49 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 122.64$
10 SPECIALTIES 100.00$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL 1,722.64$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 2,085.00$
MECHANICAL / ELECTRICAL SUBTOTAL 3,235.00$
SUBTOTAL CONSTRUCTION COST 4,957.64$
GENERAL REQUIREMENTS - 10% 495.00$ DESIGN CONTINGENCY - 5% 250.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 50.00$
TOTAL CONSTRUCTION COST 5,752.64$
Page 2 of 2
Culkin Hall: Lower Level 11/18/2016Dwyer Project No. 16-042DIV. NO.
DESCRIPTION QTY UNIT OF MEASURE
UNIT COST TOTAL
DIV. 8 DOORS & WINDOWS
3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$
DIVISION 8 - TOTAL 1,500.00$
DIV. 9 FINISHES
WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 8' high) 112 S.F. 4.76$ 533.12$
PAINTS AND COATINGSPaint interior walls (primer + 2 coats) 336 SF 1.20$ 403.20$ Paint door frames 1 EA 40.00$ 40.00$
FLOORINGRubber base 42 LF 2.92$ 122.64$ Patch carpet as required 1 LS 100.00$ 100.00$
TOTAL (Base Bid) 1,722.64$
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
FUN
NEL
LE H
ALL
: BA
SMEN
T LE
VEL
FUN
-001
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
FUN
NEL
LE H
ALL
: BA
SMEN
T LE
VEL
FUN
-002
ELE-V2
ELE-V3
ELE-V1
LOUNGELOU-B
STA-BS
LAUNDRYLAU-B
JSC-BS
MCR-BS
KITCHENKIT-B
RECYCLEROOMRCY-B
FACILITIESSERVICES
JAB-B
STA-BN
ELE-V4ELV-B
RECEIVINGRCV-B
JCL-BCJLW-B JLM-B
LOCKERS LOCKERS
JRW-BRESTROOM
JRW-BRESTROOM
STORAGEJSR-B
STORAGEJSR-BNE
DN
MECHANICALMCR-BC
MECHANICALMCR-BN
TR1-BS
LACTATION ROOM132B
104 S.F.
TRANSFORMER VAULT132B
261 S.F.
15cd
USB
LACTATION ROOM132B
104 S.F.
TRANSFORMER VAULT132B
261 S.F.
ET
R
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'
ASSIGNS INTENSITY
2x4 LIGHTING FIXTURE
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
EXISTING TO REMAINETR
DRAWING NOTES
1. PROVIDE DIFFUSER IN CEILING AND CONNECT DUCTWORK TO
EXISTING SYSTEM.
2. RECEPTACLES TO BE CONNECTED TO 1P 20A CIRCUIT BREAKER
IN NEAREST PANEL WITH AVAILABLE CAPACITY.
3. LIGHTING FIXTURES ARE EXISTING TO REMAIN.
4. CONNECT FIRE ALARM SMOKE DETECTOR AND STROBE TO
EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES COMPATIBLE
WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
1/4" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
1/4" = 1'-0"2
ELECTRICAL LIGHTING PLAN
FU
NN
EL
LE
H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
Funnelle Hall: Basement Level 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 268 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS -$ 9 FINISHES -$
10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL -$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,735.00$
MECHANICAL / ELECTRICAL SUBTOTAL 2,885.00$
SUBTOTAL CONSTRUCTION COST 2,885.00$
GENERAL REQUIREMENTS - 10% 290.00$ DESIGN CONTINGENCY - 5% 145.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 30.00$
TOTAL CONSTRUCTION COST 3,350.00$
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
KIN
G H
ALL
: BA
SEM
ENT
LEVE
L
KN
G-0
01
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
KIN
G H
ALL
: BA
SEM
ENT
LEVE
L
KN
G-0
02
LACTATIONB2A
52 S.F.
15cd
USB
LACTATIONB2A
52 S.F.
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'
ASSIGNS INTENSITY
2x4 LIGHTING FIXTURE
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
DRAWING NOTES
1. PROVIDE DIFFUSER IN DRYWALL CEILING AND CONNECT
DUCTWORK TO EXISTING SYSTEM.
2. PROVIDE ADDITIONAL RECEPTACLES ON NEW WALLS.
RECEPTACLES TO BE CONNECTED TO NEARBY RECEPTACLE
CIRCUIT SERVING THE AREA.
