Summary Report Project Name: Infoway Testing Environment Brief Project Description: Develop testing harness to allow for conformance testing of the applications and the solution that leverage HL7 v3 messaging. Key product components include following: User configuration Test case configuration Test scenario upload Test Information Access Layer (TIAL) - intercept messages, performs marshalling / un-marshalling message mapping and routing Core engine with MBT validator Logging and Reporting capabilities

Upload: christiana-jasmin-mccormick

Post on 14-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Summary Report Project Name: Infoway Testing Environment Brief Project Description: Develop testing harness to allow for conformance testing of the applications

Summary Report• Project Name: Infoway Testing Environment

• Brief Project Description: Develop testing harness to allow for conformance testing of the applications and the solution that leverage HL7 v3 messaging. Key product components include following:

– User configuration– Test case configuration– Test scenario upload– Test Information Access Layer (TIAL) - intercept messages, performs marshalling / un-

marshalling message mapping and routing– Core engine with MBT validator– Logging and Reporting capabilities

Page 2: Summary Report Project Name: Infoway Testing Environment Brief Project Description: Develop testing harness to allow for conformance testing of the applications

Summary Report - cont.• Project Name: Infoway Testing Environment

• Major milestones to date: – Funding secured (June 2010)– Development started (December 2010)– Test cases and test data prepared (Mar 2011)– End to end testing performed during (April 2011)– Product announcement (June 2011)– Extended features developed for Canada Health Infoway Certification Service (March 2012)– Pass through feature developed and tested – integration with existing jurisdictional testing facilities and

advanced routing of test messages based on configuration (July 2012)

• Projected milestones: – Working with eHealth Ontario to integrate new TE features developed to meet eHO requirements - enhanced

user interface allowing for creation of test suites, enhanced test case configuration (March 2012)– Campaign underway to stand up jurisdictional testing environment instances (Sept 2013)

• Major release dates: April 2013• Contribution date• Contribution value ~ 1 person year (3-4 developers over 3 months)

Page 3: Summary Report Project Name: Infoway Testing Environment Brief Project Description: Develop testing harness to allow for conformance testing of the applications

Infoway Testing EnvironmentMarch 2013

Content

• New user / vendor configuration• Enhanced test case configuration

capabilities – creation of test case suites, sharing of test scenarios among multiple users, ability to stop and resume testing by multiple users

• Enhanced Reporting feature – ability to see intermediate results

• Use of ESB (Mule) to support common entry point for TE and integration with MBT components

• Enhanced configuration interface(s) – User and Test suite

•Finalize integration of the new eHealth Ontario code with baseline

•Initiate communication with jurisdictional stakeholders and find areas where testing environment may be used for conformance testing (EMR integration)

TES v 2.0

• Plan to have Testing Environment deployed in at least two Canadian jurisdictions by the end of 2013

• Future funding and product continuity depends on the tool uptake in next 2 quarters.

• Readiness of jurisdictional representatives and potential

clients to develop business case for use of the platform.• Pending product governance and development coordination.

Added

Deleted & Changed

Milestones

Packaging Editions

Dependencies

Pressures

Statistics

.

Page 4: Summary Report Project Name: Infoway Testing Environment Brief Project Description: Develop testing harness to allow for conformance testing of the applications

12 Month Rolling Plan Major Dates and Deliverables

4Q12

3Q12

1Q13

2Q13

Develop governance model for future platform development and maintenance

Consolidate code base with new development from eHealth Ontario

Live customers in at least 2 provinces

Initiate conversation with potential customers in Canadian jurisdictions

3Q13