strategy rollover 2015-2020 - temenos · at24 architecture final design bank albilad roadmap what...

21
Bank Albilad Success Story Implementing Temenos Core Banking (T24) on SQL

Upload: vanminh

Post on 02-Jul-2018

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

Bank AlbiladSuccess Story Implementing Temenos Core Banking (T24) on SQL

Page 2: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

EstablishmentBank Albilad is a Saudi joint stock company, established vide Royal Decree 48/M on 21/9/1425H (corresponding to 4 November 2004) with a corporate capital of 6,000,000,000 Saudi Riyals

Vision

To be the preferred choice of genuine Islamic banking solutions.

MissionTo strive through initiatives and innovation to provide our banking services on a genuine Islamic basis to meet the ambitions of our stakeholders: clients, employees and shareholders

Values

Initiative and Innovation, Care and Partnership, Trust and Accountability

Bank Albilad

2

About

Page 3: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

Project Team

3

The Stars of the Project success

• Petros Stamatakos

• Abou Bahaj

Temenos

• Umit Tirix

• Batuhan Yildiz

Microsoft

• Ahmed AlZikan

• Marc Timothy

• Development Team

Bank Albilad

Page 4: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

A

Bank Albilad RoadmapResearch

Market Research

Page 5: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

A

Market ResearchTemenos vs others

Page 6: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

A

Market Research

• T24 is deployed across 110 countries in nearly 500 banks. The product is programmed in a domain language and is used to generate jBC, Java, C, JavaScript and XML. It runs over Unix (HP, IBM and Sun), Linux and Windows on Oracle, DB2, Microsoft SQL Server and its proprietary jBase databases.

• The T24 Process Workflow Designer provides an Eclipse-based, BPMN 2.0-compliant graphical modeler for business processes and human workflows. This enables the business to logically model business processes and link its activities with T24 business functions, for either human or automated system execution within T24 and the Process Workflow module.

• Temenos Group drives medium- and long-term strategy through an interlock structure that focuses investment in targeted market segments.

• T24 provides support for event-driven architecture (EDA), WebSphere Message Broker software.

Temenos T24

Page 7: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

A

Market RevenuesOperating systems

Page 8: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

A

Market RevenuesProcessor type

Page 9: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

A

Market RevenuesDatabases

Page 10: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

A

INTEL(Windows/Linux)

MAINFRAME(Z/OS)

RISC(AIX/Solaris/HP-UX)

Training 1$ 10$ 5$

Maintenance Cost

1$ 10$ 5$

Administratorsalary

1$ 2$ 1.5$

Availability of resources

High Very low andaging

low

Market RevenuesTotal Cost of Ownership

Page 11: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

AOld AIX/Jbase

Architecture

Bank Albilad RoadmapWhere we used to be

Page 12: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

WAN

Old AIX ArchitectureUnix – 2006-2012

Page 13: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

ANew Windows / SQL Architecture

Page 14: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

WAN

New ArchitectureBank Albilad Roadmap

Page 15: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

C

Description AIX T24 Windows T24

Server IBM Cisco

Hypervisor IBM PowerVM Vmware

Operating system IBM AIX MS DC Edition 2012

Storage Brocade/EMC EMC

Switch Cisco Cisco

Database JBASEMS SQL 2012

AlwaysOn

Application Temenos R11 Temenos R11

Comparison

Bank Albilad Roadmap

Page 16: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

A

Activity AIX T24/Jbase Windows/SQL T24

Virtualization No Yes

Disaster Recovery Corruption No Corruption

24x7 OperationNo.

It requires downtime minimum once a week, for file resizing

Yes.There is no downtime

BackupOffline, weekly, only before

COBOnline, daily, before and

after COB

COB time 1 hrs. 49 min. Less than 2 hrs.

Resiliency2 offline servers, 1 in MDC and

1 in SDC

Online redundancy fully in 2 different sites and 3rd

for historical logs

Online deployment No Yes

Always on No Yes

Log Shipping No Yes

Comparison

Bank Albilad Roadmap

Page 17: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

AT24 Architecture

final design

Bank Albilad RoadmapWhat we achieved

Page 18: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

Bank Albilad

18

T24 Architecture final design

Page 19: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

Bank Albilad

19

Go Live Day

Page 20: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

APartners

Page 21: Strategy Rollover 2015-2020 - Temenos · AT24 Architecture final design Bank Albilad Roadmap What we achieved . Bank Albilad 18 T24 Architecture final design . Bank Albilad 19 Go

Thanks you

Bank Albilad © April , 2017