STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.002264 LA 302: BAYOU BARATARIA MB REPLACEMENTLA 45 JEFFERSON 4.87 5.44249-90Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 302-P JEFFERSON 0.00 0.28826-64
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
BRIDGE REPL.(KERNER'S)249-90-0041;TEA-21 KERNER'S FERRY BRIDGE,
PRIORITY BRIDGE PROJECT; 249-90 TTF MATCH
826-64 NFA MATCH
DEMO / HIGH PRIORITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,700,000.00 2017FBROFF $1,360,000.00Right of Way $1,700,000.00
$1,639,327.00 2017STPFLEX $1,311,461.60$1,639,327.00
$30,000.00 2019DEMO $24,000.00Utility Relocation $30,000.00
$20,570,000.00 2022FBROFF $16,456,000.00Construction $18,700,000.00
$7,480,000.00 2022STPFLEX $5,984,000.00$6,800,000.00
$31,419,327.00Total Cost $25,135,461.60$28,869,327.00
Project: H.002956 EARHART AT DAKINLA 3139 JEFFERSON 4.54 4.55430-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
RAMP CONNECTOR (EB EARHART - DAKIN)430-01-0020; USE TTF AS MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$339,587.00 2017STP>200K $271,669.60Design (Engineering) $339,587.00
$3,960,000.00 2021STP>200K $3,168,000.00Construction $3,600,000.00
$4,299,587.00Total Cost $3,439,669.60$3,939,587.00
Project: H.004424 AIRLINE AT CLEARVIEW INTERSECTION IMPROVUS 61 JEFFERSON 2.84 3.40007-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 3152 JEFFERSON 1.06 1.22826-03
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
INTERSECTION IMPROVEMENT, WIDENING, SUBSURFACE
DRAINAGE
USE TTF AS MATCH FOR PHASES 4 AND 6.,
LOCAL MATCH FOR PHASES 2 AND 3
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$584,999.25 2009DEMO $467,999.40Environmental $584,999.25
$4,730,000.00 2020STP>200K $3,784,000.00Construction $4,300,000.00
$5,314,999.25Total Cost $4,251,999.40$4,884,999.25
Page 1 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.007181 L&A ROAD IMPROVEMENTSJEFFERSON 0.00 0.00000-26Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
NEW ROADWAY AND ALIGNMENTUSE LOCAL AS MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$884,442.00 2017STP>200K JEFFERSON PARISH$707,553.60Right of Way $884,442.00
$729,858.00 2017STP>200K JEFFERSON PARISH$669,086.40Utility Relocation $729,858.00
$4,950,000.00 2022STP>200K JEFFERSON PARISH$3,960,000.00Construction $4,500,000.00
$6,564,300.00Total Cost $5,336,640.00$6,114,300.00
Project: H.007208 HARVEY BLVD EXT(PETERS RD-MANHATTANLA 3017 JEFFERSON 3.58 3.89826-11Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
JEFFERSON 0.00 0.00000-26 HARVEY BOULEVARD
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
NEW ROADWAY EXTENSION742-26-0073; SEE NOTES, USE LOCAL AS MATCH URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$560,020.00 2017STP>200K JEFFERSON PARISH$448,016.00Right of Way $560,020.00
$5,615,000.00 2020STP>200K JEFFERSON PARISH$4,492,000.00Utility Relocation $5,615,000.00
$6,175,020.00Total Cost $4,940,016.00$6,175,020.00
Project: H.007214 EAST AMES BOULEVARD IMPROVEMENTSJEFFERSON 0.00 0.00000-26 AMES BOULEVARDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
WIDEN FROM 2 TO 3 LANES742-26-0080;OREGON DR.-BLANCHE DR, USE
LOCAL AS MATCH
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$570,000.00 2020STP>200K JEFFERSON PARISH$456,000.00Right of Way $570,000.00
$750,000.00 2019STP>200K JEFFERSON PARISH$600,000.00Utility Relocation $750,000.00
$8,140,000.00 2022STP>200K JEFFERSON PARISH$6,512,000.00Construction $7,400,000.00
$9,460,000.00Total Cost $7,568,000.00$8,720,000.00
Project: H.010017 US 90Z: WESTBANK EXPRESSWAY REHABUS 90-Z JEFFERSON 0.00 5.50283-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
MAJOR BRIDGE REHABILITATIONUSE CCCD TOLL CREDITS AS MATCH, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$575,000.00 2021NHPP $575,000.00Design (Engineering) $575,000.00
$13,200,000.00 2021NHPP $13,200,000.00Construction $12,000,000.00
$13,775,000.00Total Cost $13,775,000.00$12,575,000.00
Page 2 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.010570 LA 49/WILLIAMS BLVD CORRIDOR IMPROVSLA 49 JEFFERSON 2.03 3.18283-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
ACCESS MANAGEMENT/SAFETY IMPROVEMENTS, BIKE
LANES, SIDEWALKS
MATCH FROM THE CITY OF KENNER, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$215,000.00 2018SATRANS CITY OF KENNER$0.00Feasibility $215,000.00
$106,633.50 2018LOCAL CITY OF KENNER$0.00Environmental $106,633.50
$684,000.00 2019HSIP CITY OF KENNER$615,600.00Right of Way $684,000.00
$684,000.00 2019STP>200K CITY OF KENNER$547,200.00$684,000.00
$789,000.00 2019HSIP CITY OF KENNER$710,100.00Utility Relocation $789,000.00
$789,000.00 2019STP>200K CITY OF KENNER$631,200.00$789,000.00
$319,900.49 2018LOCAL CITY OF KENNER$0.00Design (Engineering) $319,900.49
$3,520,000.00 2021HSIPPEN CITY OF KENNER$3,520,000.00Construction $3,200,000.00
$3,520,000.00 2021STP>200K CITY OF KENNER$2,816,000.00$3,200,000.00
$10,627,533.99Total Cost $8,840,100.00$9,987,533.99
Project: H.010673 US90Z:HARVEY CANAL TUNNEL REHABILITATIONUS 90-Z JEFFERSON 3.01 3.37283-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL
REHABILITATI
SEE NOTES FOR FUNDING INFO, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,150,000.00 2019NHPP $1,720,000.00Design (Engineering) $2,150,000.00
$335,000.00 2019STCASH $0.00$335,000.00
$11,176,000.00 2021NHPP $11,176,000.00Construction $10,160,000.00
$2,794,000.00 2021STP>200K $2,794,000.00$2,540,000.00
$16,455,000.00Total Cost $15,690,000.00$15,185,000.00
Project: H.011670 I-10 / LOYOLA INTERCHANGE IMPROVEMENTI-10 JEFFERSON 0.30 0.95450-15Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
INTERCHANGE IMPROVEMENTSTIP PH 6 AC W/GARVEE. SEE NOTES FOR
CONVERSION PLAN,
INTERMODAL CONNECTOR,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,009,897.00 2016STBONDS $0.00Feasibility $1,009,897.00
$1,700,000.00 2017STBONDS $0.00Environmental $1,700,000.00
$40,000,000.00 2019GARVEE $0.00Right of Way $40,000,000.00
$1,000,000.00 2018STBONDS $0.00Design (Engineering) $1,000,000.00
$164,664,500.00 2019GARVEE $0.00Construction $149,695,000.00
$208,374,397.00Total Cost $0.00$193,404,897.00
Page 3 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.011731 W. ESPLANADE BRIDGES @ DUNCAN CANALJEFFERSON 0.00 0.00000-26 W. ESPLANADERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENTCITY OF KENNER PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$5,995,000.00 2019LOCAL $0.00Construction $5,450,000.00
$9,992,400.00 2019STP>200K $7,993,920.00$9,084,000.00
$15,987,400.00Total Cost $7,993,920.00$14,534,000.00
Project: H.011732 JEFFERSON PARISH: CANAL ST. IMPROVEMENTSJEFFERSON 0.00 0.00000-26 CANAL STREETRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
REHABILITATION, SIDEWALK, AND BIKE LANESJEFFERSON PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2022STP>200K $80,000.00Utility Relocation $100,000.00
$1,708,300.00 2022STP>200K JEFFERSON PARISH$1,366,640.00Construction $1,553,000.00
$1,808,300.00Total Cost $1,446,640.00$1,653,000.00
Project: H.011752 SEVERN AVE: VETERANS - W. ESPLANADEJEFFERSON 0.00 0.00000-26 SEVERN AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
CONCRETE REHABILITATION WITH DRAINAGE & PED
IMPROVEMENTS
JEFFERSON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,410,000.00 2019LOCAL $0.00Construction $3,100,000.00
$1,540,000.00 2019STP>200K JEFFERSON PARISH$1,232,000.00$1,400,000.00
$7,810,000.00 2019STP>200K-E $6,248,000.00$7,100,000.00
$12,760,000.00Total Cost $7,480,000.00$11,600,000.00
Project: H.011779 POWER BLVD MEDIAN IMPROVEMENTSJEFFERSON 0.00 0.00000-26 POWER BOULEVARDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
MULTI-USE PATHMATCH PROVIDED BY CITY OF KENNER., ENHANCEMENTS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,100,000.00 2021STP>200K $880,000.00Construction $1,000,000.00
$2,200,000.00 2021TAP>200K $1,760,000.00$2,000,000.00
$3,300,000.00Total Cost $2,640,000.00$3,000,000.00
Page 4 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.011797 AMES BLVD (WB EXPY - HAPPY ST)JEFFERSON 0.00 0.00000-26 AMES BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
COLD-MILL AND OVERLAYJEFFERSON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$781,000.00 2020STP>200K JEFFERSON PARISH$624,800.00Construction $710,000.00
$781,000.00Total Cost $624,800.00$710,000.00
Project: H.011798 AIRLINE PARK BLVD (CAMPHOR - W NAPOLEON)JEFFERSON 0.00 0.00000-26 AIRLINE PARKRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
CONCRETE REHABILITATION WITH DRAINAGE
IMPROVEMENTS
JEFFERSON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$6,589,000.00 2019STP>200K $5,271,200.00Construction $5,990,000.00
$6,589,000.00Total Cost $5,271,200.00$5,990,000.00
Project: H.012012 RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR)JEFFERSON 0.00 0.00000-26 RIDGEWOOD / STROELITZRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
CONCRETE OVERLAYJEFFERSON PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,577,400.00 2021STP>200K JEFFERSON PARISH$1,261,920.00Construction $1,434,000.00
$1,577,400.00Total Cost $1,261,920.00$1,434,000.00
Project: H.012553 LA 541: LA 18 (LOUISIANA) - LA 18 (4TH)LA 541 JEFFERSON 1.22 4.18826-13Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 541 JEFFERSON 0.00 1.22826-13
LA 560-2 JEFFERSON 0.00 0.17826-49
LA 18 JEFFERSON 3.46 3.73063-02
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
MILL AND OVERLAY & DRAINAGE AND RELATED WORK, PRESERVATION, NON-INTERSTATE ON STP SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,096,500.00 2019STPFLEX $2,477,200.00Construction $2,815,000.00
$3,096,500.00Total Cost $2,477,200.00$2,815,000.00
Page 5 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.012620 LA 48: EVANS RD - EDWARDS AVELA 48 JEFFERSON 0.64 0.71006-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$660,000.00 2022NHPP $528,000.00Construction $600,000.00
$660,000.00Total Cost $528,000.00$600,000.00
Project: H.012783 WB VETERANS: SEVERN AVE - CLEARVIEW PKWYJEFFERSON 0.00 0.00000-26 VETERANS BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
RESURFACING/REHABILITATIONJEFFERSON PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,645,500.00 2019STP>200K-E JEFFERSON PARISH$2,116,400.00Construction $2,405,000.00
$2,645,500.00Total Cost $2,116,400.00$2,405,000.00
Project: H.012795 HARVEY TUNNEL DRAINAGE STRUCTURE REPAIRUS 90-Z JEFFERSON 3.08 3.09283-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
REPAIR OF GRATE SYSTEM ON ROADWAY AT TUNNEL
ENTRANCE
OPERATING/MISCELLANEOUS REPAIR FUNDS,
LETTER BID IN THE DISTRICT
OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$38,500.00 2020STCASH $0.00Construction $35,000.00
$38,500.00Total Cost $0.00$35,000.00
Project: H.012884 WOODMERE BLVD. PANEL REPLACEMENTJEFFERSON 0.00 0.00000-26 WOODMERE BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
JEFFERSON 0.00 0.00000-26 WOODMERE BLVD
JEFFERSON 0.00 0.00000-26 WOODMERE BLVD W
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
CONCRETE PANEL REPLACEMENTJEFFERSON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$124,000.00 2018STP>200K JEFFERSON PARISH$99,200.00Design (Engineering) $124,000.00
$3,001,665.70 2020STP>200K JEFFERSON PARISH$2,401,332.56Construction $2,728,787.00
$3,125,665.70Total Cost $2,500,532.56$2,852,787.00
Page 6 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.012885 LA 466: 5TH ST IMPROVEMENTS (GRETNA)LA 466 JEFFERSON 0.00 0.58063-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
BIKE LANES, MULTI-USE PATHS, ADA SIDEWALKSCITY OF GRETNA WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$-10,000.00 2019STP>200K CITY OF GRETNA$-8,000.00Environmental $-10,000.00
$-277,000.00 2019STP>200K CITY OF GRETNA$-221,600.00Design (Engineering) $-277,000.00
$4,800,400.00 2022STP>200K CITY OF GRETNA$3,840,320.00Construction $4,364,000.00
$4,513,400.00Total Cost $3,610,720.00$4,077,000.00
Project: H.013104 LOYOLA DR IMPROVEMENTS (I-10 - VETERANS)JEFFERSON 0.00 0.00000-26 LOYOLA DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
RELOCATE A FIRE STATION AND BUILD ADDITIONAL
TURNING LANES
LA 1 TOLL CREDITS AS MATCH TO PHASE 3, INTERMODAL CONNECTOR,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$20,000.00 2019STCASH $0.00Right of Way $20,000.00
$3,500,000.00 2019STPFLEX $3,500,000.00$3,500,000.00
$3,520,000.00Total Cost $3,500,000.00$3,520,000.00
Project: H.013757 US 90 & LA 3046: MILL & OVERLAYUS 90 JEFFERSON 0.00 3.23006-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 3046 JEFFERSON 0.00 0.59423-01
LA 3046 JEFFERSON 0.17 0.59423-01
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
MILL AND OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$247,500.00 2020NHPP $198,000.00Construction $225,000.00
$3,412,200.00 2020STP>200K $2,729,760.00$3,102,000.00
$1,620,300.00 2020STP>200K-E $1,296,240.00$1,473,000.00
$650,100.00 2020STPFLEX $520,080.00$591,000.00
$5,930,100.00Total Cost $4,744,080.00$5,391,000.00
Project: H.013813 VINTAGE DR MU PATH: POWER - WILSONJEFFERSON 0.00 0.00000-26 VINTAGE DR MU PATHRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
MUTLI USE PATHJEFFERSON PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,287,000.00 2021STP>200K $1,029,600.00Construction $1,170,000.00
$1,287,000.00Total Cost $1,029,600.00$1,170,000.00
Page 7 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.013842 CAUSEWAY BLVD - EARHART EXPRESSWAY PH 1ALA 3046 JEFFERSON 0.53 0.81423-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 3139 JEFFERSON 3.31 3.44430-01
JEFFERSON 0.00 0.00000-26 CAUSEWAY RD W
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
REHABILITATION BRIDGE AND ROAD AND ADD ON RAMPJEFFERSON PARISH PROVIDES THE MATCH,
INTERCHANGE PROJECT HAS BEEN SPLIT INTO 6
PHASES
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$4,105,000.00 2019STP>200K $3,284,000.00Right of Way $4,105,000.00
$100,000.00 2021STP>200K $80,000.00Utility Relocation $100,000.00
$2,090,000.00 2022LOCAL $0.00Construction $1,900,000.00
$20,628,861.00 2022NHPP $16,503,088.80$18,753,510.00
$11,880,000.00 2022STP>200K $9,504,000.00$10,800,000.00
$38,803,861.00Total Cost $29,371,088.80$35,658,510.00
Project: H.013939 VETERANS BLVD TRANSIT SIGNAL PRIORITYJEFFERSON 0.00 0.00000-26 VETERANS BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
SIGNAL UPGRADE FOR TRANSIT OPS IMPROVEMENTJEFFERSON PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$457,600.00 2020STP>200K $366,080.00Construction $416,000.00
$457,600.00Total Cost $366,080.00$416,000.00
Project: H.000263 CHEF MENTEUR PASS BRIDGE & APPROACHUS 90 ORLEANS 0.00 0.72006-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 90 ORLEANS 15.83 16.48006-90
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT006-05-0067;STAGE 1 PROJECT, PRIORITY BRIDGE
PROJECT
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,775,000.00 2020STPFLEX $1,420,000.00Right of Way $1,775,000.00
$163,000.00 2020STPFLEX $130,400.00Utility Relocation $163,000.00
$1,938,000.00Total Cost $1,550,400.00$1,938,000.00
Page 8 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.007272 HOWARD AVENUE EXTENSIONORLEANS 0.00 0.00000-36 HOWARD AVE EXTENSIONRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
NEW 2-LANE ROADWAY742-36-0136;CITY OWNS R/W, DEMO / HIGH PRIORITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$63,367.00 2012DEMO CITY OF NEW ORLEANS$50,693.60Environmental $63,367.00
$116,648.00 2012LOCAL CITY OF NEW ORLEANS$0.00$116,648.00
$267,000.00 2020DEMO $213,600.00Right of Way $267,000.00
$312,606.00 2012DEMO CITY OF NEW ORLEANS$250,084.80Design (Engineering) $312,606.00
$3,548,600.00 2021DEMO CITY OF NEW ORLEANS$2,838,880.00Construction $3,226,000.00
$4,308,221.00Total Cost $3,353,258.40$3,985,621.00
Project: H.007273 MAGAZINE ST (LEAKE AVE TO EAST DRIVE)ORLEANS 0.00 0.00000-36 MAGAZINE STREETRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
REHABILITATION742-36-0137; USE LOCAL AS MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$169,840.00 2021LOCAL $0.00Construction $154,400.00
$4,174,500.00 2021STP>200K CITY OF NEW ORLEANS$3,339,600.00$3,795,000.00
$4,344,340.00Total Cost $3,339,600.00$3,949,400.00
Project: H.007274 MAGAZINE ST (EAST DRIVE TO NASHVILLE)ORLEANS 0.00 0.00000-36 MAGAZINE STREETRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
REHABILITATION742-36-0139; USE LOCAL AS MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,300,000.00 2021STP>200K CITY OF NEW ORLEANS$2,640,000.00Construction $3,000,000.00
$3,300,000.00Total Cost $2,640,000.00$3,000,000.00
Project: H.010018 I-10: NO EAST DRAIN CANAL BRIDGE REPLACEI-10 ORLEANS 19.16 21.76450-90Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$35,640,000.00 2020NHPP $28,512,000.00Construction $32,400,000.00
$35,640,000.00Total Cost $28,512,000.00$32,400,000.00
Page 9 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.010331 US 90: FLOODWALL - VICTORY RDUS 90 ORLEANS 13.74 14.57006-90Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
RAISING ROADWAY GRADE TO CONSISTENT ELEVATION BY
ADDING ASPH
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$63,000.00 2018STPFLEX $50,400.00Right of Way $63,000.00
$15,740.00 2018STPFLEX $12,592.00Design (Engineering) $15,740.00
$1,090,690.70 2020STPFLEX $872,552.56Construction $991,537.00
$1,169,430.70Total Cost $935,544.56$1,070,277.00
Project: H.011965 LA 47: IWGO BRIDGE REHABILITATION (HBI)LA 47 ORLEANS 1.06 2.32148-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
CLEANING, PAINTING, AND STRUCTURAL REPAIRS, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$600,000.00 2017NHPP $480,000.00Design (Engineering) $600,000.00
$33,000,000.00 2022NHPP $26,400,000.00Construction $30,000,000.00
$33,600,000.00Total Cost $26,880,000.00$30,600,000.00
Project: H.012370 MORRISON RD: MAYO AVE - BULLARD AVEORLEANS 0.00 0.00000-36 MORRISON RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ORLEANS 0.00 0.00000-36 MORRISON RD
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
PRESERVATION ASPHALT OVERLAY AND RELATED ADA
CURB WORK
ORLEANS PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$12,133,000.00 2022STP>200K ORLEANS PARISH$9,706,400.00Construction $11,030,000.00
$12,133,000.00Total Cost $9,706,400.00$11,030,000.00
Project: H.012371 MARCONI DRIVE: CITY PARK AVE - I-610ORLEANS 0.00 0.00000-36 MARCONI DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ORLEANS 0.00 0.00000-36 MARCONI DR
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
REHABILITATION ASPHALT OVERLAY AND ADA CURB WORKORLEANS PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$4,078,800.00 2019STP>200K $3,263,040.00Construction $3,708,000.00
$4,078,800.00Total Cost $3,263,040.00$3,708,000.00
Page 10 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.012373 ML KING BLVD: S CLAIBORNE - ST. CHARLESORLEANS 0.00 0.00000-36 MARTIN LUTHER KING BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ORLEANS 0.00 0.00000-36 MARTIN LUTHER KING BLVD
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
REHABILITATION ASPHALT OVERLAY AND ADA COMPLIANT
CURBS
ORLEANS PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$5,424,100.00 2020STP>200K ORLEANS PARISH$4,339,280.00Construction $4,931,000.00
$5,424,100.00Total Cost $4,339,280.00$4,931,000.00
Project: H.012956 LA 39: JUDGE SEEBER BR MECH REHAB (HBI)LA 39 ORLEANS 2.33 2.57046-31Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
MECHANICAL REHAB OF SPAN LIFT MACHINERYHISTORIC BRIDGE IMPROVEMENT (HBI), OPER EFFICIENCY/MOTORIST ASSISTANCE, MOVABLE
BRIDGE REHABILITATION
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$814,000.00 2019NHPP $651,200.00Construction $740,000.00
$814,000.00Total Cost $651,200.00$740,000.00
Project: H.013150 ANDREW HIGGINS: MAGAZINE TO CONVENTIONORLEANS 0.00 0.00000-36 ANDREW HIGGINS STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
ROADWAY REHABILITATION, SIDEWALK AND LIGHTING
IMPROVEMENTS
CITY OF NEW ORLEANS TO MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,373,800.00 2022STP>200K ORLEANS PARISH$1,899,040.00Construction $2,158,000.00
$2,373,800.00Total Cost $1,899,040.00$2,158,000.00
Project: H.014134 US 90B @ CLAIBORNE EXIT RAMPUS 90-Z ORLEANS 0.19 0.33283-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
INSTALLATION OF SUBSURFACE DRAINAGE STRUCTURES, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$451,000.00 2020NHPP $405,900.00Construction $410,000.00
$451,000.00Total Cost $405,900.00$410,000.00
Page 11 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.014344 LA 428 PHASE 1:BEHRMAN AVE TO MERRILL STLA 428 ORLEANS 0.00 0.70409-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
BIKE LANESCITY OF NEW ORLEANS TO PROVIDE THE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2021STP>200K $40,000.00Utility Relocation $50,000.00
$3,083,300.00 2022STP>200K $2,466,640.00Construction $2,803,000.00
$3,133,300.00Total Cost $2,506,640.00$2,853,000.00
Project: H.014345 LA 428 PHASE 2: MERRILL ST TO WILTZ LNLA 428 ORLEANS 0.70 1.24409-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
ACCESS MANAGEMENT FOR BIKE/PED/TRANSITCITY OF NEW ORLEANS TO PROVIDE THE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$75,000.00 2021STP>200K $60,000.00Utility Relocation $75,000.00
$2,942,500.00 2022STP>200K $2,354,000.00Construction $2,675,000.00
$3,017,500.00Total Cost $2,414,000.00$2,750,000.00
Project: H.014486 I-10:NO EAST BRIDGE - LAKE PONTCHARTRAINI-10 ORLEANS 19.73 24.42450-90Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
MILLING AND OVERLAY WITH ASPHALT CONCRETE, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$16,032,500.00 2022NHPP $14,429,250.00Construction $14,575,000.00
$16,032,500.00Total Cost $14,429,250.00$14,575,000.00
Project: H.014530 ALMONASTER AVENUE BRIDGE REHABILITATIONORLEANS 0.00 0.00000-36 ALMONASTER AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
MOVABLE BRIDGE REHABILITATION, OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$4,719,000.00 2022LOCAL $0.00Construction $4,290,000.00
$27,500,000.00 2022NHPP $22,000,000.00$25,000,000.00
$32,219,000.00Total Cost $22,000,000.00$29,290,000.00
Page 12 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.004791 LA 23: BELLE CHASSE BRIDGE & TUNNEL(HBI)LA 23 PLAQUEMINES 0.35 1.16062-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
REPLACE BRIDGE AND TUNNELSEE NOTES FOR CONVERSION PLAN.STIP PH 6
AC-ED W FUNDS SHOWN, HISTORIC BRIDGE
IMPROVEMENT (HBI)
OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$252,675.00 2008DEMO $202,140.00Feasibility $252,675.00
$666,380.00 2011DEMO $533,104.00Environmental $666,380.00
$1,093,000.00 2011STP>200K $874,400.00$1,093,000.00
$2,209,279.54 2017STPFLEX $1,868,218.63Design (Engineering) $2,209,279.54
$16,469,200.00 2020GARVEE $0.00Construction $14,972,000.00
$100,552,100.00 2020STCASH $0.00$91,411,000.00
$72,691,300.00 2020TOLLS $0.00$66,083,000.00
$193,933,934.54Total Cost $3,477,862.63$176,687,334.54
Project: H.008220 LA 406: ROUNDABOUT AT FE HEBERTLA 406 PLAQUEMINES 0.00 0.50838-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
PLAQUEMINES 0.00 0.00000-38
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
CONSTRUCT ROUNDABOUT, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$120,000.00 2021STP>200K $96,000.00Design (Engineering) $120,000.00
$120,000.00Total Cost $96,000.00$120,000.00
Project: H.012752 LA 46 @ WEINBERGER RD INTERSECTIONLA 46 ST BERNARD 0.88 1.36046-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ST BERNARD 0.00 0.00000-44 WEINBERGER RD
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
INTERSECTION IMPROVEMENTPORT OF ST. BERNARD WILL PROVIDE THE
MATCHFOR CS 000-44, DOTD WILL PROVIDE THE
MATCH FOR CS 046-03
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$300,000.00 2021STP>200K $240,000.00Utility Relocation $300,000.00
$1,540,000.00 2021STP>200K PORT OF ST BERNARD$1,232,000.00Construction $1,400,000.00
$1,840,000.00Total Cost $1,472,000.00$1,700,000.00
Page 13 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.013525 ST. BERNARD PARISH 40 ARPENT TRAIL, PH 1ST BERNARD 0.00 0.00000-44 40 ARPENT LEVEERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
CONSTRUCTION OF A 8.5 MILE X 10' WIDE, MULTI-USE
TRAIL
ST. BERNARD PARISH GOVERNMENT WILL
PROVIDETHE LOCAL MATCH.,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$5,445,000.00 2020STP>200K $4,356,000.00Construction $4,950,000.00
$5,445,000.00Total Cost $4,356,000.00$4,950,000.00
Project: H.013936 40 ARPENT TRAIL BIKE/PEDESTRIAN BRIDGEST BERNARD 0.00 0.00000-44 40 ARPENT TRAIL BIKE/PEDESTRIAN BRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
GRADE SEPARATION TRAIL - BIKE/PED BRIDGEMATCH PROVIDED BY ST. BERNARD PARISH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$5,456,000.00 2022STP>200K $4,364,800.00Construction $4,960,000.00
$5,456,000.00Total Cost $4,364,800.00$4,960,000.00
Page 14 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.013945 ST BERNARD BIKEWAYSST BERNARD 0.00 0.00000-44 E ST AVIDE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ST BERNARD 0.00 0.00000-44 E GENIE ST
ST BERNARD 0.00 0.00000-44 E GENIE ST
ST BERNARD 0.00 0.00000-44 E GENIE ST
ST BERNARD 0.00 0.00000-44 PATRICIA ST
ST BERNARD 0.00 0.00000-44 BARTOLO DR
ST BERNARD 0.00 0.00000-44 BENJAMIN ST
ST BERNARD 0.00 0.00000-44 BENJAMIN ST
ST BERNARD 0.00 0.00000-44 COUGAR DR
ST BERNARD 0.00 0.00000-44 DEBOUCHEL BLVD
ST BERNARD 0.00 0.00000-44 E SOLIDELLE ST
ST BERNARD 0.00 0.00000-44 FARMSITE RD
ST BERNARD 0.00 0.00000-44 KINGS DR
ST BERNARD 0.00 0.00000-44 OHIO ST
ST BERNARD 0.00 0.00000-44 SYLVIA BLVD
ST BERNARD 0.00 0.00000-44 SYLVIA DR
ST BERNARD 0.00 0.00000-44 N PETERS ST
ST BERNARD 0.00 0.00000-44 ROWLEY BLVD
ST BERNARD 0.00 0.00000-44 W GENIE ST
LA 47 ST BERNARD 0.00 0.43148-01
LA 47 ST BERNARD 0.43 0.49148-01
LA 47 ST BERNARD 2.13 3.83148-01
LA 39 ST BERNARD 4.26 11.42046-32
LA 46 ST BERNARD 0.00 5.76284-01
LA 39 ST BERNARD 11.42 12.70046-32
LA 300 ST BERNARD 0.00 5.42284-30
LA 39 ST BERNARD 10.29 11.49046-03
LA 1245 ST BERNARD 0.00 0.43046-33
ST BERNARD 0.00 0.00000-44 DE LA RONDE DR
ST BERNARD 0.00 0.00000-44 REISS PL
ST BERNARD 0.00 0.00000-44 TRIST PL
ST BERNARD 0.00 0.00000-44 W JOSEPHINE ST
ST BERNARD 0.00 0.00000-44 LAFONTAINE ST
ST BERNARD 0.00 0.00000-44 W VIRTUE ST
ST BERNARD 0.00 0.00000-44 LE BLANC RD
ST BERNARD 0.00 0.00000-44 KEANE DR
ST BERNARD 0.00 0.00000-44 VOLPE DR
ST BERNARD 0.00 0.00000-44 FLORIDA AVE
ST BERNARD 0.00 0.00000-44 CHALONA DR
ST BERNARD 0.00 0.00000-44 LEGEND DR
ST BERNARD 0.00 0.00000-44 RODRIGUEZ LN
ST BERNARD 0.00 0.00000-44 CLAIBORNE AVE
ST BERNARD 0.00 0.00000-44 ALEXANDER AVE
ST BERNARD 0.00 0.00000-44 GENERAL PERSHING ST
ST BERNARD 0.00 0.00000-44 CHALMETTE BATTLEFIELD
ST BERNARD 0.00 0.00000-44 STORY PARK BLVD
ST BERNARD 0.00 0.00000-44 W PROSPER ST
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
DELINEATE/CONSTRUCT BIKEWAYSST BERNARD PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$588,500.00 2021STP>200K $470,800.00Construction $535,000.00
$588,500.00Total Cost $470,800.00$535,000.00
Page 15 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.014049 ST BERNARD PEDESTRIAN IMPROVEMENTSLA 47 ST BERNARD 1.42 1.43148-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 47 ST BERNARD 0.76 0.77148-01
LA 39 ST BERNARD 3.40 3.41046-32
LA 39 ST BERNARD 7.51 8.12046-32
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
SIGNING, STRIPING, SIGNAL, CROSSWALK IMPROVEMENTSST. BERNARD PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$415,800.00 2021STP>200K $332,640.00Construction $378,000.00
$415,800.00Total Cost $332,640.00$378,000.00
Project: H.000320 US 61: RR OVERPASS - LA 50US 61 ST CHARLES 0.00 1.68007-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 61 JEFFERSON 8.36 9.33007-02
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
MILL AND OVERLAY007-03-0060, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,191,300.00 2019LOCAL $0.00Construction $1,083,000.00
$1,400,300.00 2019NHPP $1,120,240.00$1,273,000.00
$3,289,000.00 2019STP>200K $2,631,200.00$2,990,000.00
$5,880,600.00Total Cost $3,751,440.00$5,346,000.00
Project: H.013494 LA 52 (PH1): BLUEBERRY HILL - ANGUS DRLA 52 ST CHARLES 0.97 1.84845-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
BIKE/PED - COMPLETE STREETSMATCH BY ST. CHARLES PARISH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,812,866.20 2022STP>200K ST CHARLES PARISH$3,050,292.96Construction $3,466,242.00
$3,812,866.20Total Cost $3,050,292.96$3,466,242.00
Project: H.014050 WILLOWDALE BLVD: US 90 - E. HEATHER DR.ST CHARLES 0.00 0.00000-45 WILLOWDALE BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
PAVEMENT REHAB, TURN LANEST. CHARLES PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$407,000.00 2022STP>200K $325,600.00Construction $370,000.00
$407,000.00Total Cost $325,600.00$370,000.00
Page 16 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.014051 LAKEWOOD DR. RECONSTRUCTIONST CHARLES 0.00 0.00000-45 LAKEWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
RECONSTRUCTIONST. CHARLES TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$5,173,410.00 2022STP>200K $4,138,728.00Construction $4,703,100.00
$5,173,410.00Total Cost $4,138,728.00$4,703,100.00
Project: H.014368 IC RR XINGS (NEW SARPY)ST CHARLES 0.00 0.00000-45 W HARDING STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ST CHARLES 0.00 0.00000-45 TERRACE ST
ST CHARLES 0.00 0.00000-45 VANS LN
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
UPGRADE RR CROSSINGS TO GATES, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$20,000.00 2021STP>200K $20,000.00Design (Engineering) $20,000.00
$825,000.00 2022STP>200K $825,000.00Construction $750,000.00
$845,000.00Total Cost $845,000.00$770,000.00
Project: H.002960 LA 3213:GRAMERCY BRIDGE OVER UP RAILROADLA 3213 ST JOHN 0.22 0.98434-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
GRADE SEPARATE EXISTING AT GRADE CROSSING, DOT # RAILROADS, GRADE SEPARATION
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$250,000.00 2012STPFLEX $200,000.00Environmental $250,000.00
$2,100,000.00 2014STPFLEX $1,680,000.00Design (Engineering) $2,100,000.00
$2,350,000.00Total Cost $1,880,000.00$2,350,000.00
Project: H.011515 LA 44: PALM ST & BEECH ST DRAINAGELA 44 ST JOHN 0.29 1.36256-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$55,000.00 2021STPFLEX $44,000.00Construction $50,000.00
$55,000.00Total Cost $44,000.00$50,000.00
Page 17 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NEW ORLEANS
Project: H.013239 US 61:LA 3188-ORMOND BLVD,BIKE/PED IMPUS 61 ST JOHN 3.56 4.17007-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
BIKE/PED IMPROVEMENTSST. JOHN PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,601,500.00 2022STP>200K ST JOHN PARISH$2,081,200.00Construction $2,365,000.00
$2,601,500.00Total Cost $2,081,200.00$2,365,000.00
Project: H.014367 LA 44: KCS RR XING (LAPLACE)LA 44 ST JOHN 0.11 0.12256-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NEW ORLEANS
Work TypeType ImprovementRemarks
INSTALL A NEW RR CROSSING SURFACEMATCH FROM RR AND PARISH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$234,300.00 2021STP>200K $187,440.00Construction $213,000.00
$234,300.00Total Cost $187,440.00$213,000.00
Page 18 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SHREVEPORT
Project: H.003370 I-220/1-20 INTERCHANGE IMP & BAFB ACCESSI-20 BOSSIER 6.10 7.60451-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-220 BOSSIER 8.60 9.13451-31
LA 1267 BOSSIER 0.00 1.45808-12
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
I-220/1-20 INTERCHANGE IMP & BAFB ACCESSSTIP PH 6 AC W/GARVEE. SEE NOTES FOR
CONVERSION PLAN,
OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,298,359.00 2018STCASH $0.00Design (Engineering) $1,298,359.00
$102,080,000.00 2019GARVEE $0.00Construction $92,800,000.00
$103,378,359.00Total Cost $0.00$94,098,359.00
Project: H.012889 I20 REHAB (PINES ROAD TO I-220)I-20 BOSSIER 0.35 7.62451-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-20 CADDO 10.40 12.45451-01
I-20 CADDO 17.93 18.95451-01
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
APPROACH SLAB & PAVEMENT REPLACEMENT, PATCHING, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$790,481.00 2018NHPP $711,432.90Design (Engineering) $790,481.00
$42,350,000.00 2021NHPP $38,115,000.00Construction $38,500,000.00
$43,140,481.00Total Cost $38,826,432.90$39,290,481.00
Project: H.012896 DIST04:ABC BR REP BOSS,CADD,RED RIV PARSLA 157 BOSSIER 9.44 9.80082-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 160 BOSSIER 3.10 3.20085-03
LA 537 BOSSIER 6.30 8.06808-05
LA 2 CADDO 2.20 2.30045-30
LA 169 CADDO 0.60 1.00048-02
LA 789 CADDO 1.70 1.80809-07
LA 155 RED RIVER 2.25 2.35091-01
LA 783 RED RIVER 5.20 5.30303-01
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$282,000.00 2021NFA $0.00Design (Engineering) $282,000.00
$772,000.00 2021STPFLEX $617,600.00$772,000.00
$1,054,000.00Total Cost $617,600.00$1,054,000.00
Page 19 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SHREVEPORT
