STORMWATER CONCEPT PLAN
AT SEYMOUR PLACE, ROPES CROSSING NSW
EXISTING LEVEL
NEW LEVEL
PROVIDE 150mm GAP UNDER THE FENCE
AND IF BLOCK WALL PROVIDED, THEN PROVIDE
OPENING FOR EMERGENCY OVERFLOW.
DRAWING TITLE
COVER SHEET, LEGEND & DRAWING SCHEDULEDOO
DO3
DRAWING No.
D R A W I N G S C H E D U L E
EROSION AND SEDIMENT CONTROL PLAN AND DETAILS
: 100Ø DOWN PIPE U.N.O.
DP
: STORMWATER PIPE
@1% MIN. U.N.O.
P1 : 100Ø UPVC PIPE AT 1.0% MIN. GRADE
P2 : 150Ø UPVC PIPE AT 1.0% MIN. GRADE
P3 : 225Ø UPVC PIPE AT 0.5% MIN. GRADE
P4 : 300Ø UPVC PIPE AT 0.4% MIN. GRADE
REFER TO AS.3500 PART 3 TABLE 7.2
P5 : 375Ø UPVC PIPE AT 0.4% MIN. GRADE
P6 : 450Ø RCP PIPE AT 0.4% MIN. GRADE
BASEMENT & GROUND FLOOR STORMWATER DRAINAGE PLAN
DO4
DO1
DO2
MUSIC RESULTS AND DETAILS
SYMBOLS
ABBREVIATIONS
GTD
GMS
GL
CL
DIA
DDO
DP
HIGH LEVEL
INVERT LEVEL
JUNCTION PIT
GRATED TRENCH DRAIN
EXISTING
GALVANISED MILD STEEL
GRADED SURFACE INLET PIT
FINISHED FLOOR LEVEL
GROUND LEVEL
CLEARANCE
DISH DRAIN OUTLET
DOWNPIPE
DIAMETER
KERB INLET PIT
Ex.
FFL
GSIP
HL
IL
JP
KIP
INSPECTION OPENING
LOW LEVEL
OVERFLOW
IO
LL
O/F
POLYVINYLCHLORIDEPVC
SURFACE LEVELSL
STORMWATERSTW
STAINLESS STELLS/S
UNDER SIDEU/S
N.T.S.
STANDARD PIT
TYPICAL PIT SECTION
PIT
N.T.S.
OUTLET PIPE
450
(M
IN
)
450 X 450 HINGED GRATE (MIN)
HINGED GRATE
450 SQ
(MIN)
450
NTS
GALVANISED
GRATE
TYPICAL PIT DETAIL
MUSIC LINK REPORT
FW
IO
DP
F.F.L.
T.K.
RL
IL
GRATED INLET PIT
GRATED DRAIN
OVERLAND FLOW PATH
FLOOR WASTE 300Ø
STORMWATER DRAINAGE PIPE
INSPECTION OPENING
MASONRY RETAINING WALL
DOWNPIPE TO RAINWATER TANK
100Ø DOWN PIPE (U.N.O.)
FINISHED FLOOR LEVEL
PIT SURFACE LEVEL
INVERT LEVEL
TOP OF KERB
VD VERTICAL DROP PIPE
SP
SPREADER
VRVERTICAL RISER
DDO DISH DRAIN OUTLET 100Ø
ESEMERGENCY SPITTER
RWO RAINWATER OUTLET 150Ø
DRAINAGE LINES SHOWN DASHED
TO COLLECT ROOF WATER ONLY TO RAINWATER TANK
NOTES: DRAINAGE LINES
DRAINAGE LINES SHOWN continuous
TO COLLECT SURFACE WATER
DEPTH TO INVERT
OF OUTLET
MINIMUM INTERNAL DIMENSIONS
(mm)
RECTANGULAR
CIRCULAR
WIDTHLENGTH DIAMETER
450≤600
≤900
≤1200
>600
>900
>1200
600
600
900
450
600
900
900
600
900
1000
1000
SURFACE INLET PIT DIMENSION
ON LONGITUDINAL SECTION.
THE RELEVANT AUTHORTIES BEFORE
COMMENCEMENT OF ANY WORKS
BUILDER CONTRACTOR BY CONTACTING
EXACT LOCATIONS & DEPTHS
TO BE ACURATELY LOCATED BY
EXISTING SERVICES SHOWN
NOTE RE. SERVICES
APPROXIMATE LOCATIONS OF
GENERAL NOTES
1. ALL LINES ARE TO BE MIN. 100Ø UPVC @ MIN 1.0%
GRADE UNLESS NOTED OTHERWISE.
2. IT IS THE CONTRACTORS RESPONSIBILITY TO
LOCATE & LEVEL ALL EXISTING SERVICES PRIOR TO
THE COMMENCEMENT OF ANY EARTHWORKS. ALL
DESIGN LEVELS SHOWN ON PLAN SHALL BE
VERIFIED ON SITE PRIOR TO THE COMMENCEMENT
OF ANY WORK.
3. ALL PIPES TO HAVE MIN 200mm COVER IF LOCATED
WITHIN PROPERTY.
4. ALL PITS IN DRIVEWAYS BE HEAVY DUTY GRATES.
DIRECT SURFACE FLOW TO ALL GRATED SURFACE
INLET PITS.
5. ALL WORK DO BE DONE IN ACCORDANCE WITH
COUNCIL'S DCP AND TO COUNCIL'S SATISFACTION.
