strategic partner: 50% turn to the eco energy 2.pdf · afisa eco 2.cdr author: tabako main created...
TRANSCRIPT
![Page 1: Strategic partner: 50% TURN TO THE ECO ENERGY 2.pdf · AFISA ECO 2.cdr Author: Tabako Main Created Date: 6/3/2016 1:35:52 PM](https://reader034.vdocuments.site/reader034/viewer/2022050109/5f46b875a4f5d163416bd352/html5/thumbnails/1.jpg)
TURN TO THE SUN
INVEST IN SOLAR POWER PLANTS
HODOVO
ECO ENERGY d.o.o.ANAREA d.o.o.
Own investment 30%
Strategic partner: 50%
Addi�onal private investment: 20%
Project financing
Contacts:
Eco energy d.o.o.,
Gracanica, Bosnia and Herzegovina
E-mail: [email protected]
Tel: 00387 35 707 800
www.ecoenergy.ba
Anarea d.o.o., Mostar, Bosnia and Herzegovina E-mail: �[email protected] Tel: 00387 63 311 959
![Page 2: Strategic partner: 50% TURN TO THE ECO ENERGY 2.pdf · AFISA ECO 2.cdr Author: Tabako Main Created Date: 6/3/2016 1:35:52 PM](https://reader034.vdocuments.site/reader034/viewer/2022050109/5f46b875a4f5d163416bd352/html5/thumbnails/2.jpg)
Loca�on: Bosnia and Herzegovina Stolac-Hodovo
Stolac
Distances between major regional centers
Dubrovnik 80 Km
Stolac
Mostar 30 Km
Stolac
Sarajevo 130 Km
Basic informa�on:
100 % private ownership
Total power plant of 900 kW
The most favorable clima�c condi�ons in Bosnia and Herzegovina
High-quality road infrastructure and proximity to the future highway -
Corridor Vc
Loca�ons with the highest number of sunny days a year - sta�s�cally determined
Close to toll transmission line
Stolac
Koridor Vc
The main equipment
:
PV panels REC 240 PE Inverter SMA SUNNY Tripower
15000 TL
Radox solar cables Monitoring system SMA portal
Atmosheric discharge protec�on system Hermi
Data on solar radia�on
Based
on
reports
from
PVGIS
European
Communi�es,
2001-2010
year,
the
most
important
data
on
solar
radia�on
at
coordinates
430
and
170
4I
57I
53II
13II
east
longitude
and
69
meters
above
sea
level
are:
Summary global radia�on is hm
= 1740 kWh/m2 and
Chance of electricity produc�on Em = 1330 kWh / kWp
Capital investments and returns:
The amount of investment €
1,700,000
The first phase of €
380,000
Profitability of investment a�er 8 years
Expected annual income of € 420,000
Net present value NPV: € 30,396
Internal rate of return IRR 8%