stip - louisiana...$684,000.00 $684,000.00 $547,200.00 stp>200k 2019 city of kenner utility...

136
STIP STATE OF LOUISIANA STIP Date 10/01/2018 STIP Version 2019 (Approved) NEW ORLEANS Project: H.002264 LA 302: BAYOU BARATARIA MB REPLACEMENT LA 45 JEFFERSON 4.87 5.44 249-90 Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road: LA 302-P JEFFERSON 0.00 0.28 826-64 Urbanized Area: NEW ORLEANS Work Type Type Improvement Remarks BRIDGE REPL.(KERNER'S) 249-90-0041;TEA-21 KERNER'S FERRY BRIDGE, PRIORITY BRIDGE PROJECT; 249-90 TTF MATCH 826-64 NFA MATCH DEMO / HIGH PRIORITY, Project Phase Project Cost Year Fund Sponsor Tot Cost(w/CE&I+IDC) Federal Share $1,700,000.00 2017 FBROFF $1,360,000.00 Right of Way $1,700,000.00 $1,639,327.00 2017 STPFLEX $1,311,461.60 $1,639,327.00 $30,000.00 2019 DEMO $24,000.00 Utility Relocation $30,000.00 $20,570,000.00 2022 FBROFF $16,456,000.00 Construction $18,700,000.00 $7,480,000.00 2022 STPFLEX $5,984,000.00 $6,800,000.00 $31,419,327.00 Total Cost $25,135,461.60 $28,869,327.00 Project: H.002956 EARHART AT DAKIN LA 3139 JEFFERSON 4.54 4.55 430-01 Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road: Urbanized Area: NEW ORLEANS Work Type Type Improvement Remarks RAMP CONNECTOR (EB EARHART - DAKIN) 430-01-0020; USE TTF AS MATCH, URBAN SYSTEMS, Project Phase Project Cost Year Fund Sponsor Tot Cost(w/CE&I+IDC) Federal Share $339,587.00 2017 STP>200K $271,669.60 Design (Engineering) $339,587.00 $3,960,000.00 2021 STP>200K $3,168,000.00 Construction $3,600,000.00 $4,299,587.00 Total Cost $3,439,669.60 $3,939,587.00 Project: H.004424 AIRLINE AT CLEARVIEW INTERSECTION IMPROV US 61 JEFFERSON 2.84 3.40 007-02 Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road: LA 3152 JEFFERSON 1.06 1.22 826-03 Urbanized Area: NEW ORLEANS Work Type Type Improvement Remarks INTERSECTION IMPROVEMENT, WIDENING, SUBSURFACE DRAINAGE USE TTF AS MATCH FOR PHASES 4 AND 6., LOCAL MATCH FOR PHASES 2 AND 3 URBAN SYSTEMS, Project Phase Project Cost Year Fund Sponsor Tot Cost(w/CE&I+IDC) Federal Share $584,999.25 2009 DEMO $467,999.40 Environmental $584,999.25 $4,730,000.00 2020 STP>200K $3,784,000.00 Construction $4,300,000.00 $5,314,999.25 Total Cost $4,251,999.40 $4,884,999.25 Page 1 of 136 Report Date: 2/12/2021 4:51:54AM Version No: 1.16.4

Upload: others

Post on 10-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.002264 LA 302: BAYOU BARATARIA MB REPLACEMENTLA 45 JEFFERSON 4.87 5.44249-90Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 302-P JEFFERSON 0.00 0.28826-64

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

BRIDGE REPL.(KERNER'S)249-90-0041;TEA-21 KERNER'S FERRY BRIDGE,

PRIORITY BRIDGE PROJECT; 249-90 TTF MATCH

826-64 NFA MATCH

DEMO / HIGH PRIORITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,700,000.00 2017FBROFF $1,360,000.00Right of Way $1,700,000.00

$1,639,327.00 2017STPFLEX $1,311,461.60$1,639,327.00

$30,000.00 2019DEMO $24,000.00Utility Relocation $30,000.00

$20,570,000.00 2022FBROFF $16,456,000.00Construction $18,700,000.00

$7,480,000.00 2022STPFLEX $5,984,000.00$6,800,000.00

$31,419,327.00Total Cost $25,135,461.60$28,869,327.00

Project: H.002956 EARHART AT DAKINLA 3139 JEFFERSON 4.54 4.55430-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

RAMP CONNECTOR (EB EARHART - DAKIN)430-01-0020; USE TTF AS MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$339,587.00 2017STP>200K $271,669.60Design (Engineering) $339,587.00

$3,960,000.00 2021STP>200K $3,168,000.00Construction $3,600,000.00

$4,299,587.00Total Cost $3,439,669.60$3,939,587.00

Project: H.004424 AIRLINE AT CLEARVIEW INTERSECTION IMPROVUS 61 JEFFERSON 2.84 3.40007-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 3152 JEFFERSON 1.06 1.22826-03

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

INTERSECTION IMPROVEMENT, WIDENING, SUBSURFACE

DRAINAGE

USE TTF AS MATCH FOR PHASES 4 AND 6.,

LOCAL MATCH FOR PHASES 2 AND 3

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$584,999.25 2009DEMO $467,999.40Environmental $584,999.25

$4,730,000.00 2020STP>200K $3,784,000.00Construction $4,300,000.00

$5,314,999.25Total Cost $4,251,999.40$4,884,999.25

Page 1 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 2: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.007181 L&A ROAD IMPROVEMENTSJEFFERSON 0.00 0.00000-26Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

NEW ROADWAY AND ALIGNMENTUSE LOCAL AS MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$884,442.00 2017STP>200K JEFFERSON PARISH$707,553.60Right of Way $884,442.00

$729,858.00 2017STP>200K JEFFERSON PARISH$669,086.40Utility Relocation $729,858.00

$4,950,000.00 2022STP>200K JEFFERSON PARISH$3,960,000.00Construction $4,500,000.00

$6,564,300.00Total Cost $5,336,640.00$6,114,300.00

Project: H.007208 HARVEY BLVD EXT(PETERS RD-MANHATTANLA 3017 JEFFERSON 3.58 3.89826-11Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

JEFFERSON 0.00 0.00000-26 HARVEY BOULEVARD

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

NEW ROADWAY EXTENSION742-26-0073; SEE NOTES, USE LOCAL AS MATCH URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$560,020.00 2017STP>200K JEFFERSON PARISH$448,016.00Right of Way $560,020.00

$5,615,000.00 2020STP>200K JEFFERSON PARISH$4,492,000.00Utility Relocation $5,615,000.00

$6,175,020.00Total Cost $4,940,016.00$6,175,020.00

Project: H.007214 EAST AMES BOULEVARD IMPROVEMENTSJEFFERSON 0.00 0.00000-26 AMES BOULEVARDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

WIDEN FROM 2 TO 3 LANES742-26-0080;OREGON DR.-BLANCHE DR, USE

LOCAL AS MATCH

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$570,000.00 2020STP>200K JEFFERSON PARISH$456,000.00Right of Way $570,000.00

$750,000.00 2019STP>200K JEFFERSON PARISH$600,000.00Utility Relocation $750,000.00

$8,140,000.00 2022STP>200K JEFFERSON PARISH$6,512,000.00Construction $7,400,000.00

$9,460,000.00Total Cost $7,568,000.00$8,720,000.00

Project: H.010017 US 90Z: WESTBANK EXPRESSWAY REHABUS 90-Z JEFFERSON 0.00 5.50283-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

MAJOR BRIDGE REHABILITATIONUSE CCCD TOLL CREDITS AS MATCH, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$575,000.00 2021NHPP $575,000.00Design (Engineering) $575,000.00

$13,200,000.00 2021NHPP $13,200,000.00Construction $12,000,000.00

$13,775,000.00Total Cost $13,775,000.00$12,575,000.00

Page 2 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 3: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.010570 LA 49/WILLIAMS BLVD CORRIDOR IMPROVSLA 49 JEFFERSON 2.03 3.18283-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

ACCESS MANAGEMENT/SAFETY IMPROVEMENTS, BIKE

LANES, SIDEWALKS

MATCH FROM THE CITY OF KENNER, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$215,000.00 2018SATRANS CITY OF KENNER$0.00Feasibility $215,000.00

$106,633.50 2018LOCAL CITY OF KENNER$0.00Environmental $106,633.50

$684,000.00 2019HSIP CITY OF KENNER$615,600.00Right of Way $684,000.00

$684,000.00 2019STP>200K CITY OF KENNER$547,200.00$684,000.00

$789,000.00 2019HSIP CITY OF KENNER$710,100.00Utility Relocation $789,000.00

$789,000.00 2019STP>200K CITY OF KENNER$631,200.00$789,000.00

$319,900.49 2018LOCAL CITY OF KENNER$0.00Design (Engineering) $319,900.49

$3,520,000.00 2021HSIPPEN CITY OF KENNER$3,520,000.00Construction $3,200,000.00

$3,520,000.00 2021STP>200K CITY OF KENNER$2,816,000.00$3,200,000.00

$10,627,533.99Total Cost $8,840,100.00$9,987,533.99

Project: H.010673 US90Z:HARVEY CANAL TUNNEL REHABILITATIONUS 90-Z JEFFERSON 3.01 3.37283-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL

REHABILITATI

SEE NOTES FOR FUNDING INFO, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,150,000.00 2019NHPP $1,720,000.00Design (Engineering) $2,150,000.00

$335,000.00 2019STCASH $0.00$335,000.00

$11,176,000.00 2021NHPP $11,176,000.00Construction $10,160,000.00

$2,794,000.00 2021STP>200K $2,794,000.00$2,540,000.00

$16,455,000.00Total Cost $15,690,000.00$15,185,000.00

Project: H.011670 I-10 / LOYOLA INTERCHANGE IMPROVEMENTI-10 JEFFERSON 0.30 0.95450-15Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

INTERCHANGE IMPROVEMENTSTIP PH 6 AC W/GARVEE. SEE NOTES FOR

CONVERSION PLAN,

INTERMODAL CONNECTOR,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,009,897.00 2016STBONDS $0.00Feasibility $1,009,897.00

$1,700,000.00 2017STBONDS $0.00Environmental $1,700,000.00

$40,000,000.00 2019GARVEE $0.00Right of Way $40,000,000.00

$1,000,000.00 2018STBONDS $0.00Design (Engineering) $1,000,000.00

$164,664,500.00 2019GARVEE $0.00Construction $149,695,000.00

$208,374,397.00Total Cost $0.00$193,404,897.00

Page 3 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 4: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.011731 W. ESPLANADE BRIDGES @ DUNCAN CANALJEFFERSON 0.00 0.00000-26 W. ESPLANADERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENTCITY OF KENNER PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$5,995,000.00 2019LOCAL $0.00Construction $5,450,000.00

$9,992,400.00 2019STP>200K $7,993,920.00$9,084,000.00

$15,987,400.00Total Cost $7,993,920.00$14,534,000.00

Project: H.011732 JEFFERSON PARISH: CANAL ST. IMPROVEMENTSJEFFERSON 0.00 0.00000-26 CANAL STREETRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

REHABILITATION, SIDEWALK, AND BIKE LANESJEFFERSON PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2022STP>200K $80,000.00Utility Relocation $100,000.00

$1,708,300.00 2022STP>200K JEFFERSON PARISH$1,366,640.00Construction $1,553,000.00

