Submission Standards WisDOT Fabrication & Field Welding Library Bureau of Structures Wisconsin Department of Transportation Rev. 01/19

Upload: others

Post on 28-May-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

Submission Standards

WisDOT Fabrication & Field Welding Library

Bureau of Structures Wisconsin Department of Transportation

Rev. 01/19

Page 2: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

1

Table of Contents

Referenced Documents ......................................................................................................................... 2

Overview ................................................................................................................................................ 3

High Strength Structural Steel Members (Highway Bridge) ............................................................................. 4

Prestressed Concrete Members (Highway Bridge) ........................................................................................... 5

Prefabricated Steel Truss Pedestrian Bridges ................................................................................................... 5

Retaining Walls ....................................................................................................................................................... 6

Sign Structures ....................................................................................................................................................... 6

Fabricated Bridge Components ............................................................................................................................ 7

Submittal Requirements ........................................................................................................................ 8

Shop Drawings ........................................................................................................................................................ 8

QA Inspection Report........................................................................................................................................... 10

Fabrication Status Report.................................................................................................................................... 10

Final Fabrication Package ................................................................................................................................... 10

All other files .......................................................................................................................................................... 10

Choosing a Content Type.................................................................................................................... 11

Shop Drawing Review ......................................................................................................................... 12

Field Welding Forms ........................................................................................................................... 14

Appendix A – Updating Fabrication Status Reports ........................................................................................ 16

Appendix B – Reviewing a file from SharePoint using Adobe Reader ......................................................... 21

Appendix C – Reviewing a file from SharePoint using Bluebeam................................................................. 25

Bluebeam/SharePoint Setup for First Use.................................................................................................... 25

Editing ................................................................................................................................................................ 28

Appendix D – Changing the Project Management Review Status ................................................................ 33

Symbols in this document

Important Reference to Appendices

Tips

Page 3: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

2

Referenced Documents

WisDOT Standard Specifications https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/rdwy/stndspec.aspx WisDOT Construction Materials Manual (CMM) https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/rdwy/cmm.aspx Fabrication & QA SharePoint https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/strct/fab-sharepoint.aspx Fabrication & QA Construction Resources https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/strct/fab-cnstr.aspx Fabrication & QA SharePoint Policy Memos https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/strct/fab-policy-memos.aspx WisDOT Fabrication & Field Welding Library https://wigov.sharepoint.com/sites/dot-dtsd/scr/SitePages/Home.aspx DT Forms https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/strct/fab-cnstr.aspx

DT Number Frequency Form Name DT2172 W Fabrication Status Report – Steel Bridges DT2320 D Field Welding Checklist DT2326 EA Contractor’s Certificate of Quality Control – Sign Structures DT2327 EA Contractor’s Certificate of Quality Control – Fabricated Bridge Components DT2328 EA Contractor’s Certificate of Quality Control – Prestressed Girders DT2329 EA Contractor’s Certificate of Quality Control – Retaining Walls DT2330 EA Fabrication Storage and Shipping Plan DT2333 EA Contractor’s Certificate of Quality Control – Steel Bridges DT2334 W Fabrication Status Report – Sign Structures and Fabricated Bridge Components DT2335 W Fabrication Status Report – Steel Truss Pedestrian Bridges DT2336 W Fabrication Status Report – Prestressed Girders DT2337 Y Contractor’s Field Welding Plan

D – Daily EA – For each shop drawing W – Weekly Y – Yearly

Page 4: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

3

Overview

For records requiring submittal per Standard Specification 105.2.2, you will need to register with WisDOT Structures Construction Records SharePoint site to access the WisDOT Fabrication & Field Welding Libraries. Visit the following website to request access: http://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/strct/fab-sharepoint.aspx

The tables in this section list all required documentation per structure type, parties responsible for submitting documents and governing WisDOT Specifications.