Project: H.013581 I-20: US 80 OPASS - CRAWFORD ST OPASSI-20 BOSSIER 15.67 18.56451-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-20 WEBSTER 0.00 6.28451-03
I-20 BIENVILLE 7.42 13.96451-04
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
MILL & OVERLAY, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$13,915,000.00 2019NHPP $12,523,500.00Construction $12,650,000.00
$13,915,000.00Total Cost $12,523,500.00$12,650,000.00
Project: H.000413 CROSS BAYOU BRIDGE REPLACEMENTUS 71 CADDO 0.35 0.43011-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT011-01-0054, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$13,200,000.00 2022NHPP $10,560,000.00Construction $12,000,000.00
$13,200,000.00Total Cost $10,560,000.00$12,000,000.00
Project: H.001166 CADDO LAKE BRIDGE (HBI)LA 1 CADDO 12.16 12.88045-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT045-01-0029; PRIORITY BRIDGE PROJECT,
HISTORIC BRIDGE IMPROVEMENT (HBI)
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$30,000.00 2020STPFLEX $24,000.00Right of Way $30,000.00
$500,000.00 2019STPFLEX $400,000.00Utility Relocation $500,000.00
$1,205,000.00 2015STPFLEX $964,000.00Design (Engineering) $1,205,000.00
$23,537,800.00 2021STPFLEX $18,830,240.00Construction $21,398,000.00
$25,272,800.00Total Cost $20,218,240.00$23,133,000.00
Project: H.010206 LA 3132 AT LA 523: EXTEND C OF ALA 3132 CADDO 10.10 10.22427-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 523 CADDO 4.37 4.45103-01
LA 523 CADDO 4.45 4.78103-01
LA 523 CADDO 4.78 4.88103-01
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
EXTEND CONTROL OF ACCESS LA 3132 AT LA 523, OPER EFFICIENCY/MOTORIST ASSISTANCE, ACCESS
MANAGEMENT
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,563,000.00 2021NHPP $2,050,400.00Construction $2,330,000.00
$2,563,000.00Total Cost $2,050,400.00$2,330,000.00
Page 20 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SHREVEPORT
Project: H.010468 I-20: WEST END HUDSON ST. BRIDGE TO I-49I-20 CADDO 15.62 17.28451-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
REMOVE AND REPLACE PCC, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$16,500,000.00 2022NHPP $14,850,000.00Construction $15,000,000.00
$16,500,000.00Total Cost $14,850,000.00$15,000,000.00
Project: H.012005 US80: KCS RR OVERPASS (HBI)US 80 CADDO 9.10 9.30001-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT/REHABILITATION, STR. 013480 HISTORIC BRIDGE IMPROVEMENT
(HBI)
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2019STPFLEX $40,000.00Feasibility $50,000.00
$500,000.00 2021STPFLEX $400,000.00Design (Engineering) $500,000.00
$550,000.00Total Cost $440,000.00$550,000.00
Project: H.012008 US 71:ICG RAILROAD OVERPASS REHAB (HBI)US 71 CADDO 8.90 9.08053-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
HISTORIC BRIDGE PRESERVATION PRIORITY FEASIBILITY
STUDY
, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2019NHPP $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.013426 GRIMMETT DR PIPE REHABUS 71 CADDO 1.61 1.61011-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
REHAB/REPLACE PIPE FROM US 71 TO GRIMMETT DRIVE, OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$325,000.00 2019NHPP $260,000.00Right of Way $325,000.00
$100,000.00 2019NHPP $80,000.00Utility Relocation $100,000.00
$863,500.00 2019NHPP $690,800.00Construction $785,000.00
$1,288,500.00Total Cost $1,030,800.00$1,210,000.00
Page 21 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SHREVEPORT
Project: H.014410 LINWOOD AVENUE RECONSTRUCTION-PHASE IIICADDO 0.00 0.00000-09 LINWOOD AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
ROADWAY RECONSTRUCTION - JOINT AND PANEL REPAIRCITY OF SHREVEPORT TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$6,352,500.00 2021STP>200K $5,082,000.00Construction $5,775,000.00
$6,352,500.00Total Cost $5,082,000.00$5,775,000.00
Project: H.014411 LINWOOD AVENUE RECONSTRUCTION-PHASE IVCADDO 0.00 0.00000-09 LINWOOD AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
ROADWAY RECONSTRUCTION - JOINT AND PANEL REPAIRCITY OF SHREVEPORT TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$6,352,500.00 2021STP>200K $5,082,000.00Construction $5,775,000.00
$6,352,500.00Total Cost $5,082,000.00$5,775,000.00
Project: H.014059 US 80: BRIDGES NEAR MINDENUS 80 WEBSTER 4.22 4.23001-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 80 WEBSTER 7.02 9.59001-04
US 80 BOSSIER 16.23 16.26001-03
Urbanized Area: SHREVEPORT
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$400,000.00 2022STPFLEX $320,000.00Design (Engineering) $400,000.00
$18,095,000.00 2021STPFLEX $14,476,000.00Construction $16,450,000.00
$18,495,000.00Total Cost $14,796,000.00$16,850,000.00
Page 22 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.010909 LA 44: WIDENING AND ROUNDABOUT AT LA 941LA 44 ASCENSION 2.35 3.03265-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 941 ASCENSION 4.15 4.30803-27
LA 44 ASCENSION 3.12 3.45265-01
LA 44 ASCENSION 3.45 3.63265-01
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
CONST. RAB NEAR LA44/LA941, WIDEN LA44 B/W I-10 &
CONWAY RAB
FEASIBILITY STUDY FUNDED WITH SATRANS, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,226,000.00 2020STPFLEX $2,022,000.00Right of Way $2,226,000.00
$226,000.00 2020STBONDS $0.00Utility Relocation $226,000.00
$1,774,000.00 2020STPFLEX $1,619,200.00$1,774,000.00
$3,630,000.00 2021HSIP $3,630,000.00Construction $3,300,000.00
$1,584,000.00 2021STBONDS $0.00$1,440,000.00
$9,440,000.00Total Cost $7,271,200.00$8,966,000.00
Project: H.013793 GERMANY RD WIDENING (US 61 TO LA 44)ASCENSION 0.00 0.00000-03 GERMANY RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
WIDENING/RECONSTRUCTIONASCENSION PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$800,000.00 2021STP>200K $640,000.00Right of Way $800,000.00
$550,000.00 2021STP>200K $440,000.00Utility Relocation $550,000.00
$4,125,000.00 2022STP>200K $3,300,000.00Construction $3,750,000.00
$5,475,000.00Total Cost $4,380,000.00$5,100,000.00
Project: H.013850 DUPLESSIS RD WIDENING (US 61 - LA 73)ASCENSION 0.00 0.00000-03 DUPLESSIS RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
MINOR WIDENINGASCENSION PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$900,000.00 2020STP>200K $720,000.00Right of Way $900,000.00
$1,100,000.00 2021STP>200K $880,000.00Utility Relocation $1,100,000.00
$4,675,000.00 2022STP>200K $3,740,000.00Construction $4,250,000.00
$6,675,000.00Total Cost $5,340,000.00$6,250,000.00
Project: H.014087 US 61: ST. JAMES PL - 2450' S. OF LA 22US 61 ASCENSION 0.00 5.00007-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
MILL, PATCH, AND OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$9,900,000.00 2022NHPP $7,920,000.00Construction $9,000,000.00
$9,900,000.00Total Cost $7,920,000.00$9,000,000.00
Page 23 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.014407 LA 621 AT RODDY RDLA 621 ASCENSION 4.78 4.82803-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ASCENSION 0.00 0.00000-03 RODDY RD
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
ROUNDABOUTASCENSION PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2021STP>200K $80,000.00Utility Relocation $100,000.00
$1,650,000.00 2022STP>200K $1,320,000.00Construction $1,500,000.00
$1,750,000.00Total Cost $1,400,000.00$1,600,000.00
Project: H.014409 LA 933 AT JOE SEVARIO ROADLA 933 ASCENSION 1.01 1.05803-18Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ASCENSION 0.00 0.00000-03 JOE SEVARIO RD
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
ROUNDABOUTASCENSION PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STP>200K $120,000.00Design (Engineering) $150,000.00
$1,650,000.00 2022STP>200K $1,320,000.00Construction $1,500,000.00
$1,800,000.00Total Cost $1,440,000.00$1,650,000.00
Project: H.014422 LA 931 @ RODDY RD. & JOE SEVARIO RD.LA 931 ASCENSION 0.99 1.03803-16Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ASCENSION 0.00 0.00000-03 RODDY RD
ASCENSION 0.00 0.00000-03 JOE SEVARIO RD
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
ROUNDABOUTASCENSION PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2021STP>200K $40,000.00Utility Relocation $50,000.00
$1,650,000.00 2022STP>200K $1,320,000.00Construction $1,500,000.00
$1,700,000.00Total Cost $1,360,000.00$1,550,000.00
Project: H.000337 US 61:BAYOU MANCHAC & FRANCOIS BRS.US 61 EAST BATON ROUGE 0.00 0.48007-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 61 ASCENSION 3.59 4.17007-07
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
NEW BRIDGES007-07-0058;JT W/007-08-0040, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$15,000.00 2019NHPP $12,000.00Utility Relocation $15,000.00
$116,871.00 2016NHPP $93,496.80Design (Engineering) $116,871.00
$13,200,000.00 2019NHPP $10,560,000.00Construction $12,000,000.00
$13,331,871.00Total Cost $10,665,496.80$12,131,871.00
Page 24 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.002320 SULLIVAN RD (WAX - HOOPER)LA 3034 EAST BATON ROUGE 0.00 0.88255-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 408 EAST BATON ROUGE 6.93 7.16255-02
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
4 LN DIVIDED CONC HWY RAISED MEDIAN255-30-0014;GREEN LIGHT PROJ; PR NI PROJ
INCLUDED SEE NOTES, STBONDS AS MATCH;
OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$30,869.00 2017STGEN $0.00Environmental $30,869.00
$3,000,000.00 2018STGEN $0.00Right of Way $3,000,000.00
$1,500,000.00 2018STBONDS $0.00Utility Relocation $1,500,000.00
$0.00 2021LOCAL $0.00Construction $0.00
$10,241,000.00 2021STBONDS $0.00$9,310,000.00
$3,300,000.00 2021STPFLEX $2,640,000.00$3,000,000.00
$18,071,869.00Total Cost $2,640,000.00$16,840,869.00
Project: H.002825 LA 30(NICHOLSON DR): BRIGHTSIDE-GOURRIERLA 30 EAST BATON ROUGE 2.76 3.96414-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
WIDEN TO 4 LANES WITH MEDIAN, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,476,000.00 2021HSIPPEN EAST BATON ROUGE$3,476,000.00Construction $3,160,000.00
$18,246,800.00 2021STP>200K EAST BATON ROUGE$14,597,440.00$16,588,000.00
$21,722,800.00Total Cost $18,073,440.00$19,748,000.00
Project: H.003047 PECUE LANE/I-10 INTERCHANGEI-10 EAST BATON ROUGE 9.90 10.77450-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
EAST BATON ROUGE 0.00 0.00000-17 PECUE BLVD
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
NEW INTERCHANGE450-10-0161, DEMO / HIGH PRIORITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$4,400,000.00 2019LOCAL $0.00Construction $4,000,000.00
$30,800,000.00 2019STPFLEX $24,640,000.00$28,000,000.00
$35,200,000.00Total Cost $24,640,000.00$32,000,000.00
Page 25 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.004100 I-10: LA 415 TO ESSEN ON I-10 AND I-12I-10 EAST BATON ROUGE 0.00 5.00450-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-10 EAST BATON ROUGE 0.00 0.86450-09
I-10 W BATON ROUGE 10.27 12.52450-08
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
INCREASE CAPACITY(STAGE 3, 4 AND 5)INNOVATIVE PROCUREMENT STAGES 3, 4 AND 5, CAPACITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$18,400,000.00 2021NHPP $14,720,000.00Right of Way $18,400,000.00
$3,100,000.00 2021NHPP $2,480,000.00Utility Relocation $3,100,000.00
$500,500,000.00 2021GARVEE $0.00Construction $455,000,000.00
$522,000,000.00Total Cost $17,200,000.00$476,500,000.00
Project: H.007160 EBR COMPUTERIZED TRAFFIC SIGNAL, PH VBEAST BATON ROUGE 0.00 0.00000-17 CHOCTAW AND FOSTER SIGNALSRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 61-X EAST BATON ROUGE 1.36 1.45817-20
LA 3164 EAST BATON ROUGE 0.82 0.91019-01
US 61 EAST BATON ROUGE 5.67 5.67007-90
US 61 EAST BATON ROUGE 8.94 9.00007-90
LA 67 EAST BATON ROUGE 1.78 1.87060-01
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
TRAFFIC SIGNAL SYNCHRONIZATION742-17-0159, CHOCTAW DR, GREENWEL SPRINGS
RD, S CHOCTAW DR & N FOSTER DR
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$6,820,000.00 2020CM $5,456,000.00Construction $6,200,000.00
$6,820,000.00Total Cost $5,456,000.00$6,200,000.00
Project: H.010251 CHIPPEWA ST PUMP STATION IMP US61/190-XUS 61-X EAST BATON ROUGE 2.20 2.30817-20Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
REPLACE/UPGRADE PUMP HOUSE COMPONENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$20,000.00 2020STPFLEX $16,000.00Design (Engineering) $20,000.00
$550,000.00 2021STPFLEX $440,000.00Construction $500,000.00
$570,000.00Total Cost $456,000.00$520,000.00
Page 26 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.010253 BLUEBONNET BLVD. PUMP STAT. IMP LA 1248LA 1248 EAST BATON ROUGE 5.60 5.70258-33Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
REPLACE PUMP STATION FLOAT SYSTEM, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$170,000.00 2020STPFLEX $136,000.00Design (Engineering) $170,000.00
$440,000.00 2021STPFLEX $352,000.00Construction $400,000.00
$610,000.00Total Cost $488,000.00$570,000.00
Project: H.010565 ACADIAN STREET PUMPING STATIONLA 427 EAST BATON ROUGE 3.30 3.40258-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
REPLACE/UPGRADE PUMPHOUSE COMPONENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$175,000.00 2018STPFLEX $140,000.00Design (Engineering) $175,000.00
$902,000.00 2019STPFLEX $721,600.00Construction $820,000.00
$1,077,000.00Total Cost $861,600.00$995,000.00
Project: H.010729 TRAFFIC SIGNAL COORD & SYNCH PH VI (EBR)LA 67 EAST BATON ROUGE 0.28 5.60060-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 73 EAST BATON ROUGE 7.35 7.35077-05
US 61-X EAST BATON ROUGE 1.76 2.27013-04
EAST BATON ROUGE 0.00 0.00000-17 VARIOUS STREETS. SEE SCOPE.
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
TRAFFIC SIGNAL COORDINATION & SYNCHRONIZATIONEBR WILL PROVIDE 20% MATCH, CONGESTION MITIGATION,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$600,000.00 2021CM EAST BATON ROUGE$600,000.00Design (Engineering) $600,000.00
$9,020,000.00 2022CM EAST BATON ROUGE$9,020,000.00Construction $8,200,000.00
$9,620,000.00Total Cost $9,620,000.00$8,800,000.00
Page 27 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.011098 LA 30: SOUTH BLVD - W CHIMES STLA 30 EAST BATON ROUGE 0.30 1.75414-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-10 EAST BATON ROUGE 0.31 0.50450-10
LA 3290-1 EAST BATON ROUGE 0.01 0.17870-34
LA 3290-3 EAST BATON ROUGE 0.06 0.09870-36
LA 3290-4 EAST BATON ROUGE 0.03 0.20870-37
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
MEDIAN AND PAVEMENT WIDENING, AND RELATED WORK, OPER EFFICIENCY/MOTORIST ASSISTANCE, ACCESS
MANAGEMENT
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,880,000.00 2020NHPP $1,504,000.00Right of Way $1,880,000.00
$2,605,900.00 2021NFA $0.00Construction $2,369,000.00
$15,764,100.00 2021NHPP $12,611,280.00$14,331,000.00
$20,250,000.00Total Cost $14,115,280.00$18,580,000.00
Project: H.011496 QUAIL DR: TURN LANE AT PERKINS (LA 427)EAST BATON ROUGE 0.00 0.00000-17 QUAIL DR.Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 427 EAST BATON ROUGE 1.10 1.11258-02
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
CONSTRUCT RIGHT TURN LANE ON NORTHBOUND QUAIL
DR
USE LOCAL AS MATCH, CONGESTION MITIGATION,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$38,500.00 2020CM EAST BATON ROUGE$30,800.00Right of Way $38,500.00
$489,500.00 2020CM EAST BATON ROUGE$391,600.00Construction $445,000.00
$528,000.00Total Cost $422,400.00$483,500.00
Project: H.011543 TRAFFIC SIGNAL COORD & SYNCH PH VII(EBR)LA 3164 EAST BATON ROUGE 0.11 1.00019-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 61-X EAST BATON ROUGE 1.32 3.30019-01
US 61 EAST BATON ROUGE 3.84 4.54019-01
US 61 EAST BATON ROUGE 0.71 1.32019-02
LA 408 EAST BATON ROUGE 1.46 1.95255-01
EAST BATON ROUGE 0.00 0.00000-17 VARIOUS INTERSECTIONS
LA 37 EAST BATON ROUGE 0.00 1.70254-01
LA 37 EAST BATON ROUGE 0.00 1.90254-02
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
TRAFFIC SIGNAL COORDINATION AND SIGNAL
SYNCHRONIZATION
USE LOCAL AS MATCH, CONGESTION MITIGATION,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2021CM EAST BATON ROUGE$50,000.00Right of Way $50,000.00
$11,000.00 2021CM EAST BATON ROUGE$11,000.00Utility Relocation $11,000.00
$780,000.00 2021CM EAST BATON ROUGE$780,000.00Design (Engineering) $780,000.00
$8,558,000.00 2022CM EAST BATON ROUGE$8,558,000.00Construction $7,780,000.00
$9,399,000.00Total Cost $9,399,000.00$8,621,000.00
Page 28 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.011684 LA 327 SPUR: STARING LANE EXTENSIONEAST BATON ROUGE 0.00 0.00000-17 STARING LANERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 327-S EAST BATON ROUGE 2.40 2.72257-03
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
EXTEND 4-LANE DIVIDED ROADWAY, ROAD TRANSFER,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$675,000.00 2020STPFLEX $540,000.00Right of Way $675,000.00
$1,000,000.00 2021STPFLEX $800,000.00Utility Relocation $1,000,000.00
$170,000.00 2018STPFLEX $136,000.00Design (Engineering) $170,000.00
$10,780,000.00 2022STPFLEX $8,624,000.00Construction $9,800,000.00
$12,625,000.00Total Cost $10,100,000.00$11,645,000.00
Project: H.011791 CAL RD AND MOSS SIDE LN BR REPLACEMENTSEAST BATON ROUGE 0.00 0.00000-17 CAL ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
EAST BATON ROUGE 0.00 0.00000-17 MOSS SIDE LANE
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENTEAST BATON ROUGE WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,480,500.00 2021STP>200K EAST BATON ROUGE$1,984,400.00Construction $2,255,000.00
$2,480,500.00Total Cost $1,984,400.00$2,255,000.00
Project: H.011842 CHOCTAW DRIVE PAVEMENT PRESERVATIONEAST BATON ROUGE 0.00 0.00000-17 CHOCTAW DRIVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
REHABILITATIONEAST BATON ROUGE PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$628,100.00 2019LOCAL $0.00Construction $571,000.00
$4,398,900.00 2019STP>200K EAST BATON ROUGE$3,519,120.00$3,999,000.00
$5,027,000.00Total Cost $3,519,120.00$4,570,000.00
Project: H.011843 S. SHERWOOD FOREST BLVD SUPERSTREET MODEAST BATON ROUGE 0.00 0.00000-17 S. SHERWOOD FOREST BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
ACCESS MANAGEMENTEAST BATON ROUGE PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,970,000.00 2021STP>200K EAST BATON ROUGE$2,376,000.00Construction $2,700,000.00
$2,970,000.00Total Cost $2,376,000.00$2,700,000.00
Page 29 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.012232 LA 3064 TO LA 1248 PHASE 2EAST BATON ROUGE 0.00 0.00000-17 DIJON DRIVE EXTENSIONRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
NEW ALIGNMENTENTITY WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,000,000.00 2019STP>200K EAST BATON ROUGE$3,000,000.00Right of Way $3,000,000.00
$2,970,000.00 2019LOCAL EAST BATON ROUGE$0.00Construction $2,700,000.00
$5,940,000.00 2019STP>200K EAST BATON ROUGE$5,940,000.00$5,400,000.00
$11,910,000.00Total Cost $8,940,000.00$11,100,000.00
Project: H.012563 LA 73: BAYOU MANCHAC BRIDGE (HBI)LA 73 EAST BATON ROUGE 0.00 0.10077-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
FEASIBILITY STUDY TO DETERMINE
REHABILITATION/REPLACEMENT
, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2019STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.012730 BRMPO TRAVEL DEMAND MANAGEMENT PRGM 2017EAST BATON ROUGE 0.00 0.00000-17 BTR MPORoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
PROMOTE COMMUTER CARPOOLING AND
VANPOOLING/FLEX TIME
, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$250,000.00 2019CM CRPC$250,000.00Feasibility $250,000.00
$250,000.00 2019STP>200K CRPC$250,000.00$250,000.00
$500,000.00Total Cost $500,000.00$500,000.00
Page 30 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.013267 SCOTLANDVILLE PKWY TO DWTN BR TRAIL-PH 1EAST BATON ROUGE 0.00 0.00000-17 N 19TH STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
EAST BATON ROUGE 0.00 0.00000-17 FOSS ST
EAST BATON ROUGE 0.00 0.00000-17 N 17TH ST
EAST BATON ROUGE 0.00 0.00000-17 MADISON AVE
EAST BATON ROUGE 0.00 0.00000-17 N 18TH ST
EAST BATON ROUGE 0.00 0.00000-17 JESSAMINE AVE
EAST BATON ROUGE 0.00 0.00000-17 ONTARIO ST
US 61-X EAST BATON ROUGE 1.20 1.22019-01
EAST BATON ROUGE 0.00 0.00000-17 ONTARIO ST
EAST BATON ROUGE 0.00 0.00000-17 POCAHONTAS ST
EAST BATON ROUGE 0.00 0.00000-17 WYANDOTTE ST
EAST BATON ROUGE 0.00 0.00000-17 POWHATAN ST
EAST BATON ROUGE 0.00 0.00000-17 GORDON ST
EAST BATON ROUGE 0.00 0.00000-17 BATON ROUGE AVE
EAST BATON ROUGE 0.00 0.00000-17 SHERWOOD ST
EAST BATON ROUGE 0.00 0.00000-17 ALAMONSTER AVE
EAST BATON ROUGE 0.00 0.00000-17 LORRAINE ST
EAST BATON ROUGE 0.00 0.00000-17 BATON ROUGE AVE
EAST BATON ROUGE 0.00 0.00000-17 AMARILLO ST
EAST BATON ROUGE 0.00 0.00000-17 BRECKENRIDGE AVE
EAST BATON ROUGE 0.00 0.00000-17 GREENWELL ST
EAST BATON ROUGE 0.00 0.00000-17 ALEXANDER AVE
EAST BATON ROUGE 0.00 0.00000-17 SHADA AVE
EAST BATON ROUGE 0.00 0.00000-17 CASPER ST
EAST BATON ROUGE 0.00 0.00000-17 MASON AVE
US 61 EAST BATON ROUGE 3.43 3.59019-01
EAST BATON ROUGE 0.00 0.00000-17 MONTE SANO AVE
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
CONSTRUCT PEDESTRIAN/BIKE PATHSBREC WILL PROVIDE MATCH, CONGESTION MITIGATION,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,190,000.00 2020CM BREC$2,552,000.00Construction $2,900,000.00
$46,200.00 2020LOCAL $0.00$42,000.00
$3,236,200.00Total Cost $2,552,000.00$2,942,000.00
Project: H.013542 CHEVELLE AND SARASOTA DR BR REPLACEMENTSEAST BATON ROUGE 0.00 0.00000-17 CHEVELLE DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
EAST BATON ROUGE 0.00 0.00000-17 SARASOTA DR
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT (OFF-SYSTEM)EAST BATON ROUGE TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,590,500.00 2021STP>200K EAST BATON ROUGE$2,072,400.00Construction $2,355,000.00
$2,590,500.00Total Cost $2,072,400.00$2,355,000.00
Page 31 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.013546 THIBODEAUX ROAD IMPROVEMENTSEAST BATON ROUGE 0.00 0.00000-17 THIBODEAUX RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
OVERLAYCITY OF CENTRAL TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$33,000.00 2020STP>200K CITY OF CENTRAL$26,400.00Utility Relocation $33,000.00
$1,500,400.00 2020STP>200K CITY OF CENTRAL$1,200,320.00Construction $1,364,000.00
$1,533,400.00Total Cost $1,226,720.00$1,397,000.00
Project: H.013755 I-10:NICHOLSON - ACADIAN R/W ACQUISITIONI-10 EAST BATON ROUGE 0.00 2.50450-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
AMICABLE ADVANCE RIGHT OF WAY ACQUISITION, CAPACITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,000,000.00 2021NHPP $800,000.00Right of Way $1,000,000.00
$1,000,000.00Total Cost $800,000.00$1,000,000.00
Project: H.013797 LA 30: EBR PL - I-10LA 30 EAST BATON ROUGE 3.96 9.69414-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 30 IBERVILLE 0.00 7.42414-02
LA 30 ASCENSION 0.00 10.74414-03
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
ENVIRONMENTAL ANALYSIS FOR CORRIDOR WIDENINGCRPC TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,000,000.00 2021STP>200K $1,600,000.00Environmental $2,000,000.00
$2,000,000.00Total Cost $1,600,000.00$2,000,000.00
Project: H.013837 KCS BRIDGE REPLACEMENT AT ACADIANEAST BATON ROUGE 0.00 0.00000-17 KCS RAILROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
RAISE RR BRIDGE AND TRACKGARVE TO FUND RR WORK UNDER PHASE 4, OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$6,125,000.00 2020GARVEE $0.00Utility Relocation $6,125,000.00
$1,600,000.00 2019GARVEE $0.00Design (Engineering) $1,600,000.00
$150,000.00 2019NFA $0.00$150,000.00
$0.00 2020 $0.00Construction $0.00
$7,875,000.00Total Cost $0.00$7,875,000.00
Page 32 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.013897 I-10 & I-12 COLLEGE DR FLYOVER RAMPI-10 EAST BATON ROUGE 3.56 5.65450-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-12 EAST BATON ROUGE 0.00 0.52454-01
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
NEW FLYOVER RAMP AND EXIT TO COLLEGEDESIGN BUILD, CAPACITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$52,800,000.00 2020GARVEE $0.00Construction $48,000,000.00
$52,800,000.00Total Cost $0.00$48,000,000.00
Project: H.014100 LA 408: I-110 - LA 37LA 408 EAST BATON ROUGE 1.42 2.34255-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 408 EAST BATON ROUGE 0.00 9.94255-02
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
PCCP PATCH, MILL AND OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$15,400,000.00 2022NHPP $12,320,000.00Construction $14,000,000.00
$15,400,000.00Total Cost $12,320,000.00$14,000,000.00
Project: H.014128 US 190: UPASS US 61 - LIVINGSTON P/LUS 190 EAST BATON ROUGE 0.00 6.34013-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
MILL, PATCH, OVERLAY, AND DRAINAGE, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$10,450,000.00 2022NHPP $8,360,000.00Construction $9,500,000.00
$10,450,000.00Total Cost $8,360,000.00$9,500,000.00
Project: H.014171 LA 30(NICHOLSON DR) CLEARING & GRUBBINGLA 30 EAST BATON ROUGE 2.76 3.96414-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
CLEARING AND GRUBBINGEBR PROVIDES MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$7,148,000.00 2021STP>200K $5,718,400.00Right of Way $7,148,000.00
$626,000.00 2021STP>200K $500,800.00Utility Relocation $626,000.00
$275,000.00 2022STP>200K $220,000.00Construction $250,000.00
$8,049,000.00Total Cost $6,439,200.00$8,024,000.00
Page 33 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.014281 US 190: MISS RIVER BR REPAIR PH. 3 (HBI)US 190 EAST BATON ROUGE 0.00 1.11007-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
REPAIR OF STRINGER CONNECTIONS AND FINGER JOINTS, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$800,000.00 2020NHPP $640,000.00Design (Engineering) $800,000.00
$11,000,000.00 2021NHPP $8,800,000.00Construction $10,000,000.00
$11,800,000.00Total Cost $9,440,000.00$10,800,000.00
Project: H.014418 REGIONAL BICYCLE/PEDESTRIAN PLAN(BR MPO)EAST BATON ROUGE 0.00 0.00000-17 BR PLANNING AREARoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
BIKE/PED PLANBR MPO TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$300,000.00 2021STP>200K $240,000.00Feasibility $300,000.00
$300,000.00Total Cost $240,000.00$300,000.00
Project: H.014430 FOSTER & ARDWD:IC XINGS SIG(BATON ROUGE)EAST BATON ROUGE 0.00 0.00000-17 N ARDENWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
EAST BATON ROUGE 0.00 0.00000-17 N FOSTER DR
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
WIDEN BOTH CROSSINGS TO INSTALL RAISED MEDIANS
AND ADD GATES
MATCH FROM RAILROAD, RAILROADS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$750,000.00 2022STCASH $0.00Utility Relocation $750,000.00
$500,000.00 2023STCASH $0.00Construction $400,000.00
$1,250,000.00Total Cost $0.00$1,150,000.00
Project: H.012604 LA 77: GROSSE TETE BR HYD REPAIRS (HBI)LA 77 IBERVILLE 7.25 7.32219-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
MOVABLE BRIDGE MACHINERY REPAIRS, HYDRAULIC
REPAIRS
, HISTORIC BRIDGE IMPROVEMENT (HBI) OPER EFFICIENCY/MOTORIST ASSISTANCE, MOVABLE
BRIDGE REHABILITATION
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$962,500.00 2020STPFLEX $770,000.00Construction $875,000.00
$962,500.00Total Cost $770,000.00$875,000.00
Page 34 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.014371 PLAQUEMINE RIVERFRONT REC TRAIL PH 3 & 4IBERVILLE 0.00 0.00000-24 PLAQUEMINE RIVERFRONT TRAILRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
RECREATIONAL TRAILCITY OF PLAQUEMINE TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$951,500.00 2021STP>200K $761,200.00Construction $865,000.00
$951,500.00Total Cost $761,200.00$865,000.00
Project: H.002375 AMITE R.BR. NEAR FRENCH SETTLEMENTLA 16 LIVINGSTON 7.14 8.01260-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
NEW BRIDGE260-02-0040, PRIORITY BRIDGE PROJECT PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$682,000.00 2013STPFLEX $545,600.00Environmental $682,000.00
$212,000.00 2018STPFLEX $169,600.00Right of Way $212,000.00
$460,000.00 2018STPFLEX $368,000.00Utility Relocation $460,000.00
$124,438.00 2013STPFLEX $99,550.40Design (Engineering) $124,438.00
$25,436,400.00 2019STPFLEX $20,349,120.00Construction $23,124,000.00
$26,914,838.00Total Cost $21,531,870.40$24,602,438.00
Project: H.003425 I-12: LA 63 - TANGIPAHOA PARISH LINEI-12 LIVINGSTON 12.80 14.79454-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-12 LIVINGSTON 0.00 1.52454-02
I-12 LIVINGSTON 0.30 1.41454-02
I-12 LIVINGSTON 0.10 0.28454-02
LIVINGSTON 0.00 0.00000-32 S RED OAK RD
I-12 LIVINGSTON 14.79 24.60454-02
I-12 LIVINGSTON 24.60 25.78454-02
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
C.P. AND OVERLAY454-02-0077, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$561,000.00 2020NFA $0.00Construction $510,000.00
$15,290,000.00 2020NHPP $13,761,000.00$13,900,000.00
$154,000.00 2020STCASH $0.00$140,000.00
$715,000.00 2020STPFLEX $572,000.00$650,000.00
$16,720,000.00Total Cost $14,333,000.00$15,200,000.00
Page 35 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.004634 JUBAN RD WIDENING (I-12 - US 190)LA 1026 LIVINGSTON 3.49 4.35832-13Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
WIDENING (CONC PAVEMENT)832-13-0019;700-32-0122 ENGINEERING ($800.000), CAPACITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$155,000.00 2017STBONDS $0.00Environmental $155,000.00
$5,000,000.00 2018STBONDS $0.00Right of Way $5,000,000.00
$2,400,000.00 2018STBONDS $0.00Utility Relocation $2,400,000.00
$980,000.00 2017STBONDS $0.00Design (Engineering) $980,000.00
$8,206,000.00 2019STBONDS $0.00Construction $7,460,000.00
$16,741,000.00Total Cost $0.00$15,995,000.00
Project: H.011520 LA 1019: LA 16-CALMES RD DRAINAGELA 1019 LIVINGSTON 0.00 0.50832-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR
ASPHALT
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$330,000.00 2021STPFLEX $264,000.00Construction $300,000.00
$330,000.00Total Cost $264,000.00$300,000.00
Project: H.011825 BUDDY ELLIS ROAD IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 BUDDY ELLIS ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT AND OVERLAYLIVINGSTON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,760,000.00 2019STP>200K $1,408,000.00Construction $1,600,000.00
$2,084,500.00 2019STPFLEX $1,667,600.00$1,895,000.00
$3,844,500.00Total Cost $3,075,600.00$3,495,000.00
Project: H.011827 DUNN ROAD IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 DUNN ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
OVERLAYLIVINGSTON PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$200,000.00 2019STP>200K LIVINGSTON PARISH$160,000.00Utility Relocation $200,000.00
$3,795,000.00 2019STP>200K LIVINGSTON PARISH$3,036,000.00Construction $3,450,000.00
$3,995,000.00Total Cost $3,196,000.00$3,650,000.00
Page 36 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.011828 FORREST DELATTE ROAD IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 FOREST DELATTE ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT AND OVERLAYLIVINGSTON PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$75,000.00 2020STP>200K LIVINGSTON PARISH$60,000.00Utility Relocation $75,000.00
$3,905,000.00 2021STP>200K LIVINGSTON PARISH$3,124,000.00Construction $3,550,000.00
$3,980,000.00Total Cost $3,184,000.00$3,625,000.00
Project: H.012308 COOK ROAD IMP: LA16 TO JUBAN CROSSINGLIVINGSTON 0.00 0.00000-32 COOK RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 16 LIVINGSTON 12.49 12.79262-01
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
CONCRETE PAVEMENT, DRAINAGE, BRIDGE, SIDEWALKS,
EARTHWORK
, DEMO / HIGH PRIORITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$344,000.00 2017LOCAL LIVINGSTON PARISH$0.00Environmental $344,000.00
$3,700,000.00 2020STPFLEX $3,160,000.00Right of Way $3,700,000.00
$70,000.00 2020STPFLEX $70,000.00Utility Relocation $70,000.00
$870,000.00 2017LOCAL LIVINGSTON PARISH$0.00Design (Engineering) $870,000.00
$5,940,000.00 2021LOCAL $0.00Construction $5,400,000.00
$10,582,000.00 2021STPFLEX $9,059,600.00$9,620,000.00
$21,506,000.00Total Cost $12,289,600.00$20,004,000.00
Project: H.012622 I-12:LIVINGSTON PAR APPROACH SLAB REP P3I-12 LIVINGSTON 16.40 18.00454-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
I-12 APPROACH SLAB REPLACEMENT AT HOG BRANCH
BRIDGE
, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$350,000.00 2017NHPP $315,000.00Design (Engineering) $350,000.00
$350,000.00Total Cost $315,000.00$350,000.00
Project: H.013158 LINDER ROAD BRIDGE REPLACEMENTLIVINGSTON 0.00 0.00000-32 LINDER RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENTLIVINGSTON PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2019STP>200K LIVINGSTON PARISH$40,000.00Utility Relocation $50,000.00
$378,400.00 2019STP>200K LIVINGSTON PARISH$302,720.00Construction $344,000.00
$428,400.00Total Cost $342,720.00$394,000.00
Page 37 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.013531 PEAK LANE IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 PEAK STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
REHABILITATIONCITY OF WALKER TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$11,000.00 2019STP>200K CITY OF WALKER$8,800.00Utility Relocation $11,000.00