6. LOCATION OF DOWNPIPES & FLOOR WASTES ARE
INDICATIVE ONLY. DOWNPIPE & FLOOR WASTE
SIZE, LOCATION & QUANTITY TO BE DETERMINED
BY BUILDER & IN ACCORDANCE WITH RELEVANT
AUSTRALIAN STANDARDS.
7. THIS PLAN IS TO BE READ IN CONJUNCTION WITH
THE ARCHITECTURAL, LANDSCAPE AND
STRUCTURAL PLANS.
8. ANY DISCREPANCIES OR OMISSIONS SHALL BE
REFERRED TO THE DESIGN ENGINEER AND
COUNCIL ENGINEER FOR RESOLUTION.
9. ALL PITS OR GRATES IN TRAFFICABLE AREAS TO BE
HEAVY DUTY.
10. ALL GUTTERS WILL BE FITTED WITH LEAF GUARDS
AND SHOULD BE INSPECTED AND CLEANED TO
ENSURE LEAF LITTER CANNOT ENTER THE
DOWNPIPES
11. ALL PIT GRATES ON SITE MUST BE HINGED WITH
J-BOLT LOCKDOWN SYSTEM.
12. PITS DEEPER THAN 1m REQUIRE STEP IRONS IN A
STAGGERED MANNER. THE DEPTH OF ANY PIT IN
EXCESS OF 2m SHALL BE STRUCTURALLY DESIGNED
AND CERTIFIED BY A STRUCTURAL ENGINEER AND
SUBMITTED TO COUNCIL FOR APPROVAL.
13. PROVIDE GRATED DRAIN IN ALL OPEN AREAS TO
THE SKY INCLUDING STAIRS AND CONNECT TO
NEAREST STORMWATER SYSTEM.
14. PROVIDE EMERGENCY SPITTERS TO ALL BALCONIES.
15. PROVIDE AGG PIPE IN ALL LANDSCAPE AREA AND
CONNECT TO THE STORMWATER DRAINAGE
SYSTEM.
16. PROVIDE AGG PIPE BEHIND THE RETAINING WALL
AND CONNECT TO THE STORMWATER DRAINAGE
SYSTEM.
17. TOP OF KERB AND INVERT OF GUTTER LEVELS ARE
TO BE CHECKED ON SITE PRIOR CONSTRUCTION.
CONTACT ENGINEER IMMEDIATELY IF LEVEL VARIES
FROM DESIGN DRAWING.
18. ALL RETAINING WALL FOR ABOVE GROUND
OSD/BIORETENTION BASIN TO BE FULLY
CONSTRUCTED WITHIN THE PROPERTY BOUNDARY.
A N.L.FOR D.A. APPROVAL
J.P.
N.T.S.
D00
COVER SHEET, LEGEND AND
DRAWING SCHEDULE
A
03-05-18
AUTHORISED DWG No
SCALE @ A1 JOB No
REV
SHEET SUBJECTPROJECT PROJECT
DATE DRAWN DESIGNED CHECKED
LOT 3985 SEYMOUR PLACE, ROPES CROSSING NSWARCHITECT
NERMEIN LOKA
N
14A/8 AVENUE OF AMERICAS, NEWINGTON, NSWT: +61 2 8065 9689 F: +61 2 8065 9690MOBILE: 0404 142 063 EMAIL: [email protected]
LOKAC O N S U L T I N G
E N G I N E E R S.Pty Ltd
N.L.N.L.
THIS DRAWING IS THE
PROPERTY OF LOKA
CONSULTING ENGINEERS
AND MUST NOT BE
RETAINED, COPIED OR USED
WITHOUT THE WRITTEN
CONSENT OF THE COMPANY
C
Copyright
Loka
Consulting
Engineers
as date of
issue
NOT FOR CONSTRUCTION
CONSENT AUTHORITY:BLACKTOWN CITY COUNCIL
COPYRIGHT: THIS DESIGN AND PLANS ARE NOT TO BE USED OR REPRODUCED WHOLLY
OR IN PART WITHOUT WRITTEN PERMISSION OF LOKA CONSULTING ENGINEERS
PROPOSED RESIDENTIAL DEVELOPMENT
LOT 3985 SEYMOUR PLACE,
ROPES CROSSING NSW
15NL039
MAY 18 J.P.
LOCALITY SKETCH
NOT TO SCALE
SITE OF WORK
EXISTING BUILDING
GROUND LEVEL
8 UNITS
RL 21.2
L'DRY
BATHROOM
BEDROOM 2
KITCHEN
DINING
LIVINGBEDROOM 1
L.
ENSUITE
AWNING OVER
F.P.
L'DRY
BATHROOM
BEDROOM 2
KITCHEN
DINING
LIVING
BEDROOM 1
L.
ENSUITE
F.
P.
PRIVATE OPEN SPACE
PRIVATE OPEN SPACE
L'DRY
BATHROOM
BEDROOM 2
KITCHEN
DINING
LIVING
BEDROOM 1
L.
ENSUITE
F.P.
L'DRY
BATHROOM
BEDROOM 2
KITCHEN
DINING
LIVING BEDROOM 1
L.
ENSUITE
F.
P.
PRIVATE OPEN SPACE
PRIVATE OPEN SPACE
L'DRY
BATHROOM
BEDROOM 2
KITCHEN
DINING
LIVINGBEDROOM 1
L.
ENSUITE
F.P.
L'DRY
BATHROOM
BEDROOM 2
KITCHEN
DINING
LIVING
F.
P.
