STORMWATER MANAGEMENT
REPORT
Homebush Apartments
Cnr Powell St and Parramatta Rd, Homebush, NSW
February 2015
Prepared by: ACOR Consultants Pty Limited
Level 1, 24 Falcon Street
CROWS NEST NSW 2065 Tel: 02 9438 5098 Fax: 02 9438 5398
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page ii
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................................ iv
1 INTRODUCTION ................................................................................................................... 1
1.1 Purpose of Report ................................................................................................................. 1
1.2 Project Description ................................................................................................................ 1
1.3 Guidelines and Standards ..................................................................................................... 1
2 EXISTING CONDITIONS ...................................................................................................... 2
2.1 Existing Site Description ........................................................................................................ 2
2.2 Existing Stormwater Drainage ............................................................................................... 2
3 PROPOSED DEVELOPMENT .............................................................................................. 3
3.1 Proposed Site Development .................................................................................................. 3
3.2 Proposed Stormwater Drainage Layout ................................................................................ 3
3.3 Design of Proposed Drainage System .................................................................................. 3
4 CONCLUSION ....................................................................................................................... 5
APPENDIX A - DRAWINGS ............................................................................................................ 6
APPENDIX B – MUSIC MODEL ...................................................................................................... 7
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page iii
ISSUE AND REVISION RECORD
Issue Date Purpose Prepared By Checked By Approved By
A 14/02/2014 Review JS GK GK
B 26/02/2014 DA Submission JS RE RE
C 27/2/2015 DA Submission JS GK GK
D 02/03/2015 DA Submission JS GK GK
This document is issued for the party which
commissioned it and for specific purposes connected with
the above-captioned project only. It should not be relied
upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this
document being relied upon by any other party, or being
used for any other purpose, or containing any error or
omission which is due to an error or omission in data
supplied to us by other parties
This document contains confidential information and
proprietary intellectual property. It should not be shown to
other parties without consent from us and from the party
which commissioned it.
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page iv
EXECUTIVE SUMMARY
This Stormwater Management Report has been prepared by ACOR Consultants for the proposed residential development located at Cnr Powell St and Parramatta Rd, Homebush NSW.
This report documents the methodology involved in determining the design of the proposed stormwater and water quality treatment train.
The report finds that the installation of rainwater tanks, a bio-retention system and a detention system in the Homebush Apartment complex achieve the required water quality performance requirements as required by the Strathfield Consolidated Development Control Plan (2005) and the Strathfield Council Stormwater Management Code (1994).
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page 1
1 INTRODUCTION
1.1 Purpose of Report
This Stormwater Management Report has been prepared by ACOR Consultants for the proposed residential development located at Cnr Powell St and Parramatta Rd, Homebush NSW.
This report documents the methodology involved in determining the design of the proposed stormwater drainage system for the proposed developments, including the stormwater quantity and quality management.
1.2 Project Description
ACOR Consultants has been engaged by Al Maha PTY LTD to prepare a Stormwater Management Plan and Water Quality Modelling report for the proposed development located at Cnr Powell St and Parramatta Rd, Homebush, NSW. The proposed Homebush Apartments will be a residential apartment block with an underground car park and ground floor retail outlets. The development will consist of the following:
- Demolition of existing buildings - Removal of trees - Excavation and construction of a residential apartment and car park
complex
1.3 Guidelines and Standards
The stormwater system is to be designed to the local authority and water authority requirements:
- Strathfield Council Stormwater Management Code - Strathfield Council Consolidated Development Control Plan
Water Sensitive Urban Design (WSUD) is to be designed to the following documents:
- ‘Part N of Strathfield Consolidated Development Control Plan 2005 – Water Sensitive Urban Design (WSUD)’ published by Strathfield Council
- ‘Strathfield Council WSUD Reference Guideline’ published by Strathfield Council
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page 2
2 EXISTING CONDITIONS
2.1 Existing Site Description
The proposed site is bound to the North and East by bushland/undeveloped land and a motorway, to the South by Parramatta Rd and to the West by Powell St.