$1,808,300.00Total Cost $1,446,640.00$1,653,000.00

Project: H.011752 SEVERN AVE: VETERANS - W. ESPLANADEJEFFERSON 0.00 0.00000-26 SEVERN AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

CONCRETE REHABILITATION WITH DRAINAGE & PED

IMPROVEMENTS

JEFFERSON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,410,000.00 2019LOCAL $0.00Construction $3,100,000.00

$1,540,000.00 2019STP>200K JEFFERSON PARISH$1,232,000.00$1,400,000.00

$7,810,000.00 2019STP>200K-E $6,248,000.00$7,100,000.00

$12,760,000.00Total Cost $7,480,000.00$11,600,000.00

Project: H.011779 POWER BLVD MEDIAN IMPROVEMENTSJEFFERSON 0.00 0.00000-26 POWER BOULEVARDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

MULTI-USE PATHMATCH PROVIDED BY CITY OF KENNER., ENHANCEMENTS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,100,000.00 2021STP>200K $880,000.00Construction $1,000,000.00

$2,200,000.00 2021TAP>200K $1,760,000.00$2,000,000.00

$3,300,000.00Total Cost $2,640,000.00$3,000,000.00

Page 4 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 5: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.011797 AMES BLVD (WB EXPY - HAPPY ST)JEFFERSON 0.00 0.00000-26 AMES BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

COLD-MILL AND OVERLAYJEFFERSON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$781,000.00 2020STP>200K JEFFERSON PARISH$624,800.00Construction $710,000.00

$781,000.00Total Cost $624,800.00$710,000.00

Project: H.011798 AIRLINE PARK BLVD (CAMPHOR - W NAPOLEON)JEFFERSON 0.00 0.00000-26 AIRLINE PARKRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

CONCRETE REHABILITATION WITH DRAINAGE

IMPROVEMENTS

JEFFERSON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$6,589,000.00 2019STP>200K $5,271,200.00Construction $5,990,000.00

$6,589,000.00Total Cost $5,271,200.00$5,990,000.00

Project: H.012012 RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR)JEFFERSON 0.00 0.00000-26 RIDGEWOOD / STROELITZRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

CONCRETE OVERLAYJEFFERSON PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,577,400.00 2021STP>200K JEFFERSON PARISH$1,261,920.00Construction $1,434,000.00

$1,577,400.00Total Cost $1,261,920.00$1,434,000.00

Project: H.012553 LA 541: LA 18 (LOUISIANA) - LA 18 (4TH)LA 541 JEFFERSON 1.22 4.18826-13Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 541 JEFFERSON 0.00 1.22826-13

LA 560-2 JEFFERSON 0.00 0.17826-49

LA 18 JEFFERSON 3.46 3.73063-02

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

MILL AND OVERLAY & DRAINAGE AND RELATED WORK, PRESERVATION, NON-INTERSTATE ON STP SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,096,500.00 2019STPFLEX $2,477,200.00Construction $2,815,000.00

$3,096,500.00Total Cost $2,477,200.00$2,815,000.00

Page 5 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 6: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.012620 LA 48: EVANS RD - EDWARDS AVELA 48 JEFFERSON 0.64 0.71006-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$660,000.00 2022NHPP $528,000.00Construction $600,000.00

$660,000.00Total Cost $528,000.00$600,000.00

Project: H.012783 WB VETERANS: SEVERN AVE - CLEARVIEW PKWYJEFFERSON 0.00 0.00000-26 VETERANS BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

RESURFACING/REHABILITATIONJEFFERSON PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,645,500.00 2019STP>200K-E JEFFERSON PARISH$2,116,400.00Construction $2,405,000.00

$2,645,500.00Total Cost $2,116,400.00$2,405,000.00

Project: H.012795 HARVEY TUNNEL DRAINAGE STRUCTURE REPAIRUS 90-Z JEFFERSON 3.08 3.09283-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

REPAIR OF GRATE SYSTEM ON ROADWAY AT TUNNEL

ENTRANCE

OPERATING/MISCELLANEOUS REPAIR FUNDS,

LETTER BID IN THE DISTRICT

OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$38,500.00 2020STCASH $0.00Construction $35,000.00

$38,500.00Total Cost $0.00$35,000.00

Project: H.012884 WOODMERE BLVD. PANEL REPLACEMENTJEFFERSON 0.00 0.00000-26 WOODMERE BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

JEFFERSON 0.00 0.00000-26 WOODMERE BLVD

JEFFERSON 0.00 0.00000-26 WOODMERE BLVD W

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

CONCRETE PANEL REPLACEMENTJEFFERSON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$124,000.00 2018STP>200K JEFFERSON PARISH$99,200.00Design (Engineering) $124,000.00

$3,001,665.70 2020STP>200K JEFFERSON PARISH$2,401,332.56Construction $2,728,787.00

$3,125,665.70Total Cost $2,500,532.56$2,852,787.00

Page 6 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 7: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.012885 LA 466: 5TH ST IMPROVEMENTS (GRETNA)LA 466 JEFFERSON 0.00 0.58063-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

BIKE LANES, MULTI-USE PATHS, ADA SIDEWALKSCITY OF GRETNA WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$-10,000.00 2019STP>200K CITY OF GRETNA$-8,000.00Environmental $-10,000.00

$-277,000.00 2019STP>200K CITY OF GRETNA$-221,600.00Design (Engineering) $-277,000.00

$4,800,400.00 2022STP>200K CITY OF GRETNA$3,840,320.00Construction $4,364,000.00

$4,513,400.00Total Cost $3,610,720.00$4,077,000.00

Project: H.013104 LOYOLA DR IMPROVEMENTS (I-10 - VETERANS)JEFFERSON 0.00 0.00000-26 LOYOLA DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

RELOCATE A FIRE STATION AND BUILD ADDITIONAL

TURNING LANES

LA 1 TOLL CREDITS AS MATCH TO PHASE 3, INTERMODAL CONNECTOR,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$20,000.00 2019STCASH $0.00Right of Way $20,000.00

$3,500,000.00 2019STPFLEX $3,500,000.00$3,500,000.00

$3,520,000.00Total Cost $3,500,000.00$3,520,000.00

Project: H.013757 US 90 & LA 3046: MILL & OVERLAYUS 90 JEFFERSON 0.00 3.23006-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 3046 JEFFERSON 0.00 0.59423-01

LA 3046 JEFFERSON 0.17 0.59423-01

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

MILL AND OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$247,500.00 2020NHPP $198,000.00Construction $225,000.00

$3,412,200.00 2020STP>200K $2,729,760.00$3,102,000.00

$1,620,300.00 2020STP>200K-E $1,296,240.00$1,473,000.00

$650,100.00 2020STPFLEX $520,080.00$591,000.00

$5,930,100.00Total Cost $4,744,080.00$5,391,000.00

Project: H.013813 VINTAGE DR MU PATH: POWER - WILSONJEFFERSON 0.00 0.00000-26 VINTAGE DR MU PATHRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

MUTLI USE PATHJEFFERSON PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,287,000.00 2021STP>200K $1,029,600.00Construction $1,170,000.00

$1,287,000.00Total Cost $1,029,600.00$1,170,000.00

Page 7 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 8: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.013842 CAUSEWAY BLVD - EARHART EXPRESSWAY PH 1ALA 3046 JEFFERSON 0.53 0.81423-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 3139 JEFFERSON 3.31 3.44430-01

JEFFERSON 0.00 0.00000-26 CAUSEWAY RD W

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

REHABILITATION BRIDGE AND ROAD AND ADD ON RAMPJEFFERSON PARISH PROVIDES THE MATCH,

INTERCHANGE PROJECT HAS BEEN SPLIT INTO 6

PHASES

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$4,105,000.00 2019STP>200K $3,284,000.00Right of Way $4,105,000.00

$100,000.00 2021STP>200K $80,000.00Utility Relocation $100,000.00

$2,090,000.00 2022LOCAL $0.00Construction $1,900,000.00

$20,628,861.00 2022NHPP $16,503,088.80$18,753,510.00

$11,880,000.00 2022STP>200K $9,504,000.00$10,800,000.00

$38,803,861.00Total Cost $29,371,088.80$35,658,510.00

Project: H.013939 VETERANS BLVD TRANSIT SIGNAL PRIORITYJEFFERSON 0.00 0.00000-26 VETERANS BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

SIGNAL UPGRADE FOR TRANSIT OPS IMPROVEMENTJEFFERSON PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$457,600.00 2020STP>200K $366,080.00Construction $416,000.00

$457,600.00Total Cost $366,080.00$416,000.00

Project: H.000263 CHEF MENTEUR PASS BRIDGE & APPROACHUS 90 ORLEANS 0.00 0.72006-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 90 ORLEANS 15.83 16.48006-90

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT006-05-0067;STAGE 1 PROJECT, PRIORITY BRIDGE

PROJECT

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,775,000.00 2020STPFLEX $1,420,000.00Right of Way $1,775,000.00

$163,000.00 2020STPFLEX $130,400.00Utility Relocation $163,000.00

$1,938,000.00Total Cost $1,550,400.00$1,938,000.00

Page 8 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 9: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.007272 HOWARD AVENUE EXTENSIONORLEANS 0.00 0.00000-36 HOWARD AVE EXTENSIONRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

NEW 2-LANE ROADWAY742-36-0136;CITY OWNS R/W, DEMO / HIGH PRIORITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$63,367.00 2012DEMO CITY OF NEW ORLEANS$50,693.60Environmental $63,367.00

$116,648.00 2012LOCAL CITY OF NEW ORLEANS$0.00$116,648.00

$267,000.00 2020DEMO $213,600.00Right of Way $267,000.00

$312,606.00 2012DEMO CITY OF NEW ORLEANS$250,084.80Design (Engineering) $312,606.00

$3,548,600.00 2021DEMO CITY OF NEW ORLEANS$2,838,880.00Construction $3,226,000.00

$4,308,221.00Total Cost $3,353,258.40$3,985,621.00

Project: H.007273 MAGAZINE ST (LEAKE AVE TO EAST DRIVE)ORLEANS 0.00 0.00000-36 MAGAZINE STREETRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

REHABILITATION742-36-0137; USE LOCAL AS MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$169,840.00 2021LOCAL $0.00Construction $154,400.00

$4,174,500.00 2021STP>200K CITY OF NEW ORLEANS$3,339,600.00$3,795,000.00

$4,344,340.00Total Cost $3,339,600.00$3,949,400.00

Project: H.007274 MAGAZINE ST (EAST DRIVE TO NASHVILLE)ORLEANS 0.00 0.00000-36 MAGAZINE STREETRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

REHABILITATION742-36-0139; USE LOCAL AS MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,300,000.00 2021STP>200K CITY OF NEW ORLEANS$2,640,000.00Construction $3,000,000.00

$3,300,000.00Total Cost $2,640,000.00$3,000,000.00

Project: H.010018 I-10: NO EAST DRAIN CANAL BRIDGE REPLACEI-10 ORLEANS 19.16 21.76450-90Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$35,640,000.00 2020NHPP $28,512,000.00Construction $32,400,000.00

$35,640,000.00Total Cost $28,512,000.00$32,400,000.00

Page 9 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 10: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.010331 US 90: FLOODWALL - VICTORY RDUS 90 ORLEANS 13.74 14.57006-90Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

RAISING ROADWAY GRADE TO CONSISTENT ELEVATION BY

ADDING ASPH

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$63,000.00 2018STPFLEX $50,400.00Right of Way $63,000.00

