stormwater budget overview just a reminder. infrastructure inventory for stormwater drainage system...

9
Stormwater Budget Stormwater Budget Overview Overview Just a Reminder Just a Reminder

Upload: louisa-bailey

Post on 21-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control

Stormwater Budget Stormwater Budget Overview Overview

Just a ReminderJust a Reminder

Page 2: Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control

Infrastructure Inventory for Infrastructure Inventory for Stormwater Drainage SystemStormwater Drainage System

19 Major Canal Control Structures19 Major Canal Control Structures 12 Minor Canal Control Structures12 Minor Canal Control Structures 72 Major Roadway Crossing Culverts72 Major Roadway Crossing Culverts 1,555 Minor Roadway Crossing Culverts1,555 Minor Roadway Crossing Culverts 145 Culverts Leading into Saltwater 145 Culverts Leading into Saltwater

CanalsCanals 369 Valley Gutters Crossing Roadways369 Valley Gutters Crossing Roadways 1,100+ Miles of Roadside Swales1,100+ Miles of Roadside Swales 154 Miles of Drainage Ditches154 Miles of Drainage Ditches 58 Miles of Freshwater Canals58 Miles of Freshwater Canals 26 Miles of Saltwater Canals26 Miles of Saltwater Canals Drainage Inlets, Spillways, Catch Basins, Drainage Inlets, Spillways, Catch Basins,

etc.etc.

Page 3: Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control

I-6 Structure

Page 4: Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control

ITT Structure

Page 5: Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control

Canal Control Structures 5-Year Plan

Structure Waterway Roadway __ Rating Year

R-1 Royal Palms Belle Terre Parkway 11 2012

BT-2 Bellaire Bird of Paradise Drive 11 2013

L-1 Sesame Sentinel Trail 9 2014

M-2 Mulberry Old Kings Road North 9 2014

I-1 Iroquois Underwood Trail 9 2015

I-4 Ulysses (N) Underwood Trail 9 2015

I-6 Ulysses (S) Underwood Trail 9 2015

L-4 Royal Palms Royal Palms 9 2016

Page 6: Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control

Major Roadway Crossing Major Roadway Crossing CulvertsCulverts

Emergency – FloridaPark Drive June 2010Cost $666,244

RatingRating

ConditionCondition# of# of

CrossingCrossingss

6 – Failure, 6 – Failure, non-non-functioningfunctioning

00

5 – Needs 5 – Needs replacemenreplacement/ repairt/ repair

00

4 – 4 – Functioning Functioning /Deteriorati/Deterioratingng

1313

3 – 3 – Functioning Functioning / Minor / Minor DeterioratioDeteriorationn

4242

2 – 2 – ReplacedReplaced

99

1 – Recent 1 – Recent replacemenreplacementt

88

TotalTotal 72722012 Budget = 0 Replacements

Page 7: Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control

Florida Park DriveEstimated planned construction = $ 369,110Actual emergency repair = $ 666,244

Mulberry Creek StructureEstimated planned construction = ~$180,000 Actual emergency repair = $ 251,000

Rippling Waterway StructureEstimated planned construction = ~$ 75,000Actual emergency repair = $ 85,000

D-10 StructureEstimated planned construction = ~ $ 60,000Actual emergency repair = $ 63,325

Crandell CoveEstimated planned construction = ~ $ 90,000Actual emergency repair = $ 154,000

Total Actual Emergency Cost = $ 1,219,569Total Planned Cost = $ 774,110Difference = $ 445,459

Planned Construction vs. Emergency Repair Cost

Page 8: Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control

Swale Maintenance & Swale Maintenance & RehabilitationRehabilitation

Priorities are Complaint Driven

Page 9: Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control

RECOMMENDED 5-YEAR PLANRECOMMENDED 5-YEAR PLAN2012 Capital Structures - 1Major Crossings - 0Minor Crossings - 30To Saltwater Canals - 2Valley Gutters - 10Swales – 40 Miles

2013 CapitalStructures - 1Major Crossings - 1Minor Crossings - 30To Saltwater Canals - 4Valley Gutters - 10Swales – 40 Miles

2014 Capital Structures - 1Major Crossings - 0Minor Crossings - 30To Saltwater Canals - 8Valley Gutters – 10Swales – 40 Miles

2015 Capital Structures - 1Major Crossings - 1Minor Crossings - 30To Saltwater Canals - 8 Valley Gutters - 10Swales – 40 Miles

2016 Capital Structures - 1Major Crossings - 0Minor Crossings - 30To Saltwater Canals - 8 Valley Gutters - 10Swales – 40 Miles

Future Capital Structures – 18 remainingMajor Crossings – 53 remainingMinor Crossings – 1,229 remainingTo Saltwater Canals – 114 remainingValley Gutters – 215 remainingSwales - Ongoing