PRIVATE OPEN SPACE
PRIVATE OPEN SPACE
RETAIN EXISTING
HERITAGE STAIR
PRIVATE OPEN
SPACE
LAUNDRY + LINEN
BEDROOM 2
DINING
F.
P.
PRIVATE OPEN SPACE
ENTRY
ENTRY
SE
RV
IC
ES
BEDROOM 1
L.
ENSUITE
FH
FH
FH
40000
LIVING
STORAGE
BEDROOM 1
WASTE ROOM
MA
ILB
OX
ES
RIGHT OF WAY
BATHROOMENSUITE
CHILD CARE
WASTE ROOM
BULKY
GOODS
STORE
CHILDCARE
CP3
CHILDCARE
CP4
CHILDCARE
CP5
CHILDCARE
CP6
CHILDCARE
CP7
CHILDCARE
CP8
CHILDCARE
CP9
CHILDCARE
CP10
CHILDCARE
CP11
CHILDCARE
CP20
CHILDCARE
CP21
CHILDCARE
CP22
CHILDCARE
CP23
CHILDC3RE
CP24
CHILDCARE
CP14
CHILDCARE
CP15
CHILDCARE
CP16
CHILDCARE
CP17
CHILDCARE
CP18
CHILDCARE
CP25
CHILDCARE
CP19
ROLLER DOOR
ROLLER DOOR
CHILDCARE
CP2
CHILDCARE
CP1
CHILDCARE
CP12
CHILDCARE
CP13
MAXIMUM CHILDCARE BUILDING FOOTPRINT
~960mw
2
0
.
8
3
m
41.22m
18
.8
25
m
DISABLED DISABLED
CP1 CP2 CP3 CP4 CP5 CP6 CP7 CP8 CP9 CP10 CP11 CP12 CP13 CP14 CP15 CP16 CP17 CP18
CP19 CP20 CP21 CP22 CP23 CP24 CP25 CP26 CP27 CP28
CP36CP35CP34CP33CP32CP30
CP29
CP31
WASTE COLLECTION
AREA
LAUNDRY + LINEN
BEDROOM 2
DINING
F.
P.
BATHROOM
LIVING
STORAGE
BEDROOM 1
MASTER
BEDROOM
ENSUITE
UNIT
HB.101
UNIT
HB.102
UNIT
HB.103
UNIT
HB.104
UNIT
HB.105
UNIT
HB.106
UNIT
HB.107
UNIT
HB.108
4070 x 1810mm
3735 x 2730mm
4070 x 1810mm
2280 x 2700mm
4070 x 1810mm4070 x 1810mm 4070 x 1810mm 4070 x 1810mm4070 x 1810mm 4070 x 1810mm 4070 x 1810mm 4070 x 1810mm 4070 x 1810mm 4070 x 1810mm
3750 x 2730mm
3750 x 2730mm
3750 x 2730mm3750 x 2730mm3750 x 2730mm
4070 x 1810mm4070 x 1810mm
3160 x 1810mm
3750 x 2730mm
4070 x 1810mm2805 x 2730mm 4070 x 1810mm
3545 x 1810mm
4070 x 1810mm 4070 x 1810mm 4070 x 1810mm4070 x 1810mm 4070 x 1810mm 4070 x 1810mm 4070 x 1810mm 4070 x 1810mm
3750 x 2730mm
3750 x 2730mm
3750 x 2730mm
3750 x 2730mm
450X450 PIT
RL 21.05
IL 20.70
600x600 PIT
RL 21.05
IL 20.54
600X600 PIT
RL 21.05
IL 20.46
600X600 PIT
RL 21.00
IL 20.39
600X600 PIT
RL 21.00
IL 20.32
600X600 PIT
RL 20.90
IL 20.28
900X900 PIT WITH
'DEEP PIT' ENVIROPOD
RL 20.85
IL inlet 20.22
IL outlet 19.67
900X900 PIT WITH
'DEEP PIT' ENVIROPOD
RL 20.85
IL inlet 19.66
IL outlet 19.11
600x600 PIT
RL 21.00
IL 20.41
450X450 PIT
RL 20.90
IL 20.55
P4 uPVC @ 0.5%
P4 uPVC @ 0.5%
P2
P
4
u
P
V
C
@
0
.
5
%
P
4
u
P
V
C
@
0
.
5
%
TO HEAD WALL TO OSD BASIN
DETAILS AT C.C. STAGE
ROOF DOWNPIPE
DETAILS AT C.C
ROOF DOWNPIPE
DETAILS AT C.C
ROOF DOWNPIPE
DETAILS AT C.C
P3 @ 0.5%
P3 @ 0.5%
P4 uPVC @ 0.5%
P
4
u
P
V
C
@
0
.5
%
6 CARTRIDGES STORMFILTER WITH
Ø2470mm CONCRETE MANHOLE
RL 20.85
RL overflow 19.76
IL in 18.99
IL out 18.84
CARTRIDGE Q=9.6L/s
900x900 DIVERSION PIT
WITH WEIR
RL 20.85
IL weir 19.76
IL to filter 19.01
900X900 PIT WITH
'DEEP PIT' ENVIROPOD
RL 20.85
IL inlet 20.31
IL outlet 19.76
P2
900x900 JUNCTION PIT
WITH STEP IRONS
RL 20.45
IL 18.80
IL 18.84
IL 18.99
Ø525m
m
Ø525 RCP AT
P4 uPVC @ 0.5%
P4 uPVC @ 0.5%
0.5%
BYPASS
RCP AT 0.5%
RL 21.20
RL 21.20
ALLOW 50mm GAP
UNDER FENCE FOR
WATER FLOW
ALLOW 50mm GAP
UNDER FENCE FOR
WATER FLOW
ALLOW 50mm GAP
UNDER FENCE FOR
WATER FLOW
01
02 03 04
05
06
07
0809101112
13
NOTES
1. ALL LINES ARE TO BE MIN. 100Ø UPVC @ MIN 1.0% GRADE UNLESS
NOTED OTHERWISE.