$15,740.00 2018STPFLEX $12,592.00Design (Engineering) $15,740.00

$1,090,690.70 2020STPFLEX $872,552.56Construction $991,537.00

$1,169,430.70Total Cost $935,544.56$1,070,277.00

Project: H.011965 LA 47: IWGO BRIDGE REHABILITATION (HBI)LA 47 ORLEANS 1.06 2.32148-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

CLEANING, PAINTING, AND STRUCTURAL REPAIRS, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$600,000.00 2017NHPP $480,000.00Design (Engineering) $600,000.00

$33,000,000.00 2022NHPP $26,400,000.00Construction $30,000,000.00

$33,600,000.00Total Cost $26,880,000.00$30,600,000.00

Project: H.012370 MORRISON RD: MAYO AVE - BULLARD AVEORLEANS 0.00 0.00000-36 MORRISON RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ORLEANS 0.00 0.00000-36 MORRISON RD

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

PRESERVATION ASPHALT OVERLAY AND RELATED ADA

CURB WORK

ORLEANS PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$12,133,000.00 2022STP>200K ORLEANS PARISH$9,706,400.00Construction $11,030,000.00

$12,133,000.00Total Cost $9,706,400.00$11,030,000.00

Project: H.012371 MARCONI DRIVE: CITY PARK AVE - I-610ORLEANS 0.00 0.00000-36 MARCONI DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ORLEANS 0.00 0.00000-36 MARCONI DR

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

REHABILITATION ASPHALT OVERLAY AND ADA CURB WORKORLEANS PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$4,078,800.00 2019STP>200K $3,263,040.00Construction $3,708,000.00

$4,078,800.00Total Cost $3,263,040.00$3,708,000.00

Page 10 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 11: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.012373 ML KING BLVD: S CLAIBORNE - ST. CHARLESORLEANS 0.00 0.00000-36 MARTIN LUTHER KING BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ORLEANS 0.00 0.00000-36 MARTIN LUTHER KING BLVD

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

REHABILITATION ASPHALT OVERLAY AND ADA COMPLIANT

CURBS

ORLEANS PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$5,424,100.00 2020STP>200K ORLEANS PARISH$4,339,280.00Construction $4,931,000.00

$5,424,100.00Total Cost $4,339,280.00$4,931,000.00

Project: H.012956 LA 39: JUDGE SEEBER BR MECH REHAB (HBI)LA 39 ORLEANS 2.33 2.57046-31Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

MECHANICAL REHAB OF SPAN LIFT MACHINERYHISTORIC BRIDGE IMPROVEMENT (HBI), OPER EFFICIENCY/MOTORIST ASSISTANCE, MOVABLE

BRIDGE REHABILITATION

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$814,000.00 2019NHPP $651,200.00Construction $740,000.00

$814,000.00Total Cost $651,200.00$740,000.00

Project: H.013150 ANDREW HIGGINS: MAGAZINE TO CONVENTIONORLEANS 0.00 0.00000-36 ANDREW HIGGINS STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

ROADWAY REHABILITATION, SIDEWALK AND LIGHTING

IMPROVEMENTS

CITY OF NEW ORLEANS TO MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,373,800.00 2022STP>200K ORLEANS PARISH$1,899,040.00Construction $2,158,000.00

$2,373,800.00Total Cost $1,899,040.00$2,158,000.00

Project: H.014134 US 90B @ CLAIBORNE EXIT RAMPUS 90-Z ORLEANS 0.19 0.33283-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

INSTALLATION OF SUBSURFACE DRAINAGE STRUCTURES, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$451,000.00 2020NHPP $405,900.00Construction $410,000.00

$451,000.00Total Cost $405,900.00$410,000.00

Page 11 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 12: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.014344 LA 428 PHASE 1:BEHRMAN AVE TO MERRILL STLA 428 ORLEANS 0.00 0.70409-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

BIKE LANESCITY OF NEW ORLEANS TO PROVIDE THE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2021STP>200K $40,000.00Utility Relocation $50,000.00

$3,083,300.00 2022STP>200K $2,466,640.00Construction $2,803,000.00

$3,133,300.00Total Cost $2,506,640.00$2,853,000.00

Project: H.014345 LA 428 PHASE 2: MERRILL ST TO WILTZ LNLA 428 ORLEANS 0.70 1.24409-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

ACCESS MANAGEMENT FOR BIKE/PED/TRANSITCITY OF NEW ORLEANS TO PROVIDE THE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$75,000.00 2021STP>200K $60,000.00Utility Relocation $75,000.00

$2,942,500.00 2022STP>200K $2,354,000.00Construction $2,675,000.00

$3,017,500.00Total Cost $2,414,000.00$2,750,000.00

Project: H.014486 I-10:NO EAST BRIDGE - LAKE PONTCHARTRAINI-10 ORLEANS 19.73 24.42450-90Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

MILLING AND OVERLAY WITH ASPHALT CONCRETE, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$16,032,500.00 2022NHPP $14,429,250.00Construction $14,575,000.00

$16,032,500.00Total Cost $14,429,250.00$14,575,000.00

Project: H.014530 ALMONASTER AVENUE BRIDGE REHABILITATIONORLEANS 0.00 0.00000-36 ALMONASTER AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

MOVABLE BRIDGE REHABILITATION, OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$4,719,000.00 2022LOCAL $0.00Construction $4,290,000.00

$27,500,000.00 2022NHPP $22,000,000.00$25,000,000.00

$32,219,000.00Total Cost $22,000,000.00$29,290,000.00

Page 12 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 13: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.004791 LA 23: BELLE CHASSE BRIDGE & TUNNEL(HBI)LA 23 PLAQUEMINES 0.35 1.16062-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

REPLACE BRIDGE AND TUNNELSEE NOTES FOR CONVERSION PLAN.STIP PH 6

AC-ED W FUNDS SHOWN, HISTORIC BRIDGE

IMPROVEMENT (HBI)

OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$252,675.00 2008DEMO $202,140.00Feasibility $252,675.00

$666,380.00 2011DEMO $533,104.00Environmental $666,380.00

$1,093,000.00 2011STP>200K $874,400.00$1,093,000.00

$2,209,279.54 2017STPFLEX $1,868,218.63Design (Engineering) $2,209,279.54

$16,469,200.00 2020GARVEE $0.00Construction $14,972,000.00

$100,552,100.00 2020STCASH $0.00$91,411,000.00

$72,691,300.00 2020TOLLS $0.00$66,083,000.00

$193,933,934.54Total Cost $3,477,862.63$176,687,334.54

Project: H.008220 LA 406: ROUNDABOUT AT FE HEBERTLA 406 PLAQUEMINES 0.00 0.50838-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

PLAQUEMINES 0.00 0.00000-38

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

CONSTRUCT ROUNDABOUT, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$120,000.00 2021STP>200K $96,000.00Design (Engineering) $120,000.00

$120,000.00Total Cost $96,000.00$120,000.00

Project: H.012752 LA 46 @ WEINBERGER RD INTERSECTIONLA 46 ST BERNARD 0.88 1.36046-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ST BERNARD 0.00 0.00000-44 WEINBERGER RD

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

INTERSECTION IMPROVEMENTPORT OF ST. BERNARD WILL PROVIDE THE

MATCHFOR CS 000-44, DOTD WILL PROVIDE THE

MATCH FOR CS 046-03

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$300,000.00 2021STP>200K $240,000.00Utility Relocation $300,000.00

$1,540,000.00 2021STP>200K PORT OF ST BERNARD$1,232,000.00Construction $1,400,000.00

$1,840,000.00Total Cost $1,472,000.00$1,700,000.00

Page 13 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 14: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.013525 ST. BERNARD PARISH 40 ARPENT TRAIL, PH 1ST BERNARD 0.00 0.00000-44 40 ARPENT LEVEERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

CONSTRUCTION OF A 8.5 MILE X 10' WIDE, MULTI-USE

TRAIL

ST. BERNARD PARISH GOVERNMENT WILL

PROVIDETHE LOCAL MATCH.,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$5,445,000.00 2020STP>200K $4,356,000.00Construction $4,950,000.00

$5,445,000.00Total Cost $4,356,000.00$4,950,000.00

Project: H.013936 40 ARPENT TRAIL BIKE/PEDESTRIAN BRIDGEST BERNARD 0.00 0.00000-44 40 ARPENT TRAIL BIKE/PEDESTRIAN BRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

GRADE SEPARATION TRAIL - BIKE/PED BRIDGEMATCH PROVIDED BY ST. BERNARD PARISH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$5,456,000.00 2022STP>200K $4,364,800.00Construction $4,960,000.00

$5,456,000.00Total Cost $4,364,800.00$4,960,000.00

Page 14 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 15: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.013945 ST BERNARD BIKEWAYSST BERNARD 0.00 0.00000-44 E ST AVIDE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ST BERNARD 0.00 0.00000-44 E GENIE ST

ST BERNARD 0.00 0.00000-44 E GENIE ST

ST BERNARD 0.00 0.00000-44 E GENIE ST

ST BERNARD 0.00 0.00000-44 PATRICIA ST

ST BERNARD 0.00 0.00000-44 BARTOLO DR

ST BERNARD 0.00 0.00000-44 BENJAMIN ST

ST BERNARD 0.00 0.00000-44 BENJAMIN ST

ST BERNARD 0.00 0.00000-44 COUGAR DR

ST BERNARD 0.00 0.00000-44 DEBOUCHEL BLVD

ST BERNARD 0.00 0.00000-44 E SOLIDELLE ST

ST BERNARD 0.00 0.00000-44 FARMSITE RD

ST BERNARD 0.00 0.00000-44 KINGS DR

ST BERNARD 0.00 0.00000-44 OHIO ST

ST BERNARD 0.00 0.00000-44 SYLVIA BLVD

ST BERNARD 0.00 0.00000-44 SYLVIA DR

ST BERNARD 0.00 0.00000-44 N PETERS ST

ST BERNARD 0.00 0.00000-44 ROWLEY BLVD

ST BERNARD 0.00 0.00000-44 W GENIE ST

LA 47 ST BERNARD 0.00 0.43148-01

LA 47 ST BERNARD 0.43 0.49148-01

LA 47 ST BERNARD 2.13 3.83148-01

LA 39 ST BERNARD 4.26 11.42046-32

LA 46 ST BERNARD 0.00 5.76284-01

LA 39 ST BERNARD 11.42 12.70046-32

LA 300 ST BERNARD 0.00 5.42284-30

LA 39 ST BERNARD 10.29 11.49046-03

LA 1245 ST BERNARD 0.00 0.43046-33

ST BERNARD 0.00 0.00000-44 DE LA RONDE DR

ST BERNARD 0.00 0.00000-44 REISS PL

ST BERNARD 0.00 0.00000-44 TRIST PL

ST BERNARD 0.00 0.00000-44 W JOSEPHINE ST

ST BERNARD 0.00 0.00000-44 LAFONTAINE ST

ST BERNARD 0.00 0.00000-44 W VIRTUE ST

ST BERNARD 0.00 0.00000-44 LE BLANC RD

ST BERNARD 0.00 0.00000-44 KEANE DR

ST BERNARD 0.00 0.00000-44 VOLPE DR

ST BERNARD 0.00 0.00000-44 FLORIDA AVE

ST BERNARD 0.00 0.00000-44 CHALONA DR

ST BERNARD 0.00 0.00000-44 LEGEND DR

ST BERNARD 0.00 0.00000-44 RODRIGUEZ LN

ST BERNARD 0.00 0.00000-44 CLAIBORNE AVE

ST BERNARD 0.00 0.00000-44 ALEXANDER AVE

ST BERNARD 0.00 0.00000-44 GENERAL PERSHING ST

ST BERNARD 0.00 0.00000-44 CHALMETTE BATTLEFIELD

ST BERNARD 0.00 0.00000-44 STORY PARK BLVD

ST BERNARD 0.00 0.00000-44 W PROSPER ST

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

DELINEATE/CONSTRUCT BIKEWAYSST BERNARD PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$588,500.00 2021STP>200K $470,800.00Construction $535,000.00