Summary tables:

High Strength Structural Steel Members (Highway Bridge)

Prestressed Concrete Members (Highway Bridge)

Prefabricated Steel Truss Pedestrian Bridges

Retaining Walls

Sign Structures

Fabricated Bridge Components

For trouble uploading documents, comments or questions, please contact:

Carla Principe @ (608) 261-6110 [email protected]

Kristin Revello @ (608) 266-5090 [email protected]

Page 5: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

4

High Strength Structural Steel Members (Highway Bridge) Upload documents to Fabrication Library unless noted otherwise

Document Submitted by WisDOT Specification Note

DT2330 – Fabrication Storage & Shipping Plan

Fabricator or Contractor 506.3.1.1 • Required before Start of Fabrication

Certified Mill Test Results (CMTR)

Fabricator or Contractor 506.3.21 • Required before Start of Fabrication

DT2333 – Contractor’s Certificate of Quality Control

Fabricator or Contractor 506.3.2

• For Highway Structural Steel Member fabrication only

• Submit one DT2333 form for each revision

• Required before Start of Fabrication • Attach to shop drawing pdf file

Shop Drawings Fabricator or Contractor 506.3.2

• Required before Start of Fabrication • Must include DT2333 • Submit as a single pdf file

Welding Procedure Specifications (WPS)

Fabricator or Contractor

506.3.19.2 506.3.19.3 • Required before Start of Fabrication

DT2172 – Weekly Fabrication Project Status Record

Fabricator 506.3.1.1 • For Highway Bridge Structural Steel Member fabrication only

Non-Destructive Testing (NDT) Reports

Fabricator or Contractor 506.3.19.4

High Strength Structural Bolt Test Results

Fabricator or Contractor 506.3.12

Paint System Thickness Readings

Fabricator or Contractor

506.3.31 506.3.32 STSP

Weekly Quality Assurance Inspection Reports

QA Inspector

RFI/NCR/DIN Fabricator or Contractor

• Submit to: Project Construction Engineer (email)

cc:[email protected]

RFI/NCR/DIN Response Project Construction Engineer

• Submit to: Project Construction

Engineer (email) cc:[email protected]

Page 6: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

5

Prestressed Concrete Members (Highway Bridge) Upload documents to Fabrication Library unless noted otherwise

Document Submitted by WisDOT Specification Note

DT2328 – Contractor’s Certificate of Quality Control

Contractor or Fabricator 503.3.1 • Required before Start of Fabrication

• Attach to shop drawing pdf file

Details for Welded Wire Fabric Alternate Fabricator Standard

Details • Required before submittal of Shop

Drawings and Start of Fabrication

Shop Drawings Fabricator or Contractor 503.3.1

• Required before Start of Fabrication • Submit as a single pdf file, including

form DT2328 DT2336 – Fabrication Status Report for Prestressed Girders

Fabricator 506.3.1 • Submit Weekly

Weekly Quality Assurance Inspection Reports

QA Inspector • Submit to: Region Materials Engineer cc:[email protected]

RFI/NCR/DIN Fabricator or Contractor

• Submit to: Project Construction Engineer (email)

cc:[email protected]

RFI/NCR/DIN Response Project Construction Engineer

• Submit to: Project Construction

Engineer (email) cc:[email protected]

Prefabricated Steel Truss Pedestrian Bridges Submit documents to contacts listed below

Document Submitted by WisDOT Specification Note

Shop Drawings Fabricator or Contractor

Special Provision • Follow Special Provision

DT2335 – Fabrication Status Report Fabrication Special

Provision • Submit to Fabrication Library • Submit Weekly

Welding Procedure Specifications (WPS)

Fabricator or Contractor

506.3.19.2 506.3.19.3

• Follow Special Provision • Required before Start of Fabrication

RFI/NCR/DIN Fabricator or Contractor

• Submit to: Project Construction Engineer (email)

cc:[email protected]

RFI/NCR/DIN Response Project Construction Engineer

• Submit to: Project Construction

Engineer (email) cc:[email protected]

Page 7: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

6

Retaining Walls Upload documents to Fabrication Library unless noted otherwise

Document Submitted by WisDOT Specification Note

DT2329 – Contractor’s Certificate of Quality Control

Fabricator or Contractor

Standard Special Provision

• Required before Start of Fabrication • Attach to shop drawing pdf file

Shop Drawings Fabricator or Contractor

Standard Special Provision

• Submit Shop Drawings at least 30 days before start of fabrication

• Submit as a single pdf file, including form DT2329

RFI/NCR/DIN Fabricator or Contractor

• Submit to: Project Construction Engineer (email)

cc:[email protected]

