INTRODUCTION
National Thermal Power Corporation Limited was formed in 1975 to plan,
promote and organize an integrated and efficient development of Central
Sector Power Stations.
The Singrauli Super Thermal Power Station was the first of the series of
pithead power stations along with 400kV ac transmission line network. It is
located on the banks of Govind Ballabh Pant Sagar (Rihand Reservoir),
about 200km south of Varanasi in the Sonebhadra district of Uttar Pradesh.
For coal transportation, a captive railway system with rapid loading and
unloading facility known as Merry-Go Round (MGR), continuously hauls
coal from the Jayant block of Singrauli coalfields to the plant site. The rake
consists of 30 wagons and will deliver 1800 MT of coal in each cycle. The
average daily consumption of coal is 25,000 MT per day i.e. 8.0 million
tonnes per annum considering average calorific value of 4000 kcal/kg and
7000 hrs of operation in an year for the ultimate capacity of the plant of
2000 MW having 5 units of 200 MW each and 2 units of 500 MW each.
The 5200MW generating units of Stage I are each equipped with coal-
fired, regenerative, re-heat type steam generators with electrostatic
precipitators, each generating 700 tonnes/hr of steam at 138 kg/cm 2 pressure
and 535C temperature. The steam generator feeds steam to a condensing,
horizontal, tandem compound 3-cylinder re-heat type turbo generator
rotating at 3000 rpm and each generates 200 MW. Three phase generator
transformer of 250 MVA capacity steps up the generation voltage from
15.75 KV to 400 KV.
Cooling water from the Rihand Reservoir is drawn through an approachchannel. It is then pumped into concrete intake duct by vertical pumps of
15000 m 3/hr capacity each. From the ducts, the water is circulated through
condensers and is then discharged into a duct from where it flows into an
open channel. This open channel carries the water for a distance of 6 kms to
affect sufficient cooling before it joins back into Rihand Reservoir.
The 2500MW generating units of Stage II are each equipped with coal-
fired, regenerative, re-heat type steam generators with electrostatic
-
7/27/2019 Summer Training in badarpur ntpc
2/54
-
7/27/2019 Summer Training in badarpur ntpc
3/54
Page 3
Circulating water system Ash handling system Compressed air system Hydrogen generating plant
Growth of NTPC:
Fig: figure of growth rate
NTPC was ranked 3rd
best employer and the No.1 Public sector undertaking
among 220 major companies in India by Business Today Hewitt
Association Best Employers Survey 2003.
COAL TO STEAM STEAM TO MECHANICAL POWER
-
7/27/2019 Summer Training in badarpur ntpc
4/54
Page 4
MECHANICAL POWER TO ELECTRICITY SWITCHING AND TRANSMISSION
COAL TO STEAM
Coal from the coal wagons is unloaded in the coal handling plant. This coal
is transported upto the raw coal bunkers with the help of belt conveyors.
Coal is transported to bowl mills by coal feeders. The coal is pulverized in
the bowl mill, where it is ground to a powder form. The mill consists of a
round metallic table on which coal particles fall. This table is rotated with
the help of a motor. There are three large steel rollers, which are spaced 120
apart. When there is no coal, these rollers do not rotate but when the coal is
fed to the table it packs up between the roller and the table and this forces
the roller to rotate. Coal is crushed by the crushing action between the rollers
and the rotating table. This crushed coal is taken away to the furnace through
coal pipes with the help of hot and cold air mixture from the primary air
(P.A.) fan. The P.A. fan takes atmospheric air, a part of which is sent to the
air preheaters for heating while a part goes directly to the mill for
temperature control. Atmospheric air from forced draft (F.D.0 fan is heatedin the air heaters and sent to the furnace as combustion air.
Water from the boiler feed pump passes through economiser and reaches the
boiler drum. Water from the drum passes through down comers and goes to
bottom ring header. Water from the bottom ring header is divided to all the
four sides of the furnace. Due to heat and the density difference water rises
up in the water wall tubes. Water is partly converted into steam as it rises up
in the furnace. This steam and water mixture is again taken to the boiler
drum where the steam is separated from water. Water follows the same path
while steam is sent to the superheaters for superheating. The superheaters
are located inside the furnace and the steam is superheated (540C) and
finally goes to the turbine.
Flue gases from the furnace are extracted by the induced draft (I.D.) fan,
which maintains a balanced draft in the furnace with F.D. fan. These flue
gases emit their heat energy to various superheaters in the plant house and
finally pass through the air preheaters and goes to the electrostatic
precipitator where the ash particles are extracted. Electrostatic precipitators
-
7/27/2019 Summer Training in badarpur ntpc
5/54
Page 5
consist of metal plates, which are electrically charged. Ash particles are
attracted to these plates, so that they do not pass through the chimney to
pollute the atmosphere. Regular mechanical hammer blows cause theaccumulation of ash to fall to the bottom of the precipitator where they are
collected in a hopper for disposal. This ash is mixed with water to form
slurry and is pumped to ash dyke.
STEAM TO MECHANICAL POWER
From the boiler, a steam pipe conveys steam to the turbine through a stop
valve (which can be used to shut off steam in an emergency) and through
control valves that automatically regulate the supply of steam to the turbine.Stop valves and control valves are located in the steam chest and a governor,
driven from the main turbine shaft, operates the control valves to regulate
the amount of steam used (this depends upon the speed of the turbine and the
amount of electricity required from the generator).
Steam from the control valves enters the high pressure cylinder of the
turbine, where it passes through a ring of stationary blades fixed to the
cylindrical wall. These act as nozzles and direct the steam into a second ring
of moving blades mounted on a disc secured to the turbine shaft. Thissecond ring turns the shafts as a result of the force of the steam. The
stationary and moving blades together constitute a stage of the turbine and
in practice many stages are necessary, so that the cylinder contains a number
of rings of stationary blades with rings of moving blades arranged between
them. The steam passes through each stage in turn until it reaches the end of
the high pressure cylinder and in its passage some of its heat energy is
changed into mechanical energy.
The steam leaving the high pressure cylinder goes back to the boiler for
reheating and returns by a further pipe to the intermediate pressure cylinder.Here it passes through another series of stationary and moving blades.
Finally, the steam is taken to the low pressure cylinders, each of
which it enters at the center flowing outwards in opposite directions
through the rows of turbine blades an arrangement known as double
flow to the extremities of the cylinder. As the steam gives up its heat
energy to drive the turbine, its temperature and pressure fall and it
-
7/27/2019 Summer Training in badarpur ntpc
6/54
Page 6
expands. Because of this expansion the blades are much larger and
longer towards the low pressure end of the turbine.
The turbine shaft usually rotates at 3,000 rpm. This speed is determined by
the frequency of the electrical system used in the country. In India, it is the
speed at which a 2- pole generator is driven to generate alternating current at
50 Hz.
When as much energy as possible has been extracted from the steam it is
exhausted directly to the condenser. This runs the length of the low pressure
part of the turbine and may be beneath or on either side of it. The condenser
consists of a large vessel containing some 20,000 tubes, each about 25 mm
in diameter. Cold water from the water source i.e. the Rihand Reservoir iscirculated through these tubes and as the steam from the turbine passes
round them it is rapidly condensed into water condensate. Because water has
a much smaller comparative volume than steam, a vacuum is created in the
condenser. This allows the steam pressure to reduce down to pressure below
that of the normal atmosphere and more energy can be utilized.
From the condenser, the condensate is pumped through low pressure heaters
by the extraction pump, after which its pressure is raised to boiler pressure
by the boiler feed pump. It is further passed through feed heaters to theeconomiser and the boiler for reconversion into steam.
The cooling water drawn from the reservoir is returned directly to the source
after use.
MECHANICAL POWER TO ELECTRICITY
The turbine shaft is mechanically coupled to the generator rotor shaft
through thrust bearings. The steam rotates the turbine at 3000 rpm thus the
rotor of the generator also rotates at 3000 rpm. This speed is necessary to
generate electricity at a frequency of 50 Hz with a two pole turbo- generator.
-
7/27/2019 Summer Training in badarpur ntpc
7/54
Page 7
The rotor carries the field winding over it. This field winding is excited by a
DC excitation system. The supply to the excitation system is tapped from the
unit auxiliary transformer. The flux generated by this field current cuts thearmature coil. The armature coil is star- star connected and is induced with
three phase emf. The emf is tapped with the help of slip rings and brushes.
This emf is carried over to the generator transformer through a bus duct. The
bus duct is voltage transformer grounded.
The generator transformer has delta connection in the primary side and star
connection in the secondary side. The generator bus supplies electric power
per phase to the three-phase transformer or bank of three single-phase
transformers. These transformers transmit electric power to the switchyard
for further transmission. These transformers also supply the unit auxiliarytransformers required for the working of various electric motors, pumps and
other equipments installed in the unit.