$760,100.00 2019STP>200K CITY OF WALKER$608,080.00Construction $691,000.00
$771,100.00Total Cost $616,880.00$702,000.00
Project: H.013543 SIMS ROAD IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 SIMS RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
OVERLAY AND CLOSED DRAINAGELIVINGSTON PARISH PROVIDING THE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$70,000.00 2021STP>200K LIVINGSTON PARISH$56,000.00Utility Relocation $70,000.00
$4,239,400.00 2021STP>200K LIVINGSTON PARISH$3,391,520.00Construction $3,854,000.00
$4,309,400.00Total Cost $3,447,520.00$3,924,000.00
Project: H.013545 EDGEWOOD DRIVE IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 EDGEWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
OVERLAYDENHAM SPRINGS TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$14,000.00 2022STP>200K CITY OF DENHAM SPRINGS$11,200.00Utility Relocation $14,000.00
$558,800.00 2022STP>200K CITY OF DENHAM SPRINGS$447,040.00Construction $508,000.00
$572,800.00Total Cost $458,240.00$522,000.00
Project: H.013553 PENDARVIS LANE IMPROVEMENTS PHASE 1LIVINGSTON 0.00 0.00000-32 PENDARVIS LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
OVERLAY AND DRAINAGE IMPCITY OF WALKER TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$19,000.00 2020STP>200K CITY OF WALKER$15,200.00Utility Relocation $19,000.00
$1,426,700.00 2020STP>200K CITY OF WALKER$1,141,360.00Construction $1,297,000.00
$1,445,700.00Total Cost $1,156,560.00$1,316,000.00
Page 38 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.013555 PENDARVIS LANE IMPROVEMENTS PHASE IILIVINGSTON 0.00 0.00000-32 PENDARVIS LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
OVERLAY AND DRAINAGE IMPCITY OF WALKER TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$13,000.00 2021STP>200K CITY OF WALKER$10,400.00Utility Relocation $13,000.00
$966,900.00 2021STP>200K CITY OF WALKER$773,520.00Construction $879,000.00
$979,900.00Total Cost $783,920.00$892,000.00
Project: H.013557 PENDARVIS LANE IMPROVEMENTS PHASE IIILIVINGSTON 0.00 0.00000-32 PENDARVIS LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
OVERLAY AND DRAINAGE IMPCITY OF WALKER TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$19,000.00 2022STP>200K CITY OF WALKER$15,200.00Utility Relocation $19,000.00
$1,452,000.00 2022STP>200K CITY OF WALKER$1,161,600.00Construction $1,320,000.00
$1,471,000.00Total Cost $1,176,800.00$1,339,000.00
Project: H.013674 BENTON LANE IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 BENTON LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
OVERLAYCITY OF DENHAM SPRINGS TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$12,000.00 2019STP>200K $9,600.00Utility Relocation $12,000.00
$909,700.00 2020STP>200K $727,760.00Construction $827,000.00
$921,700.00Total Cost $737,360.00$839,000.00
Project: H.014358 AMITE CHURCH ROADLIVINGSTON 0.00 0.00000-32 AMITE CHURCH RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
OVERLAY AND CLOSED DRAINAGE WHERE NECESSARYLIVINGSTON PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$21,000.00 2022STP>200K $16,800.00Utility Relocation $21,000.00
$1,710,500.00 2022STP>200K $1,368,400.00Construction $1,555,000.00
$1,731,500.00Total Cost $1,385,200.00$1,576,000.00
Page 39 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.014359 AYDELL LANE: LA 447 TO PARK STLIVINGSTON 0.00 0.00000-32 AYDELL LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
WIDEN, OVERLAY AND CLOSED DRAINAGE WHERE
NECESSARY
CITY OF WALKER TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$5,000.00 2022STP>200K $4,000.00Utility Relocation $5,000.00
$687,500.00 2022STP>200K $550,000.00Construction $625,000.00
$692,500.00Total Cost $554,000.00$630,000.00
Project: H.014419 E. RAILROAD AVENUE IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 E RAILROAD AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
REHABILITATIONCITY OF DENHAM SPRINGS TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$900.00 2021STP>200K $720.00Utility Relocation $900.00
$280,500.00 2021STP>200K $224,400.00Construction $255,000.00
$281,400.00Total Cost $225,120.00$255,900.00
Project: H.014420 YELLOW JACKET BLVD. IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 YELLOW JACKET BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
MILL AND OVERLAYCITY OF DENHAM SPRINGS TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$7,900.00 2021STP>200K $6,320.00Utility Relocation $7,900.00
$473,000.00 2021STP>200K $378,400.00Construction $430,000.00
$480,900.00Total Cost $384,720.00$437,900.00
Project: H.000358 US 190: LA 415 & RR OVERPASS REPL (HBI)US 190 W BATON ROUGE 2.70 3.16008-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT008-01-0051; PRIORITY BRIDGE PROJECT,
HISTORIC BRIDGE IMPROVEMENT (HBI)
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$33,000,000.00 2022NHPP $26,400,000.00Construction $30,000,000.00
$33,000,000.00Total Cost $26,400,000.00$30,000,000.00
Page 40 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.005121 LA 1/LA 415 CONNECTORW BATON ROUGE 0.00 0.00000-61 LA 1/LA 415 CONNECTORRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
FEDERAL EARMARK FOR STUDY700-61-0113;STAGE 0 COMPLETED, OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$5,000,000.00 2021STP>200K $4,000,000.00Right of Way $5,000,000.00
$5,000,000.00Total Cost $4,000,000.00$5,000,000.00
Project: H.012169 I-10: IBERVILLE P/L - W END OF BR 290I-10 W BATON ROUGE 0.00 5.06450-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
GRADE RAISING, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$165,000.00 2020NHPP $148,500.00Design (Engineering) $165,000.00
$14,300,000.00 2022NHPP $12,870,000.00Construction $13,000,000.00
$14,465,000.00Total Cost $13,018,500.00$13,165,000.00
Project: H.012587 I-10: W END OF BR 290 - W END OF LA 415I-10 W BATON ROUGE 5.06 9.85450-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
GRADE RAISING, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$135,000.00 2020NHPP $121,500.00Design (Engineering) $135,000.00
$18,150,000.00 2021NHPP $16,335,000.00Construction $16,500,000.00
$18,285,000.00Total Cost $16,456,500.00$16,635,000.00
Project: H.012834 JOLIET TRAIL (BRUSLY)LA 988 W BATON ROUGE 5.10 5.39861-14Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
W BATON ROUGE 0.00 0.00000-61 E ST FRANCIS ST
W BATON ROUGE 0.00 0.00000-61 W ST FRANCIS ST
LA 1 W BATON ROUGE 8.88 8.89050-07
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
CONSTRUCT TRAIL, RR SURFACE WORKWEST BATON ROUGE PARISH PROVIDES THE
MATCH,
CONGESTION MITIGATION,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$473,000.00 2021CM $378,400.00Construction $430,000.00
$473,000.00Total Cost $378,400.00$430,000.00
Page 41 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
BATON ROUGE
Project: H.014188 LA 986 PAVEMENT REHABILITATIONLA 986 W BATON ROUGE 1.58 2.18228-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
PAVEMENT REHABILITATIONWEST BATON ROUGE PARISH TO PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$605,000.00 2020STP>200K-E $484,000.00Construction $550,000.00
$605,000.00Total Cost $484,000.00$550,000.00
Project: H.013284 MRB SOUTH GBR: LA 1 TO LA 30 CONNECTORDISTRICTWIDE 61 0.00 0.00000-96 PROPOSED NEW ROUTERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: BATON ROUGE
Work TypeType ImprovementRemarks
NEW BRIDGE AND APPROACHES TO FEASIBILITY STUDY, CAPACITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,057,000.00 2020STPFLEX $845,600.00Feasibility $1,057,000.00
$2,000,000.00 2022STPFLEX $1,600,000.00Environmental $2,000,000.00
$3,057,000.00Total Cost $2,445,600.00$3,057,000.00
Page 42 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAKE CHARLES
Project: H.005967 NELSON RD EXT & BRIDGECALCASIEU 0.00 0.00000-10 NELSON ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
NEW ROAD & BRIDGE706-10-0001;TEA-21. STA 87.USE STGEN$ FOR
ENG, LOCAL MATCH&STBONDS NEEDED&AVAIL;
SEE LONG TEXT FOR FUNDING
INTERMODAL CONNECTOR,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$200,000.00 2011DEMO $160,000.00Environmental $200,000.00
$2,000,000.00 2011DEMO $1,600,000.00Design (Engineering) $2,000,000.00
$20,130,000.00 2020DEMO $16,104,000.00Construction $18,300,000.00
$11,000,000.00 2020NHPP $8,800,000.00$10,000,000.00
$2,750,000.00 2020STGEN $2,200,000.00$2,500,000.00
$36,080,000.00Total Cost $28,864,000.00$33,000,000.00
Project: H.007113 J.BENNETT JOHNSTON AVENUECALCASIEU 0.00 0.00000-10 J. BENNET JOHNSON AVE.Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
OVERLAY742-10-0125, USE LOCAL AS MATCH FOR ENG &
CONST
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$457,000.00 2017STP<200K CALCASIEU PARISH POLICE JURY$365,600.00Design (Engineering) $457,000.00
$638,000.00 2019STP<200K CALCASIEU PARISH POLICE JURY$510,400.00Construction $580,000.00
$1,095,000.00Total Cost $876,000.00$1,037,000.00
Project: H.009620 I-10:WEST OF LA 108 TO I-210 INTERCHANGEI-10 CALCASIEU 22.31 24.76450-91Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT, PAVEMENT REPLACMNT,
MILL&OVERLAY & WIDN
, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$7,200.00 2019NHPP $5,760.00Environmental $7,200.00
$225,000.00 2018NHPP $202,500.00Design (Engineering) $225,000.00
$34,870,000.00 2019NHPP $29,117,000.00Construction $31,700,000.00
$35,102,200.00Total Cost $29,325,260.00$31,932,200.00
Project: H.010000 US171:CALCASIEU RVR BR REHAB (HBI)US 171 CALCASIEU 3.50 4.58024-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
CLEANING, PAINTING, MISC. REPAIRS, LIGHTING & LOAD
RATING
, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE PREVENTIVE MAINTENANCE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$45,000.00 2019NHPP $36,000.00Design (Engineering) $45,000.00
$6,897,000.00 2021NHPP $5,517,600.00Construction $6,270,000.00
$6,942,000.00Total Cost $5,553,600.00$6,315,000.00
Page 43 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAKE CHARLES
Project: H.010865 I-210: RYAN ST INTG - E JCT I-10I-210 CALCASIEU 6.38 12.58450-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
CABLE BARRIER AND OGFC, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$218,256.00 2016HSIP $218,256.00Design (Engineering) $218,256.00
$57,500.00 2016NHPP $51,750.00$57,500.00
$1,171,500.00 2021HSIPPEN $1,171,500.00Construction $1,065,000.00
$4,895,000.00 2021NHPP $4,405,500.00$4,450,000.00
$6,342,256.00Total Cost $5,847,006.00$5,790,756.00
Project: H.011838 RUTH/HUNTINGTON OVERLAYCALCASIEU 0.00 0.00000-10 RUTH/N & S HUNTINGTONRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
OVERLAYCITY OF SULPHUR PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,522,400.00 2019STP<200K $1,217,920.00Construction $1,384,000.00
$1,522,400.00Total Cost $1,217,920.00$1,384,000.00
Project: H.011839 HENNING DR/WEEKLY RD OVERLAYCALCASIEU 0.00 0.00000-10 HENNING DR/WEEKLY RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
OVERLAYCITY OF SULPHUR PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$383,075.00 2021STP<200K CITY OF SULPHUR$306,460.00Construction $348,250.00
$383,075.00Total Cost $306,460.00$348,250.00
Project: H.012043 LA 378:CALCASIEU R MB RH(WEST FORK)(HBI)LA 378 CALCASIEU 4.15 4.35810-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Page 44 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAKE CHARLES
Project: H.012052 LA 3092: ROUNDABOUTLA 3092 CALCASIEU 1.95 2.16810-28Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
CALCASIEU 0.00 0.00000-10 W GAUTHIER RD
CALCASIEU 0.00 0.00000-10 LAKE ST
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
ADD A ROUNDABOUT TO AID IN TRAFFIC FLOW, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$300,000.00 2020HSIP $300,000.00Right of Way $300,000.00
$150,000.00 2020HSIP $150,000.00Utility Relocation $150,000.00
$32,000.00 2021HSIP $32,000.00Design (Engineering) $32,000.00
$2,200,000.00 2021HSIP $2,200,000.00Construction $2,000,000.00
$2,682,000.00Total Cost $2,682,000.00$2,482,000.00
Project: H.013812 IHLES ROAD: W PRIEN LAKE - COUNTRY CLUBCALCASIEU 0.00 0.00000-10 IHLES RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
ROADWAY WIDENINGCITY OF LAKE CHARLES TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$532,400.00 2022LOCAL $0.00Construction $484,000.00
$7,997,000.00 2022STP<200K $6,397,600.00$7,270,000.00
$8,529,400.00Total Cost $6,397,600.00$7,754,000.00
Project: H.013870 ENTERPRISE OVERLAY: 12TH ST TO BROAD ST.CALCASIEU 0.00 0.00000-10 ENTERPRISE BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
PATCH, OVERLAY AND MILLCITY OF LAKE CHARLES TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,210,000.00 2022STP<200K $968,000.00Construction $1,100,000.00
$1,210,000.00Total Cost $968,000.00$1,100,000.00
Project: H.014370 POST OAK ROAD: DIVISION RD TO BURTON STCALCASIEU 0.00 0.00000-10 POST OAK RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
CALCASIEU 0.00 0.00000-10 N POST OAK RD
Urbanized Area: LAKE CHARLES
Work TypeType ImprovementRemarks
OVERLAYCITY OF SULPHUR TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$880,000.00 2021STP<200K $704,000.00Construction $800,000.00
$880,000.00Total Cost $704,000.00$800,000.00
Page 45 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MONROE
Project: H.007289 KANSAS LANE EXTENSIONOUACHITA 0.00 0.00000-37 KANSAS LANERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 80 OUACHITA 1.65 1.85002-01
US 80 OUACHITA 1.85 2.18002-01
US 165 OUACHITA 1.89 2.20016-01
LA 840-6 OUACHITA 0.63 0.87837-23
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
ASPHALT NEW PAVEMENT742-37-0016;US 80 - US 165. R/W & UTIL BY CITY, DEMO / HIGH PRIORITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$650,000.00 2020STP<200K $520,000.00Utility Relocation $650,000.00
$650,000.00Total Cost $520,000.00$650,000.00
Project: H.007300 KANSAS LANE-GARRETT RD CONNECTORLA 594 OUACHITA 3.05 3.84326-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-20 OUACHITA 21.08 21.91451-06
OUACHITA 0.00 0.00000-37 GARRETT RD
OUACHITA 0.00 0.00000-37 KANSAS LN
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
RD CONNECTOR & INTERCHANGE IMPRVMNT742-37-0028;4TH FUND SOURCE US $300K
STP<200K, ADD WHEN PROJECT CONVERTED TO
ERP
INTERMODAL CONNECTOR,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,430,000.00 2020DEMO $2,744,000.00Right of Way $3,430,000.00
$1,912,269.00 2020DEMO $1,529,815.20Utility Relocation $1,912,269.00
$7,339,336.40 2021DEMO $5,871,469.12Construction $6,672,124.00
$5,958,627.40 2021NHPP $4,766,901.92$5,416,934.00
$6,383,714.70 2021STBONDS $6,383,714.70$5,803,377.00
$12,411,373.70 2021STPFLEX $9,929,098.96$11,283,067.00
$37,435,321.20Total Cost $31,224,999.90$34,517,771.00
Project: H.008221 LA 134 IMPROVEMENTS AT US 165LA 134 OUACHITA 0.00 0.43837-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
OUACHITA 0.00 0.00000-37 KEYSTONE RD
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
REALIGN THE INTERSECTION OF LA 134 & US 165, CAPACITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$200,000.00 2018STPFLEX $160,000.00Right of Way $200,000.00
$350,000.00 2019STPFLEX $280,000.00Utility Relocation $350,000.00
$3,600.00 2017STPFLEX $2,880.00Design (Engineering) $3,600.00
$2,557,500.00 2019STPFLEX $2,046,000.00Construction $2,325,000.00
$3,111,100.00Total Cost $2,488,880.00$2,878,600.00
Page 46 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MONROE
Project: H.011724 COLEMAN AVENUE REHABILITATIONOUACHITA 0.00 0.00000-37 COLEMAN AVENUERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
REHABILITATION, PATCH AND OVERLAYWEST MONROE WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$228,800.00 2022STP<200K CITY OF WEST MONROE$183,040.00Construction $208,000.00
$228,800.00Total Cost $183,040.00$208,000.00
Project: H.011739 US 165 SOUTH LIGHTINGUS 165 OUACHITA 5.17 5.94015-31Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
LIGHTINGCITY OF MONROE WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$731,500.00 2019STP<200K CITY OF MONROE$585,200.00Construction $665,000.00
$731,500.00Total Cost $585,200.00$665,000.00
Project: H.012626 LA 838: DRAINAGE IMPROVEMENTSLA 838 OUACHITA 2.72 2.80837-14Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$115,500.00 2022STPFLEX $92,400.00Construction $105,000.00
$115,500.00Total Cost $92,400.00$105,000.00
Project: H.013392 MANE STREET REHABILITATION PHASE 2OUACHITA 0.00 0.00000-37 MANE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
MILL AND OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$782,821.60 2021STP<200K CITY OF WEST MONROE$626,257.28Construction $711,656.00
$782,821.60Total Cost $626,257.28$711,656.00
Page 47 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MONROE
Project: H.013394 MANE STREET REHABILITATION PHASE 1OUACHITA 0.00 0.00000-37 MANE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
RECONSTRUCT 2-LANE ROADWAYCITY OF WEST MONROE TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,500.00 2019STP<200K CITY OF WEST MONROE$2,000.00Environmental $2,500.00
$682,000.00 2020STP<200K CITY OF WEST MONROE$545,600.00Construction $620,000.00
$684,500.00Total Cost $547,600.00$622,500.00
Project: H.013395 PARKWOOD DR REHAB: GLENWOOD - LA 143OUACHITA 0.00 0.00000-37 PARKWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
ASPHALT OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,500.00 2019STP<200K CITY OF WEST MONROE$2,000.00Environmental $2,500.00
$822,800.00 2020STP<200K CITY OF WEST MONROE$658,240.00Construction $748,000.00
$825,300.00Total Cost $660,240.00$750,500.00
Project: H.013398 COLEMAN AVE REHABILITATIONOUACHITA 0.00 0.00000-37 COLEMAN AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
ASPHALT OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$346,515.40 2022STP<200K CITY OF WEST MONROE$277,212.32Construction $315,014.00
$346,515.40Total Cost $277,212.32$315,014.00
Project: H.013400 NATCHITOCHES ST REHAB: TRENTON - N 7THOUACHITA 0.00 0.00000-37 NATCHITOCHES STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
ASPHALT OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,500.00 2019STP<200K CITY OF WEST MONROE$2,000.00Environmental $2,500.00
$70,157.00 2019STP<200K CITY OF WEST MONROE$56,125.60Design (Engineering) $70,157.00
$643,109.50 2021STP<200K CITY OF WEST MONROE$514,487.60Construction $584,645.00
$715,766.50Total Cost $572,613.20$657,302.00
Page 48 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MONROE
Project: H.013401 CROSELY ST REHAB: TRENTON - N 7THOUACHITA 0.00 0.00000-37 CROSLEY STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
ASPHALT OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,500.00 2020STP<200K CITY OF WEST MONROE$2,000.00Environmental $2,500.00
$41,955.00 2020STP<200K CITY OF WEST MONROE$33,564.00Design (Engineering) $41,955.00
$385,000.00 2022STP<200K CITY OF WEST MONROE$308,000.00Construction $350,000.00
$429,455.00Total Cost $343,564.00$394,455.00
Project: H.013518 OTIS STREET REHABILITATIONOUACHITA 0.00 0.00000-37 OTIS STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
OUACHITA 0.00 0.00000-37 OTIS ST
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
REHABILITATIONCITY OF MONROE TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$448,329.20 2021STP<200K CITY OF WEST MONROE$358,663.36Construction $407,572.00
$448,329.20Total Cost $358,663.36$407,572.00
Project: H.013776 WELL ROAD (NEW NATCH. RD - I-20 INT.)OUACHITA 0.00 0.00000-37 WELL RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
MILL, PATCH AND OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$731,352.66 2020STP<200K $585,082.13Construction $664,866.05
$731,352.66Total Cost $585,082.13$664,866.05
Project: H.013791 HADLEY ST (U.S. HWY 165 - NUTLAND RD)OUACHITA 0.00 0.00000-37 HADLEY STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
REHABILITATIONOUACHITA PARISH POLICE JURY TO PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$771,878.80 2020STP<200K $617,503.04Construction $701,708.00
$771,878.80Total Cost $617,503.04$701,708.00
Page 49 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MONROE
Project: H.013796 TANGLEWOOD DRIVE (LA 15 - DELLWOOD DR.)OUACHITA 0.00 0.00000-37 TANGLEWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
MILL, PATCH AND OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$661,100.00 2020STP<200K $528,880.00Construction $601,000.00
$661,100.00Total Cost $528,880.00$601,000.00
Project: H.013798 HARRELL ROAD (US 80 - ARKANSAS RD)OUACHITA 0.00 0.00000-37 HARRELL RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
MILL, PATCH AND OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,857,872.50 2020STP<200K $1,486,298.00Construction $1,688,975.00
$1,857,872.50Total Cost $1,486,298.00$1,688,975.00
Project: H.013802 GARRETT ROAD ( LA 15 - AUSTIN ST.)OUACHITA 0.00 0.00000-37 GARRETT RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
REHABILITATIONOUACHITA PARISH POLICE JURY TO PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$682,000.00 2020STP<200K $545,600.00Construction $620,000.00
$682,000.00Total Cost $545,600.00$620,000.00
Project: H.013803 RICHWOOD RD NO. 2 (US 165 - BROWN ST)OUACHITA 0.00 0.00000-37 RICHWOOD RD NO 2Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
OVERLAYOUACHITA PARISH POLICE JURY PROVIDING
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,281,500.00 2021STP<200K $1,025,200.00Construction $1,165,000.00
$1,281,500.00Total Cost $1,025,200.00$1,165,000.00
Page 50 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MONROE
Project: H.013804 WALL WILLIAMS (GOOD HOPE - WHITES FERRY)OUACHITA 0.00 0.00000-37 WALL WILLIAMS RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
OVERLAYOUACHITA PARISH POLIC JURY TO PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,473,780.00 2021STP<200K $1,179,024.00Construction $1,339,800.00
$1,473,780.00Total Cost $1,179,024.00$1,339,800.00
Project: H.013805 FINKS'S HIDE-A-WAY: BARKLEY - BAYOU OAKSOUACHITA 0.00 0.00000-37 FINKS HIDEAWAY RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
MILL, PATCH AND OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,697,080.00 2021STP<200K $1,357,664.00Construction $1,542,800.00
$1,697,080.00Total Cost $1,357,664.00$1,542,800.00
Project: H.014347 S GRAND ST: ORANGE ST - STANDIFER AVEOUACHITA 0.00 0.00000-37 S GRAND STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
MILL, PATCH & OVERLAYCITY OF MONROE TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,980,000.00 2022STP<200K $1,584,000.00Construction $1,800,000.00
$1,980,000.00Total Cost $1,584,000.00$1,800,000.00
Project: H.014348 LEE AVENUE: JACKSON ST - STANDIFER AVEOUACHITA 0.00 0.00000-37 LEE AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
MILL, PATCH & OVERLAYCITY OF MONROE TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,090,000.00 2022STP<200K $1,672,000.00Construction $1,900,000.00
$2,090,000.00Total Cost $1,672,000.00$1,900,000.00
Page 51 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MONROE
Project: H.014397 ROWLAND ROAD: LA 139 - LA 594OUACHITA 0.00 0.00000-37 ROWLAND RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MONROE
Work TypeType ImprovementRemarks
MILL, PATCH & OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE
THEMATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,804,000.00 2021STP<200K $1,443,200.00Construction $1,640,000.00
$1,804,000.00Total Cost $1,443,200.00$1,640,000.00
Page 52 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.010962 I-10: CABLE BARRIER (LAFAYETTE/ACADIA)I-10 ACADIA 0.00 14.11450-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-10 LAFAYETTE 0.00 13.98450-05
I-10 ACADIA 14.11 16.00450-04
I-10 ACADIA 16.00 21.30450-04
I-10 ACADIA 21.30 25.09450-04
I-10 ACADIA 25.09 27.13450-04
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
INSTALL MEDIAN CABLE BARRIER, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$510,000.00 2017HSIP $510,000.00Design (Engineering) $510,000.00
$11,349,800.00 2020HSIP $11,349,800.00Construction $10,318,000.00
$11,859,800.00Total Cost $11,859,800.00$10,828,000.00
Project: H.012174 I-10:JEFF DAV PL-I-49 (OGFC/SLAB REPAIR)I-10 ACADIA 0.00 27.14450-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-10 LAFAYETTE 0.00 9.78450-05
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
OGFC, APPROACH SLAB & EMBANKMENT SLIDE REPAIR &
RELATED
, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$22,000,000.00 2022FREIGHT-HY $19,800,000.00Construction $20,000,000.00
$22,000,000.00Total Cost $19,800,000.00$20,000,000.00
Project: H.009892 LDRR (NEW IBERIA) US 90 FRUS 90 IBERIA 8.60 8.60424-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
NEW XING PER DISTRICT 03 & NEW IBERIA, RAILROADS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$30,000.00 2022STP>200K $24,000.00Utility Relocation $30,000.00
$100,000.00 2021STP>200K $80,000.00Design (Engineering) $100,000.00
$130,000.00Total Cost $104,000.00$130,000.00
Project: H.011988 LA 86: BYU TECHE MB REHAB(DUPERIER)(HBI)LA 86 IBERIA 0.00 0.20237-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Page 53 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.011991 LA 86: BYU TECHE MB REHAB (DASPIT)(HBI)LA 86 IBERIA 0.00 0.50400-31Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.012738 LA 344: BAYOU TECHE MB RH(MORBIHAN)(HBI)LA 344 IBERIA 0.20 0.40823-14Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
MOVABLE BRIDGE REHABILITATION, STR 006200 (HISTORIC BRIDGE IMPROVEMENT -
HBI)
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.012792 LA 675 @ AIRPORT RD ROUNDABOUTLA 675 IBERIA 0.30 0.40823-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 90 IBERIA 6.20 6.30424-04
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
ROUNDABOUTIBERIA PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$64,000.00 2021STP>200K $51,200.00Right of Way $64,000.00
$2,750,000.00 2022STP>200K IBERIA PARISH$2,200,000.00Construction $2,500,000.00
$2,814,000.00Total Cost $2,251,200.00$2,564,000.00
Project: H.013522 S LEWIS ST WIDENINGIBERIA 0.00 0.00000-23 S LEWIS STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
CONTINUOUS TURN LANEIBERIA PARISH TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2022STP>200K IBERIA PARISH$40,000.00Right of Way $50,000.00
$60,000.00 2022STP>200K IBERIA PARISH$48,000.00Utility Relocation $60,000.00
$142,855.00 2021STP>200K IBERIA PARISH$114,284.00Design (Engineering) $142,855.00
$2,191,455.20 2022STP>200K IBERIA PARISH$1,753,164.16Construction $1,992,232.00
$2,444,310.20Total Cost $1,955,448.16$2,245,087.00
Page 54 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.014576 LA 31: LA 182 - 0.933 MI. N. LA 92LA 31 IBERIA 0.18 2.70056-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 31 ST MARTIN 0.00 4.01056-02
LA 31 ST MARTIN 4.01 4.97056-02
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
PATCH, MILL, ASPHALT OVERLAY, PRESERVATION, NON-INTERSTATE ON STP SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$10,340,000.00 2022STPFLEX $8,272,000.00Construction $9,400,000.00
$10,340,000.00Total Cost $8,272,000.00$9,400,000.00
Project: H.003459 I-49 INTERCH:LA726/LA98/PONT DES MOUTONI-49 LAFAYETTE 4.36 4.62455-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 726 LAFAYETTE 0.77 1.03828-44
LAFAYETTE 0.00 0.00000-28 W PONT DES MOUTON RD
LAFAYETTE 0.00 0.00000-28 E PONT DES MOUTON RD
LAFAYETTE 0.00 0.00000-28 HECTOR CONNOLY RD
LA 98 LAFAYETTE 6.85 7.09391-02
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
INTERCHANGE IMPROVEMENTS455-01-0054 AND 828-44-0015, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$18,000.00 2020HSIP $16,200.00Right of Way $18,000.00
$71,000.00 2020HSIP $63,900.00Utility Relocation $71,000.00
$2,200.00 2018SATRANS $0.00Design (Engineering) $2,200.00
$1,677,500.00 2021HSIP $1,509,750.00Construction $1,525,000.00
$1,768,700.00Total Cost $1,589,850.00$1,616,200.00
Project: H.007233 LAFAYETTE MPO NON STATE PVT MARKINGLAFAYETTE 0.00 0.00000-28Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
PAVEMENT MARKINGS742-28-0007, USE LOCAL AS MATCH URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,397,000.00 2020STP>200K $1,117,600.00Construction $1,270,000.00
$1,397,000.00Total Cost $1,117,600.00$1,270,000.00
Page 55 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.009500 2040PLAN IMPLEMENTATION&I-49 ACTION PLANLAFAYETTE 0.00 0.00000-28 2040 PLAN IMPLEMENTATIONRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
PLAN IMPLEMENTATION AND ACTION PLAN, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$350,000.00 2019STP>200K ACADIANA MPO$280,000.00Design (Engineering) $350,000.00
$350,000.00 2020STP>200K ACADIANA MPO$280,000.00$350,000.00
$350,000.00 2021STP<200K ACADIANA MPO$280,000.00$350,000.00
$350,000.00 2022STP<200K ACADIANA MPO$280,000.00$350,000.00
$1,400,000.00Total Cost $1,120,000.00$1,400,000.00
Project: H.009997 US 167: JOHNSTON ST IMPROVEMENTSUS 167 LAFAYETTE 7.15 8.14080-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
ACCESS MANAGEMENT AND OTHER SAFETY
COUNTERMEASURES
STUDY FUNDED WITH SAFETY TRANSFER
FUNDS, USE TTF AS MATCH FOR THIS PHASE
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$308,656.00 2012SATRANS $0.00Feasibility $308,656.00
$71,449.00 2017HSIPPEN $71,449.00Environmental $71,449.00
$71,449.00 2017NHPP $57,159.20$71,449.00
$71,449.00 2017STPFLEX $57,159.20$71,449.00
$1,391,186.33 2021HSIPPEN $1,391,186.33Right of Way $1,391,186.33
$1,391,186.34 2021NHPP $1,112,949.07$1,391,186.34
$1,391,186.33 2021STPFLEX $1,112,949.06$1,391,186.33
$1,750,000.00 2021HSIPPEN $1,750,000.00Utility Relocation $1,750,000.00
$1,750,000.00 2021NHPP $1,400,000.00$1,750,000.00
$1,750,000.00 2021STPFLEX $1,400,000.00$1,750,000.00
$219,130.67 2017HSIPPEN $219,130.67Design (Engineering) $219,130.67
$219,130.66 2017NHPP $175,304.53$219,130.66
$219,130.67 2017STPFLEX $175,304.54$219,130.67
$3,314,349.50 2022HSIPPEN $3,314,349.50Construction $3,013,045.00
$3,314,349.50 2022NHPP $2,651,479.60$3,013,045.00
$1,809,292.10 2022STP>200K $1,447,433.68$1,644,811.00
$1,505,057.40 2022STPFLEX $1,204,045.92$1,368,234.00
$20,547,002.50Total Cost $17,539,900.30$19,643,089.00
Project: H.011832 US 90: CAMERON ST. OVERLAYUS 90 LAFAYETTE 5.14 7.04003-11Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 90 LAFAYETTE 7.04 8.49003-11
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
MILL AND OVERLAY WITH TURN LANE, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,818,000.00 2020STP>200K $1,454,400.00Right of Way $1,818,000.00
$150,000.00 2021STP>200K $120,000.00Utility Relocation $150,000.00
$2,970,000.00 2021STP>200K-E CITY OF SCOTT$2,376,000.00Construction $2,700,000.00
$4,938,000.00Total Cost $3,950,400.00$4,668,000.00
Page 56 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.011833 ST. MARY STREET SIDEWALKSLAFAYETTE 0.00 0.00000-28 ST. MARY STREETRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
SIDEWALKSCITY OF SCOTT PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$141,026.00 2021STP>200K $112,820.80Design (Engineering) $141,026.00
$1,960,200.00 2022STP>200K CITY OF SCOTT$1,568,160.00Construction $1,782,000.00
$2,101,226.00Total Cost $1,680,980.80$1,923,026.00
Project: H.011990 LA 92: VERMILION RVR MB RH (MILTON)(HBI)LA 92 LAFAYETTE 0.00 0.30213-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.012018 ADAPTIVE TRAFFIC SIGNAL DESIGN AND IMPLAFAYETTE 0.00 0.00000-28 VARIOUS LAFAYETTE STREETSRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
ADAPTIVE SIGNAL IMPLEMENTATIONLAFAYETTE CONSOLIDATED GOV'T PROVIDING
MATCH ON LOCAL ROADS,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$7,894,371.10 2020STP>200K LCG$7,104,933.99Construction $7,176,701.00
$7,894,371.10Total Cost $7,104,933.99$7,176,701.00
Project: H.012231 BERTRAND DRIVE STREETSCAPELA 3025-S LAFAYETTE 0.00 0.47828-38Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
ENHANCEMENTSLAFAYETTE CONSOLIDATED GOVERNMENT WILL
PROVIDE MATCH.,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$8,158.00 2017STPFLEX LCG$6,526.40Feasibility $8,158.00
$918,500.00 2021STP>200K LCG$734,800.00Construction $835,000.00
$640,750.00 2021TAP>200K $512,600.00$582,500.00
$1,567,408.00Total Cost $1,253,926.40$1,425,658.00
Page 57 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.012304 LCG ROAD OVERLAY PROGRAMLAFAYETTE 0.00 0.00000-28 BEAU BASSIN RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LAFAYETTE 0.00 0.00000-28 BENOIT RD
LAFAYETTE 0.00 0.00000-28 GOURMET RD
LAFAYETTE 0.00 0.00000-28 JENKINS RD
LAFAYETTE 0.00 0.00000-28 JOLI RD
LAFAYETTE 0.00 0.00000-28 PREJEAN RD
LAFAYETTE 0.00 0.00000-28 ROBLEY DR
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
OVERLAY AND REHABILITATELAFAYETTE CONSOLIDATED GOVERNMENT WILL
PROVIDE MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$273,190.00 2018STPFLEX $218,552.00Design (Engineering) $273,190.00
$3,960,000.00 2020STPFLEX LCG$3,168,000.00Construction $3,600,000.00
$4,233,190.00Total Cost $3,386,552.00$3,873,190.00
Project: H.012861 PREJEAN ROAD PAVEMENT PRESERVATIONLAFAYETTE 0.00 0.00000-28 PREJEAN RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
