study on study on physical and non-physical barriers along ......interoperability along the kti...
TRANSCRIPT
![Page 1: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/1.jpg)
Study on
Study on Physical and Non-physical
barriers along KTI corridor
![Page 2: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/2.jpg)
27
Map of KTI railway corridor and other connected corridors
KTI railway corridor; ECO Rail route 4; CAREC DRC 603
( + INSTC; ITTC) Source: ECO map adapted by the author
Defining KTI corridor
Kazakhstan:(Uzen - Bolashak/TRK border) (cca 140 km)
Turkmenistan: (KAZ border/Serkhetyaka -Godurolum/ IRN border (cca 700 km)
Islamic Republic of Iran: (TKM border / Incheh Borun -Gorgan) (cca 90 km)
Total: cca 930 km
2
![Page 3: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/3.jpg)
By key segments:
Uzen – Bolashak/TKM border (KAZ)
KAZ border/Serkhetyaka – Bereket (TKM)
Bereket – Godurolum/IRN border (TKM)
TKM border/Incheh Borun – Gorgan (IRN)
Railway freight traffic (2015-2018)
number of trains/wagons/containers handled
cross border (freight handed over at border)
weight/volume of cargo:
o (North –South) (South – North)
o IM,EX, and transit
international (domestic) transport
Main types of goods
containerized / general cargo/ bulk cargo
Current and projected freight flows along KTI corridor
3
![Page 4: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/4.jpg)
Railway infrastructure and rolling stock along the KTI railway corridor
Overview of national railways
(general info)
Railway infrastructure along KTI corridor:
Rail tracks
Supporting systems employed (signaling, telecommunication, traffic management)
Conditions of rail infrastructure
Capacity for infrastructure maintenance
Infrastructure capacity to carry out traffic volumes
4
![Page 5: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/5.jpg)
Railway infrastructure and rolling stock along the KTI railway corridor
Rolling stock available along KTI corridor:
Locomotives available
Wagons available
Conditions of rolling stock available
Capacity for rolling stock maintenance and repair
Availability to carry out traffic volumes
5
![Page 6: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/6.jpg)
Railway infrastructure and rolling stock along the KTI railway corridor
Railway stations and their capacities:
Border Crossing / Interchange stations
Distributing / marshaling stations
Locomotive depots
Freight stations
Passenger (only) stations
Passing wayside stations
6
![Page 7: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/7.jpg)
Key Stations along
KTI railway Corridor
KAZ: Uzen and Bolashak
TKM: Serkhetyaka; Bereket; Etrek; and Godurolum
IRN: Incheh Borun and Gorgan
7
![Page 8: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/8.jpg)
Interoperability along the KTI corridor
From individual national railways networks
to interoperable and well connected KTI railways corridor
The comprehensive approach to railways interoperability:
Legal, Technical and Operational Interoperability
Main focus on border crossing and non-physical barriers
Common parameters for interoperability
8
![Page 9: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/9.jpg)
Interoperability along the KTI corridor
Technical Interoperability
Legal Interoperability
Operational Interoperability
▪ TECHNICAL: Common technical parameters of railways infrastructure and rolling stock
▪ LEGAL: Railway regime
▪ OPERATIONAL: harmonized operation practice over an entire international route (Railways / Customs / OGA)
9
![Page 10: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/10.jpg)
Technical Interoperability
10
![Page 11: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/11.jpg)
Interoperability along the KTI corridor
The technical parameters allow wagons to
continue the route.
Locomotive of the entry railway will replace
the locomotive of the exit railway
Harmonized legal environment between the
two railways (OSJD, Multilateral, Bilateral)
The train stops consecutively at the border
stations of each country for border crossing
procedures (Railways, Customs, OGA)
BORDER STOPKAZBolashak
BORDER STOPTKMSerkhetyaka
Railway 1 Railway 2
11
![Page 12: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/12.jpg)
Interoperability along the KTI corridor
The track gauge of the two railways is
different and bogie change is necessary at
the border station.
The locomotive of the entry railway will
replace the locomotive of the exit railway.
Harmonized legal environment between the
two railways (OSJD, Multilateral, Bilateral)
The train stops consecutively at the border
stations of each country for border crossing
procedures (Railways, Customs, OGA)
Railway 1 Railway 2
Bogie Change
12
BORDER STOPTKMGodurolum
BORDER STOPIRNIncheh Borun
![Page 13: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/13.jpg)
RAILWAY OPERATIONAL PRACTICES
Commercial handover at border crossing/interchange stations
Technical handover at border crossing/interchange stations
Equipment available for support of commercial and technical inspections
Dealing with break of gauge
Marshaling / Re-marshaling
Automation and computerization of railway transport operations
Information exchange among railways and Customs/OGA
13
Operational practices at key railway stations along the KTI railway corridor
![Page 14: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/14.jpg)
CUSTOMS FORMALITIES
Formalities at border line/border gate
Pre-arrival declaration to Customs
Customs Risk Management
Arrival of train and entry of goods into
customs territory
Type of customs procedures at key stations
Customs Transit
Import/Export Clearance
Temporary admission of rolling stock /
containers
14
Customs formalities along the KTI railway corridor
![Page 15: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/15.jpg)
15
![Page 16: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/16.jpg)
OTHER FORMALITIES AND STAKEHOLDERS
Other regulatory formalities
• Border security / Immigration control
• Veterinary inspection
• Phytosanitary inspection
• Technical standards / etc.
