Suburban Park Master Plan Update
Agenda - Public Meeting No. 2 Introductions Overview of planning process Suburban Park Existing Conditions Summary of Previous Work Summary of Research and Outreach Conceptual Alternative Designs Presentation of the Pre-Final Design Public input Next steps
Master Planning Process Goal setting Site analysis Needs assessment and research Conceptual alternative designs Pre-final design Final design Cost analysis Phasing plan
Youth Baseball
Field
Tennis & Pickleball
Courts
Basketball Court
Playground Areas
Trails & BikePaths
Undeveloped and Natural
Areas
Drainage Swale
Previous Master Plan 2003 and Stormwater Studies 2014 and 2015
Previous Study
Site Constraints
Research and Outreach Working with a Study Committee Key Person Interviews Public Meeting No. 1 Public Opinion Survey
Conceptual Alternatives
Nature Play
YourThoughts
Next Steps Goal setting Site analysis Needs assessment and research Preliminary conceptual designs Pre-final design / Public meeting No. 2 Final design Cost analysis Phasing Plan Public Meeting No. 3 (March 27, 2019) Check out
the
On-Line Survey
Thank you for Attending(717) 812-9959