suez victorian desalination project

16
Victorian Desalination Project (VDP) MELBOURNE Delivering a safe and reliable desalination water supply to Victoria AUSTRALIA

Upload: rick-nabett

Post on 13-Apr-2017

145 views

Category:

Environment


1 download

TRANSCRIPT

Page 1: Suez Victorian Desalination Project

Victorian DesalinationProject (VDP)

Melbourne

Delivering a safe and reliable desalination water supply to Victoria

AUSTRALIA

Page 2: Suez Victorian Desalination Project

The Victorian Desalination Plant, based near Wonthaggi, is able

to provide a source of drinking water independent of rainfall

for Melbourne and some regional communities. It is capable

of supplying up to 450,000 m3 of drinking water per day.

The AquaSure consortium, which brings together leaders in the field of

infrastructure, design, construction, finance, including Degremont &

Thiess, has been contracted by the Victorian Government to finance,

design, build, operate and maintain the Victorian Desalination Plant for

the 30-year project term.

This AUD 3.5 billion Victorian Desalination Project is a Public Private

Partnership (PPP) which has delivered the biggest desalination plant in

Australia and one of the biggest reverse osmosis plant in the world.

Page 3: Suez Victorian Desalination Project
Page 4: Suez Victorian Desalination Project
Page 5: Suez Victorian Desalination Project

05

Construction spanning five different project areas and multiple work sites involved at peak time up to 4,500 people on site.

• Tunnels for intake (1.2 km long) and outlet (1.5 km long)• A R.O desalination plant producing 450,000 m3 per day, expandable to 600,000 m3 per day• High quality desalinated water to complement Victoria’s world class standards• 84 km water transfer pipeline• 7 water delivery points to Melbourne and some regional areas• 87 km underground high voltage power cable• About 300 km of fibre optic cables, to monitor the pipeline, power cable, and the desalination plant, as well as to provide the community with high-speed broadband capability through future connection programs.

projectsin one5

THe VicToriAn DesAlinATion ProjecT is fiVe MAjor ProjecTs in one – MArine works, inleT AnD ouTleT Tunnels, DesAlinATionProcess PlAnT, TrAnsfer PiPeline, AnD unDergrounD Power line.

• A rainfall independent source of water

• 100 per cent offset of electricity by renewable energy certificates

• An exceptional contract in terms of both size and financial make-up

• 35,000 tonnes of equipment shipped to Wonthaggi from Australia and the rest of the world

• More than 25,000 people involved, including suppliers from some 20 countries (Australia, France, Germany, Japan, China, India, Italy and Qatar…)

i5

pro

ject

s in

on

e

Page 6: Suez Victorian Desalination Project

Green Roof

Treated water storage ponds

Pre-treatment

Dual Media Pressure Filters

Reverse Osmosis Building

1

2

3

4

5

06

sit

e to

ur

Page 7: Suez Victorian Desalination Project

1

2 3

4

5

07

sit

e to

ur

Page 8: Suez Victorian Desalination Project

4

3

5

Administrative and utilities complexThe administration building accommodates operation and maintenance staff, the operational control centre, which is the heart of the desalination plant, and a research and development laboratory, monitoring quality and process optimisation.

sea water lift Pumping station (SWLPS) transfers seawater from the underground tunnels to the desalination treatment line. It also returns seawater concentrate to the outlet at the end of the process. • 12 pumps, each capable of moving up to 1m3/second.

Pre-treatmentThe pre-treatment process is one of the key elements contributing to the performance and to the efficiency of the reverse osmosis facility.

This area contains a number of screening facilities to sort both large and fine particles from raw seawater (such as sand and sediment), before it is desalinated.

• 3 large drum screens to remove seaweed and other large suspended solids.• 72 Dual Media Pressure Filters (DMPF) to filter smaller particles.

VirTuAl siTe Tourof THe PlAnT

1

2

3

6

08

sit

e to

ur

Page 9: Suez Victorian Desalination Project

2

1

ro building or desalination processReverse Osmosis (RO) is a desalination process that uses membrane technology.

Filtered seawater passes through two stages of reverse osmosis, where it is pushed through membranes under high pressure to separate salt and water molecules.

In the end, pure water is left on one side, and seawater concentrate (brine) on the other.

• 3 streams, with 51 reverse osmosis racks;• Seawater pushed through 55,000 membranes to separate salt from water.

Potabilisation lineThis is the stage where desalinated water is re-mineralised to meet high quality drinking water standards after the pre-treatment and desalination processes.This area comprises 14 buildings including the lime buildings, RO chemicals, treated water storage ponds, sludge and solids treatment buildings.

54

Transfer pump station• The water transfer pipeline is able to carry up to 200 million m3 of water annually to Cardinia reservoir. • The drinking water is stored before it is distributed into the Melbourne and regional water network. • Water outlet, through which the seawater concentrate, is safely returned to the ocean through diffuser structures.• Ocean currents dilute the concentrate within seconds.