Coordination among the control agencies
(national level – behind the border)
Coordination among the control agencies
(international level – across the border)
Other stakeholders at key stations
16
Other regulatory formalities along the KTI railway corridor
![Page 17: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/17.jpg)
17
![Page 18: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/18.jpg)
LINKAGES OF KTI RAILWAY CORRIDOR WITH
OTHER TRANSPORT CORRIDORS:
Uzen – Eralieavo – Aktau – Mangyshlak – Beineu
– Makat – Kandagach – (Aktobe – Zhaisan) or
(Nikltau – Kirilda) (connection with Russian
Federation)
Uzen – Eralieavo – Aktau – Mangyshlak – Beineu –
Makat – Atyrau – Ganushkino - Aksarayskaya)
(connection with Russian Federation)
Uzen – Eralieavo – Aktau – Mangyshlak – Beineu –
Shalkar – (Astana) or (Dostyk) (connection with
China) or (Almaty – Altynkol) (connection with
China)
Bereket – Turkmenbashi
Bereket – Ashgabat
Gorgan – Tehran – Qom – (Esfahan) – Yazd – Bafq
– Bandar Abbas
Gorgan – (missing link) Shahrud – Neyshabur –
Torbat e Heydariyeh – Bafq – Bandar e Abbas
Gorgan – Tehran – Bafq – Kerman – Zahedan –
(missing link) Chabahar
KTI RAILWAY CORRIDOR COMPETING ROUTES
18
![Page 19: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/19.jpg)
Key Stations along the
corridors linked with
KTI railway Corridor
KAZ: Aktau/Mangyshlak, Aktobe, other
TKM: Balkanabat, Ashgabat
IRN: Sari, Tehran (Aprin), Bandar Abbas
19
![Page 20: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/20.jpg)
Performance of KTI railway corridor
➢ Option I: Use Questionnaire data
➢ Option II: Organize limited exercise (e.g. for 2-3 actual trains) using:
ESCAP Time/Cost Distance Methodology
▪ Time to move across key segments
▪ Time spent at stations / border crossing
(detailed reasons for delay)
▪ Cost incurred at stations / border crossing
20
![Page 21: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/21.jpg)
21
Zamyn Uud
1000 km
Average speed
22.4 km/h
Tianjin, 0 km
75 hrs 31 min.
500 km 1000 km 2000 km1500 km
Day 4
1,691 km33.7 km/h
04.18 a.m.
Day 3
Day 2
Day 129 hrs 12 min.
Erenhot, 983 km
02.30 a.m.
05.59 a.m.20 hrs 31 min.
Ulaanbaatar1700 km
Shunting + train formation:
3 hrs. 35 min.
Transhipment:(3.5 min. per box)
3 hrs. 20 min.
4 hrs. 50 min.Mongolia,
China, 3 hrs. 00 min.Customs:
Example of TCD application: Tianjin-Ulaanbaatar Railway link
![Page 22: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/22.jpg)
22
![Page 23: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/23.jpg)
23
KTI Railway Corridor competing routes
![Page 24: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/24.jpg)
Ways to address physical and non-physical barriers along the KTI corridor
Addressing railway infrastructure and rolling stock gaps
Enhancing technical interoperability
Options for higher legal interoperability
Electronic information exchange among stakeholders
Harmonization of customs transit formalities
Standard operating procedure for break of gauge
Simplification and standardization of documents / procedures
Training of railway, customs and other officials
24
![Page 25: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/25.jpg)
Corridor Management Mechanism for KTI railway corridor
RAILWAY CORRIDOR MANAGEMENT MECHANISM PRACTICES
EU experience in railway corridor management
EU Regulation No 913/2010 concerning a European rail network for competitive freight
Examples of EU rail freight corridor (RFC) (e.g. North Sea Baltic)
Eurasian railway corridor experience
Joint stock company United Transport and Logistics Company Eurasian Rail Alliance – JSC UTLC ERA
Other experiences
(e.g. East West Transport Association (EWTCA), Viking Train project)
25
![Page 26: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/26.jpg)
Corridor Management Mechanism for KTI railway corridor
Possible Options to be
considered
New governmental trilateral arrangement on KTI railway corridor;
Extension of present governmental multilateral arrangement (Relation with other initiatives: e.g. INSTC, Ashgabat Agreement);
Trilateral (multilateral) railways (and logistics)(business) arrangement
26
![Page 27: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/27.jpg)
Corridor Management Mechanism for KTI railway corridor
Key features of the KTI corridor management mechanism
KTI corridor management mechanism implementation plan
KPI to monitor:• implementation of KTI CMM
implementation plan
• KTI railway corridor productivity
27
![Page 28: Study on Study on Physical and Non-physical barriers along ......Interoperability along the KTI corridor From individual national railways networks to interoperable and well connected](https://reader035.vdocuments.site/reader035/viewer/2022070822/5f28dd1665d36e2f883a3fe1/html5/thumbnails/28.jpg)
THANK YOU FOR THE KIND ATTENTION !
28