SWITCHING AND TRANSMISSION
The electricity is usually produced in the stator windings of large moderngenerators and is fed through terminal connections to one side of a generator
transformer that steps up the voltage to 400KV. From here conductors carry
it to a series of three switches comprising of an isolator, a circuit breaker and
another isolator.
The circuit breaker, which is a heavy- duty switch capable of operating in a
fraction of second, is used to switch off the current flowing to the
transmission lines. Once the current has been interrupted the isolators can be
opened. These isolate the circuit breaker connected to its terminals. Here
after the maintenance or repair work can be carried out safely.
From the circuit breakers the current is taken to the busbar conductors,
which run the length of the switching compound and then to another
circuit breaker with its associated isolators, before being fed to the Grid.
Each generator in a power station has its own transformer, circuit breaker
and associated isolators but the electricity generated is fed into a common
set of busbars.
-
7/27/2019 Summer Training in badarpur ntpc
8/54
Page 8
Circuit breakers work like combined switches and fuses but they have
certain special features and are very different from the domestic switch and
fuse. When electrical current is switched off by separating two contacts, anarc is created between them. At the voltage use in homes, this arc is very
small and lasts for a fraction of a second but at very high voltages used for
transmission, the size and power of the arc is considerable and it must be
quickly quenched to prevent damage.
Three phase, four-wire system is used for large power transmission, as it is
cheaper than the single-phase two-wire system that supplies the home. Also
power is generated in a three-phase system.
The center of the power station is the control room. Here the engineersmonitor the output of electricity, supervising and controlling the operation of
generating plant and high voltage switchgear and directing power to the grid
system as required. Instruments on the control panels show the output and
the existing condition of the whole main plant and a miniature diagram
indicates the precise state of the electrical system.
COAL HANDLING PLANT STEAM GENERATOR TURBINE TURBO- GENERATOR SWITCHYARD
-
7/27/2019 Summer Training in badarpur ntpc
9/54
Page 9
CONTROL & INSTRUMENTATIONAUXILIARY POWER DISTRIBUTION SYSTEM WATER TREATMENT PLANT CIRCULATING WATER SYSTEMASH HANDLING SYSTEMHYDROGEN GENERATING PLANT
COAL HANDLING PLANT
It is estimated that the coal required for a 2000MW Super Thermal Power
Station is of the order of 8.4 million tonnes based on an average calorific
value of 4000 kcal/kg and 7000 hours of operation per year.
Two coal handling systems one for 5200MW units and the second for
2500MW units have been provided. The capacity of each of the two
conveying systems has been kept as 1200 tonnes/hour. Interconnection
-
7/27/2019 Summer Training in badarpur ntpc
10/54
Page 10
between the two coal handling systems has also been provided to transfer
crushed coal from one crusher house to the other.
The Merry-go Round (MGR) system has been provided for loading the coal
at the Jayant mines and unloading the coal into the track hopper
automatically when the wagons are moving at a predetermined speed of
8km/hr. A closed loop of rail lines has been laid between the loading and
unloading points and a rake of 30 bottom discharge type wagons of 60
tonnes capacity each transport coal of size 0 to 200mm from mines and
unload it into track hopper in 10 minutes. Automatic bottom opening type
wagons discharge coal into track hopper while the rake travels over the
hopper, the discharge door being automatically opened by a line sidetripping mechanism. The coal received at the track hopper is delivered to
two parallel conveyors 1A &1B located on the sides through four nos. of
rotary plough paddle feeders designed to handle maximum coal lump size of
200mm. Double stream of conveyor system carries the coal to the crusher
house, having four nos. crushers and vibrating screens each having a
capacity of 600T/hr. The coal after being crushed from 200mm to 20mm
size is conveyed to the boiler bunkers. The width of the conveyor belt is kept
1400mm. The crushed coal from the crusher house, if not required, is
stacked in the open stock yard. Two nos. of stacker cum reclaimer areprovided on rail track to handle maximum 20mm size coal lumps and have a
capacity of 1200T/hr.
Paddle FeedersFour nos. of traveling paddle feeders are provided to collect coal from the
track hopper. They travel along the entire length of the hopper and transfer
the coal from the hopper, uniformly to the pair of underground conveyors
1A &1B. The paddle feeders move to and fro on the rail with the help of 4
nos. of wheel mounted on the supporting structures. The wheels are drivenby electric motor of 415V supply.
Belt Conveyor SystemThe belting system is designed for conveyor capacity of 1200T/hr and belt
speed of 2.6metre/sec. The belt is of cotton fabric with rubber covers of
adequate strength having width of 1400mm.
-
7/27/2019 Summer Training in badarpur ntpc
11/54
Page 11
Magnetic SeparatorsThis is an electromagnet placed above the conveyor to attract magnetic
materials. Over this magnet there is one conveyor to transfer these materialsto chute provided for dumping at ground level. Because of this, continuous
removal is possible and it is also not necessary to stop the electric supply to
the magnetic separators for removal of separated material.
Stacker and ReclaimerTwo nos. of traveling stacker/reclaimer each capable of both stacking and
reclaiming are installed which operate on rail tracks running for adequate
length to cover the entire coal storage yard. The belt of the stacker/reclaimer
is mounted on a cantilever boom and has a capacity of 1200T/hr for bothstacking and reclaiming. The boom can revolve about the center of the
receiving hopper and discharge/reclaim materials on/from both sides of the
track anywhere between 28 meters radius of the boom. These units work in
conjunction with the conveyor 9A & 9B.
Crusher HouseThe plant has four nos. of crushers each capable of crushing coal of 200mm
size at the rate of 600T/hr. the crusher with hammer tips is symmetrical in
size and shape on either side. In case of wearing out of one side, the othercan be used by turning over the tips. These crushers are placed in the crusher
house, which have special strong foundations to bear the vibrations due to
running of the crushers.
Vibrating FeederThe vibrating feeder is used for throwing the coal on the underground
conveyor belt from where coal goes to the bunker. Coal from the stockyard,
with the help of bulldozer, is taken to the vibrating feeder via reclaimer
hopper and underground conveyor belt. In case the bunker requirement ismore than the capacity of crusher or stacker reclaimer, then with the help of
bulldozer the coal is sent to the bunker from the stockyard, through these
feeders.
-
7/27/2019 Summer Training in badarpur ntpc
12/54
Page 12
-
7/27/2019 Summer Training in badarpur ntpc
13/54
Page 13
STEAM GENERATOR
The steam generator used in Stage I of SSTPS has a primary steam flow of
700 tonnes/hr at 139 kg/cm 2 pressure and 535C temperature at the
superheater outlet. This boiler is tangentially fired, has balanced draft,
natural circulation, radiant single reheat, dry bottom open door type and is
direct fired with Indian bituminous pulverized coal. The steam generator
used in Stage II of SSTPS has a primary steam flow of 1725 tonnes/hr at 178
kg/cm 2 pressure and 540C temperature at the superheater outlet. This boiler
is balanced draft, controlled circulation, dry bottom single drum type and is
direct fired with Indian bituminous pulverized coal.
The arrangement of main boiler and its accessories is as follows:
The boiler structural are divided into two parts:
Supporting Structures:Boiler supporting structure consists of a systematic arrangement of columns
stiffened with horizontal beams and vertical diagonal bracings and comprise
of low carbon steel material. It is composed of 18 main columns and 12
auxiliary columns. The main columns support the main boiler components
viz. drum, water wall membrane, panels, superheaters, reheaters,
economisers, air preheater, burners and galleries at various levels. The
auxiliary columns support the boiler platforms and other ducts coming inthat region. The total weight of supporting structures is about 970 M.T.
Galleries and Stairways:Galleries and stairways around the combustion and heat recovery areas are
provided for proper approach to the boiler. Stairways on both the sides of the
boiler are provided. All the floors are covered with the floor gratings of
required depth for walkway and are welded to the structure. Their total
weight is 900 M.T.
-
7/27/2019 Summer Training in badarpur ntpc
14/54
Page 14
FurnaceA boiler furnace is that space under or adjacent to a boiler in which fuel isburned and from which the combustion products pass into the boiler proper.
It provides a chamber in which combustion reaction can be isolated and
confined so that the reaction remains a controlled force. In addition it
provides support or enclosure for the firing equipment.
In stage I, fusion welded furnace is used and in stage II controlled
circulation furnace is used.
Boiler DrumThe function of the boiler drum is to separate water from the steam
generated in the furnace walls and to reduce the dissolved solid contents of
the steam to below the prescribed limit of 1 ppm. The drum is located on the
upper front of the boiler.