6

09

sit

e to

ur

Page 10: Suez Victorian Desalination Project

oPerATion& MAinTenAnce

10

op

era

tio

n a

nd

ma

inte

na

nce

Page 11: Suez Victorian Desalination Project

They are responsible for the operation of the plant, ensuring water quality compliance and environmental monitoring and compliance.

• Operations and maintenance period till 2039

• full asset management including process equipment and civil infrastructure

• Maintenance of the ecological reserve and the transfer pipeline

• More than 50,000 components to maintain

• A team of 52 people to operate and maintain the infrastructures

i

MeMbers of THe o&M TeAM HAVe been inVolVeD in THe ProjecT since THe beginning, ProViDing sPecific inPuT wiTH resPecT To Design, DeVeloPMenT AnD consTrucTion AcTiViTies.

11

op

era

tio

n a

nd

ma

inte

na

nce

Page 12: Suez Victorian Desalination Project

The project partners & Degrémont have pledged to deliver the most technically advanced, environmentally friendly and energy efficient desalination facility. This project has been put through the highest levels of environmental assessment available under Commonwealth and State laws.

enVironMenTAllYsensiTiVe, energY efficienT DeVeloPMenT

12

Pri

me

exa

mp

le o

f su

sta

ina

ble

dev

elo

pm

ent

Page 13: Suez Victorian Desalination Project

• limited carbon footprint by offsetting operational power with renewable energy certificates

• state of the art architecture and landscaping

• Australia’s largest living green roof of 26,000 square

meters, with 100,000 indigenous plants

• Construction of a 225 ha ecological reserve around the plant, which is one of the largest ecological restoration projects ever undertaken in Victoria

iThe plant is totally integrated into its surroundings and preserves the natural environment by creating an ecological space, thus reducing the environmental

impact. The plant is almost invisible from any public viewing point.

13

Pri

me

exa

mp

le o

f su

sta

ina

ble

dev

elo

pm

ent

Page 14: Suez Victorian Desalination Project

The Community Relations team in Wonthaggi had a strong presence in the local community, working to connect people with fact-based information. Throughout construction, the team distributed information to the community and stakeholders, delivered presentations to groups and hosted regular site tours.A Community Information Centre in the township of Wonthaggi operated throughout the construction period.

• up to 15,000 visitors went to the Community Information Centre during the 3-year construction phase.• A mobile facility which attended community events and local shows.• Many interactions with 125 landowners directly concerned with the project.

AT THe locAl AnD insTiTuTionAl leVel, AnD wiTH our eMPloYees, ongoing DiAlogue is essenTiAl To success.

Engagement with the local community has been undertaken since day one by a team dedicated to community liaison.This strong engagement will continue under the O&M stage.

14

Dia

log

ue

at

the

hea

rt o

f th

e a

ctiv

ity

Page 15: Suez Victorian Desalination Project

sAfeTY objecTiVe: core eleMenT, zero HArM PolicY

As industrial leaders, Degrémont and Thiess make health and safety of employees, contractors and community their highest priority. Safety is a core element in all their business segment processes and an integral part of their management system. Many discussions and campaigns were undertaken to improve health and safety performances.

• More than 18 million hours worked with no serious injuries.• More than 3,000 hours of safety training completed each month.• Project inductions conducted on site, with three sessions run every week. 15

Dia

log

ue

at

the

hea

rt o

f th

e a

ctiv

ity

Page 16: Suez Victorian Desalination Project

Degrémont’s profileDegrémont is a wholly owned subsidiary of SUEZ ENVIRONNEMENT, a world leader exclusively dedicated to water and wastewater management services.

For more than seventy years, Degrémont has been designing, building, equipping, operating and financing facilities that combine technical and economic performance with respect for natural and urban environments.

Degrémont applies its extensive expertise to supporting its public and private sector customers with the most advanced, most appropriate, most reliable and most affordable solutions, tailored to local resources and conditions.

in Australia, Degrémont is a leading water management provider, now supplying over 30% of the country’s population with processed drinking water. Degrémont is involved in the construction and operation of desalination facilities (Perth and Melbourne), water treatment plants (Prospect in Sydney), and wastewater treatment and recycling plants (Pimpama and Noosa).

In February 2011, the government of the State of South Australia awarded SUEZ ENVIRONNEMENT, Degrémont in partnership with Transfield Services the O&M contract for the water services of the city of Adelaide. In February 2012, Degrémont and its partner Transfield Services were selected by the Western Australia Public Water Utility, Water Corporation, to operate and maintain the water production and wastewater treatment assets of the city of Perth, the 4th largest city in Australia.

www.degremont.com

To learn more about the Victorian Desalination Project, please visit the AquaSure website: www.aquasure.com.au

DEGRÉMONT AUSTRALIALevel 7, 5 Rider BoulevardRhodes NSW 2138 Australia