3. RELOCATE EXISTING 2X4 SURFACE MOUNTED FLUORESCENT
LIGHT FIXTURE TO CENTER OF ROOM. RE-WORK LIGHTING
FIXTURE CIRCUITING TO BE CONTROLLED BY NEW WALL SWITCH
SHOWN ON PLAN.
4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT
TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES
COMPATIBLE WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
1/4" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
1/4" = 1'-0"2
ELECTRICAL LIGHTING PLAN
KIN
G H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
King Hall: Basement Level 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 52 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 1,315.00$
10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL 2,815.00$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 2,085.00$
MECHANICAL / ELECTRICAL SUBTOTAL 3,235.00$
SUBTOTAL CONSTRUCTION COST 6,050.00$
GENERAL REQUIREMENTS - 10% 605.00$ DESIGN CONTINGENCY - 5% 305.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 60.00$
TOTAL CONSTRUCTION COST 7,020.00$
Page 2 of 2
King Hall: Basement Level 11/18/2016Dwyer Project No. 16-042DIV. NO.
DESCRIPTION QTY UNIT OF MEASURE
UNIT COST TOTAL
DIV. 8 DOORS & WINDOWS
3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$
DIVISION 8 - TOTAL 1,500.00$
DIV. 9 FINISHES
WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 8' high) 116 S.F. 4.76$ 552.16$ Transluscent film (for existing windows assume 2' high) 15 SF 5.00$ 75.00$
FLOORINGPatch carpet as required 1 LS 100.00$ 100.00$ Rubber base 44 LF 2.92$ 128.48$
PAINTS AND COATINGSPaint interior walls (primer + 2 coats) 348 SF 1.20$ 417.60$ Paint door frames 1 EA 40.00$ 40.00$
DIVISION 9 - TOTAL 1,315.00$
TOTAL (Base Bid) 2,815.00$
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
UP
UP
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
LAK
ER H
ALL
: BA
SEM
ENT
LEVE
L
LKR
-001
UP
MECHANICALROOM
12B
HYDROTHERAPY
9A
OFFICE17E
SPORTSMEDICINE
9
STORAGE9B
LOCKER10F
CLASSROOM11
STORAGE17
OFFICE11A
DRYING10E
WRESTLINGLOCKERS
7D
WEIGHT/FITNESSROOM
17B
BATTINGCAGES
14EQUIPMENTSTORAGE
13
MECHANICALROOM
12
ELEC.ROOM
12A
MECHANICALROOM
13A
STORAGE17D
LOCKER15
WRESTLING16
OFFICE9C
STAIRSTA-BSC
LOCKERS10B
DRYING10C STRETCHING
ROOM18
WRESTLINGSTORAGE
16B
FITNESSROOM
16A
TOILET15B
EQUIPMENTSTORAGE
8
TOILET10D
OFFICE17G
STAIRSTA-BNE
MECHANICALROOM
5
SHOWERS15E
DRYING15D
LOCKERS2E
TOILET15C
LOCKER10A
2G
STORAGE32
TOILET20C
EQUIPSTORAGE
22
EQUIPMENTROOM
6
ELEV.B
ELEVMECH
17J
STORAGE21
SHOWERS2D LOWER PORTION
OF SWIMMING POOL25
SHOWER20D
LOCKER20B
STAIRSTA-BSW
2F
TOILET7L
LOCKERS2B
TOILET7M
WOMENLOCKERROOM
7G
POOLMECHANICAL RM.
19SHOWERS
7K
DRYINGROOM
7H
DRYINGROOM
7I
MENLOCKERROOM
7A
TOILET7E
SHOWERS7J
LOCKERROOM
7B
LOCKERROOM
7F
LOCKERROOM
7C
20A
LOCKERS31
OFFICE23A
OFFICE23
STORAGE17A
STORAGE27
STOR29
STOR28
STAIRSTA-BSE
EQUIPSTORAGE
17F
WEIGHT/FITNESS
ROOM17C
CLOSET17H
UP
STAIRSTA-BNC
TOILET2A
CHLORINEROOM
19A
BLDGMAINT
9E
DRYING15A
TOILET9D
SHOWERS10G
DRYING2C
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
LAK
ER H
ALL
: BA
SEM
ENT
LEVE
L
LKR
-002
LACTATION1A
53 S.F.
MET
AL C
ABIN
ETS
15cd
USB
LACTATION1A
53 S.F.
MET
AL C
ABIN
ETS
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'
ASSIGNS INTENSITY
SUSPENDED LIGHTING FIXTURE
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
DRAWING NOTES
1. PROVIDE HVAC DIFFUSER AND DUCTWORK TO NEW LACTATION
ROOM AND CONNECT DUCTWORK TO EXISTING SYSTEM.