2. IT IS THE CONTRACTORS RESPONSIBILITY TO LOCATE & LEVEL ALL
EXISTING SERVICES PRIOR TO THE COMMENCEMENT OF ANY
EARTHWORKS. ALL DESIGN LEVELS SHOWN ON PLAN SHALL BE
VERIFIED ON SITE PRIOR TO THE COMMENCEMENT OF ANY WORK.
3. ALL PIPES TO HAVE MIN 200mm COVER IF LOCATED WITHIN
PROPERTY.
4. ALL PITS IN DRIVEWAYS BE HEAVY DUTY GRATES. DIRECT SURFACE
FLOW TO ALL GRATED SURFACE INLET PITS.
5. ALL WORK DO BE DONE IN ACCORDANCE WITH AS/NZ 3500.3.2:2003
AND COUNCIL SPECIFICATIONS.
6. LOCATION OF DOWNPIPES & FLOOR WASTES ARE INDICATIVE ONLY.
DOWNPIPE & FLOOR WASTE SIZE, LOCATION & QUANTITY TO BE
DETERMINED BY BUILDER & IN ACCORDANCE WITH RELEVANT
AUSTRALIAN STANDARDS.
7. THIS PLAN IS TO BE READ IN CONJUNCTION WITH THE
ARCHITECTURAL, LANDSCAPE AND STRUCTURAL PLANS.
8. ANY DISCREPANCIES OR OMISSIONS SHALL BE REFERRED TO THE
DESIGN ENGINEER FOR RESOLUTION.
9. ALL PITS OR GRATES IN TRAFFICABLE AREAS TO BE HEAVY DUTY.
10. ALL GUTTERS WILL BE FITTED WITH LEAF GUARDS AND SHOULD BE
INSPECTED AND CLEANED TO ENSURE LEAF LITTER CANNOT ENTER
THE DOWNPIPES
ON LONGITUDINAL SECTION.
THE RELEVANT AUTHORTIES BEFORE
COMMENCEMENT OF ANY WORKS
BUILDER CONTRACTOR BY CONTACTING
EXACT LOCATIONS & DEPTHS
TO BE ACCURATELY LOCATED BY
EXISTING SERVICES SHOWN
NOTE RE. SERVICES
APPROXIMATE LOCATIONS OF
SYMBOLS
FW
IO
DP
F.F.L.
T.K.
RL
IL
GRATED INLET PIT
GRATED DRAIN
OVERLAND FLOW PATH
FLOOR WASTE 150Ø
STORMWATER DRAINAGE PIPE
INSPECTION OPENING
MASONRY RETAINING WALL
DOWNPIPE TO RAINWATER TANK
100Ø DOWN PIPE (U.N.O.)
FINISHED FLOOR LEVEL
PIT SURFACE LEVEL
INVERT LEVEL
TOP OF KERB
VD VERTICAL DROP PIPE
SP
SPREADER
VRVERTICAL RISER
DDO DISH DRAIN OUTLET 100Ø
ES EMERGENCY SPITTER
SUBSOIL DRAINAGE PIPE
DRAINAGE LINES SHOWN DASHED
TO COLLECT ROOF WATER ONLY TO RAINWATER TANK
NOTES: DRAINAGE LINES
DRAINAGE LINES SHOWN continuous
TO COLLECT SURFACE WATER
COUNCIL'S ISSUED FOOTWAY DESIGN LEVELS TO BE INCORPORATED INTO THE
FINISHED LEVELS ONCE ISSUED BY COUNCIL
NOTES: COUNCIL ISSUED FOOTWAY DESIGN LEVELS
ALL STORMWATER DRAINAGE ELEMENTS PROPOSED WITHIN THE ROAD RESERVE AND FOOTWAY
SHALL BE CONSTRUCTED UNDER THE SUPERVISION AND TO THE SATISFACTION OF COUNCIL'S ENGINEER.
NOTES: ROAD RESERVE & FOOTWAY DRAINAGE ELEMENTS
: 100Ø DOWN PIPE U.N.O.
DP
: STORMWATER PIPE
@1% MIN. U.N.O.
P1 : 100Ø UPVC PIPE AT 1.0% MIN. GRADE
P2 : 150Ø UPVC PIPE AT 1.0% MIN. GRADE
REFER TO AS.3500 PART 3 TABLE 7.2
P3 : 225Ø UPVC PIPE AT 0.5% MIN. GRADE
RETAIN EXISTING
HERITAGE STAIR
STORAGE LOCKERS STORAGE LOCKERS
SANITARY
FACILITES
FH
EX. STAIR TO BE DECOMISSIONED
BULKY GOODS STORE
HERITAGE BUILDING
WASTE ROOM
EXISTING BUILDING FOOTPRINT
BASEMENT WALLS TO BE FULLY
TANKED AND WATER-PROOF
SCALE 1:200
AUTHORISED DWG No
SCALE @ A1 JOB No
REV
SHEET SUBJECTPROJECT PROJECT
DATE DRAWN DESIGNED CHECKED
LOT 3985 SEYMOUR PLACE, ROPES CROSSING NSWARCHITECT
NERMEIN LOKA
N
14A/8 AVENUE OF AMERICAS, NEWINGTON, NSWT: +61 2 8065 9689 F: +61 2 8065 9690MOBILE: 0404 142 063 EMAIL: [email protected]
LOKAC O N S U L T I N G
E N G I N E E R S.Pty Ltd
N.L.N.L.