OVERLAYCITY OF CARENCRO WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$41,000.00 2018STP>200K CITY OF CARENCRO$32,800.00Design (Engineering) $41,000.00
$382,800.00 2020STP>200K CITY OF CARENCRO$306,240.00Construction $348,000.00
$423,800.00Total Cost $339,040.00$389,000.00
Project: H.012864 LA 94/CARMEL DRIVE SIDEWALKSLA 94 LAFAYETTE 0.31 1.76080-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
CONSTRUCTION OF SIDEWALKSLAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$542,999.60 2022STP>200K LCG$434,399.68Construction $493,636.00
$542,999.60Total Cost $434,399.68$493,636.00
Project: H.012866 SOUTH COLLEGE RD (LA 3025) SIDEWALKSLA 3025 LAFAYETTE 0.00 1.63828-23Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
CONSTRUCT SIDEWALKSLAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$42,596.00 2021STP>200K $34,076.80Design (Engineering) $42,596.00
$715,632.50 2021STP>200K LCG$572,506.00Construction $650,575.00
$758,228.50Total Cost $606,582.80$693,171.00
Page 58 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.012867 S LARRIVIERE RD: LA 92 - CHEMIN METAIRIELAFAYETTE 0.00 0.00000-28 S LARRIVIERE RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
ADD CENTER TURN LANECITY OF YOUNGSVILLE WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,422,200.00 2022STP>200K CITY OF YOUNGSVILLE$1,937,760.00Construction $2,202,000.00
$2,422,200.00Total Cost $1,937,760.00$2,202,000.00
Project: H.012868 FORTUNE ROAD PAVEMENT PRESERVATIONLAFAYETTE 0.00 0.00000-28 FORTUNE RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
OVERLAYCITY OF YOUNGSVILLE WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$30,000.00 2021STP>200K CITY OF YOUNGSVILLE$24,000.00Environmental $30,000.00
$100,000.00 2021STP>200K CITY OF YOUNGSVILLE$80,000.00Design (Engineering) $100,000.00
$1,122,000.00 2022STP>200K CITY OF YOUNGSVILLE$897,600.00Construction $1,020,000.00
$1,252,000.00Total Cost $1,001,600.00$1,150,000.00
Project: H.012869 LA 182(UNIV) @ LA 723(RENAUD) ROUNDABOUTLA 182 LAFAYETTE 1.56 1.60032-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 723 LAFAYETTE 6.06 6.08828-03
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
ROUNDABOUTLAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE
MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$166,200.00 2021STP>200K LCG$132,960.00Right of Way $166,200.00
$216,600.00 2020STP>200K $173,280.00Design (Engineering) $216,600.00
$382,800.00Total Cost $306,240.00$382,800.00
Project: H.012870 LA 93: I-10 RAMP - RENAUDLA 93 LAFAYETTE 0.56 0.86217-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
ADDING TURNING LANESCITY OF SCOTT WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$200,000.00 2021STP>200K CITY OF SCOTT$160,000.00Right of Way $200,000.00
$400,000.00 2021STP>200K $320,000.00Design (Engineering) $400,000.00
$2,853,400.00 2022STP>200K CITY OF SCOTT$2,282,720.00Construction $2,594,000.00
$3,453,400.00Total Cost $2,762,720.00$3,194,000.00
Page 59 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.012871 DETENTE ROAD PAVEMENT PRESERVATIONLAFAYETTE 0.00 0.00000-28 DETENTE RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
PRESERVATIONCITY OF YOUNGSVILLE WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$10,000.00 2021STP>200K CITY OF YOUNGSVILLE$8,000.00Environmental $10,000.00
$100,000.00 2021STP>200K CITY OF YOUNGSVILLE$80,000.00Design (Engineering) $100,000.00
$1,375,000.00 2021STP>200K CITY OF YOUNGSVILLE$1,100,000.00Construction $1,250,000.00
$1,485,000.00Total Cost $1,188,000.00$1,360,000.00
Project: H.013025 LA 182: JEANNE ST. TO WALKER RD.LA 182 LAFAYETTE 0.00 0.25032-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 90-Y LAFAYETTE 0.00 0.08004-01
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
CONSTRUCT RAISED MEDIAN, SIDEWALKS AND
INTERSECTION IMPROV
ACADIANA MPO PROVIDING MATCH FOR
FEASIBILITY PHASE, LAFAYETTE CONSOL. GOVT
(LCG) PROVIDING MATCH FOR OTHER PHASES
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$180,000.00 2022STP>200K $144,000.00Right of Way $180,000.00
$925,000.00 2021STP>200K $740,000.00Utility Relocation $925,000.00
$1,958,000.00 2022STBONDS $0.00Construction $1,780,000.00
$3,861,000.00 2022STP>200K $3,088,800.00$3,510,000.00
$6,924,000.00Total Cost $3,972,800.00$6,395,000.00
Project: H.013517 E ST PETER ST SIDEWALKSLAFAYETTE 0.00 0.00000-28 E SAINT PETER STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
SIDEWALKSCITY OF CARENCRO TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$72,000.00 2021STP>200K CITY OF CARENCRO$57,600.00Design (Engineering) $72,000.00
$221,879.90 2022STP>200K CITY OF CARENCRO$177,503.92Construction $201,709.00
$293,879.90Total Cost $235,103.92$273,709.00
Project: H.014008 SIMCOE STREET CORRIDOR STUDYLAFAYETTE 0.00 0.00000-28 SIMCOE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LAFAYETTE 0.00 0.00000-28 W SIMCOE ST
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
CORRIDOR PLANNING STUDYACADIANA MPO TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$550,000.00 2020STP>200K $440,000.00Feasibility $550,000.00
$550,000.00Total Cost $440,000.00$550,000.00
Page 60 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.014342 ACADIANA MPO PLANNING SERVICES 2021 2022LAFAYETTE 0.00 0.00000-28 PLANNING ACTIVITIES - NO ROADWAYRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
ADDITIONAL MPO PLANNING TASKS TO SUPPLEMENT UPWPACADIANA MPO TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$350,000.00 2020STP>200K $280,000.00Feasibility $350,000.00
$350,000.00Total Cost $280,000.00$350,000.00
Project: H.010601 I-10: LA 328 TO LA 347I-10 ST MARTIN 2.30 7.67450-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ST MARTIN 0.00 0.00000-50 MELVIN DUPUIS RD
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
INTERSTATE WIDENING AND REHABILITATION, CORRIDOR,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$90,000.00 2014STCASH $0.00Environmental $90,000.00
$1,200,000.00 2019NHPP $960,000.00Right of Way $1,200,000.00
$1,811,236.00 2014IM DISCR $1,630,112.40Design (Engineering) $1,811,236.00
$149,577.00 2014NHPP $134,619.30$149,577.00
$409,423.00 2014STBONDS $0.00$409,423.00
$21,043,000.00 2019FREIGHT-HY $18,938,700.00Construction $19,130,000.00
$59,367,000.00 2019NHPP $48,255,900.00$53,970,000.00
$84,070,236.00Total Cost $69,919,331.70$76,760,236.00
Project: H.011485 LA336-1: BAYOU TECHE BRIDGE REHAB (HBI)LA 336-1 ST MARTIN 0.00 0.23056-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
CLEANING AND PAINTING, AND STRUCTURAL REPAIRS, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$200,000.00 2017NHPP $160,000.00Feasibility $200,000.00
$501,000.00 2019NHPP $400,800.00Design (Engineering) $501,000.00
$5,225,000.00 2020NHPP $4,180,000.00Construction $4,750,000.00
$5,926,000.00Total Cost $4,740,800.00$5,451,000.00
Project: H.011995 LA 96:B TECHE MB RH(ST MARTINVILLE)(HBI)LA 96 ST MARTIN 0.05 0.25238-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Page 61 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.012618 LA 347 DRAINAGE IMPROVEMENTSLA 347 ST MARTIN 7.30 8.30056-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
RAISE ROAD X-SECTION AND/OR REPLACE SUBDRAINAGE
STRUCTURES
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$594,000.00 2022STPFLEX $475,200.00Construction $540,000.00
$594,000.00Total Cost $475,200.00$540,000.00
Project: H.012863 CYPRESS ISLAND HWY PAVEMENT PRESERVATIONST MARTIN 0.00 0.00000-50 CYPRESS ISLAND HWYRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
OVERLAYST. MARTIN PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,584.00 2020LOCAL $0.00Design (Engineering) $3,584.00
$57,757.00 2020STP>200K $46,205.60$57,757.00
$85,255.50 2021LOCAL ST MARTIN PARISH$0.00Construction $77,505.00
$1,278,828.10 2021STP>200K ST MARTIN PARISH$1,023,062.48$1,162,571.00
$1,425,424.60Total Cost $1,069,268.08$1,301,417.00
Project: H.013516 LA 353 PAVEMENT PRESERVATIONLA 353 ST MARTIN 0.00 3.52403-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
PAVEMENT PRESERVATIONDOTD TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,300,000.00 2022STP>200K $2,640,000.00Construction $3,000,000.00
$3,300,000.00Total Cost $2,640,000.00$3,000,000.00
Project: H.013819 LA 350: BAYOU TECHE MB RH (PARKS)(HBI)LA 350 ST MARTIN 0.00 0.40400-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
MOVABLE BRIDGE MECHANICAL, ELECTRICAL,
STRUCTURAL REHAB
, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$250,000.00 2021STPFLEX $200,000.00Design (Engineering) $250,000.00
$4,009,500.00 2022STPFLEX $3,207,600.00Construction $3,645,000.00
$4,409,500.00Total Cost $3,527,600.00$4,045,000.00
Page 62 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LAFAYETTE
Project: H.014415 LA 352 DRAINAGE IMPROVEMENTLA 352 ST MARTIN 0.00 1.00850-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
DRAINAGE IMPROVEMENT, OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Design (Engineering) $150,000.00
$2,200,000.00 2022STPFLEX $1,760,000.00Construction $2,000,000.00
$2,350,000.00Total Cost $1,880,000.00$2,150,000.00
Project: H.010353 US 167: ACCESS MANAGEMENT (LFT TURN LNS)US 167 VERMILION 10.07 10.54080-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 167 LAFAYETTE 0.00 4.88080-02
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
ACCESS MANAGEMENT, LEFT TURN LANES AND U-TURNS, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$14,630,000.00 2019HSIP $13,167,000.00Construction $13,300,000.00
$14,630,000.00Total Cost $13,167,000.00$13,300,000.00
Project: H.013515 LA 92: PAVEMENT PRESERVATIONLA 92 VERMILION 4.03 7.06213-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LAFAYETTE
Work TypeType ImprovementRemarks
PAVEMENT PRESERVATION AND TURN LANEDOTD TO PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,475,000.00 2021STP>200K $1,980,000.00Construction $2,250,000.00
$2,475,000.00Total Cost $1,980,000.00$2,250,000.00
Page 63 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
ALEXANDRIA
Project: H.011194 PINEVILLE ELEMENTARY SIDEWALKSUS 165-X RAPIDES 0.25 1.80015-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
RAPIDES 0.00 0.00000-40 PINEVILLE ELEM.
Urbanized Area: ALEXANDRIA
Work TypeType ImprovementRemarks
SIDEWALKS, SIGNING AND STRIPING, SAFETY, SAFE ROUTES TO SCHOOLS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$24,600.00 2017HSIPPEN $24,600.00Design (Engineering) $24,600.00
$243,540.00 2021HSIPPEN $243,540.00Construction $221,400.00
$268,140.00Total Cost $268,140.00$246,000.00
Project: H.012559 INDUSTRIAL PARK SITE ROAD REHABRAPIDES 0.00 0.00000-40 INDUSTRIAL PARK SITE RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: ALEXANDRIA
Work TypeType ImprovementRemarks
PATCHING, COLD PLANNING AND RESURFACINGCITY OF ALEXANDRIA PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$138,000.00 2020STP<200K CITY OF ALEXANDRIA$138,000.00Utility Relocation $138,000.00
$1,210,000.00 2020STP<200K CITY OF ALEXANDRIA$968,000.00Construction $1,100,000.00
$1,348,000.00Total Cost $1,106,000.00$1,238,000.00
Project: H.013452 HORSESHOE DRIVE ROADWAY IMPROVEMENTSRAPIDES 0.00 0.00000-40 HORSESHOE DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: ALEXANDRIA
Work TypeType ImprovementRemarks
ASPHALT REHABILITATIONCITY OF ALEXANDRIA TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,870,000.00 2019STP<200K CITY OF ALEXANDRIA$1,496,000.00Construction $1,700,000.00
$1,870,000.00Total Cost $1,496,000.00$1,700,000.00
Project: H.013887 RAPIDES AVE AND 3RD ST ROAD IMPROVEMENTSRAPIDES 0.00 0.00000-40 RAPIDES AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
RAPIDES 0.00 0.00000-40 RAPIDES AVE
RAPIDES 0.00 0.00000-40 N 3RD ST
RAPIDES 0.00 0.00000-40 N 3RD ST
Urbanized Area: ALEXANDRIA
Work TypeType ImprovementRemarks
REHABILITATIONCITY OF ALEXANDRIA TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,699,850.00 2022STP<200K $2,959,880.00Construction $3,363,500.00
$3,699,850.00Total Cost $2,959,880.00$3,363,500.00
Page 64 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
ALEXANDRIA
Project: H.014167 NORTH 16TH STREET BRIDGE REPLACEMENTRAPIDES 0.00 0.00000-40 N STRACENER STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: ALEXANDRIA
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENTCITY OF ALEXANDRIA TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,062,500.00 2021STP<200K $1,650,000.00Construction $1,875,000.00
$2,062,500.00Total Cost $1,650,000.00$1,875,000.00
Project: H.014311 ALEX BIKE/PED PLAN IMPLEMENTATIONPHASE 1RAPIDES 0.00 0.00000-40 DALLAS AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
RAPIDES 0.00 0.00000-40 DALLAS AVE
LA 1208-3 RAPIDES 9.81 11.47368-03
US 165-X RAPIDES 11.47 12.24368-03
US 165-X RAPIDES 0.00 0.14015-01
RAPIDES 0.00 0.00000-40 MASONIC DR
LA 28-X RAPIDES 0.00 1.36417-03
RAPIDES 0.00 0.00000-40 VERSAILLES BLVD
Urbanized Area: ALEXANDRIA
Work TypeType ImprovementRemarks
BIKE LANESCITY OF ALEXANDRIA PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$374,000.00 2021STP<200K $299,200.00Construction $340,000.00
$374,000.00Total Cost $299,200.00$340,000.00
Project: H.014521 ALEX MPO TRAVEL DEMAND MANAGEMENT 2020RAPIDES 0.00 0.00000-40 ALEX MPO TRAVEL DEMAND MANAGEMRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: ALEXANDRIA
Work TypeType ImprovementRemarks
CARPOOL/VANPOOL, OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2021STPFLEX $100,000.00Feasibility $100,000.00
$100,000.00Total Cost $100,000.00$100,000.00
Project: H.014536 COLLEGE DRIVE PAVEMENT REHABRAPIDES 0.00 0.00000-40 COLLEGE DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: ALEXANDRIA
Work TypeType ImprovementRemarks
ROADWAY REPAIRCITY OF PINEVILLE TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$770,000.00 2021STP<200K $616,000.00Construction $700,000.00
$770,000.00Total Cost $616,000.00$700,000.00
Page 65 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
ALEXANDRIA
Project: H.011960 DISTRICT 08 CONTROLLER UPGRADESDISTRICTWIDE 08 0.00 0.00000-98 DISTRICT 08 CONTROLLER UPGRADERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: ALEXANDRIA
Work TypeType ImprovementRemarks
UPGRADE OF EXISTING SIGNAL CONTROLLERS, OPER EFFICIENCY/MOTORIST ASSISTANCE, TRAFFIC
CONTROL DEVICES
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$449,570.00 2022STPFLEX $449,570.00Construction $408,700.00
$60,000.00 2020STPFLEX $60,000.00Design (Engineering) $60,000.00
$509,570.00Total Cost $509,570.00$468,700.00
Page 66 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HOUMA
Project: H.013493 WASHINGTON STREET SIDEWALKSASSUMPTION 0.00 0.00000-04 WASHINGTON STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
ADA COMPLIANT SIDEWALKSMATCH BY VILLAGE OF NAPOLEONVILLE, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$7,976.00 2021STP<200K VILLAGE OF NAPOLEONVILLE$6,380.80Design (Engineering) $7,976.00
$87,732.70 2022STP<200K VILLAGE OF NAPOLEONVILLE$70,186.16Construction $79,757.00
$95,708.70Total Cost $76,566.96$87,733.00
Project: H.013500 DR. MARTIN LUTHER KING PHASE 1ASSUMPTION 0.00 0.00000-04 DR MARTIN LUTHER KING DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
ADA COMPLIANT SIDEWALKSMATCH BY VILLAGE OF NAPOLEONVILLE, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$9,634.00 2021STP<200K VILLAGE OF NAPOLEONVILLE$7,707.20Design (Engineering) $9,634.00
$105,979.50 2022STP<200K VILLAGE OF NAPOLEONVILLE$84,783.60Construction $96,345.00
$115,613.50Total Cost $92,490.80$105,979.00
Project: H.013501 DR MARTIN LUTHER KING PHASE 2ASSUMPTION 0.00 0.00000-04 DR MARTIN LUTHER KING DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
ADA COMPLIANT SIDEWALKSMATCH BY VILLAGE OF NAPOLEONVILLE, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$9,635.00 2022STP<200K VILLAGE OF NAPOLEONVILLE$7,708.00Design (Engineering) $9,635.00
$105,979.50 2023STP<200K VILLAGE OF NAPOLEONVILLE$84,783.60Construction $96,345.00
$115,614.50Total Cost $92,491.60$105,980.00
Project: H.009320 ACADIAN ROAD ROUNDABOUTLA 20 LAFOURCHE 0.75 0.85065-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
5 LEGGED ROUNDABOUT, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,500,000.00 2020STP<200K $3,500,000.00Right of Way $3,500,000.00
$100,000.00 2020STP<200K $100,000.00Utility Relocation $100,000.00
$561,000.00 2014STP<200K CITY OF THIBODAUX$561,000.00Design (Engineering) $561,000.00
$5,080,053.00 2021HSIP CITY OF THIBODAUX$5,080,053.00Construction $4,618,230.00
$9,241,053.00Total Cost $9,241,053.00$8,779,230.00
Page 67 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HOUMA
Project: H.011915 AIRPORT CONNECTOR ROAD AND BRIDGELAFOURCHE 0.00 0.00000-29 AIRPORT CONNECTOR ROAD& BRIDGRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 3235 LAFOURCHE 4.43 5.07829-26
LA 1 LAFOURCHE 2.87 3.23064-04
LA 308 LAFOURCHE 3.04 3.16407-01
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
NEW BRIDGE AND NEW ROAD BETWEEN LA 308 AND LA
3235
LOCAL FUNDS LAFOURCHE PARISH GOVT&
GREATERLAFOURCHE PORT, GREATER
LAFOURCHE PORT COMMISSION BUILD GRANT
OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$22,583,000.00 2020EARMARK $18,066,400.00Construction $20,530,000.00
$13,090,000.00 2020LOCAL $0.00$11,900,000.00
$35,673,000.00Total Cost $18,066,400.00$32,430,000.00
Project: H.011962 LA 1: CO CANAL MB REHAB (LOCKPORT)(HBI)LA 1 LAFOURCHE 1.20 1.70064-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
MOVABLE BRIDGE REHABILITATION FEASIBILITY STUDY, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$175,000.00 2021STPFLEX $140,000.00Feasibility $175,000.00
$175,000.00Total Cost $140,000.00$175,000.00
Project: H.012447 LA 182: B LAFOURCHE MB RH(RACELAND)(HBI)LA 182 LAFOURCHE 0.00 0.06005-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
REPLACE EXISTING VERTICAL LIFT BRIDGE, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$22,000,000.00 2022STPFLEX $17,600,000.00Construction $20,000,000.00
$22,000,000.00Total Cost $17,600,000.00$20,000,000.00
Project: H.013250 US 90: LA 308 - 2.3 MI E LA 182US 90 LAFOURCHE 11.92 15.25424-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 90 LAFOURCHE 3.61 6.12005-07
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
MILL, PATCH, AND OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$7,810,000.00 2020NHPP $6,248,000.00Construction $7,100,000.00
$7,810,000.00Total Cost $6,248,000.00$7,100,000.00
Page 68 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HOUMA
Project: H.013269 AUDUBON AVE OVLY:LA 1 TO TERREBONNE P/LLAFOURCHE 0.00 0.00000-29 AUDUBON AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
ASPHALT OVERLAYCITY OF THIBODAUX WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$69,320.00 2021STP<200K CITY OF THIBODAUX$55,456.00Design (Engineering) $69,320.00
$516,318.00 2022STP<200K CITY OF THIBODAUX$413,054.40Construction $469,380.00
$585,638.00Total Cost $468,510.40$538,700.00
Project: H.013402 LA1 &LA308 PED & MULTIUSE PATH(LOCKPORT)LA 1 LAFOURCHE 1.34 2.00064-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LAFOURCHE 0.00 0.00000-29 E FONTINELLE ST
LA 308 LAFOURCHE 14.44 14.60407-90
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
SIDEWALK AND MULTIUSE PATHLAFOURCHE PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$25,000.00 2021STP<200K LAFOURCHE PARISH$20,000.00Environmental $25,000.00
$100,000.00 2022STP<200K $80,000.00Right of Way $100,000.00
$100,000.00 2022STP<200K $80,000.00Utility Relocation $100,000.00
$45,000.00 2021STP<200K LAFOURCHE PARISH$36,000.00Design (Engineering) $45,000.00
$242,000.00 2022STP<200K LAFOURCHE PARISH$193,600.00Construction $220,000.00
$512,000.00Total Cost $409,600.00$490,000.00
Project: H.013403 LA 20 & LA 304 SIDEWALK IMP (CHACKBAY)LA 304 LAFOURCHE 6.33 7.08829-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 20 LAFOURCHE 5.54 6.20065-06
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
ADA SIDEWALKSLAFOURCHE PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$40,000.00 2022STP<200K LAFOURCHE PARISH$32,000.00Design (Engineering) $40,000.00
$288,981.00 2022STP<200K LAFOURCHE PARISH$231,184.80Construction $262,710.00
$328,981.00Total Cost $263,184.80$302,710.00
Project: H.013404 LA 1 SIDEWALKS (CUT-OFF)LA 1 LAFOURCHE 6.41 6.62064-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 1 LAFOURCHE 5.26 5.60064-04
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
SIDEWALKSLAFOURCHE PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$18,000.00 2021STP<200K LAFOURCHE PARISH$14,400.00Design (Engineering) $18,000.00
$128,700.00 2022STP<200K LAFOURCHE PARISH$102,960.00Construction $117,000.00
$146,700.00Total Cost $117,360.00$135,000.00
Page 69 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HOUMA
Project: H.013429 DOWNTOWN THIBODAUX SIDEWALKSLAFOURCHE 0.00 0.00000-29 DOWNTOWN THIBODAUXRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LAFOURCHE 0.00 0.00000-29 FOCUS ST
LAFOURCHE 0.00 0.00000-29 SAINT PHILIP ST
LAFOURCHE 0.00 0.00000-29 SAINT LOUIS ST
LAFOURCHE 0.00 0.00000-29 GREEN ST
LAFOURCHE 0.00 0.00000-29 MARONGE ST
LAFOURCHE 0.00 0.00000-29 PATRIOT ST
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
ENHANCEMENTS - UPGRADE SIDEWALKS TO ADACITY OF THIBODAUX WILL PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$19,320.00 2021STP>200K $15,456.00Design (Engineering) $19,320.00
$212,520.00 2022STP<200K CITY OF THIBODAUX$170,016.00Construction $193,200.00
$231,840.00Total Cost $185,472.00$212,520.00
Project: H.013490 CENTRAL LAFOURCHE MULTI-USE PATH PH 1ALA 1 LAFOURCHE 5.09 7.09064-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 1 LAFOURCHE 7.09 7.47064-06
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
MULTI-USE PATHLAFOURCHE PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$250,000.00 2021STP<200K LAFOURCHE PARISH$200,000.00Environmental $250,000.00
$500,000.00 2022STP<200K LAFOURCHE PARISH$400,000.00Right of Way $500,000.00
$290,000.00 2022STP<200K LAFOURCHE PARISH$232,000.00Utility Relocation $290,000.00
$250,000.00 2021STP<200K LAFOURCHE PARISH$200,000.00Design (Engineering) $250,000.00
$1,320,000.00 2022STP<200K LAFOURCHE PARISH$1,056,000.00Construction $1,200,000.00
$2,610,000.00Total Cost $2,088,000.00$2,490,000.00
Project: H.013818 LA308:B LAFOUR MB RH(GOLDEN MEADOW)(HBI)LA 308 LAFOURCHE 0.00 0.30407-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
MOVABLE BRIDGE MECHANICAL, ELECTRICAL,
STRUCTURAL REHAB
, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$175,000.00 2021STPFLEX $140,000.00Feasibility $175,000.00
$175,000.00Total Cost $140,000.00$175,000.00
Page 70 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HOUMA
Project: H.013940 LA 648 & ACADIA ROAD INTERSECTION IMPROVLA 648 LAFOURCHE 0.21 0.22829-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LAFOURCHE 0.00 0.00000-29 N ACADIA RD
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
INTERSECTION IMPROVEMENTSCPDC(HOUMA MPO) TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$575,000.00 2022STP<200K $460,000.00Right of Way $575,000.00
$320,000.00 2021STP<200K $256,000.00Design (Engineering) $320,000.00
$3,828,000.00 2022STP<200K $3,062,400.00Construction $3,480,000.00
$4,723,000.00Total Cost $3,778,400.00$4,375,000.00
Project: H.012891 LA 300: BAYOU LALOUTRE BRIDGELA 300 ST BERNARD 8.60 8.80284-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENTUSE NFA AS MATCH; AC PHASE 6, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$143,000.00 2022STPFLEX $114,400.00Design (Engineering) $143,000.00
$750,000.00 2024STCASH $0.00Construction $600,000.00
$893,000.00Total Cost $114,400.00$743,000.00
Project: H.013116 LA 20 WIDEN: LA 307 - S. VACHERIELA 20 ST JAMES 0.00 2.56065-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 20 LAFOURCHE 10.98 11.53065-06
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
WIDENING LA 20 TO INCLUDE 8' SHOULDERS, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$7,626,655.30 2022HSIPPEN $7,626,655.30Construction $6,933,323.00
$7,626,655.30Total Cost $7,626,655.30$6,933,323.00
Project: H.011986 LA 58: B TERREBONNE MB RH(MONTEGUT)(HBILA 58 TERREBONNE 1.57 1.59247-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
FEASIBILITY STUDY - MOVABLE BRIDGE REHABILITATION
OR REPLACE
, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Page 71 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HOUMA
Project: H.012337 PROSPECT BLVD SIDEWALKSTERREBONNE 0.00 0.00000-55 PROSPECT BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
NEW SIDEWALKTERREBONNE PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$41,437.00 2018STP<200K TERREBONNE PARISH$33,149.60Design (Engineering) $41,437.00
$288,750.00 2019STP<200K TERREBONNE PARISH$231,000.00Construction $262,500.00
$330,187.00Total Cost $264,149.60$303,937.00
Project: H.012338 CIVIC CENTER SIDEWALKSTERREBONNE 0.00 0.00000-55 CIVIC CENTER BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
NEW SIDEWALKSTERREBONNE PARISH PROVIDING THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$46,083.00 2018STP<200K TERREBONNE PARISH$36,866.40Design (Engineering) $46,083.00
$248,600.00 2021STP<200K TERREBONNE PARISH$198,880.00Construction $226,000.00
$294,683.00Total Cost $235,746.40$272,083.00
Project: H.012339 LA 24 SIDEWALK REHABLA 24 TERREBONNE 0.00 0.40065-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 182 TERREBONNE 6.95 7.12005-05
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
SIDEWALK REHABILITATIONTERREBONNE PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$91,748.00 2018STP<200K TERREBONNE PARISH$73,398.40Design (Engineering) $91,748.00
$1,210,000.00 2021STP<200K TERREBONNE PARISH$968,000.00Construction $1,100,000.00
$1,301,748.00Total Cost $1,041,398.40$1,191,748.00
Project: H.013340 VALHI BLVD, MULTI-USE TRAIL, PHASE 1TERREBONNE 0.00 0.00000-55 VALHI BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
MULTI-USE PATHTERREBONNE PARISH PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$99,700.00 2021STP<200K TERREBONNE PARISH$79,760.00Design (Engineering) $99,700.00
$1,070,322.00 2022STP<200K TERREBONNE PARISH$856,257.60Construction $973,020.00
$1,170,022.00Total Cost $936,017.60$1,072,720.00
Page 72 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HOUMA
Project: H.013453 BLUE BAYOU (LA 316) SIDEWALKSLA 316 TERREBONNE 0.93 1.41412-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HOUMA
Work TypeType ImprovementRemarks
SIDEWALKSTERREBONNE PARISH TO PROVIDE THE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$83,160.00 2022STP<200K TERREBONNE PARISH$66,528.00Right of Way $83,160.00
$37,378.00 2021STP<200K TERREBONNE PARISH$29,902.40Design (Engineering) $37,378.00
$138,151.20 2022STP<200K TERREBONNE PARISH$110,520.96Construction $125,592.00
$258,689.20Total Cost $206,951.36$246,130.00
Page 73 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SLIDELL
Project: H.000284 US 90: PEARL RIVER BRIDGES (HBI)US 90 ST TAMMANY 5.00 8.00006-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
NEW BRIDGES006-07-0048; PRIORITY BRIDGE PROJECT,
HISTORIC BRIDGE IMPROVEMENT (HBI)
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$15,000.00 2020STPFLEX $12,000.00Design (Engineering) $15,000.00
$15,000.00Total Cost $12,000.00$15,000.00
Project: H.000286 US 90: EAST PEARL RIVER MB REPLACEMENTUS 90 ST TAMMANY 0.00 0.18006-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 90 ST TAMMANY 8.25 8.44006-07
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT006-08-0031;STAGE 0 PROJECT, MS TO FUND
DETAIL LINE 4
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$5,490,000.00 2022STPFLEX LADOTD & MDOT$4,392,000.00Design (Engineering) $5,490,000.00
$5,490,000.00Total Cost $4,392,000.00$5,490,000.00
Project: H.000688 US 11 NORFOLK SOUTHERN RR OVERPASS (HBI)US 11 ST TAMMANY 0.40 0.81018-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT018-04-0049; PRIORITY BRIDGE PROJECT,
HISTORIC BRIDGE IMPROVEMENT (HBI)
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$320,000.00 2020STPFLEX $256,000.00Design (Engineering) $320,000.00
$320,000.00Total Cost $256,000.00$320,000.00
Project: H.004113 LA 3241: LA 435 TO LA 40/LA 41LA 3241 ST TAMMANY 11.63 16.76852-33Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 41 ST TAMMANY 6.73 6.76058-02
LA 41 ST TAMMANY 6.76 6.98058-02
LA 40 ST TAMMANY 0.00 0.07058-30
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
NEW 4-LANE852-33-0001;BL DATE 10-08 404 RE-SUBMITTED3-
96, SEE LONG TEXT FOR MATCH
TIME,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$4,460,000.00 2019NHPP $3,568,000.00Right of Way $4,460,000.00
$750,000.00 2019NHPP $600,000.00Utility Relocation $750,000.00
$38,500,000.00 2021STCASH $0.00Construction $35,000,000.00
$22,000,000.00 2021TIFIA $22,000,000.00$20,000,000.00
$65,710,000.00Total Cost $26,168,000.00$60,210,000.00
Page 74 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SLIDELL
Project: H.004435 LA 3241: LA 36 TO LA 435LA 3241 ST TAMMANY 3.53 11.69852-33Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
NEW 4-LANE852-33-0003;BL DATE 7-08, SEE LONG TEXT FOR
MATCH
TIME,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$5,528,000.00 2019NHPP $4,422,400.00Right of Way $5,528,000.00
$750,000.00 2019NHPP $600,000.00Utility Relocation $750,000.00
$53,020,000.00 2022STCASH $0.00Construction $48,200,000.00
$29,480,000.00 2022TIFIA $29,480,000.00$26,800,000.00
$88,778,000.00Total Cost $34,502,400.00$81,278,000.00
Project: H.004957 LA 3241:I-12/LA 434 INTERCHANGE TO LA 36LA 3241 ST TAMMANY 0.00 3.53852-33Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 434 ST TAMMANY 2.70 4.57852-12
LA 434 ST TAMMANY 4.57 5.56852-12
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
NEW 4-LANE852-33-0002;BL DATE 7-08, SEE LONG TEXT FOR
MATCH
TIME,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$4,650,000.00 2021NHPP $3,720,000.00Right of Way $4,650,000.00
$1,500,000.00 2021NHPP $1,200,000.00Utility Relocation $1,500,000.00
$6,150,000.00Total Cost $4,920,000.00$6,150,000.00
Project: H.011216 CITY OF SLIDELL PAVEMENT MARKINGSST TAMMANY 0.00 0.00000-52 VARIOUS LOCAL ROADSRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
PURCHASE AND INSTALL PAVEMENT MARKINGS ON 12
LOCAL ROADS
, SAFETY, LOCAL ROADS SAFETY
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$25,000.00 2018HSIPPEN $25,000.00Design (Engineering) $25,000.00
$413,600.00 2020STCASH $413,600.00Construction $376,000.00
$438,600.00Total Cost $438,600.00$401,000.00
Project: H.011775 US 11 & US 190 BICYCLE AND PED CROSSINGSUS 11 ST TAMMANY 5.16 5.17018-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
PED/BICYCLE CROSSWALKS, SIGNS AND SIGNALSCITY OF SLIDELL PROVIDES MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,210,000.00 2021STP<200K $968,000.00Construction $1,100,000.00
$1,210,000.00Total Cost $968,000.00$1,100,000.00
Page 75 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SLIDELL
Project: H.012812 US 190 @ NORTHSHORE & CAMP VILLEREUS 190 ST TAMMANY 18.18 19.05013-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ST TAMMANY 0.00 0.00000-52 NORTHSHORE BLVD
ST TAMMANY 0.00 0.00000-52 CAMP VILLERE RD
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
ROUNDABOUT INTERSECTION IMPROVEMENTSDOTD TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,160,000.00 2021STP<200K $2,528,000.00Right of Way $3,160,000.00
$870,000.00 2021STP<200K $696,000.00Utility Relocation $870,000.00
$557,000.00 2020STP<200K $445,600.00Design (Engineering) $557,000.00
$6,330,500.00 2022STP<200K $5,064,400.00Construction $5,755,000.00
$10,917,500.00Total Cost $8,734,000.00$10,342,000.00
Project: H.012856 NATCHEZ DRIVE REHABILITATIONST TAMMANY 0.00 0.00000-52 NATCHEZ DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
REHABILITATIONCITY OF SLIDELL WILL PROVIDE MATCH; TOLL
CREDITS AS MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$572,000.00 2021STP<200K CITY OF SLIDELL$572,000.00Construction $520,000.00
$572,000.00Total Cost $572,000.00$520,000.00
Project: H.012947 US 90:WEST PEARL BR WIRE ROPE REPL (HBI)US 90 ST TAMMANY 5.22 5.32006-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
WIRE ROPE REPLACEMENTHISTORIC BRIDGE IMPROVEMENT (HBI), OPER EFFICIENCY/MOTORIST ASSISTANCE, MOVABLE
BRIDGE REHABILITATION
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$440,000.00 2021STPFLEX $352,000.00Construction $400,000.00
$440,000.00Total Cost $352,000.00$400,000.00
Page 76 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SLIDELL
Project: H.013008 DIST62:ABC BR REPLACE ST TAM,WASH PARSLA 16 ST TAMMANY 0.00 0.10058-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 1129 ST TAMMANY 2.35 2.45279-02
LA 36 ST TAMMANY 0.20 4.70280-03
LA 450 ST TAMMANY 1.30 1.40852-07
LA 59 ST TAMMANY 0.60 0.70852-09
LA 434 ST TAMMANY 5.90 6.00852-12
LA 16 WASHINGTON 0.90 1.00058-04
LA 438 WASHINGTON 6.00 6.15275-02
LA 436 WASHINGTON 10.60 10.70859-08
LA 1072 WASHINGTON 3.30 4.15859-21
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$170,000.00 2021NFA $0.00Design (Engineering) $170,000.00
$940,000.00 2021STPFLEX $752,000.00$940,000.00
$1,110,000.00Total Cost $752,000.00$1,110,000.00
