summary the process and the components the tooling production back log estimation the handles and...

24

Upload: delilah-richardson

Post on 18-Jan-2018

217 views

Category:

Documents


0 download

DESCRIPTION

Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

TRANSCRIPT

Page 1: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay
Page 2: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay
Page 3: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Summary

• The process and the components• The tooling • Production back log estimation• The handles and the estimated cost and delay

Page 4: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Clarification

Collared coil production

Cold Mass production

CERN

Back logFrom the measurement that triggers feed back to the moment

when the corrected dipole gets to the same kind of measurements

Page 5: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

The components Ifrom SC Cable to Poles

Copper wedges

SC cable

End Spacers

Chips and wedge tips

Inter-layer spacers

winding

curing

Coil Pole

CERNCERNCMACMA

Page 6: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

The components IIFrom Poles to Collared Coil

Shim retainer4 Poles Quench

heatersGround

insulation

2 Dipoles

Shims

CollarsCollaring

1 Collared Coil

Collaring Rods

Collar packs

Page 7: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Jeumont /Alstom Tooling

Winding machine

Winding machine

6In.Man.

6Ou.Man.

Curing press + mould

Curing press + mould

JeumontPMM

Collaring press

6In

Shells

6Out.

shells

Page 8: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Ansaldo Tooling

Winding machine

Winding machine

Winding machine

Spare Winding machine

6In.Man.

6Ou.Man.

Inner layermould

Outer layermould

Curing Press

Collaringpress

CERNPMM

Curing Press

Page 9: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

BNN Tooling

Winding machine

Winding machine

Winding machine

Winding machine

6In.Man.

6Ou.Man.

Curing press + inner layer

mould

Curing press + outer layer

mould

BNNPMM

Collaring press

Page 10: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Back Log Estimation

Total Back Log (number of collared coil)

Production back log (Tprod X Rprod)Component stock back log

Page 11: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Collared Coil Production time divided in main phases firm I

0 30 60 90 120 150 180 210 240 270 300 330 360

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

Col

lare

d C

oil n

umbe

r

Days

Winding timeWinding / Collaring time

Page 12: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Collared Coil Production time divided in main phases firm II

0 30 60 90 120 150 180 210 240 270 300 330 360

123456789

101112131415161718192021222324252627282930313233

Col

lare

d C

oil n

umbe

r

Days

Winding time

winding/collaring time

Page 13: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Collared Coil Production time divided in main phases firm III

0 30 60 90 120 150 180 210 240 270 300 330 360

1

3

5

7

9

11

13

15

17

19

21

23

25

27

29

Col

lare

d C

oil n

umbe

r

Days

Winding timeWinding / Collaring time

Page 14: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Number of collared coil in parallel production

0

1

2

3

4

5

6

7

8

9

01-08-02 16-08-02 31-08-02 15-09-02 30-09-02 15-10-02 30-10-02 14-11-02 29-11-02 14-12-02 29-12-02 13-01-03 28-01-03 12-02-03 27-02-03 14-03-03

Dates

Num

ber o

f col

lare

d co

ils w

ound

at t

he s

ame

time

firm 1 firm 2 firm 3

Page 15: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Production back log estimation

Firm 1 collared coils week/CMAs1 collared coils week/CMAs 3 collared coils week/CMAs3 collared coils week/CMAsWinding Winding back logback log

Assembly Assembly back logback log

Tot back Tot back loglog

Winding Winding back logback log

Assembly Assembly back logback log

Tot back Tot back loglog

F I 55 77 1212 1212 1818 3030F II 99 66 1515 1010 2020 3030

F III 1313 55 1818 1717 99 2828

Total 2727 1818 4545 3939 4747 8888

Page 16: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

The handles and their estimated cost and delay

Page 17: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Polar shims• Delay of intervention: approx. 1 week to 4 weeks of

production (shim procurement time)

• Cost of the intervention: max some thousands of CHF (1 set of shims about 1500 CHF, the cost will be equal to the number of set of shims not usable)

Pole measurement

Dipole assembly Collaring

Shims

Page 18: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Mid plane insulation• Delay of intervention:

– Change of ground insulation: 1.5-2 month of production (stock and intervention at the sub supplier)

• Cost of the intervention:average price to prepare ground insulation 9000 CHF/CC possible extra costs from 150 to1800 CHF/CC. Total extra cost: 200.000 CHF to 2.000.000 extra costs (i.e. 15 minutes more per layer is 300.000 CHF)

Pole measurement

Dipole assembly Collaring

Ground insulation

Page 19: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Copper wedges• Delivery of modified copper wedges from the

decision (14 working weeks)• Modification of end spacer:

– Machined pieces about 14 working weeks– Injected pieces longer

For costs see after

Copper wedges

SC cable

End Spacers

Chips and wedge tips

winding

Page 20: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

New component productionCopper wedges

New geometryDrawings

New tooling

Approvalmanufacturer's

drawingsProduction

Acceptance

Expedition to CMA

5 days

10 days

30 days

20 days

1 day

5 days

Total time 70 Work. Days

T0

Page 21: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Previous experience and cost estimation

• Decision 15/07/01• Drawing cross section 15/08/01• Delivery of end spacers for 2 CC and chips for 2 CC 15/11/01• Delivery of new profile for 10 magnet each CMAs: 30/11/01• Delivery of spacers 10 CC per CMAs 20/12/01• Delivery of molded chips 01/02/02

• Cost I: 50 batches of copper wedges (500 magnets, i.e. cable delivered for 3/8) produced up to now. 7000 CHF/profile for tooling

• Cost II: at least only for end spacers 150.000 CHF (engineering + components)• Cost III: quality problems

Page 22: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Correction of the magnetic length with nested laminations

• We can correct the magnetic length acting on the number of nested lamination

• 10 cm of extra nested lamination (Delta Bdl 7 units):– 10 cm more nested laminations: +660 CHF/CM– 10 cm less iron lamination: -150 CHF/CM– 10 cm net cost 1 magnet : +510 CHF/CM

• For 1 CMAs: about 200.000 CHF• Other possible schemes:

– Nested laminations transfer between CMAs– Use of special full non magnetic laminations

Page 23: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Change Material delivery time

back log

Production back log

Total

Polar shims 12 CC12 CC36 CC36 CC

3 CC3 CC12 CC12 CC

3 -12CC3 -12CC12-48 CC12-48 CC

Mid plane insulation

24 CC24 CC72 CC72 CC

3 CC3 CC12 CC12 CC

27 CC27 CC84 CC84 CC

Copper wedges

14 CC14 CC140 CC140 CC

45 CC45 CC88 CC88 CC

59 CC59 CC230 CC230 CC

Laminations 12 CM12 CM48 CM48 CM

24 CM24 CM24 CM24 CM

36 CM36 CM72 CM72 CM

Page 24: Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay

Acknowledgements

• F. Bertinelli, C. Lanza, A .Schiappapietra, E. Todesco

• The whole MAS-MD and MAS-MA sections