2. RECEPTACLES TO BE CONNECTED TO 1P 20A CIRCUIT BREAKER
IN NEAREST PANEL WITH AVAILABLE CAPACITY.
3. RELOCATE EXISTING FLUORESCENT PENDANT LIGHT FIXTURE
TO CENTER OF ROOM. RE-WORK LIGHTING FIXTURE CIRCUITING
TO BE CONTROLLED BY NEW WALL SWITCH SHOWN ON PLAN.
4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT
TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES
COMPATIBLE WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
1/4" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
1/4" = 1'-0"2
ELECTRICAL LIGHTING PLAN
LA
KE
R H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
Laker Hall: Basement Level 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 53 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 1,880.00$
10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL 3,380.00$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,910.00$
MECHANICAL / ELECTRICAL SUBTOTAL 3,060.00$
SUBTOTAL CONSTRUCTION COST 6,440.00$
GENERAL REQUIREMENTS - 10% 965.00$ DESIGN CONTINGENCY - 5% 320.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 65.00$
TOTAL CONSTRUCTION COST 7,790.00$
Page 2 of 2
Laker Hall: Basement Level 11/18/2016Dwyer Project No. 16-042DIV. NO.
DESCRIPTION QTY UNIT OF MEASURE
UNIT COST TOTAL
DIV. 8 DOORS & WINDOWS
3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$
DIVISION 8 - TOTAL 1,500.00$
DIV. 9 FINISHES
WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 9' high) 130 S.F. 4.76$ 618.80$
FLOORINGVCT 53 SF 2.36$ 125.08$ Rubber base 44 LF 2.92$ 128.48$ Floor Prep 53 SF 4.36$ 231.08$
PAINTS AND COATINGSPaint interior walls 392 SF 1.20$ 470.40$ Paint door frames 1 EA 40.00$ 40.00$
CEILINGS2 x 2 ceilings 53 S.F. 5.00$ 265.00$
DIVISION 9 - TOTAL 1,880.00$
TOTAL (Base Bid) 3,380.00$
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
DN
DN
DN
UP
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
LAN
IGA
N H
ALL
: SEC
ON
D F
LOO
R
LAN
-001
LACTATION100A
126 S.F.
7'-7" V.I.F.
ALIGN NEW PARTITION WITH EXG. WALL
PROVIDE TRANSLUSCENTPRIVACY FILM BELOW EXG
HORIZONTAL MULLION
ALIGN NEW PARTITION WITH EXG. WALL
HEIGHT OF NEW PARTIONS TOEXG CEILING TO REMAIN
ACTUAL DEAD END: 24'-9"
ALLOWABLE DEAD END: 36'-0"
14'-9
1/2"
NEW SURFACE MOUNTED LIGHT FIXTURE
16'-8
" V.I.
F.
NEW DOOR WITH HM FRAME
FINISH SCHEDULE - LACATION ROOM 100A
FLOORS: CPTWALLS: PNTCEILING: EXG TO REMAINBASE: RCB
NOTES: PAINT OUTSIDE OF NEW WALLS TO MATCH EXG ADJACENT
STAIR STAIR
STAIR
STAIR
STA-1NW STA-1NE
STA-1SE
STA-1C
SERVICECLOSET
JC5
LECTUREHALL104
LECTUREHALL103
ONTARIOBAGEL CO.
103A
LECTUREHALL
102
CLASSROOM102A
SERVICECLOSET
JC3
LECTUREHALL
101
MENM3
WOMENW3
SERVICECLOSET
JC2
LECTUREHALL107
CLASSROOM107A
LECTUREHALL106
CLASSROOM106A
LECTUREHALL105
STORAGE108
TOILETR3
ELEVATORELE-1C
DN
DN
DN
CORRIDOR100
CORRIDOR100
CORRIDOR100
CORRIDOR100
CORRIDOR100D
CORRIDOR100A
CORR100B
CORR100CCORRIDOR
100E
STOR111
STOR110
STOR109
RAMP DOWN RAMP DOWN
UP
STAIRSTA-SW240 S.F.