THIS DRAWING IS THE
PROPERTY OF LOKA
CONSULTING ENGINEERS
AND MUST NOT BE
RETAINED, COPIED OR USED
WITHOUT THE WRITTEN
CONSENT OF THE COMPANY
C
Copyright
Loka
Consulting
Engineers
as date of
issue
NOT FOR CONSTRUCTION
CONSENT AUTHORITY:BLACKTOWN CITY COUNCIL
COPYRIGHT: THIS DESIGN AND PLANS ARE NOT TO BE USED OR REPRODUCED WHOLLY
OR IN PART WITHOUT WRITTEN PERMISSION OF LOKA CONSULTING ENGINEERS
PROPOSED RESIDENTIAL DEVELOPMENT
LOT 3985 SEYMOUR PLACE,
ROPES CROSSING NSW
15NL039
MAY 18 J.P.
AS SHOWN
D01 A
BASEMENT & GROUND FLOOR / SITE
STORMWATER DRAINAGE PLAN
GROUND FLOOR/SITE STORMWATER DRAINAGE PLAN
A N.L.FOR D.A. APPROVAL
J.P.
03-05-18
SCALE 1:200
BASEMENT STORMWATER DRAINAGE PLAN
PROVIDE TAP AND HOSE BEHIND
FENCELINE. ALL TRUCK TIRES
MUST BE WASHED DOWN BEFORE
DEPARTING
PROVIDE
SANDBAGS
AROUND
PIT
SITE RECYCLING
BIN
TEMPORARY
SITE TOILET
BRICK AND OTHER
NON-WEATHER
AFFECTED MATERIAL
STORAGE AREA
50mm AGGREGRATE OR DGB20
ROADBASE STABILISED SITE ACCESS
MIN 3000 WIDE x 200 THICK
(REFER TO DETAIL)
MIN 500 HIGH SEDIMENT FENCE SUPPORTED
AT 3000 MAX CTS WITH 1500 LONG STAR
PICKETS. BASE OF SEDIMENT FENCE TO BE
BURIED IN 200 DEEP x 100 WIDE TRENCH
AND BACKFILL TO BE COMPACTED
EXISTING PITS TO BE DEMOLISHED
TEMPORARY CONSTRUCTION EXIT
G
e
o
t
e
x
t
i
l
e
F
i
l
t
e
r
DETAIL OF OVERLAP
SEDIMENT FENCE
D
I
R
E
C
T
I
O
N
O
F
F
L
O
W
0
.
6
m
0
.
2
m
M
A
X
DISTURBED AREA
GEOTEXTILE
FABRIC
TRAP
RUNOFF FROM PAD
DIRECTED TO SEDIMENT
POSTS DRIVEN
UNDISTURBED AREA
GROUND
0.6m INTO
F
a
b
r
i
c
GRAVEL
50-75mm
DRAINAGE AREA 0.4Ha MAX. SLOPE GRADIENT 1:2 MAX.
WIRE OR STEEL MESH
SLOPE LENGTH 60m MAX.
3
m
M
A
X
.
E
N
T
E
R
CONSTRUCTION SITE
0.2m
E
X
I
T
M
I
N
.
W
I
D
T
H
3
m
STRAW BALE SEDIMENT FILTER
EXISTING ROADWAY
(MIN. 0.3m HIGH)
BERM
0
.
1
m
D
E
E
P
DISTURBED AREA
D
I
R
E
C
T
I
O
N
O
F
F
L
O
W
UNDISTURBED AREA
SLOPE LENGTH 40m MAX.
STAKES DRIVEN 0.6m
INTO THE GROUND
DRAINAGE AREA 0.4Ha MAX. SLOPE GRADIENT 1:2 MAX.
ANGLE FIRST STAKE TOWARDS
PREVIOUSLY LAID STRAW BALE
EXISTING CONTOURS
Ø50 PUMP LINE
WIRE MESH FENCE
STABILISED SITE ACCESS
SILT FENCE
SYMBOLS
EROSION CONTROL NOTES
1. ALL EROSION & SEDIMENT CONTROL MEASURES ARE TO BE
INSTALLED AND MAINTAINED IN ACCORDANCE WITH
'MANAGING URBAN STORMWATER, 3RD EDITION' PRODUCED
BY THE NSW DEPARTMENT OF HOUSING.
2. ALL EROSION AND SILTATION CONTROL DEVICES ARE TO BE
PLACED PRIOR TO THE COMMENCEMENT OF ANY
CONSTRUCTION WORKS, AND ALL SILT TRAPS ARE TO HAVE
DEPOSITED SILT REMOVED REGULARLY DURING
CONSTRUCTION.
3. ALL TRESS ARE TO BE PRESERVED UNLESS INDICATED
OTHERWISE ON THE ARCHITECT'S OR LANDSCAPE
ARCHITECT'S DRAWINGS. EXISTING GRASS COVER SHALL BE
MAINTAINED EXPECT IN AREAS CLEARED FOR BUILDINGS,
PAVEMENTS, ETC.