The property is currently occupied by a single story building which will be demolished during the development.
2.2 Existing Stormwater Drainage
The site has an existing system of stormwater drainage of which will be either incorporated or replaced by the new stormwater system. Please refer to Appendix A for details.
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page 3
3 PROPOSED DEVELOPMENT
3.1 Proposed Site Development
The proposed development will include the construction of a residential complex as well as a number of retail outlets at the ground floor level. The stormwater system will be designed to convey the 100 year ARI storm event for the property.
The proposed layout will be as shown in Appendix A.
3.2 Proposed Stormwater Drainage Layout
Stormwater from the proposed Homebush Apartments site will be directed through a pit and pipe system into rainwater tanks, through a detention basin and into a bio-retention system before being directed to an existing stormwater connection point along the North side of the property. This point becomes the point of discharge for the site. The stormwater system is designed to convey up to a 1 in 100 year stormwater event. Please refer to Appendix A drawings showing the stormwater catchment boundary.
3.3 Design of Proposed Drainage System
3.3.1 On-Site Detention
The site will include an on-site detention basin of volume 95.4m3 located at the North East border
of the property. The detention basin will have a surface area of 120m2. The proposed layout will
be as shown in Appendix A.
The property will also include 2 rainwater tanks sized at 23.4m3 and 37.4m
3 which will be
positioned at the appropriate positions relating to their rooftop catchment.
3.3.2 Maintenance Plan
Provision for litter bins, signage, education and regular sweeping of the accessible drainage catchments will help to reduce litter loads generated by the site.
The recommended maintenance regime for the tertiary treatment processes shall be instigated by the property manager to ensure suitable pollutant removal efficiencies of the systems.
3.3.3 Stormwater Quality Management
The proposed drainage system has been designed in accordance with the Strathfield Council requirements. The requirements are found in the Strathfield Council publication ‘Part N of Strathfield Consolidated Development Control Plan 2005 – Water Sensitive Urban Design (WSUD)’.
The following water quality targets are to be achieved as set by the council guidelines:
- 90% reduction in the post development mean annual load of total gross pollutant (greater than 5 mm).
- 85% reduction in the post development mean annual load of Total Suspended Solids (TSS).
- 60% reduction in the post development mean annual load of Total Phosphorus (TP).
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page 4
- 45% reduction in the post development mean annual load of Total Nitrogen (TN).
3.3.4 Stormwater Quality Treatment Train
It is proposed to install rainwater tanks, a bio-retention system and a detention basin to treat the stormwater within the post-development design. The roof runoff will be deposited in the rainwater tank; any excess will be directed into the bio-retention and detention systems with the urban surface runoff before being discharged to stormwater connection point indicated above.
3.3.5 MUSIC Modelling
The MUSIC software package has been used to model the water quality for the post-developed site to calculate the pollutant loads from the development and the effectiveness of the treatment train. The perviousness of catchment areas is based on the design as detailed in Appendix A. Roofs, roads and pathways were all designated as 100% impervious.
The model was run to calculate the reduction in the mean annual loads for the proposed development. A summary of the results are shown below in Table 3.1. Full MUSIC results are attached in Appendix B.
Table 3.1 – MUSIC Output – Post Developed Mean Annual Loads for the Homebush Apartments
Parameter In Out % Removal Required
% Removal Achieved
Total Suspended Solids (kg/yr) 1320 152 85% 88.4%
Total Nitrogen (kg/yr) 18.7 9.9 45% 47.1%
Total Phosphorous (kg/yr) 2.64 0.993 60% 62.4%
Gross Pollutants (kg/yr) 166 0.00 90% 100%
As can be seen in table 3.1 above, the Suspended Solids, Nitrogen, Phosphorus and Gross Pollutants are all reduced by the treatment train proposed for this development. These results meet the requirements as set by the Strathfield Council publication ‘Part N of Strathfield Consolidated Development Control Plan 2005 – Water Sensitive Urban Design (WSUD)’.