$588,500.00Total Cost $470,800.00$535,000.00

Page 15 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 16: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.014049 ST BERNARD PEDESTRIAN IMPROVEMENTSLA 47 ST BERNARD 1.42 1.43148-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 47 ST BERNARD 0.76 0.77148-01

LA 39 ST BERNARD 3.40 3.41046-32

LA 39 ST BERNARD 7.51 8.12046-32

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

SIGNING, STRIPING, SIGNAL, CROSSWALK IMPROVEMENTSST. BERNARD PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$415,800.00 2021STP>200K $332,640.00Construction $378,000.00

$415,800.00Total Cost $332,640.00$378,000.00

Project: H.000320 US 61: RR OVERPASS - LA 50US 61 ST CHARLES 0.00 1.68007-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 61 JEFFERSON 8.36 9.33007-02

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

MILL AND OVERLAY007-03-0060, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,191,300.00 2019LOCAL $0.00Construction $1,083,000.00

$1,400,300.00 2019NHPP $1,120,240.00$1,273,000.00

$3,289,000.00 2019STP>200K $2,631,200.00$2,990,000.00

$5,880,600.00Total Cost $3,751,440.00$5,346,000.00

Project: H.013494 LA 52 (PH1): BLUEBERRY HILL - ANGUS DRLA 52 ST CHARLES 0.97 1.84845-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

BIKE/PED - COMPLETE STREETSMATCH BY ST. CHARLES PARISH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,812,866.20 2022STP>200K ST CHARLES PARISH$3,050,292.96Construction $3,466,242.00

$3,812,866.20Total Cost $3,050,292.96$3,466,242.00

Project: H.014050 WILLOWDALE BLVD: US 90 - E. HEATHER DR.ST CHARLES 0.00 0.00000-45 WILLOWDALE BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

PAVEMENT REHAB, TURN LANEST. CHARLES PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$407,000.00 2022STP>200K $325,600.00Construction $370,000.00

$407,000.00Total Cost $325,600.00$370,000.00

Page 16 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 17: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.014051 LAKEWOOD DR. RECONSTRUCTIONST CHARLES 0.00 0.00000-45 LAKEWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

RECONSTRUCTIONST. CHARLES TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$5,173,410.00 2022STP>200K $4,138,728.00Construction $4,703,100.00

$5,173,410.00Total Cost $4,138,728.00$4,703,100.00

Project: H.014368 IC RR XINGS (NEW SARPY)ST CHARLES 0.00 0.00000-45 W HARDING STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ST CHARLES 0.00 0.00000-45 TERRACE ST

ST CHARLES 0.00 0.00000-45 VANS LN

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

UPGRADE RR CROSSINGS TO GATES, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$20,000.00 2021STP>200K $20,000.00Design (Engineering) $20,000.00

$825,000.00 2022STP>200K $825,000.00Construction $750,000.00

$845,000.00Total Cost $845,000.00$770,000.00

Project: H.002960 LA 3213:GRAMERCY BRIDGE OVER UP RAILROADLA 3213 ST JOHN 0.22 0.98434-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

GRADE SEPARATE EXISTING AT GRADE CROSSING, DOT # RAILROADS, GRADE SEPARATION

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$250,000.00 2012STPFLEX $200,000.00Environmental $250,000.00

$2,100,000.00 2014STPFLEX $1,680,000.00Design (Engineering) $2,100,000.00

$2,350,000.00Total Cost $1,880,000.00$2,350,000.00

Project: H.011515 LA 44: PALM ST & BEECH ST DRAINAGELA 44 ST JOHN 0.29 1.36256-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$55,000.00 2021STPFLEX $44,000.00Construction $50,000.00

$55,000.00Total Cost $44,000.00$50,000.00

Page 17 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 18: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NEW ORLEANS

Project: H.013239 US 61:LA 3188-ORMOND BLVD,BIKE/PED IMPUS 61 ST JOHN 3.56 4.17007-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

BIKE/PED IMPROVEMENTSST. JOHN PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,601,500.00 2022STP>200K ST JOHN PARISH$2,081,200.00Construction $2,365,000.00

$2,601,500.00Total Cost $2,081,200.00$2,365,000.00

Project: H.014367 LA 44: KCS RR XING (LAPLACE)LA 44 ST JOHN 0.11 0.12256-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NEW ORLEANS

Work TypeType ImprovementRemarks

INSTALL A NEW RR CROSSING SURFACEMATCH FROM RR AND PARISH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$234,300.00 2021STP>200K $187,440.00Construction $213,000.00

$234,300.00Total Cost $187,440.00$213,000.00

Page 18 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 19: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SHREVEPORT

Project: H.003370 I-220/1-20 INTERCHANGE IMP & BAFB ACCESSI-20 BOSSIER 6.10 7.60451-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-220 BOSSIER 8.60 9.13451-31

LA 1267 BOSSIER 0.00 1.45808-12

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

I-220/1-20 INTERCHANGE IMP & BAFB ACCESSSTIP PH 6 AC W/GARVEE. SEE NOTES FOR

CONVERSION PLAN,

OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,298,359.00 2018STCASH $0.00Design (Engineering) $1,298,359.00

$102,080,000.00 2019GARVEE $0.00Construction $92,800,000.00

$103,378,359.00Total Cost $0.00$94,098,359.00

Project: H.012889 I20 REHAB (PINES ROAD TO I-220)I-20 BOSSIER 0.35 7.62451-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-20 CADDO 10.40 12.45451-01

I-20 CADDO 17.93 18.95451-01

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

APPROACH SLAB & PAVEMENT REPLACEMENT, PATCHING, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$790,481.00 2018NHPP $711,432.90Design (Engineering) $790,481.00

$42,350,000.00 2021NHPP $38,115,000.00Construction $38,500,000.00

$43,140,481.00Total Cost $38,826,432.90$39,290,481.00

Project: H.012896 DIST04:ABC BR REP BOSS,CADD,RED RIV PARSLA 157 BOSSIER 9.44 9.80082-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 160 BOSSIER 3.10 3.20085-03

LA 537 BOSSIER 6.30 8.06808-05

LA 2 CADDO 2.20 2.30045-30

LA 169 CADDO 0.60 1.00048-02

LA 789 CADDO 1.70 1.80809-07

LA 155 RED RIVER 2.25 2.35091-01

LA 783 RED RIVER 5.20 5.30303-01

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$282,000.00 2021NFA $0.00Design (Engineering) $282,000.00

$772,000.00 2021STPFLEX $617,600.00$772,000.00

$1,054,000.00Total Cost $617,600.00$1,054,000.00

Page 19 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 20: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SHREVEPORT

Project: H.013581 I-20: US 80 OPASS - CRAWFORD ST OPASSI-20 BOSSIER 15.67 18.56451-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-20 WEBSTER 0.00 6.28451-03

I-20 BIENVILLE 7.42 13.96451-04

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

MILL & OVERLAY, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$13,915,000.00 2019NHPP $12,523,500.00Construction $12,650,000.00

$13,915,000.00Total Cost $12,523,500.00$12,650,000.00

Project: H.000413 CROSS BAYOU BRIDGE REPLACEMENTUS 71 CADDO 0.35 0.43011-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT011-01-0054, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$13,200,000.00 2022NHPP $10,560,000.00Construction $12,000,000.00

$13,200,000.00Total Cost $10,560,000.00$12,000,000.00

Project: H.001166 CADDO LAKE BRIDGE (HBI)LA 1 CADDO 12.16 12.88045-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT045-01-0029; PRIORITY BRIDGE PROJECT,

HISTORIC BRIDGE IMPROVEMENT (HBI)

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$30,000.00 2020STPFLEX $24,000.00Right of Way $30,000.00

$500,000.00 2019STPFLEX $400,000.00Utility Relocation $500,000.00

$1,205,000.00 2015STPFLEX $964,000.00Design (Engineering) $1,205,000.00

$23,537,800.00 2021STPFLEX $18,830,240.00Construction $21,398,000.00

$25,272,800.00Total Cost $20,218,240.00$23,133,000.00

Project: H.010206 LA 3132 AT LA 523: EXTEND C OF ALA 3132 CADDO 10.10 10.22427-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 523 CADDO 4.37 4.45103-01

LA 523 CADDO 4.45 4.78103-01

LA 523 CADDO 4.78 4.88103-01

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

EXTEND CONTROL OF ACCESS LA 3132 AT LA 523, OPER EFFICIENCY/MOTORIST ASSISTANCE, ACCESS

MANAGEMENT

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,563,000.00 2021NHPP $2,050,400.00Construction $2,330,000.00

$2,563,000.00Total Cost $2,050,400.00$2,330,000.00

Page 20 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 21: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SHREVEPORT

Project: H.010468 I-20: WEST END HUDSON ST. BRIDGE TO I-49I-20 CADDO 15.62 17.28451-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

REMOVE AND REPLACE PCC, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$16,500,000.00 2022NHPP $14,850,000.00Construction $15,000,000.00

$16,500,000.00Total Cost $14,850,000.00$15,000,000.00

Project: H.012005 US80: KCS RR OVERPASS (HBI)US 80 CADDO 9.10 9.30001-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT/REHABILITATION, STR. 013480 HISTORIC BRIDGE IMPROVEMENT

(HBI)

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2019STPFLEX $40,000.00Feasibility $50,000.00

$500,000.00 2021STPFLEX $400,000.00Design (Engineering) $500,000.00

$550,000.00Total Cost $440,000.00$550,000.00

Project: H.012008 US 71:ICG RAILROAD OVERPASS REHAB (HBI)US 71 CADDO 8.90 9.08053-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

HISTORIC BRIDGE PRESERVATION PRIORITY FEASIBILITY

STUDY

, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2019NHPP $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.013426 GRIMMETT DR PIPE REHABUS 71 CADDO 1.61 1.61011-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

REHAB/REPLACE PIPE FROM US 71 TO GRIMMETT DRIVE, OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$325,000.00 2019NHPP $260,000.00Right of Way $325,000.00

$100,000.00 2019NHPP $80,000.00Utility Relocation $100,000.00

$863,500.00 2019NHPP $690,800.00Construction $785,000.00

$1,288,500.00Total Cost $1,030,800.00$1,210,000.00

Page 21 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 22: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SHREVEPORT

Project: H.014410 LINWOOD AVENUE RECONSTRUCTION-PHASE IIICADDO 0.00 0.00000-09 LINWOOD AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

ROADWAY RECONSTRUCTION - JOINT AND PANEL REPAIRCITY OF SHREVEPORT TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$6,352,500.00 2021STP>200K $5,082,000.00Construction $5,775,000.00

$6,352,500.00Total Cost $5,082,000.00$5,775,000.00

Project: H.014411 LINWOOD AVENUE RECONSTRUCTION-PHASE IVCADDO 0.00 0.00000-09 LINWOOD AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