RFI/NCR/DIN Response Project Construction Engineer

• Submit to: Project Construction

Engineer (email) cc:[email protected]

Sign Structures Upload documents to Fabrication Library unless noted otherwise

Document Submitted by WisDOT Specification Note

Certified Mill Test Results (CMTR)

Fabricator or Contractor 506.3.21

DT2326 – Contractor’s Certificate of Quality Control

Fabricator or Contractor

641.2.8 641.2.9

• Required before Start of Fabrication • Attach to shop drawing pdf file

Shop Drawings Fabricator or Contractor

641.2.8 641.2.9

• Submit Shop Drawings 14 days before start of fabrication

• Submit as a single pdf file, per Structure ID, including form DT2326

DT2334 – Fabrication Status Report Fabricator 641.2.8

641.2.9 • Submit Weekly

Welding Procedure Specifications (WPS)

Fabricator or Contractor

506.3.19.2 506.3.19.3 • Required before Start of Fabrication

Weekly Quality Assurance Inspection Reports

QA Inspector

RFI/NCR/DIN Fabricator or Contractor

• Submit to: Project Construction Engineer (email)

cc:[email protected]

RFI/NCR/DIN Response Project Construction Engineer

• Submit to: Project Construction

Engineer (email) cc:[email protected]

Page 8: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

7

Fabricated Bridge Components Upload documents to Fabrication Library unless noted otherwise

Document Submitted by WisDOT Specification Note

DT2327 – Contractor’s Certificate of Quality Control

Fabricator or Contractor 506.3.2 • Required before Start of Fabrication

• Attach to shop drawing pdf file

Shop Drawings Fabricator or Contractor 506.3.2 • Submit Shop Drawings 14 days before

start of fabrication

DT2334 – Fabrication Status Report

Fabricator or Contractor 506.3.1.2 • Submit Weekly

Certified Mill Test Results (CMTR)

Fabricator or Contractor 506.3.21 • Upload to Fabrication Library

RFI/NCR/DIN Fabricator or Contractor

• Submit to: Project Construction Engineer (email)

cc:[email protected]

RFI/NCR/DIN Response Project Construction Engineer

• Submit to: Project Construction

Engineer (email) cc:[email protected]

Page 9: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

8

Submittal Requirements

Shop Drawings* − Shop Drawings must be submitted in pdf format − Submit a single pdf file per Structure ID − Do not include calculations in shop drawing files; this must be a separate submittal − Do not include transmittal letters in shop drawing files − Do not include material certifications in shop drawing files; this must be a separate submittal − For steel bridge shop drawings, include DT2333 in the shop drawing pdf file − For sign structure shop drawings, include DT2326 in the shop drawing pdf file − For fabricated bridge component shop drawings, include DT2327 in the shop drawing pdf file − For prestressed girder shop drawings, include DT2328 in the shop drawing pdf file − For retaining wall shop drawings, include DT2329 in the shop drawing pdf file

New versions of a shop drawing, including revisions, must be uploaded using the same filename as the original submittal. All previous versions can be viewed through the version history.

Example: Original submittal filename: JOB325A-1234-56-78-WIDOT-PSGirder Revision 01 filename: JOB325A-1234-56-78-WIDOT-PSGirder Revision 02 filename: JOB325A-1234-56-78-WIDOT-PSGirder Revision 03 filename: JOB325A-1234-56-78-WIDOT-PSGirder

1. Uploading the original file Click Upload to submit the original file by clicking Upload. Select the file and complete the Add Document window to check in the file. See the WisDOT Fabrication Library User Guide for upload instructions.

Page 10: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

9

2. Uploading a new version (revision) of a file Submit revisions by the drag and drop method as shown in the screenshot below.