SERVICE CLOSETJC4
115 S.F.
CORRIDORCOR-SW591 S.F.
PROPOSED CONSTRUCTION PLANScale: 1/4" = 1'-0" 1
0 5 10 15 FT
NORTH
PRO
J. N
O: 1
6-04
2
DAT
E IS
SUED
: 11/
18/2
016
SU
NY
OS
WE
GO
CA
MP
US
-WID
E L
AC
TATI
ON
RO
OM
IMP
LEM
EN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 13
126
LAN
IGA
N H
ALL
: SEC
ON
D F
LOO
R
LAN
-002
LACTATION100A
126 S.F.STAIRSTA-SW240 S.F.
15cd
USB
LACTATION100A
126 S.F.STAIRSTA-SW240 S.F.
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'
ASSIGNS INTENSITY
WALL MOUNTED LIGHTING FIXTURE
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
DRAWING NOTES
1. PROVIDE HVAC DIFFUSERS AND DUCTWORK TO NEW LACTATION
ROOM AND CONNECT DUCTWORK TO EXISTING VENTILATION
SYSTEM.
2. RECEPTACLES TO BE CONNECTED TO 1P 20A CIRCUIT BREAKER
IN NEAREST PANEL WITH AVAILABLE CAPACITY.
3. PROVIDE NEW WALL MOUTNED LIGHTING FIXTURE AND
CONNECT TO NEARBY LIGHTING CIRCUIT. PROVIDE SURFACE
MOUTNED WIREMOLD TO TO SWITH.
4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT
TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES
COMPATIBLE WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
3/16" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
3/16" = 1'-0"2
ELECTRICAL LIGHTING PLAN
LA
NIG
AN
H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
Lanigan Hall: Second Floor 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 126 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 3,545.00$
10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL 5,045.00$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,995.00$
MECHANICAL / ELECTRICAL SUBTOTAL 3,145.00$
SUBTOTAL CONSTRUCTION COST 8,190.00$
GENERAL REQUIREMENTS - 10% 820.00$ DESIGN CONTINGENCY - 5% 410.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 80.00$
TOTAL CONSTRUCTION COST 9,500.00$
Page 2 of 2
Lanigan Hall: Second Floor 11/18/2016Dwyer Project No. 16-042DIV. NO.
DESCRIPTION QTY UNIT OF MEASURE
UNIT COST TOTAL
DIV. 8 DOORS & WINDOWS
3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$
DIVISION 8 - TOTAL 1,500.00$
DIV. 9 FINISHES
WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 19'-4" high) 293 S.F. 4.76$ 1,394.68$ Transluscent film (for existing windows assume 5' high) 73 S.F. 5.00$ 365.00$
FLOORINGCarpet Tile 126 SF 4.45$ 560.70$ Rubber base 32 LF 2.92$ 93.44$
PAINTS AND COATINGSPaint interior walls 908 SF 1.20$ 1,089.60$ Paint door frames 1 EA 40.00$ 40.00$
DIVISION 9 - TOTAL 3,545.00$
TOTAL (Base Bid) 5,045.00$
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
DN
N.I.C.
N.I.C.
N.I.C. N.I.C.
UP
37UP
UP
UPUP
UP
DN
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
LEE
HA
LL: M
EZZA
NIN
E LE
VEL
LEE
-001
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
LEE
HA
LL: M
EZZA
NIN
E LE
VEL
LEE
-002
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
LEE
HA
LL: M
EZZA
NIN
E LE
VEL
LEE
-003
JANITOR CLOSETM1
15 S.F.
LACTATIONM1A
67 S.F.
15cd
USB
JANITOR CLOSETM1
15 S.F.
LACTATIONM1A
67 S.F.
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'
ASSIGNS INTENSITY
1'x1' FLUORESCENT SURFACE MOUNTED LIGHTING FIXTURE
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
DRAWING NOTES
1. PROVIDE HVAC DIFFUSERS AND DUCTWORK TO NEW LACTATION
ROOM AND CONNECT DUCTWORK TO EXISTING VENTILATION
SYSTEM.