ROADWAY RECONSTRUCTION - JOINT AND PANEL REPAIRCITY OF SHREVEPORT TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$6,352,500.00 2021STP>200K $5,082,000.00Construction $5,775,000.00

$6,352,500.00Total Cost $5,082,000.00$5,775,000.00

Project: H.014059 US 80: BRIDGES NEAR MINDENUS 80 WEBSTER 4.22 4.23001-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 80 WEBSTER 7.02 9.59001-04

US 80 BOSSIER 16.23 16.26001-03

Urbanized Area: SHREVEPORT

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$400,000.00 2022STPFLEX $320,000.00Design (Engineering) $400,000.00

$18,095,000.00 2021STPFLEX $14,476,000.00Construction $16,450,000.00

$18,495,000.00Total Cost $14,796,000.00$16,850,000.00

Page 22 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 23: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.010909 LA 44: WIDENING AND ROUNDABOUT AT LA 941LA 44 ASCENSION 2.35 3.03265-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 941 ASCENSION 4.15 4.30803-27

LA 44 ASCENSION 3.12 3.45265-01

LA 44 ASCENSION 3.45 3.63265-01

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

CONST. RAB NEAR LA44/LA941, WIDEN LA44 B/W I-10 &

CONWAY RAB

FEASIBILITY STUDY FUNDED WITH SATRANS, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,226,000.00 2020STPFLEX $2,022,000.00Right of Way $2,226,000.00

$226,000.00 2020STBONDS $0.00Utility Relocation $226,000.00

$1,774,000.00 2020STPFLEX $1,619,200.00$1,774,000.00

$3,630,000.00 2021HSIP $3,630,000.00Construction $3,300,000.00

$1,584,000.00 2021STBONDS $0.00$1,440,000.00

$9,440,000.00Total Cost $7,271,200.00$8,966,000.00

Project: H.013793 GERMANY RD WIDENING (US 61 TO LA 44)ASCENSION 0.00 0.00000-03 GERMANY RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

WIDENING/RECONSTRUCTIONASCENSION PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$800,000.00 2021STP>200K $640,000.00Right of Way $800,000.00

$550,000.00 2021STP>200K $440,000.00Utility Relocation $550,000.00

$4,125,000.00 2022STP>200K $3,300,000.00Construction $3,750,000.00

$5,475,000.00Total Cost $4,380,000.00$5,100,000.00

Project: H.013850 DUPLESSIS RD WIDENING (US 61 - LA 73)ASCENSION 0.00 0.00000-03 DUPLESSIS RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

MINOR WIDENINGASCENSION PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$900,000.00 2020STP>200K $720,000.00Right of Way $900,000.00

$1,100,000.00 2021STP>200K $880,000.00Utility Relocation $1,100,000.00

$4,675,000.00 2022STP>200K $3,740,000.00Construction $4,250,000.00

$6,675,000.00Total Cost $5,340,000.00$6,250,000.00

Project: H.014087 US 61: ST. JAMES PL - 2450' S. OF LA 22US 61 ASCENSION 0.00 5.00007-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

MILL, PATCH, AND OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$9,900,000.00 2022NHPP $7,920,000.00Construction $9,000,000.00

$9,900,000.00Total Cost $7,920,000.00$9,000,000.00

Page 23 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 24: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.014407 LA 621 AT RODDY RDLA 621 ASCENSION 4.78 4.82803-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ASCENSION 0.00 0.00000-03 RODDY RD

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

ROUNDABOUTASCENSION PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2021STP>200K $80,000.00Utility Relocation $100,000.00

$1,650,000.00 2022STP>200K $1,320,000.00Construction $1,500,000.00

$1,750,000.00Total Cost $1,400,000.00$1,600,000.00

Project: H.014409 LA 933 AT JOE SEVARIO ROADLA 933 ASCENSION 1.01 1.05803-18Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ASCENSION 0.00 0.00000-03 JOE SEVARIO RD

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

ROUNDABOUTASCENSION PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STP>200K $120,000.00Design (Engineering) $150,000.00

$1,650,000.00 2022STP>200K $1,320,000.00Construction $1,500,000.00

$1,800,000.00Total Cost $1,440,000.00$1,650,000.00

Project: H.014422 LA 931 @ RODDY RD. & JOE SEVARIO RD.LA 931 ASCENSION 0.99 1.03803-16Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ASCENSION 0.00 0.00000-03 RODDY RD

ASCENSION 0.00 0.00000-03 JOE SEVARIO RD

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

ROUNDABOUTASCENSION PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2021STP>200K $40,000.00Utility Relocation $50,000.00

$1,650,000.00 2022STP>200K $1,320,000.00Construction $1,500,000.00

$1,700,000.00Total Cost $1,360,000.00$1,550,000.00

Project: H.000337 US 61:BAYOU MANCHAC & FRANCOIS BRS.US 61 EAST BATON ROUGE 0.00 0.48007-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 61 ASCENSION 3.59 4.17007-07

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

NEW BRIDGES007-07-0058;JT W/007-08-0040, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$15,000.00 2019NHPP $12,000.00Utility Relocation $15,000.00

$116,871.00 2016NHPP $93,496.80Design (Engineering) $116,871.00

$13,200,000.00 2019NHPP $10,560,000.00Construction $12,000,000.00

$13,331,871.00Total Cost $10,665,496.80$12,131,871.00

Page 24 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 25: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.002320 SULLIVAN RD (WAX - HOOPER)LA 3034 EAST BATON ROUGE 0.00 0.88255-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 408 EAST BATON ROUGE 6.93 7.16255-02

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

4 LN DIVIDED CONC HWY RAISED MEDIAN255-30-0014;GREEN LIGHT PROJ; PR NI PROJ

INCLUDED SEE NOTES, STBONDS AS MATCH;

OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$30,869.00 2017STGEN $0.00Environmental $30,869.00

$3,000,000.00 2018STGEN $0.00Right of Way $3,000,000.00

$1,500,000.00 2018STBONDS $0.00Utility Relocation $1,500,000.00

$0.00 2021LOCAL $0.00Construction $0.00

$10,241,000.00 2021STBONDS $0.00$9,310,000.00

$3,300,000.00 2021STPFLEX $2,640,000.00$3,000,000.00

$18,071,869.00Total Cost $2,640,000.00$16,840,869.00

Project: H.002825 LA 30(NICHOLSON DR): BRIGHTSIDE-GOURRIERLA 30 EAST BATON ROUGE 2.76 3.96414-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

WIDEN TO 4 LANES WITH MEDIAN, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,476,000.00 2021HSIPPEN EAST BATON ROUGE$3,476,000.00Construction $3,160,000.00

$18,246,800.00 2021STP>200K EAST BATON ROUGE$14,597,440.00$16,588,000.00

$21,722,800.00Total Cost $18,073,440.00$19,748,000.00

Project: H.003047 PECUE LANE/I-10 INTERCHANGEI-10 EAST BATON ROUGE 9.90 10.77450-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

EAST BATON ROUGE 0.00 0.00000-17 PECUE BLVD

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

NEW INTERCHANGE450-10-0161, DEMO / HIGH PRIORITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$4,400,000.00 2019LOCAL $0.00Construction $4,000,000.00

$30,800,000.00 2019STPFLEX $24,640,000.00$28,000,000.00

$35,200,000.00Total Cost $24,640,000.00$32,000,000.00

Page 25 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 26: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.004100 I-10: LA 415 TO ESSEN ON I-10 AND I-12I-10 EAST BATON ROUGE 0.00 5.00450-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-10 EAST BATON ROUGE 0.00 0.86450-09

I-10 W BATON ROUGE 10.27 12.52450-08

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

INCREASE CAPACITY(STAGE 3, 4 AND 5)INNOVATIVE PROCUREMENT STAGES 3, 4 AND 5, CAPACITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$18,400,000.00 2021NHPP $14,720,000.00Right of Way $18,400,000.00

$3,100,000.00 2021NHPP $2,480,000.00Utility Relocation $3,100,000.00

$500,500,000.00 2021GARVEE $0.00Construction $455,000,000.00

$522,000,000.00Total Cost $17,200,000.00$476,500,000.00

Project: H.007160 EBR COMPUTERIZED TRAFFIC SIGNAL, PH VBEAST BATON ROUGE 0.00 0.00000-17 CHOCTAW AND FOSTER SIGNALSRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 61-X EAST BATON ROUGE 1.36 1.45817-20

LA 3164 EAST BATON ROUGE 0.82 0.91019-01

US 61 EAST BATON ROUGE 5.67 5.67007-90

US 61 EAST BATON ROUGE 8.94 9.00007-90

LA 67 EAST BATON ROUGE 1.78 1.87060-01

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

TRAFFIC SIGNAL SYNCHRONIZATION742-17-0159, CHOCTAW DR, GREENWEL SPRINGS

RD, S CHOCTAW DR & N FOSTER DR

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$6,820,000.00 2020CM $5,456,000.00Construction $6,200,000.00

$6,820,000.00Total Cost $5,456,000.00$6,200,000.00

Project: H.010251 CHIPPEWA ST PUMP STATION IMP US61/190-XUS 61-X EAST BATON ROUGE 2.20 2.30817-20Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

REPLACE/UPGRADE PUMP HOUSE COMPONENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$20,000.00 2020STPFLEX $16,000.00Design (Engineering) $20,000.00

$550,000.00 2021STPFLEX $440,000.00Construction $500,000.00

$570,000.00Total Cost $456,000.00$520,000.00

Page 26 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 27: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.010253 BLUEBONNET BLVD. PUMP STAT. IMP LA 1248LA 1248 EAST BATON ROUGE 5.60 5.70258-33Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

REPLACE PUMP STATION FLOAT SYSTEM, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$170,000.00 2020STPFLEX $136,000.00Design (Engineering) $170,000.00

$440,000.00 2021STPFLEX $352,000.00Construction $400,000.00

$610,000.00Total Cost $488,000.00$570,000.00

Project: H.010565 ACADIAN STREET PUMPING STATIONLA 427 EAST BATON ROUGE 3.30 3.40258-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

REPLACE/UPGRADE PUMPHOUSE COMPONENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$175,000.00 2018STPFLEX $140,000.00Design (Engineering) $175,000.00

$902,000.00 2019STPFLEX $721,600.00Construction $820,000.00

$1,077,000.00Total Cost $861,600.00$995,000.00

Project: H.010729 TRAFFIC SIGNAL COORD & SYNCH PH VI (EBR)LA 67 EAST BATON ROUGE 0.28 5.60060-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 73 EAST BATON ROUGE 7.35 7.35077-05

US 61-X EAST BATON ROUGE 1.76 2.27013-04

EAST BATON ROUGE 0.00 0.00000-17 VARIOUS STREETS. SEE SCOPE.

