summary of sector 45 operational tests

13
26.02.2008 R. Alemany LHCCWG Summary of sector 45 operational tests QPS PIC EE PC PM On behalf of all the peopl Involved in the HWC CYO VAC SEQ

Upload: maxwell-franklin

Post on 31-Dec-2015

33 views

Category:

Documents


3 download

DESCRIPTION

S78. S67. S56. PC. PM. SEQ. S45. PIC. EE. VAC. CYO. QPS. Summary of sector 45 operational tests. On behalf of all the people Involved in the HWC. PM. PC. SEQ. PIC. S45. EE. VAC. CRY. QPS. Cryo Performance. 120. 100. 80. 60. 40. 20. NOV07. DEC07. JAN08. FEB08. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Summary of sector 45 operational tests Summary of sector 45 operational tests

QPS

PICEE

PCPM

On behalf of all the people Involved in the HWC

CYOVAC

SEQ

Page 2: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Cryo PerformanceCryo PerformancePIC

PC

QPS

EE

PM

VACCRY

SEQ

NOV07 DEC07 JAN08 FEB08

40

60

20

80

100

120

Page 3: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Powering Test SummaryPowering Test Summary

PCS: Splice Check (200 A)PLI3: Circuit Protection at I_INT

PCC: Power Converter ConfigurationPIC2: Interlocks TestPNO: Powering to Nominal

PIC

PC

QPS

EE

PM

VACCRY

SEQ

Page 4: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Powering Test SummaryPowering Test Summary

(*) Short circuit detected at warm - circuit condemned (to be repaired during warm-up).

MR4 I_PT (I_NOM) LL5 I_PT (I_NOM)

RQ6 3610 A (3610 A) 3610 A (4310 A)

RQ5 3610 A (3610 A) 3610 A (4310 A)

RQ4 X 3610 A (3610 A)

RD4 5520 A (5520 A) X

RD3 5520 A (5520 A) X

RD2 X 4400 A (4400 A)

RU 450 A (450 A) X

PIC

PC

QPS

EE

PM

VACCRY

SEQ

Page 5: Summary of sector 45 operational tests

26.02.2008

Powering Test SummaryPowering Test SummaryPIC

PC

QPS

EE

PM

VACCRY

SEQ

Page 6: Summary of sector 45 operational tests

26.02.2008

Powering Test SummaryPowering Test Summary

24.02.08 25.02.08 24.02.08 13H

24.02.08 14H

PIC

PC

QPS

EE

PM

VACCRY

SEQ

Page 7: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Powering Test SummaryPowering Test Summary

PGC Matching Section (13-14.02.08): PGC Matching Section (13-14.02.08):

IPQ

120 A

MR4 LL5

RQ4

RQ5 RQ5

RQ6 RQ6

RD4 RD2

PIC

PC

QPS

EE

PM

VACCRY

SEQ

Page 8: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Powering Test SummaryPowering Test Summary

LL5

PIC

PC

QPS

EE

PM

VACCRY

SEQ

Page 9: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Powering Test SummaryPowering Test Summary

PGC Arc (+ MR4&LL5) (19.02.08): PGC Arc (+ MR4&LL5) (19.02.08):

Test Plan:1. 2 kA FPA2. 4 kA FPA3. Heat Run

@ 9kA + squeeze

PIC

PC

QPS

EE

PM

VACCRY

SEQ

Page 10: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Powering Test SummaryPowering Test Summary

RB VS_FAULT

PIC

PC

QPS

EE

PM

VACCRY

SEQ

Heat Run with RB, QD, QF @9kA (19.02.08)

Page 11: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Powering Test SummaryPowering Test SummaryPIC

PC

QPS

EE

PM

VACCRY

SEQ

MR4 & LL5 Squeeze (19.02.08)

Page 12: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Powering Test SummaryPowering Test SummaryPIC

PC

QPS

EE

PM

VACCRY

SEQ

PGC Summary: RB settings generated from calibration

curves obtained from FIDEL model. The rest of the magnets: linear calibration

from layout database. Ramp to 5.3 TeV. Optics used: V6.500. PGC of sector 45 done with LSA and timing

system for synchronized ramps. Tests driven by:

LHC Sequencer: PGC of the Matching Sections (see slide 7).

Equip State: PGC of the Arc (see slide 9).

PGC Summary: RB settings generated from calibration

curves obtained from FIDEL model. The rest of the magnets: linear calibration

from layout database. Ramp to 5.3 TeV. Optics used: V6.500. PGC of sector 45 done with LSA and timing

system for synchronized ramps. Tests driven by:

LHC Sequencer: PGC of the Matching Sections (see slide 7).

Equip State: PGC of the Arc (see slide 9).

Page 13: Summary of sector 45 operational tests

26.02.2008 R. Alemany LHCCWG

Powering Test SummaryPowering Test SummaryPIC

PC

QPS

EE

PM

VACCRY

SEQ

Special thanks to:HWC Teams.LHC OP Team. LSA Team.Database Management Team.Sequencer Team.

Please, forgive me if I forget somebody

Special thanks to:HWC Teams.LHC OP Team. LSA Team.Database Management Team.Sequencer Team.

Please, forgive me if I forget somebody