structural bmp compliance approach for california state parks in … · 2015. 10. 21. · “the...
TRANSCRIPT
![Page 1: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/1.jpg)
Structural BMP Compliance Approach for California State Parks in 5+ ASBS
Brian Currier, Water Programs, Sacramento State
CASQA 2015 ‐Monterey
![Page 2: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/2.jpg)
Project Team• State Parks, Facilities Management
Division (FMD), Stormwater Program• Water Programs at Sacramento State• AMEC Foster Wheeler
2
![Page 3: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/3.jpg)
Objectives• Review the ASBS Timeline for Phase II• Contrasting ASBS Submittal Requirements• Review Parks and Recreation Facilities
Requirements • Overview of the BMP retrofit program• Identify potential BMP partnership
opportunities
3
![Page 4: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/4.jpg)
Regulations Timeline• 2009 letter accepts State Parks application• 2012 General Exception 2012-0012
adopted, but requires permit coverage• 2013 Phase II permit adopted• 2014/15 State Parks receives initial
funding
4
![Page 5: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/5.jpg)
15 Phase II ASBS Park Units
5
http://webpages.csus.edu/~smeyer/stateparks.htm
![Page 6: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/6.jpg)
Phase II, Attachment C vs. 2012‐0031Submittal Requirements
I.A.3.b Compliance Schedule, Resolution No. 2012-0031“…a draft written ASBS Compliance Plan…”
I.A.3.b Compliance Schedule, Phase II, Attachment C“…a written ASBS Compliance Plan…”
6
![Page 7: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/7.jpg)
Phase II, Attachment C vs. 2012‐0031Submittal Requirements
I.A.3.b Compliance Schedule, Resolution No. 2012-0031“The final ASBS Compliance Plan, including a description and final schedule for structural controls based on the results of runoff and receiving water monitoring, must be submitted within thirty (30) months from the effective date of the Exception”
I.A.3.b Compliance Schedule, Phase II, Attachment C“The ASBS Compliance Plan shall include a time schedule to implement appropriate non-structural and structural controls (implementation schedule) to comply with these special conditions.”
7
![Page 8: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/8.jpg)
RegulationsParks and Recreation FacilitiesAttachment C, II.A.6
…include BMPs or Management Measures/Practices to address runoff from parking areas and other developed features to ensure that the runoff does not alter natural water quality in the affected ASBS. BMPs or Management Measures/Practices shall include measures to reduce pollutant loading in runoff to the ASBS through installation of natural area buffers (LID), treatment, or other appropriate measures.
8
![Page 9: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/9.jpg)
BMP Retrofit Strategy• Inventory all parking lots• Identify direct drainage to
ASBS• Identify substantial erosion
prone areas with anthropogenic influence
9
![Page 10: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/10.jpg)
Retrofit List• Del Norte State Park (Redwood National Park
ASBS): Parking lot near Wilson Creek• Prairie Creek State Park (Redwood National Park
ASBS): Beach Road parking lot• Salt Point State Park (Gerstle Cove ASBS):
Gerstle Cove visitor center parking lot• Aňo Nuevo State Park and Reserve (Aňo Nuevo
ASBS): Wheelchair Access parking lot • Point Lobos State Natural Reserve (Point Lobos
ASBS): 9 parking lots!
10http://webpages.csus.edu/~smeyer/stateparks.htm
![Page 11: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/11.jpg)
Park Units with parking lots with direct runoff to ASBS (cont.)Retrofit list (cont.)• Point Mugu State Park (Laguna Point to Latigo
Point ASBS): Sycamore Canyon parking lot• Leo Carrillo State Park (Laguna Point to Latigo
Point ASBS): 2 parking lots • Robert H. Meyer Memorial State Beach (Laguna
Point to Latigo Point ASBS): 3 parking lots• Point Dume State Beach (Laguna Point to Latigo
Point ASBS): Cliffside Drive parking lot• Crystal Cove State Park (Irvine Coast ASBS): 4
parking lots
11http://webpages.csus.edu/~smeyer/stateparks.htm
![Page 12: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/12.jpg)
• Hierarchy of BMP technologies considered:– Stormwater capture and use
(groundwater recharge)– Bioretention and other LID techniques
that maximize infiltration– Stormwater filtration BMPs
12
BMP Retrofit Siting Study
![Page 13: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/13.jpg)
Retrofit Locations
13
http://webpages.csus.edu/~smeyer/stateparks.htm
1. Search here
2. Select here
![Page 14: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/14.jpg)
Wilson Beach
14
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Del Norte State Park
![Page 15: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/15.jpg)
Gerstle Cove Visitor Center
15
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Salt Point State Park
![Page 16: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/16.jpg)
Wheelchair Access Lot
16
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Ano Nuevo State Park
![Page 17: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/17.jpg)
9 Lots at Point Lobos
17
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Point Lobos State Natural Reserve
![Page 18: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/18.jpg)
Sycamore Canyon
18
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Point Mugu State Park
![Page 19: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/19.jpg)
Leo Carrillo
19
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Leo Carrillo
![Page 20: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/20.jpg)
Robert H. Meyer: 3 lots
20
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Robert H. Meyer
![Page 21: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/21.jpg)
Cliffside Dr.
21
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Point Dume State Beach
![Page 22: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/22.jpg)
Crystal Cove: 4 lots
22
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Crystal Cove SP
![Page 23: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/23.jpg)
Carmel River Parking: Erosion Prone Area
23
http://webpages.csus.edu/~smeyer/stateparks.htm Search: Carmel River State Beach
![Page 24: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/24.jpg)
Next Steps• Compliance Plans: Complete!• QAPP: under SWRCB review• 2015/16 wet season: begin monitoring• 2016/17: begin BMP planning
– Siting and design– Permitting: CEQA, drainage easements, Coastal
Commission, etc.– Construction via district contracting– Construction management via A&E contract to be
advertised late 2016.
24
![Page 25: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural](https://reader035.vdocuments.site/reader035/viewer/2022071422/611bc26ab09bea7ec463ef13/html5/thumbnails/25.jpg)
Contact Information
• Michael Stephens (916) 324-0412
• Brian Currier, OWP (916) 278-8109
25