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

TRAFFIC SIGNAL COORDINATION & SYNCHRONIZATIONEBR WILL PROVIDE 20% MATCH, CONGESTION MITIGATION,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$600,000.00 2021CM EAST BATON ROUGE$600,000.00Design (Engineering) $600,000.00

$9,020,000.00 2022CM EAST BATON ROUGE$9,020,000.00Construction $8,200,000.00

$9,620,000.00Total Cost $9,620,000.00$8,800,000.00

Page 27 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 28: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.011098 LA 30: SOUTH BLVD - W CHIMES STLA 30 EAST BATON ROUGE 0.30 1.75414-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-10 EAST BATON ROUGE 0.31 0.50450-10

LA 3290-1 EAST BATON ROUGE 0.01 0.17870-34

LA 3290-3 EAST BATON ROUGE 0.06 0.09870-36

LA 3290-4 EAST BATON ROUGE 0.03 0.20870-37

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

MEDIAN AND PAVEMENT WIDENING, AND RELATED WORK, OPER EFFICIENCY/MOTORIST ASSISTANCE, ACCESS

MANAGEMENT

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,880,000.00 2020NHPP $1,504,000.00Right of Way $1,880,000.00

$2,605,900.00 2021NFA $0.00Construction $2,369,000.00

$15,764,100.00 2021NHPP $12,611,280.00$14,331,000.00

$20,250,000.00Total Cost $14,115,280.00$18,580,000.00

Project: H.011496 QUAIL DR: TURN LANE AT PERKINS (LA 427)EAST BATON ROUGE 0.00 0.00000-17 QUAIL DR.Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 427 EAST BATON ROUGE 1.10 1.11258-02

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

CONSTRUCT RIGHT TURN LANE ON NORTHBOUND QUAIL

DR

USE LOCAL AS MATCH, CONGESTION MITIGATION,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$38,500.00 2020CM EAST BATON ROUGE$30,800.00Right of Way $38,500.00

$489,500.00 2020CM EAST BATON ROUGE$391,600.00Construction $445,000.00

$528,000.00Total Cost $422,400.00$483,500.00

Project: H.011543 TRAFFIC SIGNAL COORD & SYNCH PH VII(EBR)LA 3164 EAST BATON ROUGE 0.11 1.00019-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 61-X EAST BATON ROUGE 1.32 3.30019-01

US 61 EAST BATON ROUGE 3.84 4.54019-01

US 61 EAST BATON ROUGE 0.71 1.32019-02

LA 408 EAST BATON ROUGE 1.46 1.95255-01

EAST BATON ROUGE 0.00 0.00000-17 VARIOUS INTERSECTIONS

LA 37 EAST BATON ROUGE 0.00 1.70254-01

LA 37 EAST BATON ROUGE 0.00 1.90254-02

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

TRAFFIC SIGNAL COORDINATION AND SIGNAL

SYNCHRONIZATION

USE LOCAL AS MATCH, CONGESTION MITIGATION,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2021CM EAST BATON ROUGE$50,000.00Right of Way $50,000.00

$11,000.00 2021CM EAST BATON ROUGE$11,000.00Utility Relocation $11,000.00

$780,000.00 2021CM EAST BATON ROUGE$780,000.00Design (Engineering) $780,000.00

$8,558,000.00 2022CM EAST BATON ROUGE$8,558,000.00Construction $7,780,000.00

$9,399,000.00Total Cost $9,399,000.00$8,621,000.00

Page 28 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 29: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.011684 LA 327 SPUR: STARING LANE EXTENSIONEAST BATON ROUGE 0.00 0.00000-17 STARING LANERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 327-S EAST BATON ROUGE 2.40 2.72257-03

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

EXTEND 4-LANE DIVIDED ROADWAY, ROAD TRANSFER,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$675,000.00 2020STPFLEX $540,000.00Right of Way $675,000.00

$1,000,000.00 2021STPFLEX $800,000.00Utility Relocation $1,000,000.00

$170,000.00 2018STPFLEX $136,000.00Design (Engineering) $170,000.00

$10,780,000.00 2022STPFLEX $8,624,000.00Construction $9,800,000.00

$12,625,000.00Total Cost $10,100,000.00$11,645,000.00

Project: H.011791 CAL RD AND MOSS SIDE LN BR REPLACEMENTSEAST BATON ROUGE 0.00 0.00000-17 CAL ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

EAST BATON ROUGE 0.00 0.00000-17 MOSS SIDE LANE

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENTEAST BATON ROUGE WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,480,500.00 2021STP>200K EAST BATON ROUGE$1,984,400.00Construction $2,255,000.00

$2,480,500.00Total Cost $1,984,400.00$2,255,000.00

Project: H.011842 CHOCTAW DRIVE PAVEMENT PRESERVATIONEAST BATON ROUGE 0.00 0.00000-17 CHOCTAW DRIVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

REHABILITATIONEAST BATON ROUGE PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$628,100.00 2019LOCAL $0.00Construction $571,000.00

$4,398,900.00 2019STP>200K EAST BATON ROUGE$3,519,120.00$3,999,000.00

$5,027,000.00Total Cost $3,519,120.00$4,570,000.00

Project: H.011843 S. SHERWOOD FOREST BLVD SUPERSTREET MODEAST BATON ROUGE 0.00 0.00000-17 S. SHERWOOD FOREST BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

ACCESS MANAGEMENTEAST BATON ROUGE PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,970,000.00 2021STP>200K EAST BATON ROUGE$2,376,000.00Construction $2,700,000.00

$2,970,000.00Total Cost $2,376,000.00$2,700,000.00

Page 29 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 30: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.012232 LA 3064 TO LA 1248 PHASE 2EAST BATON ROUGE 0.00 0.00000-17 DIJON DRIVE EXTENSIONRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

NEW ALIGNMENTENTITY WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,000,000.00 2019STP>200K EAST BATON ROUGE$3,000,000.00Right of Way $3,000,000.00

$2,970,000.00 2019LOCAL EAST BATON ROUGE$0.00Construction $2,700,000.00

$5,940,000.00 2019STP>200K EAST BATON ROUGE$5,940,000.00$5,400,000.00

$11,910,000.00Total Cost $8,940,000.00$11,100,000.00

Project: H.012563 LA 73: BAYOU MANCHAC BRIDGE (HBI)LA 73 EAST BATON ROUGE 0.00 0.10077-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

FEASIBILITY STUDY TO DETERMINE

REHABILITATION/REPLACEMENT

, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2019STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.012730 BRMPO TRAVEL DEMAND MANAGEMENT PRGM 2017EAST BATON ROUGE 0.00 0.00000-17 BTR MPORoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

PROMOTE COMMUTER CARPOOLING AND

VANPOOLING/FLEX TIME

, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$250,000.00 2019CM CRPC$250,000.00Feasibility $250,000.00

$250,000.00 2019STP>200K CRPC$250,000.00$250,000.00

$500,000.00Total Cost $500,000.00$500,000.00

Page 30 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 31: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.013267 SCOTLANDVILLE PKWY TO DWTN BR TRAIL-PH 1EAST BATON ROUGE 0.00 0.00000-17 N 19TH STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

EAST BATON ROUGE 0.00 0.00000-17 FOSS ST

EAST BATON ROUGE 0.00 0.00000-17 N 17TH ST

EAST BATON ROUGE 0.00 0.00000-17 MADISON AVE

EAST BATON ROUGE 0.00 0.00000-17 N 18TH ST

EAST BATON ROUGE 0.00 0.00000-17 JESSAMINE AVE

EAST BATON ROUGE 0.00 0.00000-17 ONTARIO ST

US 61-X EAST BATON ROUGE 1.20 1.22019-01

EAST BATON ROUGE 0.00 0.00000-17 ONTARIO ST

EAST BATON ROUGE 0.00 0.00000-17 POCAHONTAS ST

EAST BATON ROUGE 0.00 0.00000-17 WYANDOTTE ST

EAST BATON ROUGE 0.00 0.00000-17 POWHATAN ST

EAST BATON ROUGE 0.00 0.00000-17 GORDON ST

EAST BATON ROUGE 0.00 0.00000-17 BATON ROUGE AVE

EAST BATON ROUGE 0.00 0.00000-17 SHERWOOD ST

EAST BATON ROUGE 0.00 0.00000-17 ALAMONSTER AVE

EAST BATON ROUGE 0.00 0.00000-17 LORRAINE ST

EAST BATON ROUGE 0.00 0.00000-17 BATON ROUGE AVE

EAST BATON ROUGE 0.00 0.00000-17 AMARILLO ST

EAST BATON ROUGE 0.00 0.00000-17 BRECKENRIDGE AVE

EAST BATON ROUGE 0.00 0.00000-17 GREENWELL ST

EAST BATON ROUGE 0.00 0.00000-17 ALEXANDER AVE

EAST BATON ROUGE 0.00 0.00000-17 SHADA AVE

EAST BATON ROUGE 0.00 0.00000-17 CASPER ST

EAST BATON ROUGE 0.00 0.00000-17 MASON AVE

US 61 EAST BATON ROUGE 3.43 3.59019-01

EAST BATON ROUGE 0.00 0.00000-17 MONTE SANO AVE

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

CONSTRUCT PEDESTRIAN/BIKE PATHSBREC WILL PROVIDE MATCH, CONGESTION MITIGATION,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,190,000.00 2020CM BREC$2,552,000.00Construction $2,900,000.00

$46,200.00 2020LOCAL $0.00$42,000.00

$3,236,200.00Total Cost $2,552,000.00$2,942,000.00

Project: H.013542 CHEVELLE AND SARASOTA DR BR REPLACEMENTSEAST BATON ROUGE 0.00 0.00000-17 CHEVELLE DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

EAST BATON ROUGE 0.00 0.00000-17 SARASOTA DR

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT (OFF-SYSTEM)EAST BATON ROUGE TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,590,500.00 2021STP>200K EAST BATON ROUGE$2,072,400.00Construction $2,355,000.00

$2,590,500.00Total Cost $2,072,400.00$2,355,000.00

Page 31 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 32: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.013546 THIBODEAUX ROAD IMPROVEMENTSEAST BATON ROUGE 0.00 0.00000-17 THIBODEAUX RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

OVERLAYCITY OF CENTRAL TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$33,000.00 2020STP>200K CITY OF CENTRAL$26,400.00Utility Relocation $33,000.00

$1,500,400.00 2020STP>200K CITY OF CENTRAL$1,200,320.00Construction $1,364,000.00

$1,533,400.00Total Cost $1,226,720.00$1,397,000.00

Project: H.013755 I-10:NICHOLSON - ACADIAN R/W ACQUISITIONI-10 EAST BATON ROUGE 0.00 2.50450-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

AMICABLE ADVANCE RIGHT OF WAY ACQUISITION, CAPACITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,000,000.00 2021NHPP $800,000.00Right of Way $1,000,000.00

$1,000,000.00Total Cost $800,000.00$1,000,000.00

Project: H.013797 LA 30: EBR PL - I-10LA 30 EAST BATON ROUGE 3.96 9.69414-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 30 IBERVILLE 0.00 7.42414-02

LA 30 ASCENSION 0.00 10.74414-03

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

ENVIRONMENTAL ANALYSIS FOR CORRIDOR WIDENINGCRPC TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,000,000.00 2021STP>200K $1,600,000.00Environmental $2,000,000.00

$2,000,000.00Total Cost $1,600,000.00$2,000,000.00

Project: H.013837 KCS BRIDGE REPLACEMENT AT ACADIANEAST BATON ROUGE 0.00 0.00000-17 KCS RAILROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

RAISE RR BRIDGE AND TRACKGARVE TO FUND RR WORK UNDER PHASE 4, OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$6,125,000.00 2020GARVEE $0.00Utility Relocation $6,125,000.00

$1,600,000.00 2019GARVEE $0.00Design (Engineering) $1,600,000.00

$150,000.00 2019NFA $0.00$150,000.00

$0.00 2020 $0.00Construction $0.00

$7,875,000.00Total Cost $0.00$7,875,000.00

Page 32 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 33: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.013897 I-10 & I-12 COLLEGE DR FLYOVER RAMPI-10 EAST BATON ROUGE 3.56 5.65450-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-12 EAST BATON ROUGE 0.00 0.52454-01