Project: H.013151 US 190(GAUSE BLVD) SIDEWALK IMPROVEMENTSUS 190 ST TAMMANY 0.00 0.66852-24Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
SIDEWALK IMPROVEMENTSCITY OF SLIDELL TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$588,500.00 2021STP<200K CITY OF SLIDELL$470,800.00Construction $535,000.00
$588,500.00Total Cost $470,800.00$535,000.00
Project: H.013381 LINDBERG DRIVE @ US 190(GAUSE BLVD)ST TAMMANY 0.00 0.00000-52 LINDBERG DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
TURN LANECITY OF SLIDELL TO PROVIDE MATCH; TOLL
CREDITS AS MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$303,600.00 2021STP<200K CITY OF SLIDELL$303,600.00Construction $276,000.00
$303,600.00Total Cost $303,600.00$276,000.00
Project: H.014011 N CARNATION ST PAVEMENT REHABST TAMMANY 0.00 0.00000-52 N CARNATION STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
PAVEMENT REHABCITY OF SLIDELL TO PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,760,000.00 2021STP<200K $1,408,000.00Construction $1,600,000.00
$1,760,000.00Total Cost $1,408,000.00$1,600,000.00
Page 77 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SLIDELL
Project: H.014142 US 190: DRAINAGE IMPROVEMENTS (LACOMBE)US 190 ST TAMMANY 11.00 11.20013-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$935,000.00 2021NHPP $748,000.00Construction $850,000.00
$935,000.00Total Cost $748,000.00$850,000.00
Project: H.014315 GRAFTON DRIVE PAVEMENT REHABILITATIONST TAMMANY 0.00 0.00000-52 GRAFTON DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
REHABILITATIONCITY OF SLIDELL TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$950,400.00 2022STP<200K $760,320.00Construction $864,000.00
$950,400.00Total Cost $760,320.00$864,000.00
Project: H.014317 CAREY ST PAVEMENT REHABILITATIONST TAMMANY 0.00 0.00000-52 CAREY STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
PAVEMENT REHABCITY OF SLIDELL TO PROVIDE MATCH; TOLL
CREDITS AS MATCH,
URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$550,000.00 2022STP<200K $440,000.00Construction $500,000.00
$550,000.00Total Cost $440,000.00$500,000.00
Project: H.014375 US 190W ROUNDABOUTS, SLIDELLUS 190 ST TAMMANY 19.66 19.68013-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 190 ST TAMMANY 19.93 19.94013-12
US 190 ST TAMMANY 20.18 20.19013-12
ST TAMMANY 0.00 0.00000-52 WESTMINSTER DR
ST TAMMANY 0.00 0.00000-52 CARROLL RD
ST TAMMANY 0.00 0.00000-52 MARIS STELLA ST
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
CONSTRUCT ROUNDABOUTSST. TAMMANY PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,710,000.00 2021STP<200K $2,968,000.00Right of Way $3,710,000.00
$1,000,000.00 2021STP<200K $800,000.00Utility Relocation $1,000,000.00
$6,682,500.00 2022STP<200K $5,346,000.00Construction $6,075,000.00
$11,392,500.00Total Cost $9,114,000.00$10,785,000.00
Page 78 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
SLIDELL
Project: H.014528 TERRACE AVE PAVEMENT REHABST TAMMANY 0.00 0.00000-52 TERRACE AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SLIDELL
Work TypeType ImprovementRemarks
MILL AND OVERLAY ROADWAYCITY OF SLIDELL TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$385,000.00 2022STP<200K $308,000.00Construction $350,000.00
$385,000.00Total Cost $308,000.00$350,000.00
Page 79 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MANDEVILLE / COVINGTON
Project: H.001344 US 190: LA 437 - US 190 BUS (PH 1)US 190 ST TAMMANY 1.23 2.13059-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MANDEVILLE / COVINGTON
Work TypeType ImprovementRemarks
WIDEN TO 4 LANES, NEW BRIDGE059-30-0008, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,960,000.00 2021STP<200K $3,168,000.00Right of Way $3,960,000.00
$200,000.00 2019STP<200K $160,000.00Utility Relocation $200,000.00
$1,000,000.00 2018STP<200K $800,000.00Design (Engineering) $1,000,000.00
$210,000.00 2018STPFLEX $168,000.00$210,000.00
$485,000.00 2018TCSP $388,000.00$485,000.00
$18,700,000.00 2021STP<200K $14,960,000.00Construction $17,000,000.00
$24,555,000.00Total Cost $19,644,000.00$22,855,000.00
Project: H.009460 ST. TAMMANY PARISH SIGNING & STRIPINGST TAMMANY 0.00 0.00000-52 DOVE PARK, HELENBURGRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MANDEVILLE / COVINGTON
Work TypeType ImprovementRemarks
SIGNAGE, SAFETY, LOCAL ROADS SAFETY
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$632,500.00 2019STCASH $0.00Construction $575,000.00
$632,500.00Total Cost $0.00$575,000.00
Project: H.010116 LA 1088 CORRIDOR STUDYLA 1088 ST TAMMANY 0.00 3.30852-11Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MANDEVILLE / COVINGTON
Work TypeType ImprovementRemarks
TRAFFIC STUDY ON LA 1088, OPER EFFICIENCY/MOTORIST ASSISTANCE, ACCESS
MANAGEMENT
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$60,000.00 2020STPFLEX $48,000.00Design (Engineering) $60,000.00
$60,000.00Total Cost $48,000.00$60,000.00
Project: H.010184 LA 59: CURVE REALIGN AND TUNNEL AT TRACELA 59 ST TAMMANY 4.94 5.28281-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ST TAMMANY 0.00 0.00000-52 EMILE STRAIN RD
ST TAMMANY 0.00 0.00000-52 TRAILS/BIKEWAYS
ST TAMMANY 0.00 0.00000-52 MARSHALL RD
Urbanized Area: MANDEVILLE / COVINGTON
Work TypeType ImprovementRemarks
REALIGN CURVE & PROVIDE A TUNNEL FOR TAMMANY
TRACE CROSSING
ENG & R/W BY ST TAMMANY PARISH, MATCH 15%
TOLL CREDITS & 5% TTF FOR TAP<200K
ENHANCEMENTS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,805,000.00 2019HSIP $2,524,500.00Construction $2,550,000.00
$1,650,000.00 2019TAP<200K $1,567,500.00$1,500,000.00
$4,455,000.00Total Cost $4,092,000.00$4,050,000.00
Page 80 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MANDEVILLE / COVINGTON
Project: H.011152 I-12: US 190 TO LA 59I-12 ST TAMMANY 9.96 13.22454-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MANDEVILLE / COVINGTON
Work TypeType ImprovementRemarks
ROADWAY WIDENING AND OVERLAY, BRIDGE
WIDENING/REPLACEMENT
SEE NOTES FOR MATCH, CAPACITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$62,700,000.00 2019NHPP $50,875,660.00Construction $57,000,000.00
$62,700,000.00Total Cost $50,875,660.00$57,000,000.00
Project: H.011260 US 190B @ JEFFERSON AVE. ROUNDABOUTUS 190-X ST TAMMANY 9.06 9.17013-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
ST TAMMANY 0.00 0.00000-52 N JEFFERSON AVE
ST TAMMANY 0.00 0.00000-52 S JEFFERSON AVE
Urbanized Area: MANDEVILLE / COVINGTON
Work TypeType ImprovementRemarks
ROUNDABOUT CONSTRUCTION, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$251,043.00 2015HSIP $251,043.00Design (Engineering) $251,043.00
$2,085,600.00 2021HSIP $2,085,600.00Construction $1,896,000.00
$2,336,643.00Total Cost $2,336,643.00$2,147,043.00
Project: H.011721 US 190/LA 22 IMPROVEMENTSLA 22 ST TAMMANY 0.00 0.10013-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 190 ST TAMMANY 0.10 0.38013-12
LA 22 ST TAMMANY 3.98 4.08261-06
Urbanized Area: MANDEVILLE / COVINGTON
Work TypeType ImprovementRemarks
INTERSECTION IMPROVEMENTSUSE TTF AS MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,520,000.00 2020STP<200K $2,816,000.00Construction $3,200,000.00
$3,520,000.00Total Cost $2,816,000.00$3,200,000.00
Project: H.013866 I-12: LA 21 TO US 190I-12 ST TAMMANY 6.67 10.06454-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: MANDEVILLE / COVINGTON
Work TypeType ImprovementRemarks
ROADWAY WIDENING INCLUDES BRIDGE
WIDENING/REPLACEMENT
ST. TAMMANY PARISH WILL PROVIDE MATCH, CAPACITY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$27,500,000.00 2020EARMARK $22,000,000.00Construction $25,000,000.00
$27,830,000.00 2020NHPP $22,264,000.00$25,300,000.00
$55,330,000.00Total Cost $44,264,000.00$50,300,000.00
Page 81 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
MANDEVILLE / COVINGTON
Project: H.013872 LA 22 @ LA 1085 ROUNDABOUTLA 22 ST TAMMANY 0.54 1.00261-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 1085 ST TAMMANY 0.00 0.20852-02
Urbanized Area: MANDEVILLE / COVINGTON
Work TypeType ImprovementRemarks
CONSTRUCT A ROUNDABOUTDOTD TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$250,000.00 2020STP<200K $200,000.00Right of Way $250,000.00
$150,000.00 2020STP<200K $120,000.00Utility Relocation $150,000.00
$1,100,000.00 2022STP<200K $880,000.00Construction $1,000,000.00
$1,500,000.00Total Cost $1,200,000.00$1,400,000.00
Page 82 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HAMMOND
Project: H.009425 LA 16 AMITE DRAINAGE IMPROVEMENTSLA 16 TANGIPAHOA 0.04 0.71047-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HAMMOND
Work TypeType ImprovementRemarks
DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$310,843.42 2014STPFLEX $248,674.74Design (Engineering) $310,843.42
$1,442,100.00 2022STPFLEX $1,153,680.00Construction $1,311,000.00
$1,752,943.42Total Cost $1,402,354.74$1,621,843.42
Project: H.010289 LA 22: ROUNDABOUT DUNSON/RIDGEDELL RDS.LA 22 TANGIPAHOA 2.61 2.84261-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
TANGIPAHOA 0.00 0.00000-53 RIDGEDELL RD AT DUNSON ROAD
Urbanized Area: HAMMOND
Work TypeType ImprovementRemarks
CONSTRUCT ROUNDABOUT @ LA 22/DUNSON/RIDGEDELL, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$521,000.00 2017HSIP $521,000.00Right of Way $521,000.00
$25,152.00 2016HSIP $25,152.00Design (Engineering) $25,152.00
$1,848,000.00 2022HSIP $1,848,000.00Construction $1,680,000.00
$2,394,152.00Total Cost $2,394,152.00$2,226,152.00
Project: H.011512 US 51 @ SYCAMORE ST AMITE CITY DRAINAGEUS 51 TANGIPAHOA 4.60 4.90017-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HAMMOND
Work TypeType ImprovementRemarks
ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$110,000.00 2020STPFLEX $88,000.00Construction $100,000.00
$110,000.00Total Cost $88,000.00$100,000.00
Project: H.011519 LA 1063: GLENDALE DR - US 51 DRAINAGELA 1063 TANGIPAHOA 6.30 6.60853-34Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HAMMOND
Work TypeType ImprovementRemarks
ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$35,000.00 2017STPFLEX $28,000.00Design (Engineering) $35,000.00
$247,500.00 2021STPFLEX $198,000.00Construction $225,000.00
$282,500.00Total Cost $226,000.00$260,000.00
Page 83 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HAMMOND
Project: H.013113 LA 22: LA 42 - YELLOW WATER RIVERLA 22 TANGIPAHOA 0.00 0.46261-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 22 TANGIPAHOA 0.46 3.33261-03
LA 22 LIVINGSTON 8.41 8.57261-02
Urbanized Area: HAMMOND
Work TypeType ImprovementRemarks
ADDING CONTINUOUS TURN LANEDOTD WILL PROVIDE THE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,300,000.00 2019STP<200K $2,640,000.00Construction $3,000,000.00
$3,300,000.00Total Cost $2,640,000.00$3,000,000.00
Project: H.013520 BARRINGER DRIVE SIDEWALKSTANGIPAHOA 0.00 0.00000-53 BARRINGER DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HAMMOND
Work TypeType ImprovementRemarks
SIDEWALKSCITY OF PONCHATOULA WILL PROVIDE MATCH., URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$247,500.00 2021STP<200K CITY OF PONCHATOULA$198,000.00Construction $225,000.00
$247,500.00Total Cost $198,000.00$225,000.00
Project: H.013938 LA 3234 UNIVERSITY AVE SIDEWALKSLA 3234 TANGIPAHOA 0.42 1.51853-40Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: HAMMOND
Work TypeType ImprovementRemarks
SIDEWALKSMATCH PROVIDED BY TANGIPAHOA PARISH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,430,000.00 2022STP<200K $1,144,000.00Construction $1,300,000.00
$1,430,000.00Total Cost $1,144,000.00$1,300,000.00
Project: H.014048 S TANGIPAHOA ROADS - PAVEMENT REHABTANGIPAHOA 0.00 0.00000-53 RUFUS BANKSTON RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
TANGIPAHOA 0.00 0.00000-53 WARDLINE RD
TANGIPAHOA 0.00 0.00000-53 SISTERS RD
TANGIPAHOA 0.00 0.00000-53 N BAPTIST RD
TANGIPAHOA 0.00 0.00000-53 HAPPYWOODS RD
Urbanized Area: HAMMOND
Work TypeType ImprovementRemarks
PAVEMENT REHABTANGIPAHOA PARISH TO PROVIDE MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,200,000.00 2021STP<200K $1,760,000.00Construction $2,000,000.00
$2,200,000.00Total Cost $1,760,000.00$2,000,000.00
Page 84 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
HAMMOND
Project: H.014340 E. MINNESOTA PARK RD AT RANGE RDTANGIPAHOA 0.00 0.00000-53 E MINNESOTA PARK AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
TANGIPAHOA 0.00 0.00000-53 S RANGE RD
Urbanized Area: HAMMOND
Work TypeType ImprovementRemarks
INTERSECTION IMPROVEMENTTANGIPAHOA PROVIDING MATCH, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$2,750,000.00 2022STP<200K $2,200,000.00Construction $2,500,000.00
$2,750,000.00Total Cost $2,200,000.00$2,500,000.00
Page 85 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.013859 GUILLORY AVE: UP RR XING (OBERLIN)ALLEN 0.00 0.00000-02 GUILLORY AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
INSTALL SIGNALSMATCH BY RAILROAD, RAILROADS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$313,600.00 2021STCASH $0.00Construction $245,000.00
$313,600.00Total Cost $0.00$245,000.00
Project: H.010007 LA 70: PIERRE PASS MB REHAB (HBI)LA 70 ASSUMPTION 16.62 16.65232-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
CLEANING & PAINTING, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$146,581.00 2018STPFLEX $117,264.80Design (Engineering) $146,581.00
$825,000.00 2021STPFLEX $660,000.00Construction $750,000.00
$1,121,581.00Total Cost $897,264.80$1,046,581.00
Project: H.010443 LA 308: CURVE REALIGN AND SHOULDERSLA 308 ASSUMPTION 0.00 5.62407-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 308 ASSUMPTION 0.00 0.52407-08
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
REALIGN CURVE AND ADD SHOULDERS, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$440,600.00 2018HSIPPEN $440,600.00Right of Way $440,600.00
$180,000.00 2018HSIP $162,000.00Utility Relocation $180,000.00
$355,000.00 2012HSIP $319,500.00Design (Engineering) $355,000.00
$2,328,577.31 2019STCASH $0.00Construction $2,116,888.46
$3,304,177.31Total Cost $922,100.00$3,092,488.46
Project: H.013251 LA 114: X-DRAIN REPLACE WEST OF HESSMERLA 114 AVOYELLES 7.07 7.14145-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
REPLACE EXISTING CROSS DRAIN, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$67,000.00 2020STPFLEX $53,600.00Right of Way $67,000.00
$90,000.00 2020STPFLEX $72,000.00Utility Relocation $90,000.00
$448,800.00 2020STPFLEX $359,040.00Construction $408,000.00
$605,800.00Total Cost $484,640.00$565,000.00
Page 86 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.003184 I-10: TEXAS STATE LINE-E. OF COONE GULLYI-10 CALCASIEU 0.00 10.49450-91Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-10 CALCASIEU 0.93 0.99450-01
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
WIDEN TO 6 LANES450-91-0078, CORRIDOR,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$14,100.00 2014NHPP $11,280.00Environmental $14,100.00
$1,012,642.00 2014NHPP $911,377.80Design (Engineering) $1,012,642.00
$173,940,884.70 2020STCASH $0.00Construction $158,128,077.00
$174,967,626.70Total Cost $922,657.80$159,154,819.00
Project: H.001557 LA 4: BANKS SPRINGS - JCT. US 165LA 4 CALDWELL 18.21 19.70068-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
WIDENING & OVERLAY068-04-0030, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$380,000.00 2018HSIPPEN $380,000.00Right of Way $380,000.00
$81,000.00 2019HSIPPEN $81,000.00Utility Relocation $81,000.00
$169,057.00 2014HSIP $152,151.30Design (Engineering) $169,057.00
$1,540,000.00 2019HSIPPEN $1,540,000.00Construction $1,400,000.00
$2,170,057.00Total Cost $2,153,151.30$2,030,057.00
Project: H.013011 DIST58: ABC BR REPLACE CALDWELL PARISHLA 126 CALDWELL 3.72 5.57041-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 4 CALDWELL 1.84 4.20068-04
LA 127 CALDWELL 1.68 1.97127-04
LA 506 CALDWELL 7.20 7.30345-03
LA 506 CALDWELL 2.81 3.71345-04
LA 850 CALDWELL 0.70 0.75811-02
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$345,000.00 2021NFA $0.00Design (Engineering) $345,000.00
$800,000.00 2021STPFLEX $640,000.00$800,000.00
$1,145,000.00Total Cost $640,000.00$1,145,000.00
Page 87 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.009470 LA 82: SUPERIOR CANAL BRIDGE (HBI)LA 82 CAMERON 20.91 21.29194-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT - MOVEABLE BRIDGE, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$25,000.00 2019STPFLEX $20,000.00Feasibility $25,000.00
$25,000.00Total Cost $20,000.00$25,000.00
Project: H.012044 LA 384: ICWW MB REHAB (GRAND LAKE)(HBI)LA 384 CAMERON 0.00 0.20195-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.014288 LA 82:MERMENTAU MB REHAB(G CHENIER)(HBI)LA 82 CAMERON 0.00 0.30194-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
BRIDGE REHABILITATION / STRENGTHENINGHISTORIC BRIDGE IMPROVEMENT (HBI), PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$65,000.00 2020STPFLEX $52,000.00Design (Engineering) $65,000.00
$1,100,000.00 2021STPFLEX $880,000.00Construction $1,000,000.00
$1,165,000.00Total Cost $932,000.00$1,065,000.00
Project: H.013006 DIST58:ABC BR REPL CA,CO,FR,TN,LA PARISHLA 124 CATAHOULA 0.59 2.13143-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 126 CATAHOULA 2.13 2.80353-03
LA 568 CONCORDIA 7.95 8.05075-01
LA 135 FRANKLIN 6.20 6.30167-01
LA 577 FRANKLIN 2.00 2.05344-01
LA 605 TENSAS 9.30 9.40020-30
LA 569 TENSAS 0.00 0.05176-03
LA 772 LASALLE 1.00 1.10039-01
LA 127 LASALLE 1.00 1.05149-05
LA 778 LASALLE 1.70 1.80830-05
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$245,000.00 2021NFA $0.00Design (Engineering) $245,000.00
$905,000.00 2021STPFLEX $724,000.00$905,000.00
$1,150,000.00Total Cost $724,000.00$1,150,000.00
Page 88 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.006187 LA 15 @ DEER PARK (S OF LA 565 - LEVEE)LA 15 CONCORDIA 17.99 18.33177-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
LA 15 AT DEER PARK REALIGNMENT177-04-0033, SAFETY,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$58,000.00 2018HSIPPEN $58,000.00Environmental $58,000.00
$30,000.00 2018HSIPPEN $30,000.00Right of Way $30,000.00
$275,000.00 2018HSIPPEN $275,000.00Utility Relocation $275,000.00
$88,000.00 2019HSIPPEN $88,000.00Construction $80,000.00
$1,562,000.00 2019STCASH $0.00$1,420,000.00
$2,013,000.00Total Cost $451,000.00$1,863,000.00
Project: H.012910 DIST08:ABC BR REP GRAN, NATCH, WINN PARSUS 167 GRANT 14.30 14.40023-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 472 GRANT 5.02 7.90365-01
LA 119 NATCHITOCHES 0.20 0.35118-02
LA 1226 NATCHITOCHES 3.20 3.30359-01
LA 126 WINN 2.60 2.70091-07
LA 124 WINN 2.80 8.85125-01
LA 499 WINN 10.05 10.15126-02
LA 505 WINN 1.70 1.80321-02
LA 1229 WINN 0.86 1.76864-13
LA 1234 WINN 1.00 2.60864-14
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$675,000.00 2021NFA $0.00Design (Engineering) $675,000.00
$96,000.00 2021NHPP $76,800.00$96,000.00
$450,000.00 2021STPFLEX $360,000.00$450,000.00
$1,221,000.00Total Cost $436,800.00$1,221,000.00
Project: H.010155 US 90: RAIL SPUR REMOVAL SE OF LA 85US 90 IBERIA 17.71 18.33424-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
ROADWAY RECONSTRUCTION NO ADDED CAPACITYSTBONDS AND I-49 SOUTH UNCLAIMED
PROPERTY FUNDS AS MATCH,
RAILROADS, GRADE SEPARATION
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$18,000.00 2021STBONDS $0.00Right of Way $18,000.00
$13,000,000.00 2021STP<5K $13,000,000.00$13,000,000.00
$700,000.00 2019STP<5K $560,000.00Design (Engineering) $700,000.00
$507,650.00 2022DEMO $406,120.00Construction $461,500.00
$25,300,000.00 2022STP<5K $24,706,000.00$23,000,000.00
$39,525,650.00Total Cost $38,672,120.00$37,179,500.00
Page 89 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.011026 LA 182 WB: LASALLE ST. - VINE ST.LA 182 IBERIA 4.80 5.10004-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
DRAINAGE STRUCTURE REMOVAL AND REPLACEMENT,
ROADWAY WORK
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$1,100,000.00 2022STPFLEX $880,000.00Construction $1,000,000.00
$1,100,000.00Total Cost $880,000.00$1,000,000.00
Project: H.014191 LA 3195: BAYOU TECHE MB RH (NELSON)LA 3195 IBERIA 0.00 0.30823-44Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
FEASIBILITY STUDY OF MOVABLE BRIDGE REHAB, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.012588 I-10: ATCH BASIN BR - W BATON ROUGE P/LI-10 IBERVILLE 8.54 14.81450-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
GRADE RAISING, PRESERVATION, INTERSTATE
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$225,000.00 2020NHPP $202,500.00Design (Engineering) $225,000.00
$21,505,000.00 2021NHPP $19,354,500.00Construction $19,550,000.00
$21,730,000.00Total Cost $19,557,000.00$19,775,000.00
Project: H.013243 BYU PIGEON PONTOON BR ELEC WINCHES (HBI)LA 997 IBERVILLE 9.55 9.61230-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
MOVABLE BRIDGE MACHINERY REPAIRSUSE NFA AS MATCH, HISTORIC BRIDGE
IMPROVEMENT (HBI)
OPER EFFICIENCY/MOTORIST ASSISTANCE, MOVABLE
BRIDGE REHABILITATION
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$550,000.00 2022STPFLEX $440,000.00Construction $500,000.00
$550,000.00Total Cost $440,000.00$500,000.00
Page 90 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.012740 I-20: REPLACE FIVE OVERPASSES (LINCOLN)I-20 LINCOLN 1.80 2.00451-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
I-20 LINCOLN 17.75 17.80451-05
I-20 LINCOLN 19.00 19.20451-05
I-20 LINCOLN 4.60 4.80451-05
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENTS, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$750,000.00 2021NHPP $675,000.00Design (Engineering) $750,000.00
$750,000.00Total Cost $675,000.00$750,000.00
Project: H.014354 N MONROE ST: S SERVICE RD W - W PARK AVELINCOLN 0.00 0.00000-31 N MONROE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
REALIGNMENT/SIDEWALKS/MULTIUSE PATHCITY OF RUSTON TO PROVIDE MATCH, CITY OF
RUSTON BUILD GRANT
OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$6,022,500.00 2021EARMARK $4,818,000.00Construction $5,475,000.00
$6,022,500.00Total Cost $4,818,000.00$5,475,000.00
Project: H.014355 S MONROE ST, W TEX, W LA & OIL MILL STLINCOLN 0.00 0.00000-31 S MONROE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LINCOLN 0.00 0.00000-31 W TEXAS AVE
LINCOLN 0.00 0.00000-31 W LOUISIANA AVE
LINCOLN 0.00 0.00000-31 OILMILL ST
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
PAVEMENT PRESERVATION/SIDEWALKS/MULTIUSE PATHCITY OF RUSTON TO PROVIDE MATCH, CITY OF
RUSTON BUILD GRANT
OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$6,292,000.00 2021EARMARK $5,033,600.00Construction $5,720,000.00
$6,292,000.00Total Cost $5,033,600.00$5,720,000.00
Project: H.014356 LOUISIANA TECH RR MULTI-USE PATHLINCOLN 0.00 0.00000-31 W RAILROAD AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LINCOLN 0.00 0.00000-31 PORTIONS OF THE PATH NOT ALONG
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
MULTIUSE PATHCITY OF RUSTON TO PROVIDE MATCH, CITY OF
RUSTON BUILD GRANT
OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,960,000.00 2021EARMARK $3,168,000.00Construction $3,600,000.00
$3,960,000.00Total Cost $3,168,000.00$3,600,000.00
Page 91 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.014357 DAN RENEAU DR, S HOMER ST & W MISS AVELINCOLN 0.00 0.00000-31 W MISSISSIPPI AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LINCOLN 0.00 0.00000-31 S HOMER ST
LINCOLN 0.00 0.00000-31 DAN RENEAU DR
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
PAVEMENT PRESERVATION/SIDEWALKS/BIKE LANESCITY OF RUSTON TO PROVIDE MATCH, CITY OF
RUSTON BUILD GRANT
OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$6,099,500.00 2021EARMARK $4,879,600.00Construction $5,545,000.00
$6,099,500.00Total Cost $4,879,600.00$5,545,000.00
Project: H.011446 MOUND REST AREA RENOVATIONSMADISON 0.00 0.00000-33 I-20Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
REST AREA RENOVATION, OPER EFFICIENCY/MOTORIST ASSISTANCE, REST
AREAS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$500,000.00 2021NHPP $450,000.00Utility Relocation $500,000.00
$440,000.00 2021NHPP $396,000.00Design (Engineering) $440,000.00
$9,900,000.00 2021NHPP $8,910,000.00Construction $9,000,000.00
$10,840,000.00Total Cost $9,756,000.00$9,940,000.00
Project: H.012739 I-20 MRB AT VICKSBURG OVERLAY AND REHABI-20 MADISON 0.00 2.09451-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
BRIDGE REHABILITATION, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$500,000.00 2017NHPP $450,000.00Design (Engineering) $500,000.00
$500,000.00 2017OTHER $450,000.00$500,000.00
$23,650,000.00 2019NHPP $21,285,000.00Construction $21,500,000.00
$23,650,000.00 2019OTHER $0.00$21,500,000.00
$48,300,000.00Total Cost $22,185,000.00$44,000,000.00
Project: H.011613 US 425: DRAINAGE IMPROV AT EAST PINE AVEUS 425 MOREHOUSE 0.09 0.16038-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
SUBSURFACE DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$320,000.00 2020NHPP $256,000.00Construction $320,000.00
$320,000.00Total Cost $256,000.00$320,000.00
Page 92 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.001271 CANE RIVER BRIDGE AT CHURCH STREETLA 1-X NATCHITOCHES 14.63 14.66053-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT053-04-0031;STAGE 0, CK POST ENVIRON DATES PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$16,586.00 2014STPFLEX $13,268.80Feasibility $16,586.00
$954,521.00 2014NHPP $763,616.80Environmental $954,521.00
$36,000.00 2022NHPP $28,800.00Right of Way $36,000.00
$125,000.00 2022NHPP $100,000.00Utility Relocation $125,000.00
$15,000.00 2014NHPP $12,000.00Design (Engineering) $15,000.00
$1,147,107.00Total Cost $917,685.60$1,147,107.00
Project: H.011615 LA 151: DRAINAGE IMPROV 0.02 MI N US 80LA 151 OUACHITA 0.02 0.04317-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
REMOVE AND REPLACE THE EXISTING DRAINAGE
STRUCTURE
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$66,000.00 2019STPFLEX $52,800.00Construction $60,000.00
$66,000.00Total Cost $52,800.00$60,000.00
Project: H.012063 LA 15: OLD RIVER NAV CANAL MB RH (HBI)LA 15 POINTE COUPEE 5.80 6.20177-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.014454 LA 15: BOEUF RIVER BRIDGE REPL (HBI)LA 15 RICHLAND 6.81 7.53026-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT (HBI), PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$27,000.00 2021STPFLEX $21,600.00Design (Engineering) $27,000.00
$6,270,000.00 2021STPFLEX $5,016,000.00Construction $5,700,000.00
$6,297,000.00Total Cost $5,037,600.00$5,727,000.00
Page 93 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.014195 LYDDY TURNPIKE: KCS RR XING (FISHER)SABINE 0.00 0.00000-43 LYDDY TPKERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
INSTALL GATESMATCH FROM PARISH AND RAILROAD, RAILROADS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$487,500.00 2020STCASH $0.00Construction $390,000.00
$487,500.00Total Cost $0.00$390,000.00
Project: H.014141 LA 43: DRAINAGE IMPROVEMENTSLA 43 ST HELENA 0.50 1.00254-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
ADDITION OF CROSS DRAIN AND UPSIZING CULVERTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$82,500.00 2021STPFLEX $66,000.00Construction $75,000.00
$82,500.00Total Cost $66,000.00$75,000.00
Project: H.012066 LA 3213: GRAMERCY BRIDGE REHABILITATIONLA 3213 ST JAMES 0.00 0.57434-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
MAJOR BRIDGE REHABILITATION, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$315,500.00 2021STPFLEX $252,400.00Feasibility $315,500.00
$33,000,000.00 2023STPFLEX $26,400,000.00Construction $30,000,000.00
$500,000.00 2022STPFLEX $400,000.00Design (Engineering) $500,000.00
$33,815,500.00Total Cost $27,052,400.00$30,815,500.00
Project: H.014140 I-55 SERVICE ROAD: GRADE RAISINGI-55 ST JOHN 1.20 7.50452-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
GRADE RAISING TO PREVENT CONSTANT SUBMERSION OF
ROADWAY
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$4,180,000.00 2020STP<5K $3,344,000.00Construction $3,800,000.00
$4,180,000.00Total Cost $3,344,000.00$3,800,000.00
Page 94 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.000445 US 190: UPRR OVERPASS NEAR OPELOUSASUS 190 ST LANDRY 1.30 1.64012-13Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 190 ST LANDRY 4.30 4.65012-13
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
BRIDGE REHAB.REDECK & MAYBE WIDEN012-13-0101, WESTBOUND STRUCTURE
REPLACED,EASTBOUND STRUCTURE REHAB
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$207,000.00 2018NHPP $165,600.00Feasibility $207,000.00
$10,000.00 2018NHPP $8,000.00Utility Relocation $10,000.00
$30,690,000.00 2022NHPP $24,552,000.00Construction $27,900,000.00
$30,907,000.00Total Cost $24,725,600.00$28,117,000.00
Project: H.011549 US 190 EB: DRAINAGE IMPROVEMENTSUS 190 ST LANDRY 3.80 4.00012-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
REMOVE BASE & SURFACING, RECONSTRUCT AT HIGHER
ELEV
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$880,000.00 2022STPFLEX $704,000.00Construction $800,000.00
$880,000.00Total Cost $704,000.00$800,000.00
Project: H.013198 US 190 EB & WB: WALLIOR ST - LA 742US 190 ST LANDRY 1.22 6.80012-13Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 190 ST LANDRY 0.58 1.22012-13
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
MILL, PATCH, OVERLAY, AND TURNLANE ADDITIONS, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$13,145,000.00 2020NHPP $10,516,000.00Construction $11,950,000.00
$13,145,000.00Total Cost $10,516,000.00$11,950,000.00
Project: H.014378 LA 70: 7.90 MI S LA 997-8.83 MI S LA 997LA 70 ST MARTIN 13.19 14.28230-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
RAISE ROADWAY ELEVATION TO MITIGATE FLOODING, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$660,000.00 2021STPFLEX $528,000.00Construction $600,000.00
$660,000.00Total Cost $528,000.00$600,000.00
Page 95 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.011487 LA 182: BERWICK BAY BRIDGE REHAB (HBI)LA 182 ST MARY 0.00 0.71005-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRS, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$500,000.00 2018STPFLEX $400,000.00Design (Engineering) $500,000.00
$16,500,000.00 2021STPFLEX $13,200,000.00Construction $15,000,000.00
$17,000,000.00Total Cost $13,600,000.00$15,500,000.00
Project: H.011494 US 90: ATCHAFALAYA RIVER BRIDGE REHABUS 90 ST MARY 32.70 33.05424-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRS, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$500,000.00 2017NHPP $400,000.00Design (Engineering) $500,000.00
$31,900,000.00 2018NHPP $25,520,000.00Construction $29,000,000.00
$32,400,000.00Total Cost $25,920,000.00$29,500,000.00
Project: H.014280 US 90: BAYOU RAMOS REHAB. PHASE IIIUS 90 ST MARY 36.00 38.00424-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
STRENGTHENING DEFICIENT SUPERSTRUCTURE/GIRDERS, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$400,000.00 2021NHPP $320,000.00Design (Engineering) $400,000.00
$400,000.00Total Cost $320,000.00$400,000.00
Project: H.011997 LA 14X:VRMLN R MB RH(OLD ABBEVILLE)(HBI)LA 14-X VERMILION 0.00 0.30055-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021NHPP $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Page 96 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.011998 LA 14: VRMLN R MB RH(ABBEVILLE BYP)(HBI)LA 14 VERMILION 1.00 1.50055-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021NHPP $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.012000 LA 82:OLD ICC MB RH(LITTLE PRAIRIE)(HBI)LA 82 VERMILION 6.50 6.80207-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.012003 LA 330: BAYOU TIGRE MB REHAB (HBI)LA 330 VERMILION 4.20 4.40397-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2019STPFLEX $120,000.00Feasibility $150,000.00
$150,000.00Total Cost $120,000.00$150,000.00
Project: H.014465 LA 82: VERMILION RIVER MB RH(PERRY)(HBI)LA 82 VERMILION 7.40 7.70194-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
MOVABLE BRIDGE REHABILITATIONHISTORIC BRIDGE IMPROVEMENT (HBI), PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$250,000.00 2021STPFLEX $200,000.00Design (Engineering) $250,000.00
$10,026,500.00 2022STPFLEX $8,021,200.00Construction $9,115,000.00
$10,276,500.00Total Cost $8,221,200.00$9,365,000.00
Page 97 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.014143 LA 121: CROSS DRAIN REPLACE LM 10.1LA 121 VERNON 10.03 10.11029-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
REPLACE EXISTING UNDERSIZED CROSS DRAIN, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$269,500.00 2022STPFLEX $215,600.00Construction $245,000.00
$269,500.00Total Cost $215,600.00$245,000.00
Project: H.012159 LA 430: LA 25 - LA 1069 DRAINAGELA 430 WASHINGTON 0.00 0.18859-26Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR
ASPHALT
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$275,000.00 2022STPFLEX $220,000.00Construction $250,000.00
$275,000.00Total Cost $220,000.00$250,000.00
Project: H.013928 BOGUE CHITTO SP MOUNTAIN BIKE TRAILWASHINGTON 0.00 0.00000-59 BOGUE CHITTO STATE PARKRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
CONST. OF 17 MILES OF MOUNTAIN BIKE TRAILSNORTHSHORE OFF ROAD BICYCLING ASSC.