In stage I, the drum weighs about 127 MT is apporx.15.7 m. long and is
placed at a height of 53340 mm. It is made of carbon steel. It is designed for
maximum pressure of 176 kg/cm 2 and maximum metal temperature of
354C. In stage II, the drum is 22.07 m. long and is placed at a height of 72m. It is made of carbon steel. It is designed for maximum pressure of 204.9
kg/cm 2 and maximum metal temperature of 366C.
SuperheaterSuperheater is meant to raise the temperature of saturated steam by
absorbing the heat from flue gases and thus increases the cycle efficiency
economically. There are three stages of super heater besides the sidewalls
and the extended walls. The first stage consists of horizontal superheater of
convection mixed flow type with upper and lower bank located aboveeconomiser assembly in the rear pass. The upper bank terminates into hanger
tubes, which are connected to outlet header of the first stage superheater.
The second stage superheater consists of pendant platen, which is of radiant
parallel flow type. The third stage superheater pendant spaced is of
convection parallel flow type.
In Stage I, the primary steam flow is 700 tonnes/hr at 139 kg/cm 2 pressure
and 535C temperature at the superheater outlet. In Stage II, the primary
-
7/27/2019 Summer Training in badarpur ntpc
15/54
Page 15
steam flow is 1725 tonnes/hr at 178 kg/cm 2 pressure and 540C temperature
at the superheater outlet.
AttemperatorAttemperation or desuperheating is the reduction or removal of superheat
from steam to the extent required. The characteristic performance of a
superheater, which receives its heat by convection from gases flowing over
it, is raising temperature with increasing output. To obtain some degree of
control, the superheater must be designed for full temperature at some partial
load. As a result, there will be excessive surface, with corresponding
excessive temperatures at higher loads. Attemperator is used to reduce the
steam temperature.
EconomiserThe purpose of the economiser is to preheat the boiler feed water before it is
introduced into the steam drum by recovering heat from the flue gases
leaving the boiler. The economiser is located in the boiler rear gas pass
below the rear horizontal superheater. The economiser is continuous loop
type, without fins, and water flows in upward direction and gas in the
downward direction.
A single stage of economizer is used to absorb the heat from the flue gases
and add this as sensible heat to the feed water before it enters into boiler
drum. The economizer is non-steaming continuous plain tube type and of
tubular construction.
ReheaterA single reheat system is used to further increase the efficiency of the cycle
by raising the temperature of already expanded steam. After passing through
the high-pressure stage of the turbine, steam is returned to the reheated bytwo cold reheat lines. After being reheated to the designated temperature, the
reheated system at 535 degree Celsius temperature and 24.5 kg/sq. cm
pressure is returned to the intermediate pressure stage of the turbine via the
hot reheat line.
BurnersIn stage I, there are total twenty four pulverized coal burners for corner fired
boilers and twelve oil burners provided each in between two pulverized fuel
-
7/27/2019 Summer Training in badarpur ntpc
16/54
Page 16
burner. The pulverized coal burners are arranged in such a way that the six
mills supply the coal burners at four corners of the furnace.
In stage II, there are total thirty-two pulverized coal burners for corner fired
boilers and sixteen oil burners provided each in between two pulverized fuel
burner. The pulverized coal burners are arranged in such a way that the eight
mills supply the coal burners at four corners of the furnace.
IgnitersThere are twelve side igniters per boiler in stage I and sixteen in stage II.
The atomizing air for the igniter is taken from the service air compressors.
The burners are located at three elevations in stage I and four elevations instage II. Each elevation has four oil burners and igniters. These elevations
are normally referred to as AB elevation, CD elevation, EF elevation and
GH elevation. Igniters are used for lighting the main oil gun. There are two
igniter air fans to supply air for combustion of igniter oil.
-
7/27/2019 Summer Training in badarpur ntpc
17/54
Page 17
-
7/27/2019 Summer Training in badarpur ntpc
18/54
Page 18
The arrangement of various boiler auxiliaries is as follows:
Coal BunkerThese are in- process storage silos used for storing crushed coal from the
coal handling system. Generally, are made up of welded steel plates. There
are six such bunkers supplying coal to the corresponding mills in stage I and
eight in stage II. These are located on top of the mills so as to aid in gravity
feeding of coal.
Coal FeederEach mill is provided with a drag link gravimetric feeder to transport raw
coal from the bunker to the inlet chute, leading to mill at desired rate. Coalfeeders are essential as the mills do not have any storage provision therefore
only that much coal should be sent to the mill that has to be directly sent to
the furnace and this is decided by the load requirement.
MillsThere are six mills in stage I, out of which five are required for operation at
maximum load and one acts as standby. In stage II, there are eight mills and
here six are required for operation and two act as standby. These are located
adjacent to the furnace at 0 m level. These mills pulverize the coal to thedesired fineness to be fed to the furnace for combustion.
Primary Air FanPrimary air fan is used to supply primary air to transport the pulverized coal
from the mills/bunkers to the furnace and to dry up the coal in the path.
There are two PA fans per unit and are designed to handle atmospheric air
upto a temperature of 50C. These fans are driven by a 6.6KV motor each.
They are located at 0 m level near the boiler.
Air PreheaterAir preheater transfers heat from the flue gases to the cold primary and/ or
secondary air by means of rotating heating surface elements. Beneath these
regenerative type air preheaters, there exists a steam coil air preheater. These
are located in the secondary pass of the furnace at a height of around 16 m
level. Each unit has two such air preheaters.
-
7/27/2019 Summer Training in badarpur ntpc
19/54
Page 19
Forced Draft FanThe FD fan is designed for handling secondary air for the boiler. These fans
are located at 0 m level near the PA fan. The fan is coupled with an 800Winduction motor and is commissioned to drive the cold air through the air
preheater.
Wind BoxThese act as distributing media for supplying secondary/ excess air to the
furnace for combustion. These are generally located on the left and right
sides of the furnace while facing the chimney.
Scanner Air FanScanner fans are installed in the boiler for supplying continuously cooling
air to the flame scanner provided for flame supervision. Normally one fan
remains in service while the other one remains available as standby.
Igniter Air FanIgniter fan provides necessary combustion air to all the igniters. Fan makes
the suction from atmosphere directly and supplies air to the wind boxes of
individual igniters at a fixed constant uncontrolled rate at ambient
temperature.
Electrostatic PrecipitatorTwo ESPs have been set up for each generating units to remove the major
part of fly ash. Each ESP has 304 electrodes made of steel sheets. Between
each pair of electrodes a unidirectional high voltage of 60kV is applied,
connecting its negative polarity to emitting electrodes and positive to
collecting electrodes. The flue gases that are normally neutral when pass
between rows of these electrodes are ionized due to the emitting and the
negative towards the collecting electrodes. Since dust particles have great
affinity towards negative particles they get attached to them and are thus
negatively charged. Thus the dust particles are deposited on the collecting
electrodes and are dislodged from there by periodic rapping of electrodes
and are drained to the ash disposal system through hoppers.
-
7/27/2019 Summer Training in badarpur ntpc
20/54
Page 20
Induced Draught FanInduced draught fan is used to drive the waste flue gases out of the chimney
after they have been deprived almost all of their heat energy. A 1300 kWinduction motor is used to drive this fan. The major part of the energy
transferred to the gas is the velocity energy after the impeller. The velocity
energy is converted into pressure energy by the diffuser. Flow is controlled
by changing the direction of gas entry to the impeller blades by providing
adjustable guide vanes.
Fig: induced draft fan
ChimneyThese are tall RCC structures with single or multiple flues. The height of
these chimneys helps in natural draught of the flue gases to the atmosphere.
There are four chimneys in SSTPS- one for units 1, 2 and 3, second for units
-
7/27/2019 Summer Training in badarpur ntpc
21/54
Page 21
4 and 5 and one each for units 6 and 7.
Fig: figure of chimney
Seal Air FanThese are used for supplying seal air to the mills to prevent ingress of coal
dust into gearbox lubrication oil. There are two fans per boiler.
-
7/27/2019 Summer Training in badarpur ntpc
22/54
Page 22
Soot Blowers
The soot blowers are used for efficient on-load cleaning of furnace,
-
7/27/2019 Summer Training in badarpur ntpc
23/54
Page 23
superheaters, reheaters and regenerative air heaters. There are three types of
soot blowers provided in the plant in requisite numbers. They are:
1. Long retractable soot blowers2. Wall blower3. Air heater blower
Superheated steam is tapped from the superheater for the purpose of soot
blowing.
In stage I, there are 20 long retractable soot blowers, 56 wall blowers and 2
air heater blowers and in stage II, there are all together 104 soot blowers. All
these soot blowers are operated together once in every eight hours for few
minutes only.
