Page 1: Sunset cove restoration project -update

Sunset Cove Restoration Update and Stakeholder Advocacy

Page 2: Sunset cove restoration project -update

Sunset Cove

12 acre site

Spectacular views of Jamaica Bay and NYC

Located at extreme south end of Broad Channel

NYC Parks land adjacent to NPS wetlands

Wetland cove and upland area

Unique Opportunity to restore Degraded shoreline area

NEXT MAJOR RESTORATION PROJECT TO BEGIN IN JAMAICA BAY

Page 3: Sunset cove restoration project -update
Page 4: Sunset cove restoration project -update

History

Small Marina since the 40’s

Marina greatly expanded thru illegal fill in 1970’s and 80’s.

Court action at both state and Federal level

Resulted in 1998 decision to reduce size

2008 decision for additional violations led to state acquisition

2008 Land put under jurisdiction of NYC DCAS

Page 5: Sunset cove restoration project -update

History

Broad Channel Civic Association led effort to have area deeded to NYC Parks.

Worked thru Councilman Ulrich’s office to have transferred to NYC Parks in 2009

BCCA passed unanimous resolution in February of 2010 endorsing wetlands restoration, upland forest, walking trails, boardwalk plan.

BCCA plan submitted to NYC PARKS RFEI—only plan submitted

Page 6: Sunset cove restoration project -update

Sunset Cove 2006

Page 7: Sunset cove restoration project -update

Sunset Cove 2013

Page 8: Sunset cove restoration project -update

DOI grant effort Post Sandy

Effort led by Broad Channel Civic Association

Letters of support obtained from

Senator Schumer ***

Congressman Meeks

Congressman Jeffries

State Senator Addabbo

Assemblyman Goldfeder

Councilman Ulrich

Federal lobbying coordinated with Harbor Coalition

Page 9: Sunset cove restoration project -update

Dept of Interior Grant awarded for 4.8 Million

Page 10: Sunset cove restoration project -update

Partners

NYC Parks

NYC DEP

NYS DEC

National Parks Service

Jamaica Bay Ecowatchers

American Littoral Society

Page 11: Sunset cove restoration project -update

Features of Project:

• Restoration of approximately 4 acres of low marsh.

• Restoration of approximately 0.5 acres of high marsh.

• Restoration of approximately 4 acres of scrubland.

• Restoration of approximately 3.5 acres of coastal forest.

• Restoration of approximately 1,000 linear feet of upland perimeter.

• Construction of boardwalk, outdoor classroom and perimeter walking trail/Berm and Eco-dock for student use .

Page 12: Sunset cove restoration project -update

Phase 1 funding

NEWIPCC EPA Grant - $60,000 State EPF Grant - $50,000 DOI NFWF Grant - $4,850,000 DEC Mitigation Payments Transco Williams - $500,000 Dept of Sanitation - $750,000 NYCDOT - $990,000 DPR - $70,000 (Beach 108 Bulkhead Project) DEP Design Contribution - $50,000

Total original Funding expectation- $7,320,000

Page 13: Sunset cove restoration project -update

Phase 2 Funding--

Total final cost estimate $ 1.8 Million

Funding Sources--

◦ Broad Channel CRZ NY Rising- -----$500,000◦ Queens Borough President Melinda Katz--$1,000,000◦ Assemblywoman Amato - $125,000◦ State Senator Addabbo--$ 175,000◦ Broad Channel Civic thru Participatory Budget-$200,00

* all design costs for Louis Berger firm from NY Rising

Page 14: Sunset cove restoration project -update

Funding shortfall

Project out for bid in May 2017

Minimum bid received 7 million short

Project in Jeopardy and DOI Funding

Ecowatchers and BCCA lobby Mayors office

Elected officials lend full support

Worked with Offic of Resiliency

October 6th Funding received from Mayors Office

Page 15: Sunset cove restoration project -update

Press Conference- October 6th

Page 16: Sunset cove restoration project -update

Sunset Cove Revised Time Frame

Phase 1—Funded/Design Completed Contractor identified /Construction to start Spring 2018

Total---$16,320,000

Phase 2- funding in Place/Design underway by Louis Berger/ Construction Spring 2019

Total funds---$1,800,000

Page 17: Sunset cove restoration project -update

Site plan

Page 18: Sunset cove restoration project -update

North site Plan with eco dock

Page 19: Sunset cove restoration project -update

Boardwalk and Entrance to Park –Phase 2

Page 20: Sunset cove restoration project -update
Page 21: Sunset cove restoration project -update

u

Page 22: Sunset cove restoration project -update

Boardwalk design using restored lumber from Rockaway Boardwalk

Page 23: Sunset cove restoration project -update

Shade features

Page 24: Sunset cove restoration project -update

SUNSET COVE

Page 25: Sunset cove restoration project -update

Wetlands Experience

Page 26: Sunset cove restoration project -update

Learning/Research

Page 27: Sunset cove restoration project -update

Solstice Markers

Page 28: Sunset cove restoration project -update

Sunset at the Cove