WILL PROVIDE LOCAL MATCH, DCRT IS THE
PROJECT MANAGER
RECREATIONAL TRAILS PROGRAM,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$180,000.00 2021LOCAL NORTHSHORE OFF ROAD BICYCLING ASS.$0.00Construction $150,000.00
$24,000.00 2021RTP NORTHSHORE OFF ROAD BICYCLING ASS.$19,200.00$20,000.00
$204,000.00Total Cost $19,200.00$170,000.00
Project: H.001799 LA 531 OVERPASSI-20 WEBSTER 11.60 12.00451-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 531 WEBSTER 3.10 3.27111-02
LA 531 WEBSTER 3.27 3.50111-02
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENT451-03-0047;GEOM. STUDY UNDERWAY (E), PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$222,000.00 2021STPFLEX $192,600.00Utility Relocation $222,000.00
$495,000.00 2022NHPP $495,000.00Construction $450,000.00
$5,005,000.00 2022STPFLEX $4,103,000.00$4,550,000.00
$5,722,000.00Total Cost $4,790,600.00$5,222,000.00
Page 98 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.009513 LA 164: JCT. LA 163 TO JCT. US 371LA 164 WEBSTER 0.00 6.74122-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING &
RELATED WORK
, PRESERVATION, NON-INTERSTATE ON STP SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$3,520,000.00 2020STP<5K $2,816,000.00Construction $3,200,000.00
$3,520,000.00Total Cost $2,816,000.00$3,200,000.00
Project: H.012030 US371: KCS RR OVERPASSES HBIUS 371 WEBSTER 9.40 9.70027-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
LA 159 WEBSTER 13.10 13.40027-03
Urbanized Area: SMALL URBAN AREA
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENTS/REHABILITATION, STR. 019040 AND 018970 HISTORIC BRIDGE
IMPROVEMENT (HBI)
PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$175,000.00 2020STP<200K-E $140,000.00Design (Engineering) $175,000.00
$175,000.00Total Cost $140,000.00$175,000.00
Project: H.014236 LA 3008: BRIDGES NEAR COTTON VALLEYLA 3008 WEBSTER 0.12 7.25288-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
BRIDGE REPLACEMENTAC, USE NFA AS MATCH, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$400,000.00 2022FBROFF $320,000.00Design (Engineering) $400,000.00
$400,000.00Total Cost $320,000.00$400,000.00
Project: H.014146 US 190: HIGDON LN - 0.5 MI W OF LA 978US 190 W BATON ROUGE 11.01 13.19008-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
US 190 POINTE COUPEE 0.00 5.21008-02
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
MILL, STABILIZE BASE & SHOULDERS, ASPHALT OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$15,950,000.00 2021NHPP $12,760,000.00Construction $14,500,000.00
$15,950,000.00Total Cost $12,760,000.00$14,500,000.00
Page 99 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
NOT IN MPO AREA
Project: H.012780 LA 2: DRAINAGE IMPROVEMENTSLA 2 W CARROLL 0.20 0.30037-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
DRAINAGE IMPROVEMENT, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$343,895.86 2022STPFLEX $275,116.69Construction $312,632.60
$343,895.86Total Cost $275,116.69$312,632.60
Project: H.012157 LA 1228:CROSS DRAIN REPLACEMENT (WINN)LA 1228 WINN 1.66 1.90864-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: NA RURAL
Work TypeType ImprovementRemarks
REPLACE CROSS DRAINS AND RAISE ROADWAY TO
PREVENT FLOODING
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY
FLOODING
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$60,000.00 2020STPFLEX $48,000.00Environmental $60,000.00
$42,000.00 2020STPFLEX $33,600.00Right of Way $42,000.00
$5,000.00 2021STPFLEX $4,000.00Utility Relocation $5,000.00
$1,320,000.00 2021STPFLEX $1,056,000.00Construction $1,200,000.00
$1,427,000.00Total Cost $1,141,600.00$1,307,000.00
Page 100 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000038 PLANNING, TRAINING AND RESEARCH 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Work TypeType ImprovementRemarks
HANDLED THROUGH OPERATING BUDGET, OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$0.00 2019CM $0.00Feasibility $0.00
$20,000.00 2019DEMO $16,000.00$20,000.00
$2,000,000.00 2019HSIPPEN $2,000,000.00$2,000,000.00
$50,000.00 2019LOCAL $0.00$50,000.00
$400,000.00 2019LTAP $200,000.00$400,000.00
$4,000,000.00 2019SPR MAND $3,200,000.00$4,000,000.00
$24,250,000.00 2019SPR OPT $19,400,000.00$24,250,000.00
$10,000,000.00 2019STCASH $0.00$10,000,000.00
$630,000.00 2019STP<200K $504,000.00$630,000.00
$15,500,000.00 2019STP<5K $12,400,000.00$15,500,000.00
$500,000.00 2019STP>200K $400,000.00$500,000.00
$50,000.00 2020CM $50,000.00$50,000.00
$1,500,000.00 2020HSIPPEN $1,500,000.00$1,500,000.00
$400,000.00 2020LTAP $200,000.00$400,000.00
$3,000,000.00 2020SPR MAND $2,400,000.00$3,000,000.00
$21,000,000.00 2020SPR OPT $16,800,000.00$21,000,000.00
$400,000.00 2020STCASH $0.00$400,000.00
$900,000.00 2020STP<200K $720,000.00$900,000.00
$15,000,000.00 2020STP<5K $12,000,000.00$15,000,000.00
$900,000.00 2020STP>200K $720,000.00$900,000.00
$50,000.00 2020STPFLEX $50,000.00$50,000.00
$7,500,000.00 2021CM $7,500,000.00$7,500,000.00
$60,000.00 2021DEMO $48,000.00$60,000.00
$1,000,000.00 2021HSIPPEN $1,000,000.00$1,000,000.00
$400,000.00 2021LTAP $200,000.00$400,000.00
$7,000,000.00 2021SPR MAND $5,600,000.00$7,000,000.00
$19,000,000.00 2021SPR OPT $15,200,000.00$19,000,000.00
$800,000.00 2021STCASH $0.00$800,000.00
$400,000.00 2021STP<200K $320,000.00$400,000.00
$6,500,000.00 2021STP<5K $5,200,000.00$6,500,000.00
$440,000.00 2021STP>200K $352,000.00$440,000.00
$450,000.00 2021STPFLEX-E $450,000.00$450,000.00
$50,000.00 2021TCP $50,000.00$50,000.00
$6,500,000.00 2022HSIPPEN $6,500,000.00$6,500,000.00
$400,000.00 2022LTAP $200,000.00$400,000.00
$9,000,000.00 2022NHPP $9,000,000.00$9,000,000.00
$7,000,000.00 2022SPR MAND $5,600,000.00$7,000,000.00
$19,000,000.00 2022SPR OPT $15,200,000.00$19,000,000.00
$400,000.00 2022STCASH $0.00$400,000.00
$400,000.00 2022STP<200K $320,000.00$400,000.00
$500,000.00 2022STP>200K $400,000.00$500,000.00
$187,350,000.00Total Cost $145,700,000.00$187,350,000.00
Page 101 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000039 ACCELERATED LOADING FACILITY 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Work TypeType ImprovementRemarks
CONSTRUCT TEST SECTIONS, OTHER / MISCELLANEOUS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$55,000.00 2019STPFLEX $44,000.00Construction $50,000.00
$55,000.00 2020STPFLEX $44,000.00$50,000.00
$55,000.00 2021STPFLEX $44,000.00$50,000.00
$55,000.00 2022STPFLEX $44,000.00$50,000.00
$220,000.00Total Cost $176,000.00$200,000.00
Project: L.000040 FEDERAL BRIDGE INSPECTION PROGRAMS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Work TypeType ImprovementRemarks
INSPECTIONS, RATINGS, LOAD FACTORS, PRESERVATION, BRIDGE (ON SYSTEM)
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$6,000,000.00 2019STPFLEX $4,800,000.00Feasibility $6,000,000.00
$200,000.00 2020DEMO $200,000.00$200,000.00
$300,000.00 2020NHPP $270,000.00$300,000.00
$4,500,000.00 2020STPFLEX $3,600,000.00$4,500,000.00
$1,000,000.00 2021FBROFF $800,000.00$1,000,000.00
$4,000,000.00 2021STPFLEX $3,200,000.00$4,000,000.00
$5,000,000.00 2022STPFLEX $4,000,000.00$5,000,000.00
$100,000.00 2019STPFLEX $80,000.00Design (Engineering) $100,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$550,000.00 2019STPFLEX $440,000.00Construction $500,000.00
$110,000.00 2020STPFLEX $88,000.00$100,000.00
$110,000.00 2021STPFLEX $88,000.00$100,000.00
$110,000.00 2022STPFLEX $88,000.00$100,000.00
$22,180,000.00Total Cost $17,814,000.00$22,100,000.00
Page 102 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000046 MISC STP ENHANCEMENT PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2020TAP<200K $40,000.00Design (Engineering) $50,000.00
$50,000.00 2020TAP<5K $40,000.00$50,000.00
$500,000.00 2020TAP>200K $400,000.00$500,000.00
$50,000.00 2020TAPFLEX $40,000.00$50,000.00
$50,000.00 2021TAP<200K $40,000.00$50,000.00
$50,000.00 2021TAP<5K $40,000.00$50,000.00
$50,000.00 2021TAP>200K $40,000.00$50,000.00
$50,000.00 2021TAPFLEX $40,000.00$50,000.00
$50,000.00 2022TAP<200K $40,000.00$50,000.00
$50,000.00 2022TAP<5K $40,000.00$50,000.00
$50,000.00 2022TAP>200K $40,000.00$50,000.00
$50,000.00 2022TAPFLEX $40,000.00$50,000.00
$550,000.00 2019LOCAL $0.00Construction $500,000.00
$1,650,000.00 2019STCASH $0.00$1,500,000.00
$550,000.00 2019TAP<200K $522,500.00$500,000.00
$1,100,000.00 2019TAP<5K $1,045,000.00$1,000,000.00
$825,000.00 2019TAP>200K $783,750.00$750,000.00
$1,100,000.00 2019TAPFLEX $1,045,000.00$1,000,000.00
$1,100,000.00 2020LOCAL $0.00$1,000,000.00
$3,300,000.00 2020STPENH $3,135,000.00$3,000,000.00
$550,000.00 2020TAP<200K $440,000.00$500,000.00
$550,000.00 2020TAP<5K $440,000.00$500,000.00
$4,400,000.00 2020TAP>200K $3,520,000.00$4,000,000.00
$1,100,000.00 2020TAPFLEX $880,000.00$1,000,000.00
$110,000.00 2021LOCAL $0.00$100,000.00
$1,650,000.00 2021STCASH $0.00$1,500,000.00
$385,000.00 2021STPENH $365,750.00$350,000.00
$2,200,000.00 2021TAP<200K $1,760,000.00$2,000,000.00
$1,430,000.00 2021TAP<5K $1,144,000.00$1,300,000.00
$4,400,000.00 2021TAP>200K $3,520,000.00$4,000,000.00
$1,650,000.00 2021TAPFLEX $1,320,000.00$1,500,000.00
$550,000.00 2022LOCAL $0.00$500,000.00
$330,000.00 2022STPFLEX $264,000.00$300,000.00
$4,400,000.00 2022TAP<200K $3,520,000.00$4,000,000.00
$2,750,000.00 2022TAP<5K $2,200,000.00$2,500,000.00
$3,300,000.00 2022TAP>200K $2,640,000.00$3,000,000.00
$770,000.00 2022TAPFLEX $616,000.00$700,000.00
$41,750,000.00Total Cost $30,001,000.00$38,050,000.00
Page 103 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000047 MISC NATIONAL TRAILS PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$150,000.00 2019RTP $120,000.00Feasibility $150,000.00
$240,000.00 2020RTP $192,000.00$240,000.00
$150,000.00 2021RTP $120,000.00$150,000.00
$150,000.00 2022RTP $120,000.00$150,000.00
$25,000.00 2019RTP $20,000.00Design (Engineering) $25,000.00
$25,000.00 2020RTP $20,000.00$25,000.00
$25,000.00 2021RTP $20,000.00$25,000.00
$25,000.00 2022RTP $20,000.00$25,000.00
$825,000.00 2019LOCAL $0.00Construction $750,000.00
$1,650,000.00 2019RTP $1,320,000.00$1,500,000.00
$660,000.00 2020LOCAL $0.00$600,000.00
$1,650,000.00 2020RTP $1,320,000.00$1,500,000.00
$550,000.00 2021LOCAL $0.00$500,000.00
$2,310,000.00 2021RTP $1,848,000.00$2,100,000.00
$550,000.00 2022LOCAL $0.00$500,000.00
$1,650,000.00 2022RTP $1,320,000.00$1,500,000.00
$10,635,000.00Total Cost $6,440,000.00$9,740,000.00
Project: L.000048 SCENIC BYWAYS OF LA 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$350,000.00 2019NSB $280,000.00Feasibility $350,000.00
$350,000.00 2020NSB $280,000.00$350,000.00
$350,000.00 2021NSB $280,000.00$350,000.00
$350,000.00 2022NSB $280,000.00$350,000.00
$350,000.00 2019NSB $280,000.00Design (Engineering) $350,000.00
$1,200,000.00 2019STCASH $0.00$1,200,000.00
$350,000.00 2020NSB $280,000.00$350,000.00
$350,000.00 2021NSB $280,000.00$350,000.00
$350,000.00 2022NSB $280,000.00$350,000.00
$1,100,000.00 2019LOCAL $0.00Construction $1,000,000.00
$275,000.00 2019NSB $275,000.00$250,000.00
$1,100,000.00 2019STCASH $0.00$1,000,000.00
$275,000.00 2019STPFLEX $275,000.00$250,000.00
$495,000.00 2020NSB $396,000.00$450,000.00
$495,000.00 2021NSB $396,000.00$450,000.00
$495,000.00 2022NSB $396,000.00$450,000.00
$8,235,000.00Total Cost $3,978,000.00$7,850,000.00
Page 104 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000049 INDIAN RESERVATION ROADS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$20,000.00 2019FLH $16,000.00Design (Engineering) $20,000.00
$20,000.00 2020FLH $16,000.00$20,000.00
$20,000.00 2021FLH $16,000.00$20,000.00
$20,000.00 2022FLH $16,000.00$20,000.00
$440,000.00 2019FLH $352,000.00Construction $400,000.00
$440,000.00 2020FLH $352,000.00$400,000.00
$440,000.00 2021FLH $352,000.00$400,000.00
$440,000.00 2022FLH $352,000.00$400,000.00
$1,840,000.00Total Cost $1,472,000.00$1,680,000.00
Project: L.000050 LA PUBLIC LANDS HIGHWAY PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$275,000.00 2019FLH $220,000.00Construction $250,000.00
$4,400,000.00 2020FLH $3,520,000.00$4,000,000.00
$1,100,000.00 2020STP<5K $880,000.00$1,000,000.00
$5,500,000.00 2021FLH $4,400,000.00$5,000,000.00
$5,500,000.00 2022FLH $4,400,000.00$5,000,000.00
$16,775,000.00Total Cost $13,420,000.00$15,250,000.00
Project: L.000051 OVERLAY OR SURFACE REPAIR ON INTERSTATE 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2019NHPP $45,000.00Environmental $50,000.00
$50,000.00 2020NHPP $45,000.00$50,000.00
$50,000.00 2021NHPP $45,000.00$50,000.00
$50,000.00 2022NHPP $45,000.00$50,000.00
$1,000,000.00 2019NHPP $900,000.00Design (Engineering) $1,000,000.00
$1,000,000.00 2020NHPP $900,000.00$1,000,000.00
$1,000,000.00 2021NHPP $900,000.00$1,000,000.00
$1,000,000.00 2022NHPP $900,000.00$1,000,000.00
$275,000.00 2019IM $247,500.00Construction $250,000.00
$11,000,000.00 2019NHPP $9,900,000.00$10,000,000.00
$275,000.00 2019STP<5K $247,500.00$250,000.00
$275,000.00 2019STP>200K $247,500.00$250,000.00
$825,000.00 2019STPFLEX $660,000.00$750,000.00
$550,000.00 2020DEMO $440,000.00$500,000.00
$16,940,000.00 2020NHPP $15,246,000.00$15,400,000.00
$1,650,000.00 2020STPFLEX $1,485,000.00$1,500,000.00
$33,000,000.00 2021NHPP $29,700,000.00$30,000,000.00
$33,000,000.00 2022NHPP $29,700,000.00$30,000,000.00
$101,990,000.00Total Cost $91,653,500.00$93,100,000.00
Page 105 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000053 STATEWIDE OVERLAY PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2019STPFLEX $40,000.00Environmental $50,000.00
$125,000.00 2020NHPP $100,000.00$125,000.00
$25,000.00 2020STPFLEX $20,000.00$25,000.00
$50,000.00 2021STPFLEX $40,000.00$50,000.00
$50,000.00 2022STPFLEX $40,000.00$50,000.00
$100,000.00 2019STPFLEX $80,000.00Right of Way $100,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$1,125,000.00 2019NHPP $1,000,000.00Utility Relocation $1,125,000.00
$475,000.00 2019STPFLEX $460,000.00$475,000.00
$500,000.00 2020LOCAL $0.00$500,000.00
$800,000.00 2020NHPP $640,000.00$800,000.00
$500,000.00 2020STPFLEX $400,000.00$500,000.00
$200,000.00 2021LOCAL $0.00$200,000.00
$350,000.00 2021NHPP $280,000.00$350,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$800,000.00 2022STPFLEX $640,000.00$800,000.00
$150,000.00 2019NHPP $120,000.00Design (Engineering) $150,000.00
$150,000.00 2019STPFLEX $120,000.00$150,000.00
$150,000.00 2020NHPP $120,000.00$150,000.00
$150,000.00 2020STPFLEX $120,000.00$150,000.00
$100,000.00 2021DEMO $80,000.00$100,000.00
$150,000.00 2021NHPP $120,000.00$150,000.00
$150,000.00 2021STPFLEX $120,000.00$150,000.00
$150,000.00 2022NHPP $120,000.00$150,000.00
$150,000.00 2022STPFLEX $120,000.00$150,000.00
$550,000.00 21HSIPPEN $550,000.00Construction $500,000.00
$3,300,000.00 2019HRRR $2,970,000.00$3,000,000.00
$275,000.00 2019HSIP $247,500.00$250,000.00
$11,000,000.00 2019NFA $0.00$10,000,000.00
$33,000,000.00 2019NHPP $26,400,000.00$30,000,000.00
$110,000.00 2019SATRANS $0.00$100,000.00
$16,500,000.00 2019STBONDS $0.00$15,000,000.00
$1,100,000.00 2019STCASH $0.00$1,000,000.00
$1,650,000.00 2019STP<200K $1,320,000.00$1,500,000.00
$6,600,000.00 2019STP<5K $5,280,000.00$6,000,000.00
$55,000,000.00 2019STPFLEX $44,000,000.00$50,000,000.00
$385,000.00 2020DEMO $308,000.00$350,000.00
$3,850,000.00 2020HRRR $3,465,000.00$3,500,000.00
$1,100,000.00 2020HSIP $990,000.00$1,000,000.00
$660,000.00 2020HSIPPEN $660,000.00$600,000.00
$550,000.00 2020LOCAL $0.00$500,000.00
$11,000,000.00 2020NFA $0.00$10,000,000.00
$82,500,000.00 2020NHPP $66,000,000.00$75,000,000.00
$5,500,000.00 2020STBONDS $0.00$5,000,000.00
$5,500,000.00 2020STCASH $0.00$5,000,000.00
$2,420,000.00 2020STGEN $0.00$2,200,000.00
$16,500,000.00 2020STP<200K $13,200,000.00$15,000,000.00
$10,615,000.00 2020STP<5K $8,492,000.00$9,650,000.00
$2,200,000.00 2020STP>200K $1,760,000.00$2,000,000.00
$71,500,000.00 2020STPFLEX $57,200,000.00$65,000,000.00
Page 106 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
$1,100,000.00 2021DEMO $880,000.00Construction $1,000,000.00
$550,000.00 2021HRRR $440,000.00$500,000.00
$2,200,000.00 2021HSIP $1,980,000.00$2,000,000.00
$550,000.00 2021HSIPPEN $550,000.00$500,000.00
$11,000,000.00 2021NFA $0.00$10,000,000.00
$66,000,000.00 2021NHPP $52,800,000.00$60,000,000.00
$5,500,000.00 2021STBONDS $0.00$5,000,000.00
$2,475,000.00 2021STCASH $0.00$2,250,000.00
$11,440,000.00 2021STP<5K $9,152,000.00$10,400,000.00
$57,750,000.00 2021STPFLEX $46,200,000.00$52,500,000.00
$1,100,000.00 2022DEMO $880,000.00$1,000,000.00
$2,200,000.00 2022HSIP $1,980,000.00$2,000,000.00
$11,000,000.00 2022NFA $0.00$10,000,000.00
$26,400,000.00 2022NHPP $21,120,000.00$24,000,000.00
$5,500,000.00 2022STBONDS $0.00$5,000,000.00
$1,100,000.00 2022STCASH $0.00$1,000,000.00
$1,650,000.00 2022STP<200K $1,320,000.00$1,500,000.00
$7,150,000.00 2022STP<5K $5,720,000.00$6,500,000.00
$66,000,000.00 2022STPFLEX $52,800,000.00$60,000,000.00
$630,880,000.00Total Cost $433,764,500.00$574,150,000.00
Project: L.000054 ROAD PREVENTIVE MAINTENANCE PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$400,000.00 2019STPFLEX $400,000.00Utility Relocation $400,000.00
$400,000.00 2020STPFLEX $400,000.00$400,000.00
$500,000.00 2021STPFLEX $500,000.00$500,000.00
$400,000.00 2022STPFLEX $400,000.00$400,000.00
$550,000.00 2019DEMO $550,000.00Construction $500,000.00
$550,000.00 2019NFA $0.00$500,000.00
$2,750,000.00 2019NHPP $2,200,000.00$2,500,000.00
$8,800,000.00 2019STPFLEX $7,040,000.00$8,000,000.00
$550,000.00 2020DEMO $440,000.00$500,000.00
$550,000.00 2020NFA $440,000.00$500,000.00
$1,650,000.00 2020NHPP $1,320,000.00$1,500,000.00
$2,475,000.00 2020STP<200K $1,980,000.00$2,250,000.00
$550,000.00 2020STP<5K $440,000.00$500,000.00
$10,450,000.00 2020STPFLEX $8,360,000.00$9,500,000.00
$550,000.00 2021NFA $495,000.00$500,000.00
$550,000.00 2021NHPP $440,000.00$500,000.00
$11,000,000.00 2021STPFLEX $8,800,000.00$10,000,000.00
$550,000.00 2022HSIP $495,000.00$500,000.00
$550,000.00 2022NFA $495,000.00$500,000.00
$4,400,000.00 2022NHPP $3,520,000.00$4,000,000.00
$3,850,000.00 2022STPFLEX $3,080,000.00$3,500,000.00
$52,025,000.00Total Cost $41,795,000.00$47,450,000.00
Page 107 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000055 RAILROAD CROSSING IMPROVEMENTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2019STCASH $40,000.00Feasibility $50,000.00
$50,000.00 2020STCASH $40,000.00$50,000.00
$50,000.00 2021STCASH $40,000.00$50,000.00
$50,000.00 2022STCASH $40,000.00$50,000.00
$50,000.00 2019STCASH $40,000.00Environmental $50,000.00
$50,000.00 2020STCASH $40,000.00$50,000.00
$50,000.00 2021STCASH $40,000.00$50,000.00
$50,000.00 2022STCASH $40,000.00$50,000.00
$50,000.00 2019LOCAL $0.00Right of Way $50,000.00
$50,000.00 2019STCASH $40,000.00$50,000.00
$50,000.00 2020STCASH $40,000.00$50,000.00
$50,000.00 2021STCASH $40,000.00$50,000.00
$50,000.00 2022STCASH $40,000.00$50,000.00
$100,000.00 2019LOCAL $0.00Utility Relocation $100,000.00
$150,000.00 2019STCASH $120,000.00$150,000.00
$150,000.00 2020STCASH $120,000.00$150,000.00
$250,000.00 2021LOCAL $0.00$250,000.00
$2,000,000.00 2021STCASH $0.00$2,000,000.00
$150,000.00 2022STCASH $120,000.00$150,000.00
$100,000.00 2019STCASH $80,000.00Design (Engineering) $100,000.00
$100,000.00 2020STCASH $80,000.00$100,000.00
$100,000.00 2021STCASH $80,000.00$100,000.00
$100,000.00 2022STCASH $80,000.00$100,000.00
$880,000.00 2019HSIP $880,000.00Construction $800,000.00
$1,650,000.00 2019LOCAL $0.00$1,500,000.00
$8,250,000.00 2019STCASH $6,600,000.00$7,500,000.00
$1,650,000.00 2020LOCAL $0.00$1,500,000.00
$8,250,000.00 2020STCASH $6,600,000.00$7,500,000.00
$1,650,000.00 2021LOCAL $0.00$1,500,000.00
$8,250,000.00 2021STCASH $6,600,000.00$7,500,000.00
$1,650,000.00 2022LOCAL $0.00$1,500,000.00
$8,250,000.00 2022STCASH $6,600,000.00$7,500,000.00
$44,330,000.00Total Cost $28,440,000.00$40,650,000.00
Page 108 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000056 MISC HAZARD ELIMINATION AND SAFETY 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2019HSIP $90,000.00Feasibility $100,000.00
$300,000.00 2019HSIPPEN $300,000.00$300,000.00
$100,000.00 2020HSIP $90,000.00$100,000.00
$1,100,000.00 2020HSIPPEN $1,100,000.00$1,100,000.00
$350,000.00 2020STCASH $0.00$350,000.00
$100,000.00 2021HSIP $90,000.00$100,000.00
$800,000.00 2021HSIPPEN $800,000.00$800,000.00
$350,000.00 2021STCASH $350,000.00$350,000.00
$100,000.00 2022HSIP $90,000.00$100,000.00
$2,500,000.00 2022HSIPPEN $2,500,000.00$2,500,000.00
$500,000.00 2022STCASH $0.00$500,000.00
$150,000.00 2019HSIP $135,000.00Environmental $150,000.00
$50,000.00 2019HSIPPEN $50,000.00$50,000.00
$150,000.00 2020HSIP $135,000.00$150,000.00
$50,000.00 2020HSIPPEN $50,000.00$50,000.00
$50,000.00 2021HSIP $45,000.00$50,000.00
$150,000.00 2021HSIPPEN $150,000.00$150,000.00
$65,000.00 2021SATRANS $0.00$65,000.00
$150,000.00 2022HSIP $135,000.00$150,000.00
$50,000.00 2022HSIPPEN $50,000.00$50,000.00
$2,000,000.00 2019HSIP $1,800,000.00Right of Way $2,000,000.00
$1,000,000.00 2019HSIPPEN $1,000,000.00$1,000,000.00
$100,000.00 2019SATRANS $0.00$100,000.00
$500,000.00 2019STCASH $0.00$500,000.00
$3,750,000.00 2020HSIP $3,375,000.00$3,750,000.00
$500,000.00 2020HSIPPEN $500,000.00$500,000.00
$500,000.00 2020STCASH $0.00$500,000.00
$3,000,000.00 2021HSIP $2,700,000.00$3,000,000.00
$1,000,000.00 2021HSIPPEN $1,000,000.00$1,000,000.00
$100,000.00 2021SATRANS $0.00$100,000.00
$100,000.00 2021STCASH $0.00$100,000.00
$2,000,000.00 2022HSIP $1,800,000.00$2,000,000.00
$1,000,000.00 2022HSIPPEN $1,000,000.00$1,000,000.00
$2,000,000.00 2019HSIP $1,800,000.00Utility Relocation $2,000,000.00
$1,000,000.00 2019HSIPPEN $1,000,000.00$1,000,000.00
$2,000,000.00 2020HSIP $1,800,000.00$2,000,000.00
$1,000,000.00 2020HSIPPEN $1,000,000.00$1,000,000.00
$1,500,000.00 2021HSIP $1,350,000.00$1,500,000.00
$1,300,000.00 2021HSIPPEN $1,300,000.00$1,300,000.00
$4,000,000.00 2021STCASH $0.00$4,000,000.00
$250,000.00 2021STPFLEX $200,000.00$250,000.00
$2,000,000.00 2022HSIP $1,800,000.00$2,000,000.00
$1,000,000.00 2022HSIPPEN $1,000,000.00$1,000,000.00
$500,000.00 2019HSIP $450,000.00Design (Engineering) $500,000.00
$200,000.00 2019HSIPPEN $200,000.00$200,000.00
$800,000.00 2019SATRANS $0.00$800,000.00
$500,000.00 2019STCASH $0.00$500,000.00
$400,000.00 2020HSIP $360,000.00$400,000.00
$450,000.00 2020HSIPPEN $450,000.00$450,000.00
$900,000.00 2021HSIP $810,000.00$900,000.00
$200,000.00 2021HSIPPEN $200,000.00$200,000.00
$500,000.00 2021STCASH $0.00$500,000.00
Page 109 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
$1,000,000.00 2022HSIP $900,000.00Design (Engineering) $1,000,000.00
$200,000.00 2022HSIPPEN $200,000.00$200,000.00
$19,525,000.00 2019HSIP $17,572,500.00Construction $17,750,000.00
$14,850,000.00 2019HSIPPEN $14,850,000.00$13,500,000.00
$275,000.00 2019NHPP $220,000.00$250,000.00
$275,000.00 2019SATRANS $0.00$250,000.00
$1,100,000.00 2019STCASH $0.00$1,000,000.00
$23,650,000.00 2020HSIP $21,285,000.00$21,500,000.00
$11,110,000.00 2020HSIPPEN $11,110,000.00$10,100,000.00
$3,850,000.00 2020SATRANS $0.00$3,500,000.00
$4,400,000.00 2020STCASH $0.00$4,000,000.00
$550,000.00 2020TAP<5K $522,500.00$500,000.00
$20,350,000.00 2021HSIP $18,315,000.00$18,500,000.00
$20,900,000.00 2021HSIPPEN $20,900,000.00$19,000,000.00
$1,100,000.00 2021STCASH $0.00$1,000,000.00
$5,500,000.00 2021STPFLEX $4,400,000.00$5,000,000.00
$550,000.00 2021TAP<5K $522,500.00$500,000.00
$25,850,000.00 2022HSIP $23,265,000.00$23,500,000.00
$22,000,000.00 2022HSIPPEN $22,000,000.00$20,000,000.00
$550,000.00 2022NHPP $440,000.00$500,000.00
$550,000.00 2022STCASH $0.00$500,000.00
$221,350,000.00Total Cost $189,557,500.00$205,265,000.00
Project: L.000057 SOFT SIDE SAFETY 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$250,000.00 2019HSIP $225,000.00Feasibility $250,000.00