TURBINE
A steam turbine has two main parts viz. the cylinder and the rotor. The
cylinder (stator) is a cast iron or steel housing usually divided at the
horizontal centerline. Its halves are bolted together for easy access. The
cylinder contains fixed blades, vanes and nozzles that direct steam into
moving blades carried by the rotor. Each fixed blade set is mounted in
diaphragms located in front of each disc on the rotor, or directly in the
casing. A disc and diaphragm together make a turbine stage. Steam turbine
can have many stages. The rotor is a rotating shaft that carries the moving
blades on the outer edges of either drums or discs. The blades rotate as the
rotor rotates. The rotor of a large steam turbine consists of high, intermediate
and low pressure sections.
In a multiple stage turbine, steam at a high pressure and high temperature
enters the first row of fixed blades or nozzles through an inlet valve or
valves. As the steam passes through the fixed blades or nozzles it expands
and its velocity increases. The high velocity jet of steam strikes the first set
of moving blades. The kinetic energy of the steam changes into mechanicalenergy, causing the shaft to rotate. The steam then enters the next set of
fixed blades and strikes the next row of moving blades.
-
7/27/2019 Summer Training in badarpur ntpc
24/54
Page 24
As the steam flows through the turbine, its pressure and temperature
decreases, while its volume increases. The decrease in pressure and
temperature occurs as the steam transmits energy to the shaft and performs
work. After passing through the last turbine stage, the steam exhausts into
the condenser or process steam system.
ROTOR OF H.P. TURBINE
-
7/27/2019 Summer Training in badarpur ntpc
25/54
Page 25
Large turbines use both impulse and reaction types. These combination
turbines have impulse blades at the high pressure end and reaction blades atthe low pressure end. The blade length and size increases throughout the
turbine to use the expanding steam efficiently. Blade rows require seals to
prevent steam leakage where the pressure drops. Seals for impulse blades are
provided between the rotor and the diaphragm to stop leakage past the
nozzle. Seals for reaction blades are provided at the tips of both the fixed
and moving blades.
In stage I, condensing, tandem reheat, impulse type turbine is installed. The
HP cylinder has 12 stages, IP cylinder has 11 stages and LP cylinder has 42
stages. The HP and IP parts are single flow cylinders and the LP part has
double flow cylinder.
In stage II, 3 cylinder, reheat, reaction type turbine is installed. The HP
cylinder has 18 stages, IP cylinder has 142 stages and LP cylinder has 62
stages. The HP part is a single- flow cylinder and the IP and LP parts are
double flow cylinders.
The arrangement of various turbine auxiliaries is as follows:
Vacuum systemThis system comprises of condenser, ejector, CW pump and gland steam and
gland steam coolers. The equipments under this system strive to maximize
the work done of turbine by maintaining the rated vacuum limits.
Condenser: There are two condensers entered to the two exhausters of the
LP turbine. These are surface type condensers with two-pass arrangement.
Cooling water is pumped into each condenser by a vertical CW pump
through the inlet pipe. Steam exhausted from the LP turbine by washing theoutside of the condenser tubes losses its latent heat to the cooling water and
is connected with water in the steam side of condenser. This condensate
collects in the hot well, welded to the bottom of the condensers.
Ejectors: there are two 100% capacity ejectors of the steam eject system.
The purpose of the ejector is to evacuate air and other non-condensing gases
from the condensers and thus maintain the vacuum in the condensers.
C.W. Pumps: the pumps which supply the cooling water to the condensers
are called the circulating water pumps. There are two such pumps in each
-
7/27/2019 Summer Training in badarpur ntpc
26/54
Page 26
unit. These pumps are normally vertical, wet-pit, mixed flow type, designed
for continuous heavy duty.
Condensate System:The steam after condensing in the condenser known as condensate is
extracted out of the condenser hot well by condensate pump and taken to the
deaerator through ejectors, gland steam cooler and series of LP heaters. This
comprises of condensate pumps, low pressure heaters and deaerator.
Condensate Pumps: the function of these pumps is to pump out the
condensate to the deaerator through ejectors, gland steam coolers and LP
heaters. These pumps have four stages and since the suction at a negativepressure, special arrangements have been made for providing sealing.
L.P. Heaters: Turbine has been provided with non-controlled extractions
which are utilized for heating the condensate, from turbine bleed steam.
There are 4 LP heaters in which the last four extractions are used.
Deaerator: The presence of certain gases, principally oxygen, carbon
dioxide and ammonia, dissolved in water is generally considered harmful
because of their corrosive attack on metals, particularly at high temperatures.
The function of the deaerator unit is to remove dissolved gases from the
boiler feed water by mechanical means.
Feed Water System:This system helps in the supply of feed water to the boiler at requisite
pressure and steam/ water ratio. This system comprises of boiler feed pumps,
high pressure heaters and drip pumps.
Boiler Feed Pump: The function of the boiler feed pump is that the water
with the given operating temperature should flow continuously to the pumpunder a certain minimum pressure. It passes through the suction branch into
the intake spiral and from there is directed to the first impeller. After leaving
the impeller it passes through the distributing passages of the diffuser and
thereby gets a certain pressure rise and at the same time it flows over to the
guide vanes to the inlet of the next impeller. This will repeat from one stage
to the other till it passes through the last impeller and the end diffuser. Thus
the feed water reaching into the discharge space develops the necessary
operating pressure.
-
7/27/2019 Summer Training in badarpur ntpc
27/54
Page 27
There are three boiler feed pumps in each unit in SSTPS. Two of these are
turbine driven while one, which is a stand by is motor driven. The feed
pump motor, which is the biggest motor in the whole plant, is a 9800 Winduction motor.
H.P. Heaters: These are regenerative feed water heaters operating at high
pressure and located by the side of turbine. These are generally vertical type
and turbine bleed steam pipes are connected to them. HP heaters are
connected in series on feed water side and by such arrangement, the feed
water, after feed pump enters the HP heaters.
Drip Pump: The steam that bleeds from the turbine after condensation is
termed as drip/ drain. Two numbers of sectional multistage centrifugal
horizontal pumps per unit are provided. Out of these one will be running and
other is stand- by. These are especially suited for the purpose of pumpingfrom the space of high vacuum.
Turbine Lubricating Oil System:Turbine lub- oil system seeks to provide proper lubrication of turbo-
generator bearings and operation of barring gear. This consists of main oil
pump (MOP), starting oil pump (SOP), AC standby oil pumps and
emergency DC oil pump and jacking oil pump (JOP).
Main Oil Pump: This is coupled with turbine rotor through a gear
coupling. When the turbine is running at normal speed i.e. 3000 rpm or the
turbine speed is more than 2800 rpm, then the desired quantity of oil to the
governing system and to the lubrication system is supplied by this oil pump.
Starting Oil Pump: It is a multistage centrifugal oil pump driven by AC
electric motor. Starting oil pump is provided to meet the oil requirement of
the turbo- set during starting and stopping. It also serves as stand by to main
oil pump.
AC Standby Oil Pump: This is a centrifugal pump driven by an AC electricmotor. It runs for 10 minutes in the beginning to remove air from the
governing system and fill the oil system with oil. This pump automatically
takes over under interlock condition when the oil pressure falls below a
certain standard level. Thus this pump meets the requirement of lubrication
system under emergency conditions.
Jack Oil Pump: This pump enables the main bearing of the complete rotor
assembly to be raised or floated in the bearing during turbine generator start
up and during shut down, thus preventing damage to the bearings when shaft
-
7/27/2019 Summer Training in badarpur ntpc
28/54
Page 28
speeds are too low for hydrodynamic lubrication to take place. This pump
takes suction from the main oil tank and after lifting the bearing the drain is
connected back to the main oil tank.Oil Coolers: The oil of the lubrication and the governing systems is cooled
in the oil coolers. The cooling medium for these coolers is circulating water.
The pressure of the cooling is kept lower than that of oil to avoid its mixing
with oil if the tubes rupture. There are five oil coolers out of which four are
for continuous operation and one remains as standby. All the oil coolers are
arranged to operate in parallel. The cooling water temperature is not more
than 36C.
Auxiliary Steam System:Some of the thermal cycle equipments/ systems require steam for primaryheating, actuation, sealing etc. This requirement is met by the auxiliary
steam system.
-
7/27/2019 Summer Training in badarpur ntpc
29/54
Page 29
-
7/27/2019 Summer Training in badarpur ntpc
30/54
Page 30
TURBO-GENERATOR
The turbo-generator essentially consists of a fixed stator and a revolving
rotor. The stator core carries a three phase winding in which alternating emf
is induced, the rotor carrying field magnets and coils which provide the
magnetic flux of the machine, set up by exciting the generator field current.
The turbo-generator, one no. for each unit is of three phase, two-pole
cylindrical rotor type which is directly driven by a steam turbine, at
3000RPM.