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

NEW FLYOVER RAMP AND EXIT TO COLLEGEDESIGN BUILD, CAPACITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$52,800,000.00 2020GARVEE $0.00Construction $48,000,000.00

$52,800,000.00Total Cost $0.00$48,000,000.00

Project: H.014100 LA 408: I-110 - LA 37LA 408 EAST BATON ROUGE 1.42 2.34255-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 408 EAST BATON ROUGE 0.00 9.94255-02

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

PCCP PATCH, MILL AND OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$15,400,000.00 2022NHPP $12,320,000.00Construction $14,000,000.00

$15,400,000.00Total Cost $12,320,000.00$14,000,000.00

Project: H.014128 US 190: UPASS US 61 - LIVINGSTON P/LUS 190 EAST BATON ROUGE 0.00 6.34013-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

MILL, PATCH, OVERLAY, AND DRAINAGE, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$10,450,000.00 2022NHPP $8,360,000.00Construction $9,500,000.00

$10,450,000.00Total Cost $8,360,000.00$9,500,000.00

Project: H.014171 LA 30(NICHOLSON DR) CLEARING & GRUBBINGLA 30 EAST BATON ROUGE 2.76 3.96414-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

CLEARING AND GRUBBINGEBR PROVIDES MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$7,148,000.00 2021STP>200K $5,718,400.00Right of Way $7,148,000.00

$626,000.00 2021STP>200K $500,800.00Utility Relocation $626,000.00

$275,000.00 2022STP>200K $220,000.00Construction $250,000.00

$8,049,000.00Total Cost $6,439,200.00$8,024,000.00

Page 33 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 34: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.014281 US 190: MISS RIVER BR REPAIR PH. 3 (HBI)US 190 EAST BATON ROUGE 0.00 1.11007-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

REPAIR OF STRINGER CONNECTIONS AND FINGER JOINTS, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$800,000.00 2020NHPP $640,000.00Design (Engineering) $800,000.00

$11,000,000.00 2021NHPP $8,800,000.00Construction $10,000,000.00

$11,800,000.00Total Cost $9,440,000.00$10,800,000.00

Project: H.014418 REGIONAL BICYCLE/PEDESTRIAN PLAN(BR MPO)EAST BATON ROUGE 0.00 0.00000-17 BR PLANNING AREARoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

BIKE/PED PLANBR MPO TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$300,000.00 2021STP>200K $240,000.00Feasibility $300,000.00

$300,000.00Total Cost $240,000.00$300,000.00

Project: H.014430 FOSTER & ARDWD:IC XINGS SIG(BATON ROUGE)EAST BATON ROUGE 0.00 0.00000-17 N ARDENWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

EAST BATON ROUGE 0.00 0.00000-17 N FOSTER DR

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

WIDEN BOTH CROSSINGS TO INSTALL RAISED MEDIANS

AND ADD GATES

MATCH FROM RAILROAD, RAILROADS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$750,000.00 2022STCASH $0.00Utility Relocation $750,000.00

$500,000.00 2023STCASH $0.00Construction $400,000.00

$1,250,000.00Total Cost $0.00$1,150,000.00

Project: H.012604 LA 77: GROSSE TETE BR HYD REPAIRS (HBI)LA 77 IBERVILLE 7.25 7.32219-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

MOVABLE BRIDGE MACHINERY REPAIRS, HYDRAULIC

REPAIRS

, HISTORIC BRIDGE IMPROVEMENT (HBI) OPER EFFICIENCY/MOTORIST ASSISTANCE, MOVABLE

BRIDGE REHABILITATION

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$962,500.00 2020STPFLEX $770,000.00Construction $875,000.00

$962,500.00Total Cost $770,000.00$875,000.00

Page 34 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 35: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.014371 PLAQUEMINE RIVERFRONT REC TRAIL PH 3 & 4IBERVILLE 0.00 0.00000-24 PLAQUEMINE RIVERFRONT TRAILRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

RECREATIONAL TRAILCITY OF PLAQUEMINE TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$951,500.00 2021STP>200K $761,200.00Construction $865,000.00

$951,500.00Total Cost $761,200.00$865,000.00

Project: H.002375 AMITE R.BR. NEAR FRENCH SETTLEMENTLA 16 LIVINGSTON 7.14 8.01260-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

NEW BRIDGE260-02-0040, PRIORITY BRIDGE PROJECT PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$682,000.00 2013STPFLEX $545,600.00Environmental $682,000.00

$212,000.00 2018STPFLEX $169,600.00Right of Way $212,000.00

$460,000.00 2018STPFLEX $368,000.00Utility Relocation $460,000.00

$124,438.00 2013STPFLEX $99,550.40Design (Engineering) $124,438.00

$25,436,400.00 2019STPFLEX $20,349,120.00Construction $23,124,000.00

$26,914,838.00Total Cost $21,531,870.40$24,602,438.00

Project: H.003425 I-12: LA 63 - TANGIPAHOA PARISH LINEI-12 LIVINGSTON 12.80 14.79454-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-12 LIVINGSTON 0.00 1.52454-02

I-12 LIVINGSTON 0.30 1.41454-02

I-12 LIVINGSTON 0.10 0.28454-02

LIVINGSTON 0.00 0.00000-32 S RED OAK RD

I-12 LIVINGSTON 14.79 24.60454-02

I-12 LIVINGSTON 24.60 25.78454-02

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

C.P. AND OVERLAY454-02-0077, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$561,000.00 2020NFA $0.00Construction $510,000.00

$15,290,000.00 2020NHPP $13,761,000.00$13,900,000.00

$154,000.00 2020STCASH $0.00$140,000.00

$715,000.00 2020STPFLEX $572,000.00$650,000.00

$16,720,000.00Total Cost $14,333,000.00$15,200,000.00

Page 35 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 36: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.004634 JUBAN RD WIDENING (I-12 - US 190)LA 1026 LIVINGSTON 3.49 4.35832-13Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

WIDENING (CONC PAVEMENT)832-13-0019;700-32-0122 ENGINEERING ($800.000), CAPACITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$155,000.00 2017STBONDS $0.00Environmental $155,000.00

$5,000,000.00 2018STBONDS $0.00Right of Way $5,000,000.00

$2,400,000.00 2018STBONDS $0.00Utility Relocation $2,400,000.00

$980,000.00 2017STBONDS $0.00Design (Engineering) $980,000.00

$8,206,000.00 2019STBONDS $0.00Construction $7,460,000.00

$16,741,000.00Total Cost $0.00$15,995,000.00

Project: H.011520 LA 1019: LA 16-CALMES RD DRAINAGELA 1019 LIVINGSTON 0.00 0.50832-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR

ASPHALT

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$330,000.00 2021STPFLEX $264,000.00Construction $300,000.00

$330,000.00Total Cost $264,000.00$300,000.00

Project: H.011825 BUDDY ELLIS ROAD IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 BUDDY ELLIS ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT AND OVERLAYLIVINGSTON PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,760,000.00 2019STP>200K $1,408,000.00Construction $1,600,000.00

$2,084,500.00 2019STPFLEX $1,667,600.00$1,895,000.00

$3,844,500.00Total Cost $3,075,600.00$3,495,000.00

Project: H.011827 DUNN ROAD IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 DUNN ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

OVERLAYLIVINGSTON PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$200,000.00 2019STP>200K LIVINGSTON PARISH$160,000.00Utility Relocation $200,000.00

$3,795,000.00 2019STP>200K LIVINGSTON PARISH$3,036,000.00Construction $3,450,000.00

$3,995,000.00Total Cost $3,196,000.00$3,650,000.00

Page 36 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 37: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.011828 FORREST DELATTE ROAD IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 FOREST DELATTE ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT AND OVERLAYLIVINGSTON PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$75,000.00 2020STP>200K LIVINGSTON PARISH$60,000.00Utility Relocation $75,000.00

$3,905,000.00 2021STP>200K LIVINGSTON PARISH$3,124,000.00Construction $3,550,000.00

$3,980,000.00Total Cost $3,184,000.00$3,625,000.00

Project: H.012308 COOK ROAD IMP: LA16 TO JUBAN CROSSINGLIVINGSTON 0.00 0.00000-32 COOK RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 16 LIVINGSTON 12.49 12.79262-01

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

CONCRETE PAVEMENT, DRAINAGE, BRIDGE, SIDEWALKS,

EARTHWORK

, DEMO / HIGH PRIORITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$344,000.00 2017LOCAL LIVINGSTON PARISH$0.00Environmental $344,000.00

$3,700,000.00 2020STPFLEX $3,160,000.00Right of Way $3,700,000.00

$70,000.00 2020STPFLEX $70,000.00Utility Relocation $70,000.00

$870,000.00 2017LOCAL LIVINGSTON PARISH$0.00Design (Engineering) $870,000.00

$5,940,000.00 2021LOCAL $0.00Construction $5,400,000.00

$10,582,000.00 2021STPFLEX $9,059,600.00$9,620,000.00

$21,506,000.00Total Cost $12,289,600.00$20,004,000.00

Project: H.012622 I-12:LIVINGSTON PAR APPROACH SLAB REP P3I-12 LIVINGSTON 16.40 18.00454-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

I-12 APPROACH SLAB REPLACEMENT AT HOG BRANCH

BRIDGE

, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$350,000.00 2017NHPP $315,000.00Design (Engineering) $350,000.00

$350,000.00Total Cost $315,000.00$350,000.00

Project: H.013158 LINDER ROAD BRIDGE REPLACEMENTLIVINGSTON 0.00 0.00000-32 LINDER RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENTLIVINGSTON PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2019STP>200K LIVINGSTON PARISH$40,000.00Utility Relocation $50,000.00

$378,400.00 2019STP>200K LIVINGSTON PARISH$302,720.00Construction $344,000.00

$428,400.00Total Cost $342,720.00$394,000.00

Page 37 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 38: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.013531 PEAK LANE IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 PEAK STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

REHABILITATIONCITY OF WALKER TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$11,000.00 2019STP>200K CITY OF WALKER$8,800.00Utility Relocation $11,000.00

$760,100.00 2019STP>200K CITY OF WALKER$608,080.00Construction $691,000.00

$771,100.00Total Cost $616,880.00$702,000.00

Project: H.013543 SIMS ROAD IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 SIMS RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

OVERLAY AND CLOSED DRAINAGELIVINGSTON PARISH PROVIDING THE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$70,000.00 2021STP>200K LIVINGSTON PARISH$56,000.00Utility Relocation $70,000.00

$4,239,400.00 2021STP>200K LIVINGSTON PARISH$3,391,520.00Construction $3,854,000.00

$4,309,400.00Total Cost $3,447,520.00$3,924,000.00

Project: H.013545 EDGEWOOD DRIVE IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 EDGEWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

OVERLAYDENHAM SPRINGS TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$14,000.00 2022STP>200K CITY OF DENHAM SPRINGS$11,200.00Utility Relocation $14,000.00

$558,800.00 2022STP>200K CITY OF DENHAM SPRINGS$447,040.00Construction $508,000.00

$572,800.00Total Cost $458,240.00$522,000.00

Project: H.013553 PENDARVIS LANE IMPROVEMENTS PHASE 1LIVINGSTON 0.00 0.00000-32 PENDARVIS LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

OVERLAY AND DRAINAGE IMPCITY OF WALKER TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$19,000.00 2020STP>200K CITY OF WALKER$15,200.00Utility Relocation $19,000.00