$750,000.00 2019HSIPPEN $750,000.00$750,000.00
$475,000.00 2019STCASH $475,000.00$475,000.00
$100,000.00 2020HSIP $90,000.00$100,000.00
$1,375,000.00 2020HSIPPEN $1,375,000.00$1,375,000.00
$500,000.00 2020STCASH $0.00$500,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$2,900,000.00 2021HSIP $2,610,000.00$2,900,000.00
$750,000.00 2021HSIPPEN $750,000.00$750,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$2,900,000.00 2022HSIP $2,610,000.00$2,900,000.00
$750,000.00 2022HSIPPEN $750,000.00$750,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$11,050,000.00Total Cost $9,875,000.00$11,050,000.00
Page 110 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000060 LOCAL ROADS SAFETY PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2020HSIPPEN $100,000.00Feasibility $100,000.00
$160,000.00 2020STCASH $0.00$160,000.00
$146,000.00 2021HSIPPEN $146,000.00$146,000.00
$160,000.00 2021STCASH $0.00$160,000.00
$146,000.00 2022HSIPPEN $146,000.00$146,000.00
$160,000.00 2022STCASH $0.00$160,000.00
$10,000.00 2019HRRR $8,000.00Right of Way $10,000.00
$90,000.00 2019HSIPPEN $90,000.00$90,000.00
$100,000.00 2019STCASH $0.00$100,000.00
$50,000.00 2020HRRR $45,000.00$50,000.00
$500,000.00 2020HSIPPEN $500,000.00$500,000.00
$100,000.00 2021HRRR $90,000.00$100,000.00
$10,000.00 2022HRRR $9,000.00$10,000.00
$40,000.00 2022HSIP $36,000.00$40,000.00
$50,000.00 2022HSIPPEN $50,000.00$50,000.00
$50,000.00 2022STCASH $0.00$50,000.00
$10,000.00 2019HRRR $8,000.00Utility Relocation $10,000.00
$90,000.00 2019HSIPPEN $90,000.00$90,000.00
$100,000.00 2019STCASH $0.00$100,000.00
$100,000.00 2020HRRR $90,000.00$100,000.00
$100,000.00 2021HRRR $90,000.00$100,000.00
$10,000.00 2022HRRR $9,000.00$10,000.00
$40,000.00 2022HSIP $36,000.00$40,000.00
$50,000.00 2022HSIPPEN $50,000.00$50,000.00
$50,000.00 2022STCASH $0.00$50,000.00
$10,000.00 2019HRRR $8,000.00Design (Engineering) $10,000.00
$90,000.00 2019HSIPPEN $90,000.00$90,000.00
$100,000.00 2019STCASH $0.00$100,000.00
$50,000.00 2020HRRR $45,000.00$50,000.00
$200,000.00 2020HSIPPEN $200,000.00$200,000.00
$100,000.00 2020STCASH $0.00$100,000.00
$75,000.00 2021HRRR $67,500.00$75,000.00
$500,000.00 2021HSIPPEN $500,000.00$500,000.00
$200,000.00 2021STCASH $200,000.00$200,000.00
$10,000.00 2022HRRR $9,000.00$10,000.00
$40,000.00 2022HSIP $36,000.00$40,000.00
$250,000.00 2022HSIPPEN $250,000.00$250,000.00
$50,000.00 2022STCASH $0.00$50,000.00
$55,000.00 2019HRRR $44,000.00Construction $50,000.00
$495,000.00 2019HSIPPEN $495,000.00$450,000.00
$110,000.00 2019STCASH $0.00$100,000.00
$110,000.00 2020HRRR $99,000.00$100,000.00
$7,150,000.00 2020HSIPPEN $7,150,000.00$6,500,000.00
$330,000.00 2020STCASH $0.00$300,000.00
$110,000.00 2020STP>200K $88,000.00$100,000.00
$550,000.00 2021HRRR $495,000.00$500,000.00
$550,000.00 2021HSIP $495,000.00$500,000.00
$990,000.00 2021HSIPPEN $990,000.00$900,000.00
$110,000.00 2021LOCAL $0.00$100,000.00
$1,100,000.00 2021STP>200K $990,000.00$1,000,000.00
$27,500.00 2022HRRR $24,750.00$25,000.00
$1,512,500.00 2022HSIP $1,361,250.00$1,375,000.00
Page 111 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
$1,650,000.00 2022HSIPPEN $1,650,000.00Construction $1,500,000.00
$550,000.00 2022LOCAL $0.00$500,000.00
$550,000.00 2022STCASH $0.00$500,000.00
$20,047,000.00Total Cost $16,880,500.00$18,597,000.00
Project: L.000061 SAFE ROUTES TO PUBLIC PLACES PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$200,000.00 2019SR2S $200,000.00Feasibility $200,000.00
$680,000.00 2020SR2S $680,000.00$680,000.00
$80,000.00 2021HSIPPEN $80,000.00$80,000.00
$100,000.00 2021SR2S $100,000.00$100,000.00
$300,000.00 2021STCASH $0.00$300,000.00
$100,000.00 2022SATRANS $0.00$100,000.00
$80,000.00 2022SR2S $80,000.00$80,000.00
$600,000.00 2019HSIPPEN $600,000.00Design (Engineering) $600,000.00
$200,000.00 2019SATRANS $0.00$200,000.00
$200,000.00 2019SR2S $200,000.00$200,000.00
$100,000.00 2019STCASH $0.00$100,000.00
$250,000.00 2020HSIPPEN $250,000.00$250,000.00
$200,000.00 2020SATRANS $0.00$200,000.00
$150,000.00 2020SR2S $150,000.00$150,000.00
$500,000.00 2020STCASH $0.00$500,000.00
$100,000.00 2021HSIPPEN $100,000.00$100,000.00
$200,000.00 2021SATRANS $0.00$200,000.00
$300,000.00 2021SR2S $300,000.00$300,000.00
$200,000.00 2021STCASH $0.00$200,000.00
$400,000.00 2022HSIPPEN $400,000.00$400,000.00
$200,000.00 2022SATRANS $0.00$200,000.00
$100,000.00 2022SR2S $100,000.00$100,000.00
$200,000.00 2022STCASH $0.00$200,000.00
$2,805,000.00 2019HSIPPEN $2,805,000.00Construction $2,550,000.00
$1,100,000.00 2019SATRANS $0.00$1,000,000.00
$2,200,000.00 2019SR2S $2,200,000.00$2,000,000.00
$1,100,000.00 2019STCASH $0.00$1,000,000.00
$2,200,000.00 2020HSIPPEN $2,200,000.00$2,000,000.00
$1,100,000.00 2020SATRANS $0.00$1,000,000.00
$1,100,000.00 2020SR2S $1,100,000.00$1,000,000.00
$550,000.00 2020STCASH $0.00$500,000.00
$825,000.00 2021HSIP $742,500.00$750,000.00
$5,500,000.00 2021HSIPPEN $5,500,000.00$5,000,000.00
$275,000.00 2021LOCAL $0.00$250,000.00
$1,100,000.00 2021SATRANS $0.00$1,000,000.00
$1,100,000.00 2021SR2S $1,100,000.00$1,000,000.00
$1,100,000.00 2021STCASH $0.00$1,000,000.00
$1,100,000.00 2021STPFLEX $880,000.00$1,000,000.00
$3,850,000.00 2022HSIPPEN $3,850,000.00$3,500,000.00
$1,100,000.00 2022SATRANS $0.00$1,000,000.00
$2,200,000.00 2022SR2S $2,200,000.00$2,000,000.00
$35,745,000.00Total Cost $25,817,500.00$32,990,000.00
Page 112 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000062 MOTORIST ASSISTANCE PATROL (MAP) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2019NHPP $40,000.00Design (Engineering) $50,000.00
$50,000.00 2020NHPP $40,000.00$50,000.00
$50,000.00 2021NHPP $40,000.00$50,000.00
$50,000.00 2022NHPP $40,000.00$50,000.00
$275,000.00 2019CM $220,000.00Construction $250,000.00
$275,000.00 2019NHPP $220,000.00$250,000.00
$605,000.00 2019STP<200K $484,000.00$550,000.00
$605,000.00 2019STP>200K $484,000.00$550,000.00
$55,000.00 2020CM $44,000.00$50,000.00
$2,090,000.00 2020NHPP $1,672,000.00$1,900,000.00
$605,000.00 2020STP<200K $484,000.00$550,000.00
$2,585,000.00 2020STP>200K $2,068,000.00$2,350,000.00
$2,090,000.00 2021NHPP $1,672,000.00$1,900,000.00
$1,100,000.00 2021STP<200K $880,000.00$1,000,000.00
$3,080,000.00 2021STP>200K $2,464,000.00$2,800,000.00
$2,090,000.00 2022NHPP $1,672,000.00$1,900,000.00
$605,000.00 2022STP<200K $484,000.00$550,000.00
$1,980,000.00 2022STP>200K $1,584,000.00$1,800,000.00
$18,240,000.00Total Cost $14,592,000.00$16,600,000.00
Page 113 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000063 TRAFFIC CONTROL DEVICES PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$250,000.00 2019NHPP $250,000.00Feasibility $250,000.00
$250,000.00 2019STPFLEX $250,000.00$250,000.00
$150,000.00 2020NHPP $150,000.00$150,000.00
$1,150,000.00 2020STPFLEX $1,150,000.00$1,150,000.00
$350,000.00 2021NHPP $350,000.00$350,000.00
$350,000.00 2021STPFLEX $350,000.00$350,000.00
$350,000.00 2022NHPP $350,000.00$350,000.00
$350,000.00 2022STPFLEX $350,000.00$350,000.00
$1,050,000.00 2019NHPP $1,050,000.00Design (Engineering) $1,050,000.00
$50,000.00 2019NHPP-E $50,000.00$50,000.00
$250,000.00 2019STCASH $0.00$250,000.00
$400,000.00 2019STPFLEX $400,000.00$400,000.00
$600,000.00 2020NHPP $600,000.00$600,000.00
$300,000.00 2020STPFLEX $300,000.00$300,000.00
$600,000.00 2021NHPP $600,000.00$600,000.00
$300,000.00 2021STPFLEX $300,000.00$300,000.00
$300,000.00 2022NHPP $300,000.00$300,000.00
$600,000.00 2022STPFLEX $600,000.00$600,000.00
$550,000.00 2019HSIP $550,000.00Construction $500,000.00
$23,100,000.00 2019NHPP $23,100,000.00$21,000,000.00
$2,750,000.00 2019STCASH $0.00$2,500,000.00
$275,000.00 2019STP<5K $275,000.00$250,000.00
$7,150,000.00 2019STPFLEX $7,150,000.00$6,500,000.00
$110,000.00 2020HSIP $110,000.00$100,000.00
$5,500,000.00 2020HSIPPEN $5,500,000.00$5,000,000.00
$13,062,500.00 2020NHPP $13,062,500.00$11,875,000.00
$1,100,000.00 2020STCASH $0.00$1,000,000.00
$1,100,000.00 2020STP<5K $1,100,000.00$1,000,000.00
$5,500,000.00 2020STPFLEX $5,500,000.00$5,000,000.00
$550,000.00 2021HSIP $550,000.00$500,000.00
$12,100,000.00 2021HSIPPEN $12,100,000.00$11,000,000.00
$15,400,000.00 2021NHPP $15,400,000.00$14,000,000.00
$14,300,000.00 2021STPFLEX $14,300,000.00$13,000,000.00
$550,000.00 2022HSIP $550,000.00$500,000.00
$9,570,000.00 2022NHPP $9,570,000.00$8,700,000.00
$8,800,000.00 2022STPFLEX $8,800,000.00$8,000,000.00
$129,117,500.00Total Cost $125,017,500.00$118,075,000.00
Page 114 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000064 TRANSPORTATION SYSTEMS MANAGEMENT PROG 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$30,000.00 2020NHPP $24,000.00Environmental $30,000.00
$20,000.00 2020STPFLEX $16,000.00$20,000.00
$50,000.00 2021STPFLEX $40,000.00$50,000.00
$50,000.00 2022STPFLEX $40,000.00$50,000.00
$100,000.00 2019NHPP $80,000.00Right of Way $100,000.00
$40,000.00 2019STPFLEX $32,000.00$40,000.00
$125,000.00 2020STPFLEX $100,000.00$125,000.00
$50,000.00 2021STPFLEX $40,000.00$50,000.00
$50,000.00 2022STPFLEX $40,000.00$50,000.00
$100,000.00 2019NHPP $80,000.00Utility Relocation $100,000.00
$50,000.00 2019STPFLEX $40,000.00$50,000.00
$3,600,000.00 2020STPFLEX $2,880,000.00$3,600,000.00
$250,000.00 2021RAIL PD $250,000.00$250,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$50,000.00 2022STPFLEX $40,000.00$50,000.00
$50,000.00 2020STPFLEX $40,000.00Design (Engineering) $50,000.00
$500,000.00 2021NHPP $400,000.00$500,000.00
$2,750,000.00 2019NHPP $2,200,000.00Construction $2,500,000.00
$385,000.00 2019STCASH $0.00$350,000.00
$275,000.00 2019STP<200K $220,000.00$250,000.00
$550,000.00 2019STP<5K $440,000.00$500,000.00
$6,050,000.00 2019STPFLEX $4,840,000.00$5,500,000.00
$110,000.00 2020HSIPPEN $110,000.00$100,000.00
$4,400,000.00 2020NHPP $3,520,000.00$4,000,000.00
$1,100,000.00 2020STP<200K $880,000.00$1,000,000.00
$990,000.00 2020STP<5K $792,000.00$900,000.00
$5,225,000.00 2020STPFLEX $4,180,000.00$4,750,000.00
$550,000.00 2021HSIP $495,000.00$500,000.00
$7,150,000.00 2021NHPP $5,720,000.00$6,500,000.00
$110,000.00 2021STCASH $0.00$100,000.00
$220,000.00 2021STP<200K $176,000.00$200,000.00
$7,150,000.00 2021STPFLEX $5,720,000.00$6,500,000.00
$4,400,000.00 2022NHPP $3,520,000.00$4,000,000.00
$1,100,000.00 2022STP<200K $880,000.00$1,000,000.00
$5,500,000.00 2022STPFLEX $4,400,000.00$5,000,000.00
$53,230,000.00Total Cost $42,315,000.00$48,865,000.00
Page 115 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000065 ITS SYSTEMS (STATEWIDE) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$300,000.00 2019NHPP $240,000.00Feasibility $300,000.00
$300,000.00 2019STCASH $0.00$300,000.00
$350,000.00 2019STPFLEX $280,000.00$350,000.00
$150,000.00 2020NHPP $120,000.00$150,000.00
$500,000.00 2020STPFLEX $400,000.00$500,000.00
$200,000.00 2021NHPP $160,000.00$200,000.00
$400,000.00 2021STPFLEX $320,000.00$400,000.00
$200,000.00 2022NHPP $160,000.00$200,000.00
$500,000.00 2022STPFLEX $400,000.00$500,000.00
$1,150,000.00 2019NHPP $920,000.00Design (Engineering) $1,150,000.00
$600,000.00 2019STPFLEX $480,000.00$600,000.00
$1,500,000.00 2020NHPP $1,200,000.00$1,500,000.00
$2,000,000.00 2020STPFLEX $1,600,000.00$2,000,000.00
$1,000,000.00 2021NHPP $800,000.00$1,000,000.00
$2,000,000.00 2021STPFLEX $1,600,000.00$2,000,000.00
$1,000,000.00 2022NHPP $800,000.00$1,000,000.00
$2,000,000.00 2022STPFLEX $1,600,000.00$2,000,000.00
$8,800,000.00 2019NHPP $7,040,000.00Construction $8,000,000.00
$825,000.00 2019STPFLEX $660,000.00$750,000.00
$9,625,000.00 2020NHPP $7,700,000.00$8,750,000.00
$1,100,000.00 2020STCASH $0.00$1,000,000.00
$3,850,000.00 2020STPFLEX $3,080,000.00$3,500,000.00
$4,400,000.00 2021NHPP $3,520,000.00$4,000,000.00
$3,850,000.00 2021STPFLEX $3,080,000.00$3,500,000.00
$6,600,000.00 2022NHPP $5,280,000.00$6,000,000.00
$3,850,000.00 2022STPFLEX $3,080,000.00$3,500,000.00
$57,050,000.00Total Cost $44,520,000.00$53,150,000.00
Project: L.000067 INTERSTATE LIGHTING, ELECTRICAL PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$200,000.00 2019NHPP $160,000.00Design (Engineering) $200,000.00
$500,000.00 2020NHPP $400,000.00$500,000.00
$800,000.00 2021NHPP $640,000.00$800,000.00
$400,000.00 2022NHPP $320,000.00$400,000.00
$4,400,000.00 2019NHPP $3,960,000.00Construction $4,000,000.00
$3,300,000.00 2020NHPP $2,970,000.00$3,000,000.00
$3,300,000.00 2021NHPP $2,970,000.00$3,000,000.00
$6,050,000.00 2022NHPP $5,445,000.00$5,500,000.00
$18,950,000.00Total Cost $16,865,000.00$17,400,000.00
Page 116 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000068 ACCESS MANAGEMENT PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Work TypeType ImprovementRemarks
, OPER EFFICIENCY/MOTORIST ASSISTANCE, ACCESS
MANAGEMENT
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$600,000.00 2019NHPP $480,000.00Feasibility $600,000.00
$400,000.00 2019STPFLEX $320,000.00$400,000.00
$300,000.00 2020NHPP $240,000.00$300,000.00
$900,000.00 2020STPFLEX $720,000.00$900,000.00
$1,650,000.00 2021NHPP $1,320,000.00$1,650,000.00
$150,000.00 2021STPFLEX $120,000.00$150,000.00
$500,000.00 2022NHPP $400,000.00$500,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$50,000.00 2019NHPP $40,000.00Environmental $50,000.00
$50,000.00 2019STPFLEX $40,000.00$50,000.00
$50,000.00 2020NHPP $40,000.00$50,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$50,000.00 2021NHPP $40,000.00$50,000.00
$50,000.00 2021STPFLEX $40,000.00$50,000.00
$50,000.00 2022NHPP $40,000.00$50,000.00
$50,000.00 2022STPFLEX $40,000.00$50,000.00
$100,000.00 2019HSIP $90,000.00Right of Way $100,000.00
$300,000.00 2019NHPP $240,000.00$300,000.00
$75,000.00 2019STCASH $0.00$75,000.00
$400,000.00 2019STPFLEX $320,000.00$400,000.00
$1,350,000.00 2020NHPP $1,080,000.00$1,350,000.00
$650,000.00 2020STPFLEX $520,000.00$650,000.00
$400,000.00 2021NHPP $320,000.00$400,000.00
$400,000.00 2021STPFLEX $320,000.00$400,000.00
$50,000.00 2022NHPP $40,000.00$50,000.00
$750,000.00 2022STPFLEX $600,000.00$750,000.00
$825,000.00 2019HSIP $742,500.00Utility Relocation $825,000.00
$25,000.00 2019NHPP $20,000.00$25,000.00
$950,000.00 2019STPFLEX $760,000.00$950,000.00
$200,000.00 2020NHPP $160,000.00$200,000.00
$1,000,000.00 2020STPFLEX $800,000.00$1,000,000.00
$200,000.00 2021NHPP $160,000.00$200,000.00
$800,000.00 2021STPFLEX $640,000.00$800,000.00
$200,000.00 2022NHPP $160,000.00$200,000.00
$200,000.00 2022STPFLEX $160,000.00$200,000.00
$250,000.00 2019HSIP $225,000.00Design (Engineering) $250,000.00
$500,000.00 2019NHPP $400,000.00$500,000.00
$750,000.00 2019STPFLEX $600,000.00$750,000.00
$1,100,000.00 2020NHPP $880,000.00$1,100,000.00
$6,500.00 2020SATRANS $0.00$6,500.00
$500,000.00 2020STPFLEX $400,000.00$500,000.00
$300,000.00 2021NHPP $240,000.00$300,000.00
$900,000.00 2021STPFLEX $720,000.00$900,000.00
$500,000.00 2022NHPP $400,000.00$500,000.00
$500,000.00 2022STPFLEX $400,000.00$500,000.00
$550,000.00 2019NHPP $440,000.00Construction $500,000.00
$1,925,000.00 2019STP<200K $1,540,000.00$1,750,000.00
$275,000.00 2019STPFLEX $220,000.00$250,000.00
Page 117 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
$1,100,000.00 2020HSIP $990,000.00Construction $1,000,000.00
$110,000.00 2020NHPP $88,000.00$100,000.00
$2,200,000.00 2020STCASH $0.00$2,000,000.00
$1,650,000.00 2020STP<200K $1,320,000.00$1,500,000.00
$6,875,000.00 2020STPFLEX $5,500,000.00$6,250,000.00
$1,650,000.00 2021HSIP $1,485,000.00$1,500,000.00
$8,525,000.00 2021NHPP $6,820,000.00$7,750,000.00
$110,000.00 2021STP<200K $99,000.00$100,000.00
$4,840,000.00 2021STPFLEX $3,872,000.00$4,400,000.00
$2,200,000.00 2022NHPP $1,760,000.00$2,000,000.00
$5,500,000.00 2022STPFLEX $4,400,000.00$5,000,000.00
$56,741,500.00Total Cost $43,971,500.00$53,331,500.00
Page 118 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000069 ROAD TRANSFER PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Work TypeType ImprovementRemarks
, ROAD TRANSFER,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$25,000.00 2020STPFLEX $20,000.00Environmental $25,000.00
$200,000.00 2019NFA $0.00Right of Way $200,000.00
$200,000.00 2019STPFLEX $160,000.00$200,000.00
$200,000.00 2020NFA $0.00$200,000.00
$200,000.00 2020STPFLEX $160,000.00$200,000.00
$200,000.00 2021NFA $0.00$200,000.00
$200,000.00 2021STPFLEX $160,000.00$200,000.00
$200,000.00 2022NFA $0.00$200,000.00
$200,000.00 2022STPFLEX $160,000.00$200,000.00
$200,000.00 2019NFA $0.00Utility Relocation $200,000.00
$500,000.00 2019STPFLEX $400,000.00$500,000.00
$200,000.00 2020NFA $0.00$200,000.00
$200,000.00 2020STPFLEX $160,000.00$200,000.00
$200,000.00 2021NFA $0.00$200,000.00
$200,000.00 2021STPFLEX $160,000.00$200,000.00
$200,000.00 2022NFA $0.00$200,000.00
$200,000.00 2022STPFLEX $160,000.00$200,000.00
$100,000.00 2019HSIP $90,000.00Design (Engineering) $100,000.00
$100,000.00 2019HSIPPEN $100,000.00$100,000.00
$100,000.00 2019NFA $0.00$100,000.00
$250,000.00 2019NHPP $200,000.00$250,000.00
$100,000.00 2019STPFLEX $80,000.00$100,000.00
$500,000.00 2020HSIP $450,000.00$500,000.00
$500,000.00 2020HSIPPEN $500,000.00$500,000.00
$500,000.00 2020NFA $0.00$500,000.00
$500,000.00 2020NHPP $400,000.00$500,000.00
$500,000.00 2020STPFLEX $400,000.00$500,000.00
$500,000.00 2021HSIP $450,000.00$500,000.00
$500,000.00 2021HSIPPEN $500,000.00$500,000.00
$500,000.00 2021NFA $0.00$500,000.00
$500,000.00 2021NHPP $400,000.00$500,000.00
$500,000.00 2021STPFLEX $400,000.00$500,000.00
$500,000.00 2022HSIP $450,000.00$500,000.00
$500,000.00 2022HSIPPEN $500,000.00$500,000.00
$500,000.00 2022NFA $0.00$500,000.00
$500,000.00 2022NHPP $400,000.00$500,000.00
$500,000.00 2022STCASH $0.00$500,000.00
$500,000.00 2022STPFLEX $400,000.00$500,000.00
$550,000.00 2019HSIP $495,000.00Construction $500,000.00
$550,000.00 2019HSIPPEN $550,000.00$500,000.00
$16,500,000.00 2019NFA $0.00$15,000,000.00
$7,700,000.00 2019NHPP $6,160,000.00$7,000,000.00
$6,600,000.00 2019STPFLEX $5,280,000.00$6,000,000.00
$550,000.00 2020HSIP $495,000.00$500,000.00
$550,000.00 2020HSIPPEN $550,000.00$500,000.00
$550,000.00 2020LOCAL $0.00$500,000.00
$16,500,000.00 2020NFA $0.00$15,000,000.00
$13,750,000.00 2020NHPP $11,000,000.00$12,500,000.00
$550,000.00 2020STP<200K $440,000.00$500,000.00
Page 119 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
$550,000.00 2020STP>200K $440,000.00Construction $500,000.00
$6,050,000.00 2020STPFLEX $4,840,000.00$5,500,000.00
$275,000.00 2021HSIP $247,500.00$250,000.00
$275,000.00 2021HSIPPEN $275,000.00$250,000.00
$2,750,000.00 2021LOCAL $0.00$2,500,000.00
$14,300,000.00 2021NFA $0.00$13,000,000.00
$275,000.00 2021NHPP $220,000.00$250,000.00
$275,000.00 2021STP<200K $220,000.00$250,000.00
$7,700,000.00 2021STPFLEX $6,160,000.00$7,000,000.00
$550,000.00 2022HSIP $495,000.00$500,000.00
$550,000.00 2022HSIPPEN $550,000.00$500,000.00
$550,000.00 2022LOCAL $0.00$500,000.00
$16,500,000.00 2022NFA $0.00$15,000,000.00
$7,700,000.00 2022NHPP $6,160,000.00$7,000,000.00
$7,700,000.00 2022STPFLEX $6,160,000.00$7,000,000.00
$142,525,000.00Total Cost $57,997,500.00$130,675,000.00
Project: L.000070 INTERSTATE REST AREA REHABILITATION 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$220,000.00 2019NHPP $198,000.00Construction $200,000.00
$1,320,000.00 2020NHPP $1,188,000.00$1,200,000.00
$1,320,000.00 2021NHPP $1,188,000.00$1,200,000.00
$1,320,000.00 2022NHPP $1,188,000.00$1,200,000.00
$4,180,000.00Total Cost $3,762,000.00$3,800,000.00
Project: L.000071 WEIGH STATION REHABILITATION / UPGRADE 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$65,000.00 2020NHPP $52,000.00Feasibility $65,000.00
$25,000.00 2021NHPP $20,000.00$25,000.00
$25,000.00 2022NHPP $20,000.00$25,000.00
$150,000.00 2020NHPP $120,000.00Design (Engineering) $150,000.00
$150,000.00 2021NHPP $120,000.00$150,000.00
$150,000.00 2022NHPP $120,000.00$150,000.00
$880,000.00 2010OTHER $0.00Construction $800,000.00
$2,310,000.00 2019NHPP $2,079,000.00$2,100,000.00
$880,000.00 2019OTHER $0.00$800,000.00
$550,000.00 2019STP<5K $440,000.00$500,000.00
$55,000.00 2020NHPP $49,500.00$50,000.00
$110.00 2020STP<5K $0.00$100.00
$55,000.00 2020STPFLEX $44,000.00$50,000.00
$1,375,000.00 2021NHPP $1,237,500.00$1,250,000.00
$55,000.00 2021STPFLEX $44,000.00$50,000.00
$550,000.00 2022NHPP $495,000.00$500,000.00
$55,000.00 2022STPFLEX $44,000.00$50,000.00
$7,330,110.00Total Cost $4,885,000.00$6,715,100.00
Page 120 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000072 MOVEABLE BRIDGE PROGRAM (ELEC/MECH) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2019STPFLEX $80,000.00Design (Engineering) $100,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$1,100.00 2019FBROFF $880.00Construction $1,000.00
$330,000.00 2019NHPP $264,000.00$300,000.00
$550,000.00 2019STCASH $0.00$500,000.00
$330,000.00 2019STP<200K $264,000.00$300,000.00
$1,540,000.00 2019STPFLEX $1,232,000.00$1,400,000.00
$826,100.00 2020FBROFF $660,880.00$751,000.00
$330,000.00 2020NHPP $264,000.00$300,000.00
$330,000.00 2020STP<200K $264,000.00$300,000.00
$2,695,000.00 2020STPFLEX $2,156,000.00$2,450,000.00
$1,100.00 2021FBROFF $880.00$1,000.00
$330,000.00 2021STP<200K $264,000.00$300,000.00
$1,870,000.00 2021STPFLEX $1,496,000.00$1,700,000.00
$1,100.00 2022FBROFF $880.00$1,000.00
$2,200,000.00 2022STPFLEX $1,760,000.00$2,000,000.00
$11,734,400.00Total Cost $8,947,520.00$10,704,000.00
Page 121 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000073 URGENT BRIDGE REPAIR/REPLACEMENT 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$10,000.00 2019NHPP $8,000.00Environmental $10,000.00
$10,000.00 2020NHPP $8,000.00$10,000.00
$10,000.00 2021NHPP $8,000.00$10,000.00
$10,000.00 2022NHPP $8,000.00$10,000.00
$10,000.00 2019NHPP $8,000.00Utility Relocation $10,000.00
$10,000.00 2020NHPP $8,000.00$10,000.00
$10,000.00 2021NHPP $8,000.00$10,000.00
$10,000.00 2022NHPP $8,000.00$10,000.00
$250,000.00 2019NHPP $200,000.00Design (Engineering) $250,000.00
$1,000,000.00 2019REIMB $0.00$1,000,000.00
$250,000.00 2019STPFLEX $200,000.00$250,000.00
$500,000.00 2020NHPP $400,000.00$500,000.00
$1,000,000.00 2020REIMB $0.00$1,000,000.00
$500,000.00 2020STPFLEX $400,000.00$500,000.00
$2,000,000.00 2021NHPP $1,600,000.00$2,000,000.00
$1,000,000.00 2021REIMB $0.00$1,000,000.00
$2,000,000.00 2021STPFLEX $1,600,000.00$2,000,000.00
$2,000,000.00 2022NHPP $1,600,000.00$2,000,000.00
$1,000,000.00 2022REIMB $0.00$1,000,000.00
$2,000,000.00 2022STPFLEX $1,600,000.00$2,000,000.00
$550,000.00 2019NHPP $440,000.00Construction $500,000.00
$4,400,000.00 2019REIMB $0.00$4,000,000.00
$550,000.00 2019STPFLEX $440,000.00$500,000.00
$1,100,000.00 2020NHPP $880,000.00$1,000,000.00
$4,400,000.00 2020REIMB $0.00$4,000,000.00
$1,100,000.00 2020STP<200K $880,000.00$1,000,000.00
$4,400,000.00 2020STPFLEX $3,520,000.00$4,000,000.00
$5,500,000.00 2021NHPP $4,400,000.00$5,000,000.00
$4,400,000.00 2021REIMB $0.00$4,000,000.00
$1,100,000.00 2021STP<200K $880,000.00$1,000,000.00
$4,400,000.00 2021STPFLEX $3,520,000.00$4,000,000.00
$5,500,000.00 2022NHPP $4,400,000.00$5,000,000.00
$4,400,000.00 2022REIMB $0.00$4,000,000.00
$5,500,000.00 2022STPFLEX $4,400,000.00$5,000,000.00
$60,880,000.00Total Cost $31,424,000.00$56,580,000.00
Page 122 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000074 BRIDGE PREVENTIVE MAINTENANCE PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$600,000.00 2019NHPP $480,000.00Design (Engineering) $600,000.00
$600,000.00 2019STPFLEX $480,000.00$600,000.00
$600,000.00 2020NHPP $480,000.00$600,000.00
$600,000.00 2020STPFLEX $480,000.00$600,000.00
$1,200,000.00 2021NHPP $960,000.00$1,200,000.00
$600,000.00 2021STPFLEX $480,000.00$600,000.00
$600,000.00 2022NHPP $480,000.00$600,000.00
$600,000.00 2022STPFLEX $480,000.00$600,000.00
$4,950,000.00 2019NHPP $3,960,000.00Construction $4,500,000.00
$275,000.00 2019STP>200K $220,000.00$250,000.00