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page 5
4 CONCLUSION
The proposed Homebush Apartment Complex incorporates rainwater tanks in conjunction with bio-retention and detention systems to improve stormwater quality before it discharges as the designated stormwater discharge point.
The above measures achieve the requirements as set out by ‘Part N of Strathfield Consolidated Development Control Plan 2005 – Water Sensitive Urban Design (WSUD)’ in conjunction with the ‘Stormwater Management Code’ both published by Strathfield Council.
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page 6
APPENDIX A - DRAWINGS
ACOR Consultants Drawings:
C1.01 Ground Floor Stormwater Detention Plan
C2.01 – OSD/Bio-retention Details
+RL6.660
208m2
RL+7.670
+RL8.750
+RL7.800
RL+7.670
+RL8.700
181 m2
+RL6.660
322 m2
243m2
+RL8.700
+RL8.750
69m2
+RL8.250
+RL6.670
+RL8.700
+RL6.660
+RL7.660
+RL7.228
RL+9.400
+RL6.660
RL+8.700
+RL6.965
89m2
+RL7.450
+RL8.700
+RL7.660
+RL6.660
+RL8.250
35m2
104+RL8.250
+RL8.250
LIFT5A +RL
8.700
+RL8.750
+RL6.660
RL+8.700
101
BU
IL
DIN
G A
56m2
10273m2
103
80m2
206m2
LIFT5B
STAIR3B
STAIR4B
LIFT4A
LIFT4B
LIFT6A
LIFT6B
STAIR 3C
STAIR 3A
STAIR 4C
STAIR 4A
UPFROM B1
FHBV FSBV
PA
RR
AM
AT
TA
RO
AD
EXISTING SYDNEY WATER
SEWER MAIN TO BE MADE
REDUNDANT
EXISTING STORMWATER
TO BE DIVERTED ANDMADE REDUNDANT.
EXISTING SEWER MAIN
OSD BASIN120m
2 APPROX.
BIO-RETENTION40m
2 APPROX.
TOP OF WALL
7.60
STORMWATER DRAINAGE NOTES:
OSD:RESIDENTIAL SITE AREA: 6,257m
2
OSD STORAGE REQUIRED - 15m3 PER 1,000m
2 : TOTAL 94m3
PSD REQUIRED - 23L/s PER 1,000m2 OF SITE AREA: TOTAL 143.91L/s
RAINWATER TANKS: REFER TO BASIX REQUIREMENTS (TOTAL 20kL MINIMUM)
WATER QUALITY TREATMENT: MUSIC MODELLING
REFER TO THE STORMWATER DRAINAGE REPORT
PROPOSED SUBSOIL PIPE(TYPICAL)
EXISTING STORMWATER PIT
CL 6.61IL 4.84
GD
IL 6.00
IL 5.76
IL 5.744
IL 8.20 SWP
SWP
SWP
SWP
GDGD
GD
SW Ø225
IL 6.10
RWT
SWP
SWP
SWP
SWP
SWP
SWP
SWP
SWP
SW Ø300
SW Ø225
GD
SWP
IL 7.60
SWP
SWP
SWP
SW Ø150
SW Ø225
SWPSW
P
SWP
IL 6.00
SWP
SWP
IL 5.90
SWP
SW Ø300
GD
SWP
SWP
0102
03
04
ABOVE GROUND ROOF WATER STORAGE TANK DETAILN.T.S.
01020304
Ø2380
2500
P:\SY13\SY130538\Drawings\CIV\Drawings\130538_C1.01.dwg
NOT FOR CONSTRUCTION
Mar 02, 2015 - 9:18am
Clie
nt
Arch
ite
ct
Pro
je
ct
IssueDescription
DateDrawn
Approved
COPYRIGHT of this design and plan is the
property of ACOR Consultants Pty Ltd,
ACN 079 306 246 ATF The ACO
R Unit Trust
ABN 26 522 454 721, all rights reserved. It
must not be used, m
odified, reproduced orcopied w
holly or in part without w
rittenperm
ission from ACO
R Consultants Pty Ltd.