2. PROVIDE RECEPTACLES ON NEW WALLS AND CONNECT TO
NEARBY RECEPTACLE CIRCUIT WITH AVAILABLE CAPACITY.
3. PROVIDE WALL MOUNTED LIGHTING FIXTURE AND CONNECT TO
NEARBY LIGHTING CIRCUIT WITH AVAILABLE CAPACITY.
4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT
TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES
COMPATIBLE WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
1/4" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
1/4" = 1'-0"2
ELECTRICAL LIGHTING PLAN
LE
E H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
Lee Hall: Mezzanine Level 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 67 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION 355.00$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 1,500.00$ 9 FINISHES 1,395.00$
10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL 3,250.00$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,995.00$
MECHANICAL / ELECTRICAL SUBTOTAL 3,145.00$
SUBTOTAL CONSTRUCTION COST 6,395.00$
GENERAL REQUIREMENTS - 10% 640.00$ DESIGN CONTINGENCY - 5% 320.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 65.00$
TOTAL CONSTRUCTION COST 7,420.00$
Page 2 of 2
Lee Hall: Mezzanine Level 11/18/2016Dwyer Project No. 16-042DIV. NO.
DESCRIPTION QTY UNIT OF MEASURE
UNIT COST TOTAL
DIV. 1 GENERAL REQUIREMENTS
DEMOLITION
Remove existing sauna 42 SF 8.50$ 357.00$
DIVISION 1 - TOTAL 355.00$
DIV. 8 DOORS & WINDOWS
3' x 7' wood door, knock-down metal frame & hardware 1 EA 1,500.00$ 1,500.00$
DIVISION 8 - TOTAL 1,500.00$
DIV. 9 FINISHES
WALL CONSTRUCTIONPartition - 3-5/8" metal stud with 5/8" drywall both sides (assume 8' high) 67 S.F. 4.76$ 318.92$ Patching existing walls 1 LS 200.00$ 200.00$
FLOORINGPatch CMT floor 1 LS 200.00$ 200.00$ Carpet Tile 67 SF 4.45$ 298.15$ Rubber base 33 LF 2.92$ 96.36$
PAINTS AND COATINGSPaint interior walls 136 SF 1.20$ 163.20$ Paint interior ceilings 67 SF 1.20$ 80.40$ Paint door frames 1 EA 40.00$ 40.00$