4. STABILISE/REVEGATATE ALL DISTURBED AREAS
PROGRESSIVELY WHERE PRACTICAL.
5. INSTALL TEMPORARY SEDIMENT BARRIERS TO ALL INLET PITS
LIKELY TO COLLECT SILT LADEN WATER.
6. ADDITIONAL VEHICLES MUST PARK ON ROAD AND NOT
FOOTPATH. PUBLIC FOOTPATH ADJACENT TO SITE MUST NOT
BE OBSTRUCTED AND MUST BE SAFE FOR PEDESTRIAN
ACCESS.
14. ENSURE FENCE IS KEYED AT BOTH ENDS INTO GROUND,
WITH BASE TURNED UPSLOPE.
15. WHERE SEDIMENT FENCE IS NEAR STREET, ERECT FENCE
WITHIN DEVELOPMENT SIDE OF TURF FILTER STRIPS AND
PROPERTY BOUNDARY.
16. SEDIMENT FENCE FILTER CLOTH TO BE FASTENED SECURELY
TO WIRE FENCE WITH TIES SPACED EVERY 600MM.OVERLAP
ADJOINING FILTER CLOTH BY 150MM AND FOLDING OVER.
17. DIVERT UPSLOPE WATER AROUND WORK SITE AND
STABILISE CHANNELS.
18. LAY KERB-SIDE TURF FILTER STRIP TO TRAP EXCESS
SEDIMENT.
19. CONTAMINATED WATER WITH SEDIMENT FROM A SEDIMENT
BASIN OR EXCAVATION PIT IS TO BE FLOCCULATED/
FILTERED TO LOWER SUSPENDED SOIL LOAD TO LESS THAN
50 MILLIGRAMS PER LITRE.
20. SOIL, SAND AND GRAVEL ARE NOT TO BE STOCKPILED ON
ROADWAYS OR IN DRAINAGE AREAS.
21. WASH AREA MUST BE SLIGHTLY DEPRESSED TO COLLECT
WASTE MATERIAL.
22. APPLY DUST CONTROL MEASURES TO REDUCE SURFACE AND
AIRBORNE MOVEMENT OF SEDIMENT
23. NOT WITHSTANDING DETAILS SHOWN, IT IS THE
CONTRACTORS SOLE RESPONSIBILITY TO ENSURE THAT ALL
SITE ACTIVITIES COMPLY WITH THE REQUIREMENTS OF THE
CLEAN WATERS ACT.
NOTES:SOIL & WATER MANAGEMENT
1. ALL EROSION AND SEDIMENT CONTROL MEASURES TO BE
INSPECTED, MAINTAINED AND LOGGED DAILY BY SITE
MANAGER.
2. MINIMISE DISTURBED AREAS.
3. ALL STOCKPILES TO BE CLEAR FROM DRAINS, GUTTERS
AND FOOTPATHS.
4. NO MATERIAL TO BE STORED ON FOOTPATH.
5. STOCKPILE LASTING LONGER THAN 40 DAYS MUST BE
COVERED.
6. DRAINAGE IS TO BE CONNECTED TO STORMWATER SYSTEM
AS SOON AS POSSIBLE.
7. ROADS AND FOOTPATH TO BE SWEPT DAILY.
8. ENSURE NEIGHBOURING PROPERTY IS NOT FLOODED.
9. IF YOU DO NOT COMPLY, YOU MAY BE LIABLE TO A $1500
FINE.
HAY BAIL
HAY BAIL DETAIL
TO BE USED AS REQUIRED
150
SILT FENCE DETAIL
MIN
500
100
STAKES 450mm INTO THE GROUND
BACKING
REINFORCED
FILTER FABRIC
(SECURE TO BACKING)
FABRIC
EMBEDED FILTER
FALL
MIN
500
STAR PICKET
OR CRUSHED ROCK
60mm GRAVEL
NTS
SOIL STOCK PILE
SEDIMENT FENCE
DIVERSION DRAIN
(WHERE POSSIBLE)
100m
m D
ip
NOTE:
EXISTING BUILDING TO BE RETAINED ON SITE.
ALL EXISTING PITS TO BE COVERED DURING SITE WORK.
THREE LAYERS OF SAND
BAGS WITH ENDS
OVERLAPPED
GAP BETWEEN SAND BAGS ACT AS A
SPILLWAY
SANDBAG KERB INLET
SEDIMENT TRAP
NTS
SAND BAGS OVERLAP
INTO KERB
RU
N-O
FF
AUTHORISED DWG No
SCALE @ A1 JOB No
REV
SHEET SUBJECTPROJECT PROJECT
DATE DRAWN DESIGNED CHECKED
LOT 3985 SEYMOUR PLACE, ROPES CROSSING NSWARCHITECT
NERMEIN LOKA
N
14A/8 AVENUE OF AMERICAS, NEWINGTON, NSWT: +61 2 8065 9689 F: +61 2 8065 9690MOBILE: 0404 142 063 EMAIL: [email protected]
LOKAC O N S U L T I N G
E N G I N E E R S.Pty Ltd
N.L.N.L.
