OLA Building Award 2012 Library Architectural and Design Transformation Award project: Thornhill c0mmunity centre library. Submitted by Markham Public Library April 29, 2012. Table of Contents. Table of Contents (cont.). Plans and Drawings. Thornhill Community Centre Library . Site Plan. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/1.jpg)
OLA BUILDING AWARD 2012LIBRARY ARCHITECTURAL AND DESIGN TRANSFORMATION AWARD
PROJECT: THORNHILL C0MMUNITY CENTRE LIBRARY
Submitted by Markham Public LibraryApril 29, 2012
![Page 2: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/2.jpg)
2
Table of ContentsSLIDE
SLIDE
4 Section: Plans & Drawings 15 Interior View Circulation Desk Before
5 Site Plan 16 Interior View Circulation Desk After
6 Ground Floor Plan 17 Interior View Information Desk Before
7 Second Floor Plan 18 Interior View Information Desk After
8 Elevation – Section 1 19 Typical User Area Before9 Elevation – Sections 2 and 3 20 Typical User Area After10 Furniture Plan – Ground Floor 21 Lighting Public Space #111 Furniture Plan – Second Floor 22 Lighting Public Space #212 Section: Photographs 23 Lighting Interior Night View13 Interior View from Entrance
Before24 Interior View Workroom Before
14 Interior View from Entrance After
25 Interior View Workroom After
![Page 3: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/3.jpg)
3
Table of Contents (cont.)SLIDE
SLIDE
26 The Children’s Forest 33 New Program Rooms Before & After
27 Families Gather in the Forest 34 More Space for Civic Events28 Entrance to Forest Before &
After35 Exterior View from Northwest
29 Learning is fun in the Forest 36 Exterior View from Southwest30 Picture Books Before & After 37 Exterior Entrance31 New Study Space 38 FAQs32 More Accessible Collections
![Page 4: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/4.jpg)
4
Thornhill Community Centre Library
Plans and Drawings
![Page 5: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/5.jpg)
5
Site Plan
![Page 6: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/6.jpg)
6
Ground Floor Plan
![Page 7: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/7.jpg)
7
Second Floor Plan
![Page 8: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/8.jpg)
8
Elevation – Section 1
![Page 9: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/9.jpg)
9
Elevations – Sections 2 and 3
![Page 10: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/10.jpg)
10
Furniture Plan – Ground Floor
![Page 11: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/11.jpg)
11
Furniture Plan – Second Floor
![Page 12: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/12.jpg)
12
Thornhill Community Centre Library
Photographs
![Page 13: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/13.jpg)
13
Interior view of library from entrance area - BEFORE
![Page 14: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/14.jpg)
14
Interior view of library from entrance area - AFTER
![Page 15: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/15.jpg)
15
Interior view showing a major public services position: Circulation Desk BEFORE
![Page 16: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/16.jpg)
16
Interior view showing a major public services position: Circulation Desk AFTER
![Page 17: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/17.jpg)
17
Interior view showing a major public services position: Information Desk BEFORE
![Page 18: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/18.jpg)
18
Interior view showing a major public services position: Information / Welcome Desk AFTER
![Page 19: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/19.jpg)
19
Interior view showing a typical user area - BEFORE
![Page 20: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/20.jpg)
20
Interior view showing a typical user area - AFTER
![Page 21: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/21.jpg)
21
Lighting - public space #1 – Public Computers
![Page 22: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/22.jpg)
22
Lighting - public space #2 – Teen Area
![Page 23: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/23.jpg)
23
Lighting - interior view at night
![Page 24: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/24.jpg)
24
Interior view: a major staff function in a nonpublic area - Workroom BEFORE
![Page 25: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/25.jpg)
25
Interior view: a major staff function in a nonpublic area - Workroom AFTER
![Page 26: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/26.jpg)
26
The Children’s Forest The revitalized Children’s Area features an enchanting
mural created by local artist Pat Wheeler, and funded by a generous legacy from the estate of Leonard Wilson Black. The artwork was inspired by the local eco-history of the adjacent Don Valley watershed, designed to instill an appreciation of nature and wildlife from an early age.
Themed programs in the “Forest” include a Woodland Scavenger Hunt, Owl Craft, and lots of animal stories.
![Page 27: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/27.jpg)
27
Families gather in the Forest
There’s even an outhouse – the children’s washroom!
![Page 28: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/28.jpg)
28
Entrance to the Children’s Forest – BEFORE and AFTER
Partition walls were demolished to open up and brighten this lower level space.
![Page 29: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/29.jpg)
29
Learning is fun in the forest
![Page 30: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/30.jpg)
30
Picture Books BEFORE and AFTER
![Page 31: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/31.jpg)
31
New Study Space
Four group study rooms were created through the partitioning of existing space.A new large and bright Study Hall was created on the upper level of the previous theatre space.
![Page 32: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/32.jpg)
32
More Accessible Collections
Collections are now more accessible through merchandising, power walls and C3, Markham’s award-winning customer-friendly classification system
![Page 33: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/33.jpg)
33
New Space – Program Rooms BEFORE and AFTER
New program rooms were created through the demolition of raked theatre-style seating and the insertion of a new floor (the ceiling in this view) dividing a double-height space into two levels.
![Page 34: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/34.jpg)
34
More space for civic and cultural events
Mobile stacks and furniture on wheels makes it easy to create space for civic and cultural events.
![Page 35: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/35.jpg)
35
Exterior View – from northwest
1988 construction The exterior was not significantly changed (apart from a new
window and emergency exit staircase for the new Study Hall).
![Page 36: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/36.jpg)
36
Exterior View – from southwest
1988 construction – not changed by renovation project.
![Page 37: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/37.jpg)
37
Exterior Entrance
1974 construction – not changed by renovation project.
![Page 38: Submitted by Markham Public Library April 29, 2012](https://reader036.vdocuments.site/reader036/viewer/2022062520/568162f5550346895dd36ef0/html5/thumbnails/38.jpg)
38
FAQs: Thornhill Community Library Renovation & Expansion
Completed 2011 Architect: WK Lim Architect inc. Contractor: Charterhouse Projects Inc. Corporate Project Managers: SMA-
METTKO Ltd. Millwork: Shaw Woodworks Inc. Size (post-renovation): 26,053 sq. ft.