DIVISION 9 - TOTAL 1,395.00$
TOTAL (Base Bid) 3,250.00$
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
MA
RA
NO
CA
MPU
S C
ENTE
R: S
ECO
ND
FLO
OR
MA
R-0
01
STOR202A
INSTRUCTIONALCOMPUTER LAB202
STAIRSTA-CW2
CLASSROOM/MEETING ROOM201
SERVERY203
STORAGE201A
CLASSROOM/MEETING ROOM
205
STOR205A
STAIRSTA-CNW2
IT COMPUTER LAB207
WOMEN209B
MEN209D
VEST209A
VEST209C
STOR210A
ELECE210
CLASSROOM210
CLASSROOM208
INSTRUCTIONALCOMPUTER LAB
206
TELECOMROOM
204
CLASSROOM211
CORRIDORC202
OFFICE212F
MTGROOM212G
WORK/KITCHEN
212H
OFFICE212E
OFFICE212D
OFFICE212C
SECRY212B
CHAIRSOFFICE
212A
PHILOSOPHY212
ACADEMICCOMMONS
200N1
CORRIDOR200N
ACADEMICCOMMONS
200N2
STAIRSTA-CSW2
STAIRSTA-CSE2
LOBBY200C
ELEVATORELV-CC2
COFFEECOMMONS
218A
F.A.N.S.218
CORRIDOR200S
VESTIBULEVES-CS
IPACMEETING
ROOM220 OFFICE
222COFFICE
222BOFFICE
222A
ADVISROOM222D
ADVISROOM222E
HONORSRECEPTION
221
ASSIST DIROFFICE
221A
FILES221B
DIROFFICE
221C
INTERDISC-PLINARY
PROGRAMSIPAC222
MEETINGROOM221D
CLASSROOM223 CLASSROOM
225
MEN238A
CLASSROOM232
IPACOFFICE
228
IPACOFFICE
230
WOMEN'SSTUDIES DIR
224
MEETINGROOM
226
MEETINGAREA226A
CORRIDOR200S
ACADEMICCOMMONS
221N3
CORRIDORC202
PHILOSOPHYADJUNCT AREA
240
JANCLOS209
HALL212J
CORRIDORC201
CORRIDORC200
STAIRSTA-ES2
ELEVATORELV-CE2
DNDN
DNUP
DN
DN
UP
DN DN DN
ENTRY TOPENTHOUSESEE DWG 4
TO POUCHER HALL
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
MA
RA
NO
CA
MPU
S C
ENTE
R: S
ECO
ND
FLO
OR
MA
R-0
02
LACTATION235
268 S.F.
WOMEN237A
216 S.F.
MEETING ROOM239
345 S.F.
CLASSROOM231
890 S.F.
15cd
USB
LACTATION235
268 S.F.
WOMEN237A
216 S.F.
MEETING ROOM
345 S.F.
CLASSROOM231
890 S.F.
E
T
R
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'
ASSIGNS INTENSITY
RECESSED FLUORESCENT DOWNLIGHTS
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
ETR EXISTING TO REMAIN
DRAWING NOTES
1. LIGHTING FIXTURES ARE EXISTING TO REMAIN, VERIFY EXACT
LOCATIONS.
2. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT
TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES
COMPATIBLE WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
1/8" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
1/8" = 1'-0"2
ELECTRICAL LIGHTING PLAN
MA
RA
NO
H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
Marano Campus Center: Second Floor 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 268 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS 160.00$ 9 FINISHES -$
10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL 160.00$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC -$ 26 ELECTRICAL 840.00$
MECHANICAL / ELECTRICAL SUBTOTAL 840.00$
SUBTOTAL CONSTRUCTION COST 1,000.00$
GENERAL REQUIREMENTS - 10% 100.00$ DESIGN CONTINGENCY - 5% 50.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 10.00$
TOTAL CONSTRUCTION COST 1,160.00$
Page 2 of 2
Marano Campus Center: Second Floor 11/18/2016Dwyer Project No. 16-042DIV. NO.
DESCRIPTION QTY UNIT OF MEASURE
UNIT COST TOTAL
DIV. 8 DOORS & WINDOWS
Transluscent film (for existing windows and sidelight) 32 S.F. 5.00$ 160.00$
DIVISION 8 - TOTAL 160.00$
TOTAL (Base Bid) 160.00$
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
BASEMENT FLOOR PLAN
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
ON
ON
DA
GA
HA
LL: B
ASE
MEN
T LE
VEL
ON
D-0
01
HAL-BCE
WASH
LOUNGELOU-BSE
TELEPHONESERVICE
NYX-B
MECHANICALMCR-B
ELECTRICALELE-B
LOUNGELOU-BC
LAUNDRYLAU-B
STA-BC
KITCHENKIT-B
HAL-BC
HAL-BSWHAL-BNW
HAL-BSE
BASEMENT FLOOR PLAN
DRYDRYDRYDRYDRYDRYDRYDRYDRYDRY
WASH WASH WASH WASH WASH WASH WASH WASH WASH
WASH WASH WASH WASH WASH WASH WASH WASH WASH
DRY DRY DRY DRY DRY DRY DRY DRY
HAL-BNE
STA-BN
STORAGEJST-BC
SERVICESJAB-BN
FACILITIES
JLM-BLOCKER
EMPLOYEE
JLW-BLOCKER
EMPLOYEE
JRW-B
JRM-B
JSC-BSCLOSET
RSS-BSSTOR.
SERVICE
STORAGEJSR-BN
JSR-BNC
JST-BSTORAGE PIA-BNE
PIANO
STO-BNWSTORAGE
DST-BSESTORAGE
TR1-BSWTECH. ROOM
ROOMRCY-BN
RECYCLERPW-BC
RESTROOMRPM-BC
RESTROOM
FIRE ALARMPANEL WITHIN
SPRINKLER CONTROLVALVE WITHIN
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
ON
ON
DA
GA
HA
LL: B
ASE
MEN
T LE
VEL
ON
D-0
02
LACTATIONLAC-BSE
77 S.F.
STORAGEJSR-BSW
15cd
USB
LACTATIONLAC-BSE
77 S.F.
STORAGEJSR-BSW48 S.F.
