Page 1 Stockpile Project Disposal-SPD Stockpile Project Disposal-SPD SPD PROJECT SPD PROJECT Major General Roque de Oliveira –SPD Project Manager Joaquim Merca – SPD Project Technical Adviser

Upload: lythuy

Post on 29-Mar-2019

234 views

Category:

Documents


1 download

TRANSCRIPT

Page 1

Stockpile Project Disposal-SPDStockpile Project Disposal-SPD

SPD PROJECTSPD PROJECT

Major General Roque de Oliveira –SPD Project ManagerJoaquim Merca – SPD Project Technical Adviser

Page 2

SPD PROJECTSPD PROJECT

Implementation of the OttawaConvention through the disposalof Anti-Personal Mines in Stock

FINANCIAL SUPPORT OF EC

SPD PROJECTSPD PROJECT

OBJECTIVESTo fulfill with Article 4 of the Ottawa Convention, ratified

by the Angolan Government and made into force inDecember 2002, aiming at the disposal of all Anti-Personal landmines in stock within 4 years by January2007; and

To develop the capacity building of the national authority, CNIDAH, and the operators, state bodies, FAA and INAD to carry out the operation of destruction of the AP mines in stock in accordance with mine action internationalhumanitarian standards.

Page 3

SPD PROJECTSPD PROJECT

Profile of the Project

Timeframe: maximum 2 years (01/01/05 -31/12/06)Areas of intervention: the whole countryTotal Budget: EUR 1,765,000 Execution modality: NEX (National Execution)Partners of the project: 4 Plan of Action: 5 phases

SPD PROJECTSPD PROJECT

Budget for the Project

The Project is co-financed by 3 parties as follows:

EC: EUR 1,500,000 (85%)GoA: EUR 170,000 (10%)UNDP: EUR 95,000 (5%)Total EUR 1,765,000

Angola GovUNDPEC

Page 4

SPD PROJECTSPD PROJECT

PARTNERS/CONNECTION

CNIDAH

FAA

UNDP

INAD

IMPLEMENTING BODY

ALL THE PARTNERS SIGNED THE PROTOCOL OF AGREEMENT ON 17NOV04

Ano 1 1º Semestre 2º Semestre Actividade 1 Mês 2 3 4 5 6 7 8 9 10 11 12 Orgão imlementador 1. Preparação

CNIDAH, PNUD

2. Planificação & coordenação

CNIDAH, PNUD, FAA, INAD

3. Pesquisa e analise de minas AP em paióis

FAA, CNIDAH, PNUD

4. Revisão do projecto, testes e formação do pessoal

CNIDAH, PNUD, FAA, INAD

5. Execução (destruição de minas AP armazenadas em paióis)

FAA, CNIDAH, PNUD

Avaliação & Monitoria

CNIDAH, PNUD

2nd Planification, Coordenation andTraining

Assessment & monitoring

CNIDAH, UNDP

CNIDAH, UNDP, FAA, INAD

FAA, CNIDAH, UNDP

CNIDAH, UNDP, FAA, INAD

FAA, CNIDAH, UNDP

CNIDAH, UNDP

2005/20061º Tr. 2º Tr. 3 Tr. 4º Tr. 5º Tr. 6º Tr. 7º Tr. 8º Tr.

ACTION PLAN

Activity1st Preparation

3rd Survey and AnalisyOf the AP mines in Stock

4th Review, tests andtraining5ª Execution(destruction of AP mines in Stock)

SPD PROJECTSPD PROJECT

Page 5

THE MAIN GOAL OF THIS ACTION PLAN

31 of December 2006, To fulfill with Article 4 ofthe Ottawa Convention, aiming at the disposalof all Anti-Personal landmines in stock underAngola jurisdiction.