These generators have direct water-cooling for the stator winding and directhydrogen cooling for the rotor winding. The stator frame consists of a
cylindrical center section and two end shields, which are gas tight and
pressure resistant. It accommodates the electrically active parts of the stator
i.e. the stator core and stator winding. The stator winding consists of a
double layer, short-pitched lap winding with 540 transposition. The rotor
shaft is a single solid forging. On the forged round rotor, slots are milled out
to insert and secure the conductors of the generator excitation windings.
Rotor windings consist of two cooling ducts and L-shaped strips of
laminated insulator for slot insulation.
The field current is supplied to the rotor winding through radial terminal
bolts and two semi-circular conductors located in the hollow bores of the
exciter and rotor shafts. The field current leads are connected to the exciter
leads at the exciter coupling with Multi Kontakt plug-in contacts, which
allow for unobstructed thermal expansion of the field current leads.
The nameplate specifications of the generators are as follows:
Generator# 1 to 5:MakeM/s BHEL
Rated output200 MW/ 235 MVA
Power factor0.85 lag
Frequency50 Hz
Terminal voltage15.75 KV
Speed.3000 rpm
Stator current.9050A
Hydrogen pressure3.5 kg/cm 2
-
7/27/2019 Summer Training in badarpur ntpc
31/54
Page 31
Field current..2600 A
No. of terminals brought out. Six (6)
Generator# 6&7:Make..M/s KWU, Germany
Supplied byM/s BHEL
Type ..THDF 115/59
Rated output..500MW/ 588MVA
Power factor..0.85(lag)
Frequency..50Hz
Terminal voltage21KV
Speed.3000RPMStator current.16,200A
Hydrogen pressure.4 kg/cm 2
Short circuit ratio0.48
Field current4040A
Class & Type of insulation.MICALASTIC(Similar to Class F)
No. of terminals brought out...six (6)
Excitation System
For Stage I:In 200 MW turbo- generator, static excitation system is used. This excitation
system consists of an excitation transformer. This is a step down
transformer. The input to this transformer is taken directly from the
generator bus. From the excitation transformer the output goes to a thyristor
bridge which acts as full- converter and rectifies ac to dc. The thyristor
bridge gives a controlled dc output. The output of the rectifier bridge then
energizes the rotor of the synchronous generator. This output of the rectifier
bridge is fed to the rotor of the generator with the help of slip- rings and
brushes.
For Stage II:In 500MW turbo-generator, brushless excitation system is used. Brushless
exciter consists of a three-phase permanent magnet pilot exciter, whose
output is rectified and controlled by the thyristor voltage regulator to provide
a variable d.c. current for the revolving armature of the main exciter. The
three-phase current is induced in the rotor of the main exciter and is rectified
by the rotating diodes and fed to the field winding of the generator rotor.
Since the rotating rectifier bridge is mounted on the rotor, slip rings are not
-
7/27/2019 Summer Training in badarpur ntpc
32/54
Page 32
required and the output of the rectifier is directly connected to the field
winding through generator rotor shaft. A common shaft carries the rectifier
wheels, the rotor of the main exciter and permanent magnet rotor of the pilotexciter. The main exciter is of 6-pole revolving armature type. The three
phase pilot exciter is of 16-pole revolving field type.
De-excitation of the machine is effected by driving the thyristor to inverter
mode of operation causing the thyristor to supply maximum reverse voltage
to the field winding of the main exciter. Approximately 0.5 seconds after the
de-excitation command is received two field suppression contactors connect
field suppression resistors in parallel to the main exciter field winding and
following this a trip command is transmitted to the field circuit breaker via
its trip coil. In the event of failure of electronic de-excitation throughinverter operation, de-excitation is effected with a delay of 0.5 seconds by
the field suppression resistors.
Hydrogen Cooling SystemThe rotor winding is cooled by hydrogen flowing through the radial
ventilating ducts. It is designed for hydrogen pressure upto 3kg/sq. cm
gauge. Hydrogen is cooled by the gas coolers mounted on the stator body.
The hydrogen cooler water is cooled by water heat exchanger situated
outside the machine. The purity of hydrogen permitted is 97-99%. Hydrogenis preferred to air as the cooling media because of its lower density and
better thermal properties. While filling the generator for the very first time
with hydrogen, air inside it is purged by CO 2 and CO 2 is purged by
hydrogen. It is done in order to have safe filling of hydrogen. The hydrogen
inside the generator is maintained dry by continuously circulating the gas
through suitable hydrogen dryer.
Temperature LimitsThe class B type insulation is provided on the generator windings. RTDs
have been embedded in the windings for measurement of temperature.
Winding and core temperature recorders have been set for tripping 105C
for maximum temperature of stator winding. Rotor winding temperature is
recorded by a special recorder, which functions on the principle of rotor
winding resistance variation with temperature.
Generator Sealing Oil System
-
7/27/2019 Summer Training in badarpur ntpc
33/54
Page 33
To prevent the leakage of hydrogen, used for cooling in the generator, along
the generator shaft a seal oil system is applied. Shaft seals operate with flow
of oil under pressure. A pressure regulating valve maintains a constantdifferential pressure of seal oil over hydrogen pressure in the generator.
Vacuum treated oil is fed to the center of the seal ring assembly from the
seal oil supply unit. From here the oil flows in both directions between the
rings and the shaft, and thus a film is established in the constricted area,
which prevents the leakage of hydrogen. The main seal oil pump is driven
by a 440V ac motor. A dc motor supplied from the station battery drives an
emergency oil pump, which starts automatically when seal oil pressure drops
or ac motor trips due to any reason.
Generator Stator Water Cooling SystemA closed loop stator water cooling system is used to maintain a constant rate
of flow of demineralised cooling water to the stator winding at requisite
temperature. The stator water cooling system consists of two 100% primary
water to water heat exchanger, two 100% duty ac motor driven
demineralised water pumps, two 100% water filters, one 100% magnetic
filter, an expansion tank, specific heat measuring instruments etc. suitable
resistance temperature detectors are provided for measuring the temperature
of stator water at the inlet and outlet of stator winding.
Generator Main Bus:Generator main bus connections consist of natural air-cooled continuous
enclosure type isolated phase buses. No power circuit breakers are
interposed between the generator and the main generating transformers.
However, disconnecting links are provided for isolating purposes. The bus
duct enclosure is made of aluminium alloy sheet. Sealed openings are
provided in the bus-duct-run near the insulators for inspection and
maintenance. There is a main bus duct which is circular with diameterapproximately 1000mm where as the tap-off duct is circular of diameter
approximately 680mm.continuous current carrying capacity of main bus on
nominal voltage of 15.75KV is 10000A. Temperature rise of conductors and
for the enclosure (over the ambient of 50C) is 20C. The generator main
bus has the three isolated phase buses connected in star connection. The
neutral of the main bus is grounded through a Neutral Grounding
Transformer (NGT) i.e. a common duct comes out from where the three
-
7/27/2019 Summer Training in badarpur ntpc
34/54
Page 34
isolated phase buses are joined at a common point and goes to the primary of
the NGT.
Generator Transformer
For Stage I:
For each unit in stage I one 250MVA, 15.75/ 400KV three phase outdoor
transformer has been installed in the transformer yard. It is connected to the
generator through isolated bus ducts. The LV winding is delta-connected and
the HV winding is star-connected. The LV winding is delta-connected sothat if by chance there is a grounding fault in the generator then that fault
current will not pass on to the transmission line further as it will keep
circulating in the delta circuit itself. The HV side is star-connected because
the phase voltage in case of star-connection is 1/ 3 times the line voltage
and as the bus system used consists of isolated phase buses it is more
economical to use star-connection as the for lower voltage lesser insulation
will be required. Oil forced and water forced (OFWF) cooling is provided to
get continuous nominal rating of the transformer. It is equipped with all
-
7/27/2019 Summer Training in badarpur ntpc
35/54
Page 35
standard measuring and controlling fittings and accessories like Buccholz
relay, on-load tap changer, oil temperature indicator etc. deluge system is
also provided around the transformer for fire protection.The nameplate specifications of generator transformers in stage I are as
follows:
Generator transformer # 1 to 5:MakeBHEL
Manufacturing year.1981
Type of coolingOFWF
Rating..250MVA
Temperature rise- Oil.40CWater.60C
KV at no-load- HV400
LV15.75
Phase- HV3
LV3
Frequency.50Hz
Vector GroupYnd11
% Impedence...14%
Amperes- HV360.9
LV9184.9
Insulation level- HV1425KVP
LV95KVP
Core & Winding weight..140550 kg
Weight of oil49430 kg
Total weight.237400 kg
Quantity of oil..56820 liters
For Stage II:
The dual purpose of these transformers are to step up the output of 500MWgenerators from generation voltage of 21 KV to 400KV voltage for power
distribution and if required shall be back charged from 400KV side and used
to step down for feeding loads through unit auxiliary transformers.