THIS DRAWING IS THE
PROPERTY OF LOKA
CONSULTING ENGINEERS
AND MUST NOT BE
RETAINED, COPIED OR USED
WITHOUT THE WRITTEN
CONSENT OF THE COMPANY
C
Copyright
Loka
Consulting
Engineers
as date of
issue
NOT FOR CONSTRUCTION
CONSENT AUTHORITY:BLACKTOWN CITY COUNCIL
COPYRIGHT: THIS DESIGN AND PLANS ARE NOT TO BE USED OR REPRODUCED WHOLLY
OR IN PART WITHOUT WRITTEN PERMISSION OF LOKA CONSULTING ENGINEERS
PROPOSED RESIDENTIAL DEVELOPMENT
LOT 3985 SEYMOUR PLACE,
ROPES CROSSING NSW
15NL039
MAY 18 J.P.
EROSION AND SEDIMENT CONTROL PLAN
SCALE 1:200
A N.L.J.P.
AS SHOWN
D02
EROSION AND SEDIMENT
CONTROL PLAN AND DETAILS
A
FOR D.A. APPROVAL03-05-18
SUMMARY:
THE PROPOSED STORMWATER QUALITY TREATMENT TRAIN ARE COMPRISES OF 6-CARTRIDGE
(690mm PSORB) DETENTION STORMFILTER SYSTEM AND 3 'DEEP PIT' ENVIROPODS TO
REMOVE DIFFERENT SOURCE POLLUTANTS. IT IS OUR OPINION THAT IF THESE MEASURES
ARE IMPLEMENTED, THE PROPOSED DEVELOPMENT WILL COMPLY WITH THE INTENT OF
BLACKTOWN COUNCIL REQUIREMENT. IN ADDITION, THE PROPOSED STORMWATER QUALITY
TREATMENT TRAIN SHALL BE MAINTAINED AND SERVICES BY THE OWNERS OF THE
PROPOSED DEVELOPMENT AT NO COST TO COUNCIL.
STORMWATER TREATMENT SUMMARY
SITE AREA = 2727.54m²
"MUSIC" HAS BEEN USED FOR WATER QUALITY
TREATMENT ANALYSIS
AS PER YOUR REQUEST PLEASE SEE
STORMWATER360'S TREATMENT DESIGN FOR THE
ABOVE MENTIONED SITE. THE CATCHMENT IN MUSIC
IS MODELLED IN ACCORDANCE WITH THE FOLLOWING
GUIDELINES & PARAMETERS:
· MUSIC VERSION 6.1.0
· PART J OF BLACKTOWN COUNCIL'S DEVELOPMENT
CONTROL PLAN 2015
· RAINFALL STATION 66062 SYDNEY, 6 MINUTE
TIME STEP FROM 1963 TO 1993
· BLACKTOWN COUNCIL SOURCE NODE(S)
UTILIZING MODIFIED % IMPERVIOUS AREA,
RAINFALL THRESHOLD, SOIL PROPERTIES &
POLLUTANT CONCENTRATIONS
· NO DRAINAGE ROUTING BETWEEN NODES.
THE SYSTEM HAS BEEN MODELLED TO MEET THE
BLACKTOWN COUNCIL DCP (2015) TARGET
TSS: 85% REDUCTION
TP: 65% REDUCTION
TN: 45% REDUCTION
TREATMENT DEVICES:
1. 3 x 'DEEP PIT' ENVIROPODS
2. 6-CARTRIDGE (690mm PSORB) DETENTION
STORMFILTER SYSTEM
3. STORMFILTER CONCRETE MANHOLE FOR
CARTRIDGE INSTALLATION
ROOF PAVED AREA
892 m²
ROOF GRASS AREA
657 m²
DEEPSOIL GRASS AREA
539 m²
TOTAL SITE AREA
2865 m²
CARPARKING AREA
651 m²
HARD PAVED AREA
126 m²
STORMFILTER DESIGN TABLE
CARTRIDGE HEIGHT
TREATMENT BY MEDIA SURFACE AREA L/S/m2
CARTRIDGE FLOW RATE
SYSTEM HYDRAULIC DROP (H - REQ'D. MIN.)
(L/s)
· STORMFILTER TREATMENT CAPACITY VARIES BY NUMBER OF FILTER CARTRIDGES INSTALLED AND BY REGION SPECIFIC INTERNAL FLOW CONTROLS. CONVEYANCE CAPACITY IS RATED AT 80L/S.· THE STANDARD CONFIGURATION IS SHOWN. ACTUAL CONFIGURATION OF THE SPECIFIED STRUCTURE(S) PER CIVIL ENGINEER WILL BE SHOWN ON SUBMITTAL DRAWING(S).· ALL PARTS PROVIDED AND INTERNAL ASSEMBLY BY STORMWATER360 AUSTRALIA UNLESS OTHERWISE NOTED.
690 460 310
930 700 550
1.4
1.42
0.7 1.4 0.7 1.4 0.7
0.71 0.95 0.47 0.63 0.32
DATE: CHK:DRN:FILE NAME: W.J. M.W.