Metadata for the file can be edited in file Properties menu

Page 11: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

10

For the first revision change the Shop Drawing Version. Click Revision Click Save

QA Inspection Report

− Report must be submitted in pdf format − Submit one pdf file per Structure ID

Fabrication Status Report

− For steel bridge weekly status reports, update excel form DT2172 − For sign structure or fabricated bridge component weekly status reports, update excel form D2334 − For pedestrian bridge weekly status reports, update excel form DT2335 − For prestressed girder weekly status reports, update excel form DT2336

See Appendix A for step by step instructions for updating weekly status reports in SharePoint

Final Fabrication Package

− Submit as zipped folder under Content Type: Erection Plan

All other files − Submit in pdf format − Submit one pdf file per Structure ID

Choose a Content Type for each uploaded file Files with no Content Type or incomplete information fields will not be checked-in; the file will remain checked out to the person uploading the file.

See the WisDOT Fabrication Library User Guide for instructions on how to edit the file properties and check-in the document.

Page 12: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

11

Choosing a Content Type

Fabrication Library

File Content Type Any meeting minutes Meeting Minutes Communication Logs Meeting Minutes Storage and Shipping plan and/or details Storage & Shipping Plan Mill certifications Mill Certification Heat number reports Mill Certification Material traceability reports Mill Certification Shop drawing Shop Drawing Revision to Shop Drawing Shop Drawing Welded Wire Fabric/Mesh Substitutions Welded Wire Fabric Alternate Calculations Calculations Welding procedure specifications (WPS) WPS-PQR Procedure qualification records (PQR) WPS-PQR Welder qualification records (WPQR) WPS-PQR Welder continuity records WPS-PQR Butt welding form Butt Welding Log Fabrication status report Fabrication Status Report Test results for high strength steel bolts tested at fabrication shop HSS Bolt Test Results Test results for shear studs HSS Bolt Test Results DFT measurements Coating QC Inspection Report Paint specifications Coating QC Inspection Report Surface blasting report and notes Coating QC Inspection Report Erection plan Erection Plan Final fabrication package Final Fabrication Package QA inspection reports QA Inspection Report

Field Welding Drop-Off Library

File Content Type Field welding plan DT2337 Field welding checklist DT2320

Page 13: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

12

Shop Drawing Review

Fabricators & Contractors Follow the file submittal requirements for shop drawings. The acceptance of shop drawings is shown as Shop Drawing Status in the Fabrication Library and will be dependent on both BOS and project management acceptance of the shop drawings. Available Statuses Revise & Resubmit – Upload a revision of the shop drawing addressing all comments Accepted – No revisions needed. Proceed with fabrication. Accepted with corrections as noted – No revisions needed. Comments must be addressed during fabrication. Proceed with fabrication. Upload revised versions of shop drawings if any minor changes are made during fabrication or if any revisions were required by the fabricator’s quality control review.

Page 14: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

13

Project Leaders Follow the submittal requirements for shop drawings. Bureau of Structures does not review all shop drawings. However, a sample of shop drawings are reviewed based on fabricator, field conditions or structure complexity. BOS review comments are included in the shop drawing, marked by a stamp showing the review date and name of reviewer.

The Shop Drawing Status will be dependent on both BOS and project management acceptance of the shop drawings. The WisDOT Fabrication Library allows for project management reviewers to choose the review status of the shop drawing.

Reviewers, please include comments within the shop drawing pdf file. There are 3 ways of doing this:

A. (1) Download the file to your computer

(2) Open and Edit the file in a pdf editor (e.g. Adobe Reader, Bluebeam) (3) Save the file (do not change the filename) (4) Re-upload the file to the Fabrication Library; with the same filename, to replace the original (5) Change the review status in the file properties. To change the review status, follow the steps listed in Appendix D.

B. Open the file directly from SharePoint with Adobe Reader. See Appendix B.

C. Open the file directly from SharePoint with Bluebeam Revu. See Appendix C.

Page 15: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

14

Field Welding Forms

Contractor Submit an updated form DT2337 by January 31st each year. Email the form and all attachments to [email protected]. Form DT2320 must be completed by the contractor’s designated inspector for each day of welding.

Submit form DT2320 to the Project Construction Engineer/Construction Engineer/Resident Engineer representing WisDOT in the field. This form is considered an inspection report; it must be filled out on the day of welding, during the welding process and must contain factual observations of visual inspection of each weld. Preheat temperatures, voltage and amperage are to be recorded to verify compliance with the approved welding procedure specifications. The inspector must sign and date the form certifying that all statements are accurate. Project Leader Review and sign form DT2320. Submit form DT2320 to the WisDOT Field Welding Library.