C
No
rth
This drawing has been assigned an electronic code that signifies the drawing has been checked andapproved by:
-10
1cm at full size10cm
EN
GIN
EE
RS
MA
NA
GE
RS
IN
FR
AS
TR
UC
TU
RE
P
LA
NN
ER
SD
EV
ELO
PM
EN
T C
ON
SU
LT
AN
TS
AC
OR
C
on
su
lta
nts
P
ty
L
td
Le
ve
l 1
, 2
4 F
alco
n S
tre
et
Cro
ws N
est N
SW
2
06
5
T +
61 2 9438 5098
Drawing Title
Al Maha Pty Ltd
CNR POWELL ST & PARRAMATTA RD
HOMEBUSH APARTMENTS
EAST SYDNEY NSW 2010
2 LIVERPOOL LANE
HOMEBUSH NSW 2140
PHONE : 8354 1300Project No.Designed
DrawnDate
ScaleQ.A. Check
Dwg. No.
Date
Issue
A1
SY130538
FAX : 8354 1311
CIVIL SERVICESGROUND FLOOR STORMW
ATER DETENTION PLAN
SMcG
RG
FEB 141:200
C1.01B
RE25.02.14
P1FOR CLIENTS COMMENTS
21.02.14SMcG
REA
DA SUBMISSION26.02.14
SMcGRE
BDA SUBMISSION
26.02.15BL
REC
DA SUBMISSION02.03.15
BLRE
ON SITE DETENTION AND BIO-RETENTION BASIN SECTION1:50
AAC1.01
PROPOSED RETAINING WALL
(BY OTHERS)
1.7m WIDE BERM
3
EXISTING STORMWATER
PIPE IL 4.84. 450mm DIA.APPROX
BIO-RETENTION FILTER MATERIALAS SPECIFIED ON DETAIL
RL 6.30
CL 7.45
1BW
L 6.60
TWL 7.45
ON SITE DENTION ZONE- VOLUME 95m
3EXTENDED DETENTIONDEPTH
NSL
TOW 7.60
RL 7.60
EXISTING STORMWATER PIT
TO BE RECONSTRUCTED
CL 6.60
185mm DIA.
CONSTRUCT 0.54mm HIGHx 82mm W
IDE WEIR
OPENING IN PIT AT RL6.91
340mm2YR WL
850mm100YR WL
560.00mm10YR WL
31
GEOTEXTILE LAYER BIDUM 34
100
13
MINIMUM 200mm PONDING DEPTH IN BASIN
FILTER MEDIUM 5mm PARTICLE DIAMETERCOMPRISING FINE GRAVEL
100mm DIAMETER SLOTTED uPVC SUBSOILDRAINAGE PIPE W
RAPPED IN FILTER SOCK.PIPE TO RUN THE LENGTH OF BIOTRENCHAND CONNECT AND DRAIN INTO PIT
TOP SOIL 150mm
13
100mm DOUBLE WASHED
COARSE SAND
WATER QUALITY TREATMENT BASIN
AND BIORETENTION TRENCHN.T.S.
500100
1500
100
NOM. 100Ø HDPE (CORRUGATED ANDPERFORATED), SUBSOIL DRAINAGE LINEW
RAPPED IN GEOTEXTILE FILTER FABRICAT MIN. 0.5%
FALL.SUBSOIL PIPE LINE TO DISCHARGE TOSTORMW
ATER PIT, HEADWALL OR OUTLET
WITH SCOUR PROTECTION.