These transformers are installed in the transformer yard adjacent to the
powerhouse building. The LV winding/ HV winding are delta/ star
connected. The neutral terminal is solidly grounded. The vector group of
these transformers when connected in a bank of three single- phase
-
7/27/2019 Summer Training in badarpur ntpc
36/54
Page 36
transformers is YNd11. These transformers are connected to respective
generators through isolated bus ducts. No power circuit breakers or power
switches are connected between generator and generator transformer.However, disconnecting links are provided at generating end for isolation
purpose. These transformers are equipped with independent oil forced and
water forced cooling system.
Generator transformer # 6 & 7:MakeBHEL
Manufacturing year.1985
Type of coolingOFWF
Rating..200MVATemperature rise- Oil.50C
Water.60C
KV at no-load- HV400/ 3
LV21
Phase- HV1
LV1
Frequency.50Hz
Vector GroupYNd11
% Impedence...14%
Amperes- HV866.0
LV9523.8
Insulation level- HV1050KVP
LV125KVP
Core & Winding weight..1230- 50 kg
Weight of oil27500 kg
Total weight.179500 kg
Quantity of oil..29540 liters
400 KV SWITCHYARD AT SSTPS
Switchyard is located 350 meters south of main powerhouse
building. 400kV switchyard is having two numbers of double main
and transfer bus system. Approximately 2000MW of SSTPS power
-
7/27/2019 Summer Training in badarpur ntpc
37/54
Page 37
is transmitted through 400kV switchyard. It is consisting of 23
bays, which includes generator and interconnecting transformer
(ICT) bays. 400kV is designed to limit the switching surge overvoltages to 2.5 P.U. and sustain temporary over voltage to 1.5 P.U.
The symmetrical fault current is 40kA (rms). The basic insulation
level (B.I.L.) is 1425kV. The switching surge is 1050kV. Each bus
comprises of three phase strung buses with four sub-conductors per
phase. ACSR MOOSE conductors are used for stringing on the
gantries of the switchyard. It is tied up with double tension string
assembly in twin/quadraple bundles with 450mm sub-conductor
spacing. For connecting the breaker with isolators 4 IPS
aluminium tubular buses in each bay are used. For intermediate
supports, bus post insulators are provided. One double main
transfer bus system having main buses 1 and 2 and transfer bus no.
1 caters for Bay no. 1 to Bay no. 12. Similarly, second double main
transfer bus system having main bus no. 3 and 4 and transfer bus
no. 2 caters for Bay no. 14 to Bay no. 23. Bay no. 13 interconnects
-
7/27/2019 Summer Training in badarpur ntpc
38/54
Page 38
400kV main bus 1 to 3 and 2 to 4. There is no interconnection
between transfer buses 1 and 2.
Bay-wise description of various feeders is as follows: -
1. 400KV Lucknow Line + 63MVAR Reactor2. 200MW 15.75KV Generator-53. 400KV Allahabad Line-2 + 80MVAR Reactor4. 200MW 15.75KV Generator-45. 400KV Bus Coupler-16. 200MW 15.75KV Generator-37. 400KV Anpara Line8. 200MW 15.75KV Generator-29. 400KV Allahabad Line-1 + 80MVAR Reactor10. 200MW 15.75KV Generator-111. 400KV Transfer Bus Coupler -112. 400KV Side of 100MVA 400/132KV ICT-113. 400KVBus Section 1&214. 400KV Side of 100MVA 400/132KV ICT-215. 400KV Vindhyachal-216. 400KV Transfer Bus Coupler-217. 400KV Vindhyachal Line-I18. 400KV Bus Coupler-219. 500MW 21KV Generator-620. 400KV Rihand Line-221. 500MW 21KV Generator-722. 400 KV Kanpur line23. 400 KV Rihand-I
The bay width is 27.0m. Height of the gantry structure is 13.7m
and intermediate gantry structure is 20.7m. Minimum ground
clearance is 7.1m. Earthing mat is laid of 40mm diameter MS
rounds throughout the switchyard and equipments grounding are
done by 7512mm strips. Generator bays are connected to
generator transformer secondary by overhead stringing.
-
7/27/2019 Summer Training in badarpur ntpc
39/54
Page 39
In SSTPS, transfer bus coupler scheme is applied. This scheme is
applied to transfer the load on one breaker to another breaker for
maintenance of a breaker. Suppose if a generating unit is supplyingpower to main bus 1. Now the breaker of the bay of this generating
unit has to be repaired then it is not a practical and economic
solution to trip the unit for this purpose. Therefore a parallel path is
created for the flow of power through the transfer bus using the
transfer bus coupler bay breaker to the main bus 1. For this first the
isolator in the generator bay connecting the feeder to the transfer
bus is closed. Then, in the TBC the breaker and associated
isolators to the main bus 1 are closed. After this the TBC baybreaker is closed and this creates a parallel path for the power.
Now the circuit breaker, which is to be repaired, of the generator
bay is opened and then the associated isolators are also opened.
The various equipments used in 400KV switchyard are as follows:ISOLATOR:An isolator is a switch, which can make or break an electric circuit
when the circuit is to be switched on no-load. Isolators cannotoperate unless the breaker is open. Bus 1 and 2 isolators cannot be
closed simultaneously. No isolator can operate when
corresponding earth switch is on.
There are two types of isolators used in the switchyard, namely the
sequential isolator and the pantograph isolator. The sequential
isolator is a two-post type in which the moving contact moves
through 90 on its axis. The pantograph isolator has two moving
contact arms designed in scissor-like fashion, which move throughonly 20 on its axis.
Circuit Breaker:A circuit breaker is a switch, which can make or break the circuit
on load and even on faults. It is heavy-duty equipment mainly
-
7/27/2019 Summer Training in badarpur ntpc
40/54
Page 40
utilized for protection of various circuits and operation at load. It is
installed accompanied by two isolators.
The various types of circuit breakers used in the switchyard are:
1.Bulk oil circuit breaker2.Minimum oil circuit breaker3.Air blast circuit breaker4.Sulphur hexa-flouride circuit breaker
These circuit breakers have been classified on the basis of their
quenching mechanism. The various operating mechanisms used for
these circuit breakers are spring operation, solenoid operation andpressure or pneumatic operation.
Earth Switches:These are devices which are normally used to earth a particular
system to avoid accident, which may happen due to induction on
account of live adjoining circuit. These switches do not handle any
-
7/27/2019 Summer Training in badarpur ntpc
41/54
Page 41
appreciable current at all. These are simple mechanically operated
switches.
Lightening Arresters:Lightening arresters are equipments which are connected at the
transformer terminals and the incoming terminals of the line for
protection against lightening or any surges developing in the
system. In this plant, valve type lightening arresters are used. Such
LAs consist of nonlinear resistors in series with spark- gaps. The
spark- gap assembly acts as a fast switch, which gets ionized
(conducting) at specified voltage. The entire assembly is placed inporcelain housing, properly sealed to keep out dust and moisture.
Wave Traps:Wave traps are parallel resonant circuits having negligible
impedance to power frequency currents but having very high
impedance to carrier frequency currents. They are used to keep
carrier signals in the desired channel so as to avoid interference
with or from adjacent carrier current channels and also to avoidloss of carrier current signal in the adjoining power circuits.
Current Transformers:A current transformer is a step down transformer which produces a
replica of the high current flowing in the circuit for measurement
purposes. It is intended to operate normally with rated current of
the network flowing through the primary winding which is inserted
in series in the network. The secondary winding of the CT isconnected to measuring instruments and relays supplying a current
which is proportional to and in phase with the current circulating in
the primary except for the difference due to current error and phase
displacement inherent in the design of the CT.
-
7/27/2019 Summer Training in badarpur ntpc
42/54
Page 42
Potential Transformer:Potential transformers step down the system voltages to
sufficiently low for indication of the system voltage conditions,
metering of the supply of energy, relaying and synchronizing. In
400 KV switchyard capacitance voltage transformer is used. A set
of CVT has been provided on each incoming/ outgoing line.
Shunt Reactors:Shunt reactors are static capacitors, which are connected in parallel
in the system, which produce reactive power in the power system.
In long lines a shunt reactor is connected for reduction of line
current, increase in voltage level at the load, reduction in system
losses, increase in power factor of a source current and reduction in
loading on source generators and circuits. They draw almost a
fixed amount of leading current which is superimposed on the load
current. This reduces the reactive component of the load current,
thereby improving the power factor.