The engineer should check the form for completeness and conformance to the field welding plan. Contact the Fabrication Unit (SFU) if you have any questions regarding review of the form. This form (DT2320) is considered and inspection report and must not be filled out retroactively.

Page 16: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

15

Appendices

Appendix A – Updating Fabrication Status Reports Appendix B – Reviewing a file from SharePoint using Adobe Reader Appendix C – Reviewing a file from SharePoint using Bluebeam Appendix D – Changing the Project Management Review Status

Page 17: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

16

Appendix A – Updating Fabrication Status Reports

How to update excel Fabrication Status Report forms in SharePoint Please refer to the steps and associated screenshots shown in steps 1 through 9.

1. To open the Excel file in the browser: Click the filename

2. Click Edit Workbook

Page 18: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

17

3. Click Open in Excel

4. If prompted: Check Always open these types of links in the associated app Click Open Excel

Page 19: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

18

5. Excel will open automatically. Click Edit Workbook

6. If prompted to edit REQUIRED PROPERTIES, click Edit Properties… Otherwise move on to Step 8

Page 20: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

19

7. Edit the required property, then click the top-left arrow to return to the document

8. Edit the worksheet with the required information and click Save Close Excel

Page 21: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

20

9. To view the updated DT form in the internet browser, refresh the page

Tip: Adding extra rows Click Home tab In the Cells group, click Insert Click Insert Sheet Rows, this will insert a row above the selected cell

Page 22: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

21

Appendix B – Reviewing a file from SharePoint using Adobe Reader

1. Click on the Document Name

2. Highlight the file URL. Right-click the highlighted URL and click Copy.

Page 23: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

22

3. Open Adobe Reader. Click File > Open

4. Right-click the File name bar and click Paste

Page 24: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

23

5. Click Open

6. Edit the document (add comments, stamp, or signatures)

Page 25: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

24

7. Click Save Close Adobe and return to the WisDOT Fabrication Library

8. Change the review status in the file Properties.

Page 26: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

25

Appendix C – Reviewing a file from SharePoint using Bluebeam Bluebeam/SharePoint Setup for First Use

1. Click Revu > Preferences

2. Click Interface > Click + to add the URL for Structures Construction Records

Page 27: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

26

3. Enter the following information: Site: https://wigov.sharepoint.com/sites/dot-dtsd/scr Login Name: email used to log in to SharePoint Password: password used to log in to SharePoint Click OK

4. Enter your Login Name in the window prompt

Page 28: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

27

5. Enter your Password in the window prompt. The screen will be different for @dot.wi.gov and external email addresses. Click Yes when prompted to stay signed in. Choosing No will not allow Bluebeam to Open SharePoint files without a login prompt or resulting in an error.

6. The URL and Status will show in ‘File Access/DMS Type’. Click OK.

Page 29: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

28

Editing

1. Open Bluebeam Revu, click File > Open

2. Navigate WisDOT Fabrication Library folders to the file Select the file, click OK

Page 30: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

29

3. Click the Lock icon. Click Check Out to edit the file

4. Edit the file (add comments, stamp, signatures)

Page 31: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

30

5. Edit the Review Status. Click the checked-out icon. Click Properties.

.

6. Double-click Project Management Review. Select the status from the drop-down. Click OK.

Page 32: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

31

7. If uploading and/or editing a revision verify the Shop Drawing Version is correct. Double-click on Shop Drawing Version. Select the status from the drop down. Click OK.

8. After the shop drawing review status and version have been changed and verified, click OK.

9. Optional: Flatten document

Page 33: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

32

10. Click the checked out icon Click Check-in to save the file to the WisDOT Fabrication Library Add comments in the message box and click check-in.

Page 34: Submission Standards · Welding Procedure Specifications (WPS) Fabricator or Contractor : 506.3.19.2 . 506.3.19.3 • Required before Start of Fabrication Weekly Quality Assurance

WisDOT Fabrication & Field Welding Library – Submission Standards

33

Appendix D – Changing the Project Management Review Status