300 MINBELOW SUBGRADE
100600
20mm SINGLE SIZE AGGREGATEAS SPECIFIED
GEOTEXTILE FABRICBIDIM A24 OR APPROVEDEQUIVALENT
TYPICAL SUBSOIL DRAINAGE DETAIL (SSD)SCALE 1:20
LANDSCAPELANDSCAPE
SCALE 1:20
SURFACE INLET/JUNCTION PIT PIT TYPE "A"PLAN
SCALE 1:20
2-FLOW
PROVIDE STEP IRONS IF PIT DEEPERTHAN 900 (REFER DETAILS).
PROVIDE 3.0m LENGTH OF 100ØSUBSOIL W
RAPPED IN GEOFABRICSOCK AT UPSTREAM END OF PIT.
SECTION2-
MASS CONCRETE BENCHING.
MORTAR BED
N12 AT 200 BOTHWAYS
CENTRAL
30 FALL UNO
PIT IN CONCRETE PAVEMENT REFER DETAIL 'B' PITIN FLEXIBLE PAVEMENT REFER DETAIL 'C' PIT INLANDSCAPE AREAS REFER DETAIL 'D'
COVER (WITH SUITABLE LIFTING HOLES) OR GRATE
& FRAME AS SPECIFIED.
225
150MIN
150 "X" 150
70
400 LAP TYP
Y/2
300 TYP 300
150 DEPTH AS REQUIRED (D)
150"Y"
150
MIN
900900
D 1200
900600
D 1200
600*600
D 900
450*450
MINIMUM INTERNALPIT DIMENSIONS"Y"
"X" "D"
D 600
NOTE: PITS DENOTED * SHALL BEUSED ONLY W
HERE SPECIFIED INDRAINAGE SCHEDULE OR ON PLAN.
P:\SY13\SY130538\Drawings\CIV\Drawings\130538_C2.01.dwg
NOT FOR CONSTRUCTION
Mar 02, 2015 - 9:18am
Clie
nt
Arch
ite
ct
Pro
je
ct
IssueDescription
DateDrawn
Approved
COPYRIGHT of this design and plan is the
property of ACOR Consultants Pty Ltd,
ACN 079 306 246 ATF The ACO
R Unit Trust
ABN 26 522 454 721, all rights reserved. It
must not be used, m
odified, reproduced orcopied w
holly or in part without w
rittenperm
ission from ACO
R Consultants Pty Ltd.
C
No
rth
This drawing has been assigned an electronic code that signifies the drawing has been checked andapproved by:
-10
1cm at full size10cm
EN
GIN
EE
RS
MA
NA
GE
RS
IN
FR
AS
TR
UC
TU
RE
P
LA
NN
ER
SD
EV
ELO
PM
EN
T C
ON
SU
LT
AN
TS
AC
OR
C
on
su
lta
nts
P
ty
L
td
Le
ve
l 1
, 2
4 F
alco
n S
tre
et
Cro
ws N
est N
SW
2
06
5
T +
61 2 9438 5098
Drawing Title
Al Maha Pty Ltd
CNR POWELL ST & PARRAMATTA RD
HOMEBUSH APARTMENTS
EAST SYDNEY NSW 2010
2 LIVERPOOL LANE
HOMEBUSH NSW 2140
PHONE : 8354 1300Project No.Designed
DrawnDate
ScaleQ.A. Check
Dwg. No.
Date
Issue
A1
SY130538
FAX : 8354 1311
CIVIL SERVICESOSD/BIORETENTION DETAILS
EMEM
FEB 14AS SHOW
N
C2.01B
RE25.02.14
P1FOR CLIENTS COMMENTS
21.02.14SMcG
REA
DA SUBMISSION26.02.14
SMcGRE
BDA SUBMISSION
26.02.15BL
REC
DA SUBMISSION02.03.15
BLRE
Homebush Apartments - STORMWATER MANAGEMENT REPORT Page 7
APPENDIX B – MUSIC MODEL
Figure 1 - MUSIC Model Layout and Results for the Homebush Apartment Complex