TURN TO THE SUN INVEST IN SOLAR POWER PLANTS HODOVO ECO ENERGY d.o.o. ANAREA d.o.o. Own investment 30% Strategic partner: 50% Addional private investment: 20% Project financing Contacts: Eco energy d.o.o., Gracanica, Bosnia and Herzegovina E-mail: [email protected] Tel: 00387 35 707 800 www.ecoenergy.ba Anarea d.o.o., Mostar, Bosnia and Herzegovina E-mail: [email protected] Tel: 00387 63 311 959

Upload: others

Post on 14-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Strategic partner: 50% TURN TO THE  ECO ENERGY 2.pdf · AFISA ECO 2.cdr Author: Tabako Main Created Date: 6/3/2016 1:35:52 PM

TURN TO THE SUN

INVEST IN SOLAR POWER PLANTS

HODOVO

ECO ENERGY d.o.o.ANAREA d.o.o.

Own investment 30%

Strategic partner: 50%

Addi�onal private investment: 20%

Project financing

Contacts:

Eco energy d.o.o.,

Gracanica, Bosnia and Herzegovina

E-mail: [email protected]

Tel: 00387 35 707 800

www.ecoenergy.ba

Anarea d.o.o., Mostar, Bosnia and Herzegovina E-mail: �[email protected] Tel: 00387 63 311 959

Page 2: Strategic partner: 50% TURN TO THE  ECO ENERGY 2.pdf · AFISA ECO 2.cdr Author: Tabako Main Created Date: 6/3/2016 1:35:52 PM

Loca�on: Bosnia and Herzegovina Stolac-Hodovo

Stolac

Distances between major regional centers

Dubrovnik 80 Km

Stolac

Mostar 30 Km

Stolac

Sarajevo 130 Km

Basic informa�on:

100 % private ownership

Total power plant of 900 kW

The most favorable clima�c condi�ons in Bosnia and Herzegovina

High-quality road infrastructure and proximity to the future highway -

Corridor Vc

Loca�ons with the highest number of sunny days a year - sta�s�cally determined

Close to toll transmission line

Stolac

Koridor Vc

The main equipment

:

PV panels REC 240 PE Inverter SMA SUNNY Tripower

15000 TL

Radox solar cables Monitoring system SMA portal

Atmosheric discharge protec�on system Hermi

Data on solar radia�on

Based

on

reports

from

PVGIS

European

Communi�es,

2001-2010

year,

the

most

important

data

on

solar

radia�on

at

coordinates

430

and

170

4I

57I

53II

13II

east

longitude

and

69

meters

above

sea

level

are:

Summary global radia�on is hm

= 1740 kWh/m2 and

Chance of electricity produc�on Em = 1330 kWh / kWp

Capital investments and returns:

The amount of investment €

1,700,000

The first phase of €

380,000

Profitability of investment a�er 8 years

Expected annual income of € 420,000

Net present value NPV: € 30,396

Internal rate of return IRR 8%