SPD PROJECTSPD PROJECT

TRAINING AND DEVELOP OF NATIONAL CAPACITY

SPD PROJECTSPD PROJECT

Page 6

SPD PROJECTSPD PROJECT

TRAINING AND NATIONAL CAPACITY BUILDING

DemilitarizationCourse Technical

SurveyCourse

Reconvertion CourseOf Military Demining

Into Humanitarian Demining

DemolitionCourse

SPD PROJECTSPD PROJECT

22 FAA OFFICERS

02 NATIONAL POLICE OFFICERS

06 INAD INSTRUCTORS

02 UNDP TECHNICAL ASSISTANT

NATIONAL CAPACITY BUILDING

Page 7

FIELD OPERATIONS

SPD PROJECTSPD PROJECT

SPD team

SPD Operational Vehicle

AP Mines

Obsolete Ammu

SPD PROJECTSPD PROJECT

Page 8

40.000 m² of Acess Demining

SPD PROJECTSPD PROJECT

FIELD OPERATIONS

SPD PROJECTSPD PROJECT

FIELD OPERATIONS

Page 9

SPD PROJECTSPD PROJECT

FIELD OPERATIONS

QUANTITY OF ANTI PERSONAL IDENTIFY

83.557 AP Mines of 23 diferent “family”

DESTRUCTIONS 81.04570.179 (88%) RECYCLING

10.866 (12%) DEMOLITIONS

2.512 TO TRAINING

SPD PROJECTSPD PROJECT

Page 10

OZM (3,4 e 72) Ex.Soviet U. 360Nº 4 Israeli 45MAY75 Romania 4.688M 90 Poland 49.058M966 Portugal 17M35 (PRB) Belgium 13MON (50,100 e 200) Ex.Soviet U. 82Gayata Hungary 665Elsie (CRV9) Canada 7.080 Claymore USA 30Type Origin Quantity

Tipology & Quantity Of Anti Personal Identify thenacional level

SPD PROJECTSPD PROJECT

T72 A China 53R2M1 South Africa 68R1M1 South Africa 108PMD (6, 6m e 7) Ex.Soviet U. 3.902PPSrMi Ex.Czechoslovakia 232PRB (m409) Belgium 01PMA 1 Ex.Yugoslavia 86P5 Spain 01PPM 2 Ex.GRD 2.199VS MK2 Italy 54 PMM (1,2) Cuba (9.841 PMM1, 1.474 PMM2) 11.315PMN Ex.Soviet U. 376POMZ (2 e 2m) Ex.Soviet U. 3.124

Type Origin Quantity

Iniciar o Microsoft Office Outlook.lnk

SPD PROJECTSPD PROJECT

Page 11

ANTI PERSONAL MINES

DECLARE FROM ANGOLA IN 1fr REPORT SENT TO CICHD IN 2003

SPD PROJECTSPD PROJECT

M-90

42.350

OZM-4

1.377

PMM-1

6.932

SPD PROJECTSPD PROJECT

Page 12

M-90

49.058

+6.708

OZM-4

1.680

+ 303*

PMM-1

9.841

+ 2.909

NOW

*OBS: Demolition by FAA in 2003 and 2004, 1.320 OZM 4

SPD PROJECTSPD PROJECT

1.390TOTAL100M-9030GYATA30MON-5050OZM-4190OTK

30MINAS DE SINALIZAÇÃO

30PPMSR-150PMD-650MON-100200PMM-1100PMN200M-75200PONZ200PPM-2

QuantityType

ANTI PERSONAL MINES TO TRAINING

DECLARE FROM ANGOLA IN 1fr REPORT SENT TO GICHD IN 2003

Page 13

OZM (3,4 e 72) Ex.URSS 158MAY75 Roménia 953M 90 Polónia 719M966 Portugal 17M35 (PRB) Bélgica 12MON (50,100 e 200) Ex.URSS 35Gayata Hungria 20Elsie (CRV9) Canada 16 Claymore USA 19Type Origin Quantity

Tipology and Quantity of Anti personal Mines to Operational Training, NOW

SPD PROJECTSPD PROJECT

T 72ª China 16TOTAL 2.512

R2M2 Africa do Sul 03R1M1 Africa do Sul 10PMD (6, 6m e 7) Ex.URSS 26PPSrMi Ex.Checoslováquia 109PRB (m409) Bélgica 01P5 Espanha 01PPM 2 Ex.RDA 196PMM1/2 Cuba 114PMN Ex.URSS 37POMZ (2 e 2m) Ex.URSS 50Type Origin Quantity

SPD PROJECTSPD PROJECT

Page 14

Phase 5 Demilitarization

SPD PROJECTSPD PROJECT

Phase 5 Demolition

SPD PROJECTSPD PROJECT

Page 15

28 of December 2006, Official Ceremony

SPD PROJECTSPD PROJECT

SPD PROJECTSPD PROJECT28 of December 2006, Official Ceremony, Example of

Recycle Process

Grafanil e 44 117.mpg

Page 16

SPD PROJECTSPD PROJECT

ANGOLA, FULFILL ARTICLE 4 OF OTTAWA CONVENTION, DISPOSAL ALL ANTI PERSONAL LANDMINES UNDER ANGOLA JURISDITION.

THE OPERATIONAL SPD TEAM WIIL BE TRY FOUND MORE BUSH DUMPS IN MINED AREAS AND AFTER REPORT THROUGH ARTICLE 7 OF OTTAWA CONVENTION

SPD PROJECTSPD PROJECT

Page 17

THANK YOU FOR YOUR ATTENTION

QUESTION´S ??