CONTROL AND INSTRUMENTATION
The control and instrumentation systems installed in the plant are installed to
provide a comprehensive intelligence feedback on the important parameters
viz. temperature, pressure, level and flow. These systems are mostly based
on state of art microprocessor technology. They monitor the following
systems: -
SG C&I Systems:1. Furnace safeguard supervisory system for purging, automatic firing,
flame monitoring, sequential start- up and shut down of mills, etc.2. Secondary air damper control system3. Auxiliary PRDS control system4. Soot blower control system5. Coal feeder controls6. Furnace temperature probes
TG C&I Systems:1. Electro- hydraulic governing control system
-
7/27/2019 Summer Training in badarpur ntpc
43/54
Page 43
2. Automatic turbine run up system3. HP- LP bypass control system4. Turbine stress control system5. Automatic turbine testing system6. Turbine protection system7. Generator auxiliaries control system
Steam & Water Analysis System:This system does line analysis of various parameters like conductivity,
pH, dissolved oxygen, residual hydrazine, silica, sodium, phosphates,
chlorides, etc. at all critical points in condensate, feed water and steam
cycle.
The C&I systems employ the Distributed Control Monitoring & Information
System (DDCMIS) and Computerized Data Acquisition System. The
DDCMIS employs state of art microprocessors and is based on latest proven
technology. It performs the functions of sequencing and modulating
controls, plant start up/ shut down, in all regimes of plant operation
including emergency conditions. The main purpose of DAS is to acquire
sensor data and to produce useful output information for plant operators in
the form of displays and hard copies. This system combines special
hardware and software to facilitate interfacing between plant and operator.In addition, it also performs plant performance calculations and process
monitoring.
AUXILIARY POWER DISTRIBUTION SYSTEM
The auxiliary power distribution system distributes electrical power
requirement to various loads, control circuits and other instrumentation
circuits. The total load on auxiliaries in a power station is approximately 7%
to 9% of the plant capacity or the actual power generated. This system is
broadly divided into:-
1. Unit Auxiliary Power Distribution SystemUnit auxiliaries are those which are directly associated with the
generating unit such as ID and FD fans, boiler feed pumps, coal mills,
mill fans, circulating water pumps etc. The interruption of supply for the
auxiliary motors connected on the unit bus should not be there. For
supplying power to these unit auxiliaries the generator is connected to
-
7/27/2019 Summer Training in badarpur ntpc
44/54
Page 44
generator transformer through isolated phase bus duct and also through
two nos. of unit auxiliary transformers which step down the voltage to
6.6 KV. The UATs are connected to the unit 6.6 KV bus system by 2500A, 6.6 KV bus ducts. Each transformer is connected to unit buses A & B.
Medium voltage MOCB switchgear is used for feeding power to motors
rated above 200 KW. Facility is provided to transfer unit load to station
in the event of tripping of unit through changeover system.
Unit Auxiliary Transformer # 1 to 5:MakeKA CKBRIDGE HEWITTIC AND
EASUN LTD.
Manufacturing year.1981
Type of coolingONAN (75%) ONAF(100%)Rating (KVA).. 12000 16000
Temperature rise- Oil.40C
Water.50C
KV at no-load- HV15.75
LV6.9
Phase- HV3
LV3
Frequency.50Hz
Vector GroupDYn11Amperes- HV 439.8 586.53
LV 1004.1 1338.8
Insulation level- HV125 KVP
LV60 KV P
Core & Winding weight..19200 kg
Weight of oil7100 kg
Total weight.37799 kg
Quantity of oil..8250 liters
Unit Auxiliary Transformer # 6 to 7:MakeNGEF
Manufacturing year.1986
Type of coolingONAN (75%) ONAF(100%)
Rating (KVA).. 17500 25000
Temperature rise- Oil.50C
Water.55C
KV at no-load- HV21
-
7/27/2019 Summer Training in badarpur ntpc
45/54
Page 45
LV6.9
Phase- HV3
LV3Frequency.50Hz
Vector GroupDYn1
Amperes- HV 481.13 687.32
LV 1664.3 2091.9
Insulation level- HV125 KVP
LV60 KVP
Core & Winding weight..21.6 T
Weight of oil7.3 T
Total weight.42.2 TQuantity of oil..8296 liters
2. Station Auxiliary Power Distribution SystemStation auxiliaries are those which are required for general station
services such as coal and ash handling system, lighting system, water
purifying system etc. interruption of supply for the auxiliary motors for
the station bus for a short duration can be tolerated. There are four station
transformers in the plant. These transformers are supplied from the 132
KV yard. These transformers step down the voltage to 6.6 KV. The
station transformers are resistance grounded.
WATER TREATMENT PLANT
Water treatment plant is to produce such a quality of feed water from which
there should not be any scale formation causing resistance to heat transfer
and thus failure of tubes, no corrosion and no priming or foaming problems.
This helps in giving trouble free, uninterrupted supply of clean steam. In this
plant, raw water is fed from the Rihand reservoir, which consists of ionic
and non-ionic, dissolved and undissolved solids and gaseous impurities. The
process of removing is show in the flow diagram: -
-
7/27/2019 Summer Training in badarpur ntpc
46/54
Page 46
Fig: -Block Diagram of water treatment Plant
Pre-Treatment Plant
This plant has a capacity to produce 600cu. M/hr. of clarified water to meetthe requirement of the DM plant. The various processes involved in the
pretreatment of water are:
ChlorinationChlorine is dosed in raw water inlet to aerator and further in clarified
water tank in order to remove bacteria and other microorganisms. It is
also effective in oxidation of Fe, Mn and H2S, removal of taste and
odour producing compounds and oxidation of organic compounds byforming chloroderivatives of these compounds.
AerationBy aeration the water absorbs oxygen from the atmosphere, which helps
in oxidation of organic matter present in water. The iron dissolved in
water is precipitated as Fe2O
3.
Coagulation
-
7/27/2019 Summer Training in badarpur ntpc
47/54
Page 47
After aeration, the water flows to the flash mixture where lime and alum
are dozed by the pumps and then flows through a RCC channel by
gravity. The added chemicals are thoroughly mixed with the raw waterwith the help of a stainless steel paddle fitted in the path. Chemical
reaction takes place as under:
Al2(SO
4)
3. 18H
2O + 3Ca(OH)
23CaSO
4+ 2Al(OH)
3
+ 18H2O
Flocculation & ClarificationThe water is subjected to slow spiral motion and fine precipitates
agglomerate to look distinctly as flocks. The clear water enters throughthe bottom opening. The scrapper attached to the rotating bridge scraps
the settled sludge. The clear water overflows from the top of rotating
bridge. The clear water overflow from the top of clarifier and led to
clarified water storage tank.
FiltrationThe clarified water is passed through four pressure filters in which graded
anthracite coal is filled up. During this process suspended impurity and
turbidity is filtered effectively. Now the water is passed through active
carbon filter to remove residual chlorine and oil impurities. Then it is fed to
ion-exchanger for removing mineral salts. In the cation exchanger cations
such as Ca, Mg and Na react with strong cation exchange resin and stay with
the reacted resin. Similar action takes place for removal of anions in the
anion exchanger. In the end a mixed bed exchanger is kept which helps in
removal of any left over anions or cations.
CIRCULATING WATER SYSTEM
Condenser Cooling Water System
The CW system provides for pond cooling with Rihand Reservoir as the heat
sink. Vertical wet pit type CW pumps draw water from the Rihand Reservoir
through the approach canal and feed to the condensers. Hot water from the
condensers is discharged back to the reservoir by means of discharge
channel, which is common for stage I and stage II of the project. CW supply
from CW pump house to the condensers and CW discharge from the
condensers upto the discharge channel is through concrete ducts of
-
7/27/2019 Summer Training in badarpur ntpc
48/54
Page 48
horseshoe shape. Round the year there is a large variation in the water level
of Rihand Reservoir. Minimum water level at the intake sump is 254 m and
the maximum level is 271 m with operating floor level of the pump housebeing at 278.5 m total depth of the sump is 31 m. therefore there is large
variation in the static lift of the CW pumps ranging from 7 m to 24 m. In
SSTPS, the operating scheme used to overcome this problem is by varying
the nos. of CW pumps in operation.
In stage I, total 13 nos. of pumps have been installed while 10 pumps are
required. Requirement of cooling water of each unit is 27000 m 3/hr. The
rated capacity of each pump is 15000 m 3/hr with a total head of 31.5 m.
These pumps are designed for continuous operation with cooling water of
maximum temperature of 36C.
In stage II, 3 nos. of CW pumps have been installed for each 500MW unit.
The rated capacity of each pump is 27000 m 3/hr at 31.5 m head. The
operating speed is 375 rpm and the driver is a 3MW, 6.6KV, 16- pole, 50 Hz
induction motor. In case of low water level, three pumps feed to one unit and
in case of higher water levels two CW pumps are sufficient for each unit.
For intermediate water levels five pumps are operated for both the units and
the interconnecting butterfly valves are kept open.