$275,000.00 2019STPFLEX $220,000.00$250,000.00
$11,000,000.00 2020NHPP $8,800,000.00$10,000,000.00
$412,500.00 2020REIMB $0.00$375,000.00
$5,500,000.00 2020STPFLEX $4,400,000.00$5,000,000.00
$5,500,000.00 2021NHPP $4,400,000.00$5,000,000.00
$11,000,000.00 2021STPFLEX $8,800,000.00$10,000,000.00
$11,000,000.00 2022NHPP $8,800,000.00$10,000,000.00
$5,500,000.00 2022STPFLEX $4,400,000.00$5,000,000.00
$60,812,500.00Total Cost $48,320,000.00$55,775,000.00
Project: L.000075 BRIDGE PAINTING PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$500,000.00 2019NHPP $400,000.00Design (Engineering) $500,000.00
$500,000.00 2019STPFLEX $400,000.00$500,000.00
$500,000.00 2020NHPP $400,000.00$500,000.00
$500,000.00 2020STPFLEX $400,000.00$500,000.00
$500,000.00 2021NHPP $400,000.00$500,000.00
$500,000.00 2021STPFLEX $400,000.00$500,000.00
$500,000.00 2022NHPP $400,000.00$500,000.00
$500,000.00 2022STPFLEX $400,000.00$500,000.00
$275,000.00 2019NHPP $220,000.00Construction $250,000.00
$275,000.00 2019STPFLEX $220,000.00$250,000.00
$550,000.00 2020NHPP $99,000.00$500,000.00
$1,100,000.00 2020STPFLEX $880,000.00$1,000,000.00
$880,000.00 2021NHPP $704,000.00$800,000.00
$14,520,000.00 2021STPFLEX $11,616,000.00$13,200,000.00
$5,500,000.00 2022NHPP $4,400,000.00$5,000,000.00
$1,100,000.00 2022STPFLEX $880,000.00$1,000,000.00
$28,200,000.00Total Cost $22,219,000.00$26,000,000.00
Page 123 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000076 ON-SYSTEM BRIDGE PROGRAM w CE 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2019FBROFF $80,000.00Feasibility $100,000.00
$100,000.00 2019NHPP $80,000.00$100,000.00
$100,000.00 2019STPFLEX $80,000.00$100,000.00
$100,000.00 2020FBROFF $80,000.00$100,000.00
$100,000.00 2020NHPP $80,000.00$100,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$100,000.00 2021FBROFF $80,000.00$100,000.00
$100,000.00 2021NHPP $80,000.00$100,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$100,000.00 2022FBROFF $80,000.00$100,000.00
$100,000.00 2022NHPP $80,000.00$100,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$300,000.00 2019FBROFF $240,000.00Environmental $300,000.00
$400,000.00 2019NHPP $320,000.00$400,000.00
$300,000.00 2019STPFLEX $240,000.00$300,000.00
$300,000.00 2020FBROFF $240,000.00$300,000.00
$200,000.00 2020LOCAL $0.00$200,000.00
$400,000.00 2020NHPP $320,000.00$400,000.00
$300,000.00 2020STPFLEX $240,000.00$300,000.00
$300,000.00 2021FBROFF $240,000.00$300,000.00
$400,000.00 2021NHPP $320,000.00$400,000.00
$300,000.00 2021STPFLEX $240,000.00$300,000.00
$300,000.00 2022FBROFF $240,000.00$300,000.00
$1,000,000.00 2022NHPP $800,000.00$1,000,000.00
$300,000.00 2022STPFLEX $240,000.00$300,000.00
$1,000,000.00 2019FBROFF $800,000.00Right of Way $1,000,000.00
$500,000.00 2019NHPP $400,000.00$500,000.00
$1,000,000.00 2019STCASH $0.00$1,000,000.00
$500,000.00 2019STP<5K $400,000.00$500,000.00
$1,000,000.00 2019STPFLEX $800,000.00$1,000,000.00
$1,000,000.00 2020FBROFF $800,000.00$1,000,000.00
$1,000,000.00 2020NHPP $800,000.00$1,000,000.00
$3,000,000.00 2020STPFLEX $2,400,000.00$3,000,000.00
$1,600,000.00 2021FBROFF $1,280,000.00$1,600,000.00
$1,000,000.00 2021NHPP $800,000.00$1,000,000.00
$1,000,000.00 2021STP<5K $800,000.00$1,000,000.00
$2,000,000.00 2021STPFLEX $1,600,000.00$2,000,000.00
$1,000,000.00 2022FBROFF $800,000.00$1,000,000.00
$2,000,000.00 2022NHPP $1,600,000.00$2,000,000.00
$2,000,000.00 2022STPFLEX $1,600,000.00$2,000,000.00
$1,200,000.00 2019FBROFF $960,000.00Utility Relocation $1,200,000.00
$1,000,000.00 2019NHPP $800,000.00$1,000,000.00
$300,000.00 2019STP<5K $240,000.00$300,000.00
$2,500,000.00 2019STPFLEX $2,000,000.00$2,500,000.00
$500,000.00 2020FBROFF $400,000.00$500,000.00
$100,000.00 2020LOCAL $0.00$100,000.00
$1,000,000.00 2020NHPP $800,000.00$1,000,000.00
$100,000.00 2020STP<5K $80,000.00$100,000.00
$6,250,000.00 2020STPFLEX $5,000,000.00$6,250,000.00
$500,000.00 2021FBROFF $400,000.00$500,000.00
$250,000.00 2021NHPP $200,000.00$250,000.00
$1,250,000.00 2021STP<5K $1,000,000.00$1,250,000.00
Page 124 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
$2,000,000.00 2021STPFLEX $1,600,000.00Utility Relocation $2,000,000.00
$500,000.00 2022FBROFF $400,000.00$500,000.00
$2,000,000.00 2022NHPP $1,600,000.00$2,000,000.00
$1,500,000.00 2022STPFLEX $1,200,000.00$1,500,000.00
$250,000.00 2019FBROFF $200,000.00Design (Engineering) $250,000.00
$1,800,000.00 2019NHPP $1,440,000.00$1,800,000.00
$20,000.00 2019STCASH $0.00$20,000.00
$250,000.00 2019STP<5K-E $200,000.00$250,000.00
$500,000.00 2019STPFLEX $400,000.00$500,000.00
$600,000.00 2020FBR<200K-E $480,000.00$600,000.00
$3,250,000.00 2020FBROFF $2,600,000.00$3,250,000.00
$2,000,000.00 2020NHPP $1,600,000.00$2,000,000.00
$400,000.00 2020REIMB $0.00$400,000.00
$40,000.00 2020STCASH $0.00$40,000.00
$1,500,000.00 2020STP<5K $1,200,000.00$1,500,000.00
$4,450,000.00 2020STP<5K-E $3,560,000.00$4,450,000.00
$2,000,000.00 2020STPFLEX $1,600,000.00$2,000,000.00
$750,000.00 2021FBROFF $600,000.00$750,000.00
$150,000.00 2021LOCAL $0.00$150,000.00
$5,500,000.00 2021NFA $0.00$5,500,000.00
$2,000,000.00 2021NHPP $1,600,000.00$2,000,000.00
$200,000.00 2021REIMB $0.00$200,000.00
$750,000.00 2021STP<5K $600,000.00$750,000.00
$8,000,000.00 2021STPFLEX $6,400,000.00$8,000,000.00
$1,000,000.00 2022FBROFF $800,000.00$1,000,000.00
$2,000,000.00 2022NHPP $1,600,000.00$2,000,000.00
$2,000,000.00 2022STPFLEX $1,600,000.00$2,000,000.00
$8,800,000.00 2019FBROFF $7,040,000.00Construction $8,000,000.00
$275,000.00 2019HSIP $247,500.00$250,000.00
$6,600,000.00 2019NHPP $5,280,000.00$6,000,000.00
$550,000.00 2019REIMB $0.00$500,000.00
$13,200,000.00 2019STCASH $0.00$12,000,000.00
$275,000.00 2019STP<5K $220,000.00$250,000.00
$3,300,000.00 2019STP<5K-E $2,640,000.00$3,000,000.00
$62,370,000.00 2019STPFLEX $49,896,000.00$56,700,000.00
$13,200,000.00 2020FBROFF $10,560,000.00$12,000,000.00
$550,000.00 2020NFA $0.00$500,000.00
$147,400,000.00 2020NHPP $117,920,000.00$134,000,000.00
$19,800,000.00 2020NHPP-E $15,840,000.00$18,000,000.00
$1,100,000.00 2020REIMB $0.00$1,000,000.00
$30,800,000.00 2020STCASH $0.00$28,000,000.00
$17,600,000.00 2020STP<200K $14,080,000.00$16,000,000.00
$17,600,000.00 2020STP<5K $14,080,000.00$16,000,000.00
$50,600,000.00 2020STPFLEX $40,480,000.00$46,000,000.00
$3,300,000.00 2021DEMO $2,640,000.00$3,000,000.00
$33,000,000.00 2021FBROFF $26,400,000.00$30,000,000.00
$1,650,000.00 2021HSIP $1,485,000.00$1,500,000.00
$1,650,000.00 2021NFA $0.00$1,500,000.00
$49,500,000.00 2021NHPP $39,600,000.00$45,000,000.00
$550,000.00 2021OTHER $0.00$500,000.00
$1,100,000.00 2021REIMB $0.00$1,000,000.00
$1,650,000.00 2021STP<200K $1,320,000.00$1,500,000.00
$30,800,000.00 2021STP<5K $24,640,000.00$28,000,000.00
$34,100,000.00 2021STPFLEX $27,280,000.00$31,000,000.00
$11,000,000.00 2022DEMO $8,800,000.00$10,000,000.00
$550,000.00 2022ER $440,000.00$500,000.00
$22,000,000.00 2022FBROFF $17,600,000.00$20,000,000.00
$27,500,000.00 2022NHPP $22,000,000.00$25,000,000.00
Page 125 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
$2,200,000.00 2022REIMB $0.00Construction $2,000,000.00
$1,650,000.00 2022STP<200K $1,320,000.00$1,500,000.00
$32,312,500.00 2022STPFLEX $25,850,000.00$29,375,000.00
$734,492,500.00Total Cost $540,338,500.00$675,535,000.00
Project: L.000077 BRIDGE SCOUR ANALYSIS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2019NHPP $40,000.00Design (Engineering) $50,000.00
$50,000.00 2020NHPP $40,000.00$50,000.00
$50,000.00 2021NHPP $40,000.00$50,000.00
$50,000.00 2022NHPP $40,000.00$50,000.00
$55,000.00 2019NHPP $44,000.00Construction $50,000.00
$55,000.00 2020NHPP $44,000.00$50,000.00
$55,000.00 2021NHPP $44,000.00$50,000.00
$55,000.00 2022NHPP $44,000.00$50,000.00
$420,000.00Total Cost $336,000.00$400,000.00
Project: L.000078 OFF-SYSTEM BRIDGE REPLACEMENT PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$200,000.00 2019FBROFF $160,000.00Environmental $200,000.00
$200,000.00 2020FBROFF $160,000.00$200,000.00
$200,000.00 2021FBROFF $160,000.00$200,000.00
$200,000.00 2022FBROFF $160,000.00$200,000.00
$300,000.00 2019FBROFF $240,000.00Design (Engineering) $300,000.00
$250,000.00 2019STP<5K-E $200,000.00$250,000.00
$500,000.00 2020FBR<200K-E $400,000.00$500,000.00
$700,000.00 2020FBROFF $560,000.00$700,000.00
$2,700,000.00 2020STP<5K-E $2,160,000.00$2,700,000.00
$1,300,000.00 2021FBROFF $1,040,000.00$1,300,000.00
$200,000.00 2021STPFLEX $160,000.00$200,000.00
$1,400,000.00 2022FBROFF $1,120,000.00$1,400,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$13,750,000.00 2019FBROFF $11,000,000.00Construction $12,500,000.00
$1,650,000.00 2019STCASH $0.00$1,500,000.00
$275,000.00 2019STP<200K $220,000.00$250,000.00
$550,000.00 2019STPFLEX $440,000.00$500,000.00
$27,500,000.00 2020FBROFF $22,000,000.00$25,000,000.00
$2,750,000.00 2020STCASH $0.00$2,500,000.00
$22,000,000.00 2020STGEN $0.00$20,000,000.00
$2,200,000.00 2020STP<200K $1,760,000.00$2,000,000.00
$24,200,000.00 2021FBROFF $19,360,000.00$22,000,000.00
$1,100,000.00 2021STCASH $0.00$1,000,000.00
$22,000,000.00 2021STGEN $0.00$20,000,000.00
$24,200,000.00 2022FBROFF $19,360,000.00$22,000,000.00
$22,000,000.00 2022STGEN $0.00$20,000,000.00
$172,425,000.00Total Cost $80,740,000.00$157,500,000.00
Page 126 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000079 BRIDGE DISCRETIONARY PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$20,000.00 2019BDP $16,000.00Design (Engineering) $20,000.00
$20,000.00 2020BDP $16,000.00$20,000.00
$20,000.00 2021BDP $16,000.00$20,000.00
$20,000.00 2022BDP $16,000.00$20,000.00
$110,000.00 2019BDP $88,000.00Construction $100,000.00
$110,000.00 2020BDP $88,000.00$100,000.00
$110,000.00 2021BDP $88,000.00$100,000.00
$110,000.00 2022BDP $88,000.00$100,000.00
$520,000.00Total Cost $416,000.00$480,000.00
Project: L.000080 MISC FEDERAL DISCRETIONARY PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2019FLH $80,000.00Design (Engineering) $100,000.00
$100,000.00 2020FLH $80,000.00$100,000.00
$100,000.00 2021FLH $80,000.00$100,000.00
$100,000.00 2022FLH $80,000.00$100,000.00
$440,000.00 2019FLH $352,000.00Construction $400,000.00
$220,000.00 2019STP<5K $176,000.00$200,000.00
$110,000.00 2020FLH $88,000.00$100,000.00
$110,000.00 2021FLH $88,000.00$100,000.00
$110,000.00 2022FLH $88,000.00$100,000.00
$1,390,000.00Total Cost $1,112,000.00$1,300,000.00
Page 127 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000081 VARIOUS DEMO PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$200,000.00 2019DEMO $160,000.00Feasibility $200,000.00
$180,000.00 2020DEMO $144,000.00$180,000.00
$20,000.00 2020RAIL HE $20,000.00$20,000.00
$50,000.00 2020STCASH $0.00$50,000.00
$200,000.00 2021DEMO $160,000.00$200,000.00
$200,000.00 2022DEMO $160,000.00$200,000.00
$200,000.00 2019DEMO $160,000.00Environmental $200,000.00
$200,000.00 2020DEMO $160,000.00$200,000.00
$200,000.00 2021DEMO $160,000.00$200,000.00
$200,000.00 2022DEMO $160,000.00$200,000.00
$200,000.00 2019DEMO $160,000.00Right of Way $200,000.00
$200,000.00 2020DEMO $160,000.00$200,000.00
$200,000.00 2021DEMO $160,000.00$200,000.00
$200,000.00 2022DEMO $160,000.00$200,000.00
$200,000.00 2019DEMO $160,000.00Utility Relocation $200,000.00
$150,000.00 2020DEMO $120,000.00$150,000.00
$50,000.00 2020HSIP $50,000.00$50,000.00
$150,000.00 2021DEMO $120,000.00$150,000.00
$50,000.00 2021HSIP $45,000.00$50,000.00
$200,000.00 2022DEMO $160,000.00$200,000.00
$200,000.00 2019DEMO $160,000.00Design (Engineering) $200,000.00
$800,000.00 2020DEMO $640,000.00$800,000.00
$200,000.00 2021DEMO $160,000.00$200,000.00
$200,000.00 2022DEMO $160,000.00$200,000.00
$4,180,000.00 2019DEMO $3,344,000.00Construction $3,800,000.00
$1,320,000.00 2019STPFLEX $1,056,000.00$1,200,000.00
$3,850,000.00 2020DEMO $3,080,000.00$3,500,000.00
$1,650,000.00 2020HSIP $1,650,000.00$1,500,000.00
$3,850,000.00 2021DEMO $3,080,000.00$3,500,000.00
$1,650,000.00 2021HSIP $1,650,000.00$1,500,000.00
$5,500,000.00 2022DEMO $4,400,000.00$5,000,000.00
$26,650,000.00Total Cost $21,959,000.00$24,650,000.00
Page 128 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000082 MISC STATEWIDE TCSP PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2019TCSP $40,000.00Right of Way $50,000.00
$50,000.00 2020TCSP $40,000.00$50,000.00
$50,000.00 2021TCSP $40,000.00$50,000.00
$50,000.00 2022TCSP $40,000.00$50,000.00
$50,000.00 2019TCSP $40,000.00Utility Relocation $50,000.00
$50,000.00 2020TCSP $40,000.00$50,000.00
$50,000.00 2021TCSP $40,000.00$50,000.00
$50,000.00 2022TCSP $40,000.00$50,000.00
$500,000.00 2019TCSP $400,000.00Design (Engineering) $500,000.00
$500,000.00 2020TCSP $400,000.00$500,000.00
$500,000.00 2021TCSP $400,000.00$500,000.00
$500,000.00 2022TCSP $400,000.00$500,000.00
$275,000.00 2019STP>200K $220,000.00Construction $250,000.00
$275,000.00 2019TCSP $220,000.00$250,000.00
$1,100,000.00 2020TCSP $880,000.00$1,000,000.00
$1,100,000.00 2021TCSP $880,000.00$1,000,000.00
$1,100,000.00 2022TCSP $880,000.00$1,000,000.00
$6,250,000.00Total Cost $5,000,000.00$5,900,000.00
Page 129 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000083 CONVERSION OF AC (INCLUDES DEBT SERVICE) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2019STPFLEX $80,000.00Feasibility $100,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$100,000.00 2019STPFLEX $80,000.00Environmental $100,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$100,000.00 2019STPFLEX $80,000.00Right of Way $100,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$100,000.00 2019STPFLEX $80,000.00Utility Relocation $100,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$100,000.00 2019STPFLEX $80,000.00Design (Engineering) $100,000.00
$100,000.00 2020STPFLEX $80,000.00$100,000.00
$100,000.00 2021STPFLEX $80,000.00$100,000.00
$100,000.00 2022STPFLEX $80,000.00$100,000.00
$11,000,000.00 2019NHPP $9,900,000.00Construction $10,000,000.00
$11,000,000.00 2019STPFLEX $8,800,000.00$10,000,000.00
$11,000,000.00 2020NHPP $9,900,000.00$10,000,000.00
$11,000,000.00 2020STPFLEX $8,800,000.00$10,000,000.00
$11,000,000.00 2021NHPP $9,900,000.00$10,000,000.00
$11,000,000.00 2021STPFLEX $8,800,000.00$10,000,000.00
$11,000,000.00 2022NHPP $9,900,000.00$10,000,000.00
$11,000,000.00 2022STPFLEX $8,800,000.00$10,000,000.00
$90,000,000.00Total Cost $76,400,000.00$82,000,000.00
Page 130 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000084 MODIFIED PROJECT AGREEMENT 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$250,000.00 2019STPFLEX $200,000.00Feasibility $250,000.00
$250,000.00 2020STPFLEX $200,000.00$250,000.00
$250,000.00 2021STPFLEX $200,000.00$250,000.00
$250,000.00 2022STPFLEX $200,000.00$250,000.00
$250,000.00 2019STPFLEX $200,000.00Environmental $250,000.00
$250,000.00 2020STPFLEX $200,000.00$250,000.00
$250,000.00 2021STPFLEX $200,000.00$250,000.00
$250,000.00 2022STPFLEX $200,000.00$250,000.00
$500,000.00 2019STPFLEX $400,000.00Right of Way $500,000.00
$500,000.00 2020STPFLEX $400,000.00$500,000.00
$500,000.00 2021STPFLEX $400,000.00$500,000.00
$500,000.00 2022STPFLEX $400,000.00$500,000.00
$500,000.00 2019STPFLEX $400,000.00Utility Relocation $500,000.00
$500,000.00 2020STPFLEX $400,000.00$500,000.00
$500,000.00 2021STPFLEX $400,000.00$500,000.00
$500,000.00 2022STPFLEX $400,000.00$500,000.00
$500,000.00 2019STPFLEX $400,000.00Design (Engineering) $500,000.00
$500,000.00 2020STPFLEX $400,000.00$500,000.00
$500,000.00 2021STPFLEX $400,000.00$500,000.00
$500,000.00 2022STPFLEX $400,000.00$500,000.00
$11,000,000.00 2019STPFLEX $8,800,000.00Construction $10,000,000.00
$11,000,000.00 2020STPFLEX $8,800,000.00$10,000,000.00
$11,000,000.00 2021STPFLEX $8,800,000.00$10,000,000.00
$11,000,000.00 2022STPFLEX $8,800,000.00$10,000,000.00
$52,000,000.00Total Cost $41,600,000.00$48,000,000.00
Project: L.000085 ADVANCED TRAFFIC MANAGEMENT CENTER 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$220,000.00 2019CM $176,000.00Construction $200,000.00
$220,000.00 2020CM $176,000.00$200,000.00
$220,000.00 2021CM $176,000.00$200,000.00
$220,000.00 2022CM $176,000.00$200,000.00
$880,000.00Total Cost $704,000.00$800,000.00
Page 131 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000087 STAGE 0 AND FEASIBILITY STUDIES 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$650,000.00 2019DEMO $520,000.00Feasibility $650,000.00
$250,000.00 2019HSIP $225,000.00$250,000.00
$300,000.00 2019HSIPPEN $300,000.00$300,000.00
$1,600,000.00 2019NHPP $1,280,000.00$1,600,000.00
$2,500,000.00 2019STCASH $2,500,000.00$2,500,000.00
$2,300,000.00 2019STPFLEX $1,840,000.00$2,300,000.00
$500,000.00 2020DEMO $400,000.00$500,000.00
$500,000.00 2020HSIP $450,000.00$500,000.00
$250,000.00 2020HSIPPEN $250,000.00$250,000.00
$1,500,000.00 2020NHPP $1,200,000.00$1,500,000.00
$500,000.00 2020STCASH $0.00$500,000.00
$1,750,000.00 2020STPFLEX $1,400,000.00$1,750,000.00
$400,000.00 2021FBROFF $320,000.00$400,000.00
$500,000.00 2021HSIP $450,000.00$500,000.00
$700,000.00 2021HSIPPEN $700,000.00$700,000.00
$900,000.00 2021NHPP $720,000.00$900,000.00
$250,000.00 2021STCASH $0.00$250,000.00
$1,600,000.00 2021STPFLEX $1,280,000.00$1,600,000.00
$500,000.00 2022HSIP $450,000.00$500,000.00
$1,000,000.00 2022HSIPPEN $1,000,000.00$1,000,000.00
$1,000,000.00 2022NHPP $800,000.00$1,000,000.00
$500,000.00 2022STCASH $0.00$500,000.00
$1,000,000.00 2022STPFLEX $800,000.00$1,000,000.00
$20,950,000.00Total Cost $16,885,000.00$20,950,000.00
Project: L.000092 DBE SUPPORTIVE SERVICES 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$300,000.00 2019DBE/SS $300,000.00Feasibility $300,000.00
$300,000.00 2020DBE/SS $300,000.00$300,000.00
$300,000.00 2021DBE/SS $300,000.00$300,000.00
$300,000.00 2022DBE/SS $300,000.00$300,000.00
$1,200,000.00Total Cost $1,200,000.00$1,200,000.00
Page 132 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000093 STATEWIDE CONGESTION MITIGATION 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Work TypeType ImprovementRemarks
, CONGESTION MITIGATION,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2019STPFLEX $100,000.00Feasibility $100,000.00
$100,000.00 2020STPFLEX $100,000.00$100,000.00
$100,000.00 2021STPFLEX $100,000.00$100,000.00
$100,000.00 2022STPFLEX $100,000.00$100,000.00
$100,000.00 2019CM $100,000.00Environmental $100,000.00
$100,000.00 2020CM $100,000.00$100,000.00
$100,000.00 2021CM $100,000.00$100,000.00
$100,000.00 2022CM $100,000.00$100,000.00
$100,000.00 2019CM $100,000.00Right of Way $100,000.00
$100,000.00 2020CM $100,000.00$100,000.00
$100,000.00 2021CM $100,000.00$100,000.00
$100,000.00 2022CM $100,000.00$100,000.00
$100,000.00 2019CM $100,000.00Utility Relocation $100,000.00
$100,000.00 2020CM $100,000.00$100,000.00
$100,000.00 2021CM $100,000.00$100,000.00
$100,000.00 2022CM $100,000.00$100,000.00
$100,000.00 2019CM $100,000.00Design (Engineering) $100,000.00
$100,000.00 2020CM $100,000.00$100,000.00
$100,000.00 2021CM $100,000.00$100,000.00
$100,000.00 2022CM $100,000.00$100,000.00
$275,000.00 2019CM $275,000.00Construction $250,000.00
$5,060,000.00 2020CM $5,060,000.00$4,600,000.00
$5,060,000.00 2021CM $5,060,000.00$4,600,000.00
$5,060,000.00 2022CM $5,060,000.00$4,600,000.00
$17,455,000.00Total Cost $17,455,000.00$16,050,000.00
Page 133 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000094 URBAN TRANSIT(INCL TRANSFER TO AGENCIES) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Work TypeType ImprovementRemarks
, URBAN SYSTEMS,
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$50,000.00 2019STPFLEX $50,000.00Design (Engineering) $50,000.00
$2,100,000.00 2019TAP>200K $2,100,000.00$2,100,000.00
$50,000.00 2020STPFLEX $50,000.00$50,000.00
$50,000.00 2021STPFLEX $50,000.00$50,000.00
$50,000.00 2022STPFLEX $50,000.00$50,000.00
$2,200,000.00 2019CM $2,200,000.00Construction $2,000,000.00
$550,000.00 2019FB DISCR $550,000.00$500,000.00
$1,100,000.00 2019STP<200K $1,100,000.00$1,000,000.00
$1,100,000.00 2019STP>200K $1,100,000.00$1,000,000.00
$17,600,000.00 2019STPFLEX $17,600,000.00$16,000,000.00
$2,200,000.00 2020CM $2,200,000.00$2,000,000.00
$550,000.00 2020FB DISCR $550,000.00$500,000.00
$1,100,000.00 2020STP<200K $1,100,000.00$1,000,000.00
$1,100,000.00 2020STP>200K $1,100,000.00$1,000,000.00
$1,100,000.00 2020STPFLEX $1,100,000.00$1,000,000.00
$2,200,000.00 2021CM $2,200,000.00$2,000,000.00
$550,000.00 2021FB DISCR $550,000.00$500,000.00
$1,100,000.00 2021STP<200K $1,100,000.00$1,000,000.00
$1,100,000.00 2021STP>200K $1,100,000.00$1,000,000.00
$1,100,000.00 2021STPFLEX $1,100,000.00$1,000,000.00
$2,200,000.00 2022CM $2,200,000.00$2,000,000.00
$550,000.00 2022FB DISCR $550,000.00$500,000.00
$1,100,000.00 2022STP<200K $1,100,000.00$1,000,000.00
$1,100,000.00 2022STP>200K $1,100,000.00$1,000,000.00
$1,100,000.00 2022STPFLEX $1,100,000.00$1,000,000.00
$43,000,000.00Total Cost $43,000,000.00$39,300,000.00
Page 134 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000095 SPECIAL RULE-AREAS 5K OR LESS POPULATION 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$100,000.00 2019STP<5K $80,000.00Environmental $100,000.00
$100,000.00 2020STP<5K $80,000.00$100,000.00
$100,000.00 2021STP<5K $80,000.00$100,000.00
$100,000.00 2022STP<5K $80,000.00$100,000.00
$100,000.00 2019STP<5K $80,000.00Right of Way $100,000.00
$100,000.00 2020STP<5K $80,000.00$100,000.00
$100,000.00 2021STP<5K $80,000.00$100,000.00
$100,000.00 2022STP<5K $80,000.00$100,000.00
$100,000.00 2019STP<5K $80,000.00Utility Relocation $100,000.00
$100,000.00 2020STP<5K $80,000.00$100,000.00
$100,000.00 2021STP<5K $80,000.00$100,000.00
$100,000.00 2022STP<5K $80,000.00$100,000.00
$100,000.00 2019STP<5K $80,000.00Design (Engineering) $100,000.00
$100,000.00 2020STP<5K $80,000.00$100,000.00
$100,000.00 2021STP<5K $80,000.00$100,000.00
$100,000.00 2022STP<5K $80,000.00$100,000.00
$192,500.00 2019STP<5K $154,000.00Construction $175,000.00
$4,592,500.00 2020STP<5K $3,674,000.00$4,175,000.00
$1,100,000.00 2020STPFLEX $880,000.00$1,000,000.00
$4,592,500.00 2021STP<5K $3,674,000.00$4,175,000.00
$4,592,500.00 2022STP<5K $3,674,000.00$4,175,000.00
$16,670,000.00Total Cost $13,336,000.00$15,300,000.00
Page 135 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4
STIPSTATE OF LOUISIANA
STIP Date 10/01/2018 STIP Version 2019 (Approved)
LINE ITEMS
Project: L.000096 FERRY BOAT MECH/ELECT/DISCR PROGRAMS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:
Urbanized Area: LINE ITEMS
Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share
$800,000.00 2019FB DISCR $640,000.00Design (Engineering) $800,000.00
$10,000.00 2019STCASH $0.00$10,000.00
$10,000.00 2019STPFLEX $8,000.00$10,000.00
$10,000.00 2020FB DISCR $8,000.00$10,000.00
$10,000.00 2020STCASH $0.00$10,000.00
$10,000.00 2020STPFLEX $8,000.00$10,000.00
$10,000.00 2021FB DISCR $8,000.00$10,000.00
$10,000.00 2021STCASH $0.00$10,000.00
$10,000.00 2021STPFLEX $8,000.00$10,000.00
$10,000.00 2022FB DISCR $8,000.00$10,000.00
$10,000.00 2022STCASH $0.00$10,000.00
$10,000.00 2022STPFLEX $8,000.00$10,000.00
$6,600,000.00 2019FB DISCR $5,280,000.00Construction $6,000,000.00
$1,100,000.00 2019STCASH $0.00$1,000,000.00
$1,100,000.00 2019STPFLEX $880,000.00$1,000,000.00
$2,420,000.00 2020FB DISCR $1,936,000.00$2,200,000.00
$1,100,000.00 2020STCASH $0.00$1,000,000.00
$1,100,000.00 2020STPFLEX $880,000.00$1,000,000.00
$1,320,000.00 2021FB DISCR $1,056,000.00$1,200,000.00
$1,100,000.00 2021STCASH $0.00$1,000,000.00
$2,200,000.00 2021STPFLEX $1,760,000.00$2,000,000.00
$1,320,000.00 2022FB DISCR $1,056,000.00$1,200,000.00
$1,100,000.00 2022STCASH $0.00$1,000,000.00
$3,300,000.00 2022STP<5K-E $2,640,000.00$3,000,000.00
$2,200,000.00 2022STPFLEX $1,760,000.00$2,000,000.00
$26,870,000.00Total Cost $17,944,000.00$24,510,000.00
Page 136 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4