360Stormwater
GENERAL NOTES1. INLET AND OUTLET PIPING SHALL BE SPECIFIED BY SITE CIVIL ENGINEER (SEE PLANS) AND PROVIDED BY CONTRACTOR. STORMFILTER IS PROVIDED WITH OPENINGS AT INLET AND OUTLET LOCATIONS.2. IF THE PEAK FLOW RATE, AS DETERMINED BY THE SITE CIVIL ENGINEER, EXCEEDS THE PEAK HYDRAULIC CAPACITY OF THEPRODUCT, AN UPSTREAM BYPASS STRUCTURE IS REQUIRED. PLEASE CONTACT STORMWATER360 AUSTRALIA FOR OPTIONS.3. THE FILTER CARTRIDGE(S) ARE SIPHON-ACTUATED AND SELF-CLEANING. THE ACTUAL NUMBER SHALL BE SPECIFIED BY THESITE CIVIL ENGINEER ON SITE PLANS OR IN DATA TABLE BELOW. PRECAST STRUCTURE TO BE CONSTRUCTED BYSTORMWATER360 AUSTRALIA IN ACCORDANCE WITH AS3600.4. SEE STORMFILTER DESIGN TABLE FOR REQUIRED HYDRAULIC DROP. FOR SHALLOW, LOW DROP OR SPECIAL DESIGN CONSTRAINTS, CONTACT STORMWATER360 AUSTRALIA FOR DESIGN OPTIONS.5. ALL WATER QUALITY PRODUCTS REQUIRE PERIODIC MAINTENANCE AS OUTLINED IN THE O&M GUIDELINES. PROVIDE MINIMUM CLEARANCE FOR MAINTENANCE ACCESS.6. STRUCTURE AND ACCESS COVERS DESIGNED TO MEET AUSTROADS T44 LOAD RATING WITH 0.0m TO 2.0m FILL MAXIMUM(CLASS D).7. THE STRUCTURE THICKNESSES SHOWN ARE FOR REPRESENTATIONAL PURPOSES AND VARY REGIONALLY.8. ANY BACKFILL DEPTH, SUB-BASE, AND OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS ANDSHALL BE SPECIFIED BY SITE CIVIL ENGINEER.9. CARTRIDGE HEIGHT IS 690mm (SHOWN). CARTRIDGE HEIGHT AND ASSOCIATED DESIGN PARAMETERS PER STORMFILTER DESIGN TABLE.10. STORMFILTER BY STORMWATER360 AUSTRALIA: PHONE: 1300 354 722 OR www.stormwater360.com.au
STORMFILTER
CARTRIDGE DETAIL
MANHOLE STORMFILTER SECTION
18.05.166C_2050SFMH
MANHOLE STORMFILTER PLAN
DRAWING
STORMWATER360 AUSTRALIA
6 CARTRIDGE STORMFILTER SYSTEM
Ø 2470 CONCRETE MANHOLE
GENERAL ARRANGEMENT
1
A
OIL BUFFER
DEEP PIT ENVIROPOD
CONFIGURATION SECTION
Ø
AUTHORISED DWG No
SCALE @ A1 JOB No
REV
SHEET SUBJECTPROJECT PROJECT
DATE DRAWN DESIGNED CHECKED
LOT 3985 SEYMOUR PLACE, ROPES CROSSING NSWARCHITECT
NERMEIN LOKA
N
14A/8 AVENUE OF AMERICAS, NEWINGTON, NSWT: +61 2 8065 9689 F: +61 2 8065 9690MOBILE: 0404 142 063 EMAIL: [email protected]
LOKAC O N S U L T I N G
E N G I N E E R S.Pty Ltd
N.L.N.L.
THIS DRAWING IS THE
PROPERTY OF LOKA
CONSULTING ENGINEERS
AND MUST NOT BE
RETAINED, COPIED OR USED
WITHOUT THE WRITTEN
CONSENT OF THE COMPANY
C
Copyright
Loka
Consulting
Engineers
as date of
issue
NOT FOR CONSTRUCTION
CONSENT AUTHORITY:BLACKTOWN CITY COUNCIL
COPYRIGHT: THIS DESIGN AND PLANS ARE NOT TO BE USED OR REPRODUCED WHOLLY
OR IN PART WITHOUT WRITTEN PERMISSION OF LOKA CONSULTING ENGINEERS
PROPOSED RESIDENTIAL DEVELOPMENT
LOT 3985 SEYMOUR PLACE,
ROPES CROSSING NSW
15NL039
MAY 18 J.P.
A N.L.FOR D.A. APPROVAL
J.P.
NTS
D03 A
03-05-18
MUSIC RESULT AND DETIALS
MUSIC MODELING RESULT
AUTHORISED DWG No
SCALE @ A1 JOB No
REV
SHEET SUBJECTPROJECT PROJECT
DATE DRAWN DESIGNED CHECKED
LOT 3985 SEYMOUR PLACE, ROPES CROSSING NSWARCHITECT
NERMEIN LOKA
N
14A/8 AVENUE OF AMERICAS, NEWINGTON, NSWT: +61 2 8065 9689 F: +61 2 8065 9690MOBILE: 0404 142 063 EMAIL: [email protected]
LOKAC O N S U L T I N G
E N G I N E E R S.Pty Ltd
N.L.N.L.
THIS DRAWING IS THE
PROPERTY OF LOKA
CONSULTING ENGINEERS
AND MUST NOT BE
RETAINED, COPIED OR USED
WITHOUT THE WRITTEN
CONSENT OF THE COMPANY
C
Copyright
Loka
Consulting
Engineers
as date of
issue
NOT FOR CONSTRUCTION
CONSENT AUTHORITY:BLACKTOWN CITY COUNCIL
COPYRIGHT: THIS DESIGN AND PLANS ARE NOT TO BE USED OR REPRODUCED WHOLLY
OR IN PART WITHOUT WRITTEN PERMISSION OF LOKA CONSULTING ENGINEERS
PROPOSED RESIDENTIAL DEVELOPMENT
LOT 3985 SEYMOUR PLACE,
ROPES CROSSING NSW
15NL039
MAY 18 J.P.
A N.L.FOR D.A. APPROVAL
J.P.
NTS
D04 A
03-05-18
MUSIC LINK REPORT