Ahead of the CW pumps single flow type traveling water screens have beenprovided with a clear opening size of 9.5 mm square which prevent the
debris from entering into the CW system.
Equipment Cooling SystemThe equipment cooling system has been provided to remove the waste heat
rejected from the various plant equipments and transfer it to the
environment. The system is divided into two basic sub-systems:
a) Primary circuit using DM water employed to pick up the heat load fromvarious auxiliary coolers and rejects the same to the plate type heat
exchangers (PHE).
b) Secondary circuit using raw water employed to pick up the heat loadfrom PHEs and reject the same to main circulating water discharge seal
pit in transformer yard.
The ECW system is capable of operating continuously during all modes of
plant operation. The ECW system meets the requirements of auxiliary
coolers other than the main condensers. The following auxiliary coolers are
cooled by primary water:
-
7/27/2019 Summer Training in badarpur ntpc
49/54
Page 49
1. SG Package Coal mill lubricating oil coolers, regenerative air pre-heaters - guide
bearing and support bearing oil coolers, water cooled access door infurnace hopper zones, lubricating oil coolers for FD/ ID/ PA fans and
motors, coolers for ID fan hydraulic couplings, sample coolers, ID fan
motors stator coolers, air heaters fire se, coal mill journal hydraulic
system cooler, boiler circulation pumps.
2. TG Package Turbine lubricating oil coolers, turbine control fluid coolers, generator
hydrogen coolers, exciter coolers, generator seal oil coolers hydrogen
and airside, primary water coolers.
3.BFP Package Booster pump coolers, working oil coolers and lubricating oil coolersfor MDBFP, BFP oil coolers, BFP motor coolers.
4. CEP Package Motor and thrust bearing coolers
5. Oil coolers for generator transformers6. Auxiliary coolers for air compressors7. Primary sample coolers in SWAS panel room in control tower.
The ECW heat exchangers are of plate type located at ground floor of TG
hall and sized to provide 38C (max.) DM water at design flow condition.
The pH of DM water in the closed loop is maintained around 9.5 by dosing
sodium hydroxide. The sodium hydroxide solution is prepared in NaOH
solution preparation tank and fed to the suction of DMCW pumps through
2100% chemical dosing pumps.
ASH HANDLING SYSTEM
The ash handling system is continuous hydro sluicing type. It envisagescontinuous removal of bottom ash and fly ash in slurry form from the
different zones of bottom ash and fly ash collections in the steam generating
units. The bottom ash slurry is led to a bottom ash slurry sump at the boiler
bottom from where it is transferred by means of vertical slurry pumps to the
main fly ash slurry trench in electrostatic precipitator (E.P.) area. The fly ash
slurry flows through gravity channels and aided by high pressure jetting
water is led to the slurry sump in the main ash slurry pump house. The
combined bottom ash and fly ash slurry from the main slurry sump is
-
7/27/2019 Summer Training in badarpur ntpc
50/54
Page 50
pumped to the disposal area by means of slurry pumps and disposal lines.
The HP and LP water required for slurry formation and transportation is
supplied by HP and LP pumps installed in ash water pump house.
The entire ash handling system has been designed for removing and flushing
the bottom ash and fly ash from both the units at the following rates:
For Stage I:
a) Fly ash 162 tonnes/hr (for phase I)
108 tonnes/hr (for phase II)
b) Bottom ash 36 tonnes/hr (for phase I)
24 tonnes/hr (for phase II)
For Stage II:
a) Fly ash 320 tonnes/hrb) Bottom ash 72 tonnes/hr.The ash slurry disposal system has been designed to pump the ash slurry
continuously from the slurry pump to the disposal area through pipelines at a
rate of 700 m 3/hr for each unit of stage I and 1500m 3/hr for each unit of
stage II.
Bottom Ash Removal SystemThe bottom ash resulting from the combustion of coal in the boiler falls into
the ash hopper provided under the furnace bottom. Each hopper is divided
into two sections and each section is provided with adequately sized opening
with gates. The ash is spray- quenched in these hoppers and gets discharged
into the water impounded slag baths provided under each section. Each slag
bath is provided with a continuously moving scraper feeder for transferring
the wet slag ash to the respective clinker grinder. The crushed ash through
clinker grinder gets discharged into the slopping ash trenches provided
beneath them and from there aided by high pressure water jets, the slurry is
led to the bottom ash slurry sump provided adjacent to the boiler bottom.
From the sump the slurry is transported to the main ash slurry trench in E.P.
area by bottom ash slurry pumps for its further disposal to dump area by
means of slurry disposal pumps located in main ash slurry pump house.
Fly Ash Removal SystemFly ash removal system envisages removal of ash from each of the
electrostatic precipitators, economiser, air preheater and stack hoppers
continuously through suitable vertical pipe connections. Flushing
-
7/27/2019 Summer Training in badarpur ntpc
51/54
Page 51
equipments are provided below them. The slurry from the economiser and
air preheater flushing equipments is conveyed to the bottom ash slurry sump
from where it is pumped along with bottom ash to the main ash slurry trenchin E.P. area.
The fly ash slurry from ESP and stack gets discharged into the sloping ash
channel provided beneath them. The slurry aided by high pressure water jets
flows down the sluice channel to the slurry sump in ash slurry pump house
for its further disposal to dump area by means of slurry pumps.
Ash DykeThe ash dyke is provided for the disposal of fly ash and bottom ash in the
form of slurry. Fly ash and bottom ash are collected in the slurry form in the
sump of the ash slurry pump house. From there it is discharged through
pipes into the ash dyke for the settlement of ash in the dyke. The ash free
water is discharged into the Rihand Reservoir.
There are three main ash slurry sumps, one common for units 1, 2 & 3,
second common for units 4 & 5 and third common for 6 & 7. Low pressure
water is used for thorough mixing and high pressure water is used for
sluicing. Each ash slurry sump is located in an ash slurry pump house. Eachpump house has six vertical pumps for continuously conveying the ash
slurry from the sump to the ash dyke.
HYDROGEN GENERATION PLANT
Hydrogen gas is used for generator cooling. So supply of pure hydrogen in
the power station is essential for generator filling and maintaining of
hydrogen gas pressure inside the generator casing.
Hydrogen is prepared by electrolysis of pure demineralised water. When dc
current is passed through water it decomposes the water into two elements,
one volume of oxygen and two volumes of hydrogen. Pure distilled water is
a bad conductor of electricity but if acid, alkali or salt is added it becomes a
good conductor. To make economical use of electrolysis of water, a solution
termed as electrolyte has be used which is prepared by adding NaOH or
KOH with pure water. When current is passed through the electrolyte,
-
7/27/2019 Summer Training in badarpur ntpc
52/54
Page 52
hydrogen is given off at negative electrode, while oxygen is evolved at the
positive electrode.
A.C. power at 400/440 V, 3 phase, is changed to dc power in a transformer
and rectifier arrangement. Dc output of the plant is controlled by means of a
regulator. Dc from the terminals of the rectifier is supplied to the cells
through busbars. Gas production is directly proportional to dc current
passing through the solution of caustic potash and DM water.
DM water of high purity is collected in a storage tank from where it is fed by
gravity to the cell bank for make up. An automatic float valve is mounted in
gas washing tank to provide a continuous supply of water in proportion to
usage. The gases, after leaving the cells, pass upwardly to the collectionheaders and then through a water seal to atmosphere or to the gasholder as
the case may be.
Cooling water is supplied to the water seal, which regulates the pressure
head against which the cells operate and also prevents any backward flow
from the gasholder when the plant is not in operation. Valve is provided in
between the gas washing tank and gasholder for directing the flow to
atmosphere when desired.
Hydrogen gas flows from the gas washing tank to a low pressure wet seal
gasholder. From the gasholder it flows to a compressor, which compresses it
to rated pressure. After the compressor it flows through carbon filter and
through a silica gel dryer. The dry hydrogen is then stored in storage
cylinders from where it goes to the power station for use. Hydrogen gas is
normally sent to HP compressors from the gasholder where it is compressed
to a rated pressure. From the HP compressors, hydrogen flows through an
after cooler, which has moisture separator columns, and then to a point
filling station where it is filled in portable cylinders.
Oxygen produced in the process is let off to atmosphere.
-
7/27/2019 Summer Training in badarpur ntpc
53/54
Page 53
BIBLIOGRAPHYBIBLIOGRAPHYBIBLIOGRAPHYBIBLIOGRAPHY
The information, facts and figures presented in the project have
been collected from various sources. To mention a few,
information have been collected from websites like
www.google.comand www.wikipedia.org. Various documentaries
have also been referred to for collecting valuable information. We
have also referred to reference books. To mention a few, we
referred electrical technology by B. L. Theraja and A.K. Theraja
and Power systems by V.K. Mehta.
-