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'
ASSIGNS INTENSITY
PENDANT MOUNTED LIGHTING FIXTURE
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
EXISTING TO REMAINETR
DRAWING NOTES
1. PROVIDE HVAC DIFFUSERS AND DUCTWORK TO NEW LACTATION
ROOM AND CONNECT DUCTWORK TO EXISTING VENTILATION
SYSTEM.
2. PROVIDE RECEPTACLES ON NEW WALLS AND CONNECT TO
NEARBY RECEPTACLE CIRCUIT WITH AVAILABLE CAPACITY.
3. PROVIDE WALL MOUNTED LIGHTING FIXTURE AND CONNECT TO
NEARBY LIGHTING CIRCUIT WITH AVAILABLE CAPACITY.
4. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT
TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES
COMPATIBLE WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
1/4" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
1/4" = 1'-0"2
ELECTRICAL LIGHTING PLAN
ON
ON
DA
GA
H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
Onondaga Hall: Basement Level 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 77 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION 250.00$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS -$ 9 FINISHES 1,485.00$
10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL 1,735.00$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC 1,150.00$ 26 ELECTRICAL 1,995.00$
MECHANICAL / ELECTRICAL SUBTOTAL 3,145.00$
SUBTOTAL CONSTRUCTION COST 4,880.00$
GENERAL REQUIREMENTS - 10% 490.00$ DESIGN CONTINGENCY - 5% 245.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 50.00$
TOTAL CONSTRUCTION COST 5,665.00$
Page 2 of 2
Onondaga Hall: Basement Level 11/18/2016Dwyer Project No. 16-042DIV. NO.
DESCRIPTION QTY UNIT OF MEASURE
UNIT COST TOTAL
DIV. 1 GENERAL REQUIREMENTS
DEMOLITION
Remove existing shelving 1 LS 250.00$ 250.00$
DIVISION 1 - TOTAL 250.00$
DIV. 9 FINISHES
WALL CONSTRUCTIONPatch existing walls to remain 1 LS 200.00$ 200.00$
FLOORINGCarpet Tile 77 SF 4.45$ 342.65$ Rubber base 37 LF 2.92$ 108.04$ Floor Prep 111 SF 4.36$ 483.96$
PAINTS AND COATINGSPaint interior walls (primer + 2 coats) 290 SF 1.20$ 348.00$
DIVISION 9 - TOTAL 1,485.00$
TOTAL (Base Bid) 1,735.00$
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
PIT
CRAWLSPACE
STAIR101
STAIR100
ELEV EQUIP131
WOMEN132
MEN133
LOBBY130
VEST129
ELEC ROOM128
ELEC ROOM127
MECH ROOM125
LOBBY126
CONFERENCE104
BUSINESS ANDCOM. RELATIONS
103
FACILITY105
LOCKERS105AJAN
110A
OFFICE106
OFFICE107
OFFICE108
OFFICE109
COPY ROOM110
RECEPTION103A
CORRIDOR112
ELECROOM
113
GENROOM
115
TELECOM114
SPRINKLERROOM
116
STOR117
STAIR111
TRAINING118A
RESOURCE118A
CORRIDOR119
SHOP123
MECHRM VEST
122
SNOWBLOWERROOM
124
DIRECTOROFFICE
140
OFFICE134
OFFICE135
OFFICE136
RECEPTIONOFFICE
138
STORAGE137
OFFICE139
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
RIC
H H
ALL
: LO
WER
LEV
EL
RC
H-0
01
PIT
CRAWLSPACE
STAIR101
STAIR100
ELEV EQUIP131
WOMEN132
MEN133
LOBBY130
VEST129
ELEC ROOM128
ELEC ROOM127
MECH ROOM125
LOBBY126
CONFERENCE104
BUSINESS ANDCOM. RELATIONS
103
FACILITY105
LOCKERS105AJAN
110A
OFFICE106
OFFICE107
OFFICE108
OFFICE109
COPY ROOM110
RECEPTION103A
CORRIDOR112
ELECROOM
113
GENROOM
115
TELECOM114
SPRINKLERROOM
116
STOR117
STAIR111
TRAINING118A
RESOURCE118A
CORRIDOR119
SHOP123
MECHRM VEST
122
SNOWBLOWERROOM
124
DIRECTOROFFICE
140
OFFICE134
OFFICE135
OFFICE136
RECEPTIONOFFICE
138
STORAGE137
OFFICE139
PRO
J. N
O: 1
6-04
2
DA
TE IS
SUED
: 11/
18/2
016
SUN
Y O
SW
EG
OC
AM
PU
S-W
IDE
LAC
TATI
ON
RO
OM
IMPL
EMEN
TATI
ON
STU
DY
Mai
n C
ampu
sO
sweg
o, N
Y 1
3126
RIC
H H
ALL
: LO
WER
LEV
EL
RC
H-0
02
7'-1"
