summary on maidanak users activity: 1yr after
DESCRIPTION
Summary on Maidanak Users activity: 1yr after. Mansur Ibrahimov, Shuhrat Ehgamberdiev UBAI, Tashkent. 2 nd Maidanak Users Meeting, June 21 2010. Resume of the 1 st meeting (SNU Korea):. Uninterrupted power supply Stable internet connection Telescopes: mirror recoating - PowerPoint PPT PresentationTRANSCRIPT
Summary on Maidanak Users activity: 1yr after
Mansur Ibrahimov, Shuhrat Ehgamberdiev
UBAI, Tashkent
2nd Maidanak Users Meeting, June 21 2010
Resume of the 1st meeting (SNU Korea):
Uninterrupted power supply
Stable internet connection
Telescopes: mirror recoating
Improving of living conditions: transportation, dormitories, water supply technician and night assistance teams
Maidanak: telescopes and instruments
6 telescopes: 1.5m, 1m, 4x60cm (4 of them in operation)
5 CCDs: SI 600 Series 4K, SITe 2000x800, 2x FLI IMG 1K, SBIG ST9-XE 0.5K
Direct Imaging only (in optic), No IR No Spectra
Stable Internet: done !
2007-2010: extremely hard paperwork
Satellite based VSAT system, www.steccom.ru
Owner: AstroTel Ltd, Boris Satovski (under agreement with UBAI)
8 MB/sec down, 384 KB/sec up (chargeable down/up)
Cost estimation: 1 GB/month for US$ 700
Telescopes: recoating - partially done
June 2009- June 2010: recoated at Okayama Obs., Japan 60 cm 48 cm
Funding: JSPS+NAOJ+Okayama (1 wooden box, 2 mirrors, round-trip shipment)
Not yet recoated: 1.5 m 1.0 m 2 more 60 cm
Telescopes: cleaning – two 60cm
June 2009 – 60cm mirror at Zeiss600-Kiev
October 2009 – 60cm mirror at Zeiss600-Moscow
October 2008 – 1.5m mirror at AZT-22 (~1mag deeper) (next cleaning – fall 2010 or fall 2011)
Telescopes: reflectance as of Oct 2009
1.5m – > 80 %
1.0m – < 50 %
2x60cm – 65-75 %
(Okita Kiichi-san, Okayama Obs.)
Uninterrupted Power Supply: no changes
Governmental supply: failed and becoming more trouble year by year
Diesel + oil supply: the ONLY way for Maidanak Users
Current cost estimations in US$ : Diesel - 50-60K Oil supply – 40K (for 40 tons)
Uninterrupted Power Supply: 60cm scopes
Individually Power Supplied Scopes (using powerful battery):
Zeiss600-Kiev – almost done Zeiss600-Moscow – in project for 2010
(Artamonov and Magnitskii, SAI Russia)
FYI: Individually Power Supplied system had been already realized at AstroTel-Maidanak Telescope (AMT-1)
Satovski (AstroTel Ltd)
Living conditions: no changes
Transportation problem: Tashkent-Samarkand by train – no problem Samarkand-Maidanak – still a problem need 2 cars (at least) for transportation/logistic
Dormitories: 2 dormitories need to be reconstructed and/or repaired
Water supply: still primitive (bringing by truck from the spring) 5-6 times/year no regular shower, no WCs
Tech and night ass teams: no changes
1.5m scope: 1 regular night assistant from Kitab 2-3 visiting observers/month (summer-fall seasons)
1m scope: no regular program, no assistant at all
two 60 cm scopes: 1 episodically observing assistant from Tashkent 1-2 visiting observers/month (summer-fall seasons)
Technician team: 5 people managed by Abbas Aliev
Summary of 1yr activity:
Internet – done
Recoating – 1 mirror done, 4 mirrors not yet
Power supply – nothing changed, currently ~100K$ individually buttery supplied system ?
Living conditions – nothing changed: transportation, dormitories, water
Tech+ night ass teams – nothing changed: the both teams should be enlarged
That’s all.