LACTATION121
199 S.F.
15cd
USB
ETR
7'-1"
LACTATION121
199 S.F.ETR
ETR
ETR
DUPLEX RECEPTACLE
AC LIGHTING SWITCH
FIRE ALARM SYSTEM, SMOKE DETECTOR; PHOTOELECTRIC TYPE
UNLESS INDICATED OTHERWISE.
FIRE ALARM VISUAL DEVICE, 'C' INDICATES CEILING MOUNT, 'XXcd'
ASSIGNS INTENSITY
PENDANT MOUNTED LIGHTING FIXTURE
ELECTRICAL SYMBOL LIST
EMERGENCY LIGHT
TELEPHONE AND DATA OUTLET, INTERCOMMUNICATION SYSTEM
DUPLEX RECEPTACLE WITH USB CABLE CONNECTION
IN OUTLET
USB
ETREXISTING TO REMAIN
DRAWING NOTES
1. PROVIDE RECEPTACLES ON WALL AND CONNECT TO NEARBY
RECEPTACLE CIRCUIT WITH AVAILABLE CAPACITY.
2. EXISTING LIGHTS AND SWITCH TO REMAIN.
3. PROVIDE NEW SMOKE DETECTOR AND STROBE AND CONNECT
TO EXISTING FIRE ALARM SYSTEM. PROVIDE DEVICES
COMPATIBLE WITH EXISTING SYSTEM.
Dra
win
g T
itle
DA
TE
IS
SU
ED
:
RE
V. N
O.:
11/18/2016
SU
NY
O
SW
EG
O
CA
MP
US
-W
ID
E LA
CT
AT
IO
N R
OO
M IM
PLE
ME
NT
AT
IO
N S
TU
DY
Main C
am
pus
Osw
eg
o, N
Y 1
31
26
�
PR
OJ. N
O: 16-042
A###
1/4" = 1'-0"1
ELECTRICAL POWER AND FIRE ALARM PLAN
1/4" = 1'-0"2
ELECTRICAL LIGHTING PLAN
RIC
H H
AL
L L
AC
TA
TIO
N R
OO
M
Prepared on 11/18/16
Rough Order of Magnitude Estimate for: SUNY Oswego - Campus-Wide Lactation Room Implementation Study
Rich Hall: Lower Floor 11/18/2016
Dwyer Project No. 16-042 Renovated Area of Work 268 NSFProject Summary
DIV DESCRIPTION Cost Total Cost 0 ASBESTOS ABATEMENT -$ 1 DEMOLITION -$ 2 SITE WORK -$ 3 CONCRETE -$ 4 MASONRY -$ 5 METALS -$ 6 WOODS AND PLASTICS -$ 7 THERMAL AND MOISTURE PROTECTION -$ 8 DOORS & WINDOWS -$ 9 FINISHES -$
10 SPECIALTIES -$ 11 EQUIPMENT -$ 12 FURNISHINGS -$ 13 SPECIAL CONSTRUCTION -$ 14 CONVEYING SYSTEMS -$
GENERAL CONSTRUCTION SUBTOTAL -$
21 FIRE PROTECTION -$ 22 PLUMBING -$ 23 HVAC -$ 26 ELECTRICAL 985.00$
MECHANICAL / ELECTRICAL SUBTOTAL 985.00$
SUBTOTAL CONSTRUCTION COST 985.00$
GENERAL REQUIREMENTS - 10% 100.00$ DESIGN CONTINGENCY - 5% 50.00$ ESCALATION FOR 4 MONTHS - 3% PER YEAR 10.00$
TOTAL CONSTRUCTION COST 1,145.00$