$1,426,700.00 2020STP>200K CITY OF WALKER$1,141,360.00Construction $1,297,000.00

$1,445,700.00Total Cost $1,156,560.00$1,316,000.00

Page 38 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 39: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.013555 PENDARVIS LANE IMPROVEMENTS PHASE IILIVINGSTON 0.00 0.00000-32 PENDARVIS LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

OVERLAY AND DRAINAGE IMPCITY OF WALKER TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$13,000.00 2021STP>200K CITY OF WALKER$10,400.00Utility Relocation $13,000.00

$966,900.00 2021STP>200K CITY OF WALKER$773,520.00Construction $879,000.00

$979,900.00Total Cost $783,920.00$892,000.00

Project: H.013557 PENDARVIS LANE IMPROVEMENTS PHASE IIILIVINGSTON 0.00 0.00000-32 PENDARVIS LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

OVERLAY AND DRAINAGE IMPCITY OF WALKER TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$19,000.00 2022STP>200K CITY OF WALKER$15,200.00Utility Relocation $19,000.00

$1,452,000.00 2022STP>200K CITY OF WALKER$1,161,600.00Construction $1,320,000.00

$1,471,000.00Total Cost $1,176,800.00$1,339,000.00

Project: H.013674 BENTON LANE IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 BENTON LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

OVERLAYCITY OF DENHAM SPRINGS TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$12,000.00 2019STP>200K $9,600.00Utility Relocation $12,000.00

$909,700.00 2020STP>200K $727,760.00Construction $827,000.00

$921,700.00Total Cost $737,360.00$839,000.00

Project: H.014358 AMITE CHURCH ROADLIVINGSTON 0.00 0.00000-32 AMITE CHURCH RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

OVERLAY AND CLOSED DRAINAGE WHERE NECESSARYLIVINGSTON PARISH TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$21,000.00 2022STP>200K $16,800.00Utility Relocation $21,000.00

$1,710,500.00 2022STP>200K $1,368,400.00Construction $1,555,000.00

$1,731,500.00Total Cost $1,385,200.00$1,576,000.00

Page 39 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 40: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.014359 AYDELL LANE: LA 447 TO PARK STLIVINGSTON 0.00 0.00000-32 AYDELL LNRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

WIDEN, OVERLAY AND CLOSED DRAINAGE WHERE

NECESSARY

CITY OF WALKER TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$5,000.00 2022STP>200K $4,000.00Utility Relocation $5,000.00

$687,500.00 2022STP>200K $550,000.00Construction $625,000.00

$692,500.00Total Cost $554,000.00$630,000.00

Project: H.014419 E. RAILROAD AVENUE IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 E RAILROAD AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

REHABILITATIONCITY OF DENHAM SPRINGS TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$900.00 2021STP>200K $720.00Utility Relocation $900.00

$280,500.00 2021STP>200K $224,400.00Construction $255,000.00

$281,400.00Total Cost $225,120.00$255,900.00

Project: H.014420 YELLOW JACKET BLVD. IMPROVEMENTSLIVINGSTON 0.00 0.00000-32 YELLOW JACKET BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

MILL AND OVERLAYCITY OF DENHAM SPRINGS TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$7,900.00 2021STP>200K $6,320.00Utility Relocation $7,900.00

$473,000.00 2021STP>200K $378,400.00Construction $430,000.00

$480,900.00Total Cost $384,720.00$437,900.00

Project: H.000358 US 190: LA 415 & RR OVERPASS REPL (HBI)US 190 W BATON ROUGE 2.70 3.16008-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT008-01-0051; PRIORITY BRIDGE PROJECT,

HISTORIC BRIDGE IMPROVEMENT (HBI)

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$33,000,000.00 2022NHPP $26,400,000.00Construction $30,000,000.00

$33,000,000.00Total Cost $26,400,000.00$30,000,000.00

Page 40 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 41: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.005121 LA 1/LA 415 CONNECTORW BATON ROUGE 0.00 0.00000-61 LA 1/LA 415 CONNECTORRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

FEDERAL EARMARK FOR STUDY700-61-0113;STAGE 0 COMPLETED, OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$5,000,000.00 2021STP>200K $4,000,000.00Right of Way $5,000,000.00

$5,000,000.00Total Cost $4,000,000.00$5,000,000.00

Project: H.012169 I-10: IBERVILLE P/L - W END OF BR 290I-10 W BATON ROUGE 0.00 5.06450-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

GRADE RAISING, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$165,000.00 2020NHPP $148,500.00Design (Engineering) $165,000.00

$14,300,000.00 2022NHPP $12,870,000.00Construction $13,000,000.00

$14,465,000.00Total Cost $13,018,500.00$13,165,000.00

Project: H.012587 I-10: W END OF BR 290 - W END OF LA 415I-10 W BATON ROUGE 5.06 9.85450-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

GRADE RAISING, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$135,000.00 2020NHPP $121,500.00Design (Engineering) $135,000.00

$18,150,000.00 2021NHPP $16,335,000.00Construction $16,500,000.00

$18,285,000.00Total Cost $16,456,500.00$16,635,000.00

Project: H.012834 JOLIET TRAIL (BRUSLY)LA 988 W BATON ROUGE 5.10 5.39861-14Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

W BATON ROUGE 0.00 0.00000-61 E ST FRANCIS ST

W BATON ROUGE 0.00 0.00000-61 W ST FRANCIS ST

LA 1 W BATON ROUGE 8.88 8.89050-07

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

CONSTRUCT TRAIL, RR SURFACE WORKWEST BATON ROUGE PARISH PROVIDES THE

MATCH,

CONGESTION MITIGATION,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$473,000.00 2021CM $378,400.00Construction $430,000.00

$473,000.00Total Cost $378,400.00$430,000.00

Page 41 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 42: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

BATON ROUGE

Project: H.014188 LA 986 PAVEMENT REHABILITATIONLA 986 W BATON ROUGE 1.58 2.18228-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

PAVEMENT REHABILITATIONWEST BATON ROUGE PARISH TO PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$605,000.00 2020STP>200K-E $484,000.00Construction $550,000.00

$605,000.00Total Cost $484,000.00$550,000.00

Project: H.013284 MRB SOUTH GBR: LA 1 TO LA 30 CONNECTORDISTRICTWIDE 61 0.00 0.00000-96 PROPOSED NEW ROUTERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: BATON ROUGE

Work TypeType ImprovementRemarks

NEW BRIDGE AND APPROACHES TO FEASIBILITY STUDY, CAPACITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,057,000.00 2020STPFLEX $845,600.00Feasibility $1,057,000.00

$2,000,000.00 2022STPFLEX $1,600,000.00Environmental $2,000,000.00

$3,057,000.00Total Cost $2,445,600.00$3,057,000.00

Page 42 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 43: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAKE CHARLES

Project: H.005967 NELSON RD EXT & BRIDGECALCASIEU 0.00 0.00000-10 NELSON ROADRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

NEW ROAD & BRIDGE706-10-0001;TEA-21. STA 87.USE STGEN$ FOR

ENG, LOCAL MATCH&STBONDS NEEDED&AVAIL;

SEE LONG TEXT FOR FUNDING

INTERMODAL CONNECTOR,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$200,000.00 2011DEMO $160,000.00Environmental $200,000.00

$2,000,000.00 2011DEMO $1,600,000.00Design (Engineering) $2,000,000.00

$20,130,000.00 2020DEMO $16,104,000.00Construction $18,300,000.00

$11,000,000.00 2020NHPP $8,800,000.00$10,000,000.00

$2,750,000.00 2020STGEN $2,200,000.00$2,500,000.00

$36,080,000.00Total Cost $28,864,000.00$33,000,000.00

Project: H.007113 J.BENNETT JOHNSTON AVENUECALCASIEU 0.00 0.00000-10 J. BENNET JOHNSON AVE.Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

OVERLAY742-10-0125, USE LOCAL AS MATCH FOR ENG &

CONST

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$457,000.00 2017STP<200K CALCASIEU PARISH POLICE JURY$365,600.00Design (Engineering) $457,000.00

$638,000.00 2019STP<200K CALCASIEU PARISH POLICE JURY$510,400.00Construction $580,000.00

$1,095,000.00Total Cost $876,000.00$1,037,000.00

Project: H.009620 I-10:WEST OF LA 108 TO I-210 INTERCHANGEI-10 CALCASIEU 22.31 24.76450-91Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT, PAVEMENT REPLACMNT,

MILL&OVERLAY & WIDN

, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$7,200.00 2019NHPP $5,760.00Environmental $7,200.00

$225,000.00 2018NHPP $202,500.00Design (Engineering) $225,000.00

$34,870,000.00 2019NHPP $29,117,000.00Construction $31,700,000.00

$35,102,200.00Total Cost $29,325,260.00$31,932,200.00

Project: H.010000 US171:CALCASIEU RVR BR REHAB (HBI)US 171 CALCASIEU 3.50 4.58024-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

CLEANING, PAINTING, MISC. REPAIRS, LIGHTING & LOAD

RATING

, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE PREVENTIVE MAINTENANCE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$45,000.00 2019NHPP $36,000.00Design (Engineering) $45,000.00

$6,897,000.00 2021NHPP $5,517,600.00Construction $6,270,000.00

$6,942,000.00Total Cost $5,553,600.00$6,315,000.00

Page 43 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 44: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAKE CHARLES

Project: H.010865 I-210: RYAN ST INTG - E JCT I-10I-210 CALCASIEU 6.38 12.58450-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

CABLE BARRIER AND OGFC, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$218,256.00 2016HSIP $218,256.00Design (Engineering) $218,256.00

$57,500.00 2016NHPP $51,750.00$57,500.00

$1,171,500.00 2021HSIPPEN $1,171,500.00Construction $1,065,000.00

$4,895,000.00 2021NHPP $4,405,500.00$4,450,000.00

$6,342,256.00Total Cost $5,847,006.00$5,790,756.00

Project: H.011838 RUTH/HUNTINGTON OVERLAYCALCASIEU 0.00 0.00000-10 RUTH/N & S HUNTINGTONRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

OVERLAYCITY OF SULPHUR PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,522,400.00 2019STP<200K $1,217,920.00Construction $1,384,000.00

$1,522,400.00Total Cost $1,217,920.00$1,384,000.00

Project: H.011839 HENNING DR/WEEKLY RD OVERLAYCALCASIEU 0.00 0.00000-10 HENNING DR/WEEKLY RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

OVERLAYCITY OF SULPHUR PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$383,075.00 2021STP<200K CITY OF SULPHUR$306,460.00Construction $348,250.00

$383,075.00Total Cost $306,460.00$348,250.00

Project: H.012043 LA 378:CALCASIEU R MB RH(WEST FORK)(HBI)LA 378 CALCASIEU 4.15 4.35810-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Page 44 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 45: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAKE CHARLES

Project: H.012052 LA 3092: ROUNDABOUTLA 3092 CALCASIEU 1.95 2.16810-28Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

CALCASIEU 0.00 0.00000-10 W GAUTHIER RD

CALCASIEU 0.00 0.00000-10 LAKE ST

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

ADD A ROUNDABOUT TO AID IN TRAFFIC FLOW, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$300,000.00 2020HSIP $300,000.00Right of Way $300,000.00

$150,000.00 2020HSIP $150,000.00Utility Relocation $150,000.00

$32,000.00 2021HSIP $32,000.00Design (Engineering) $32,000.00

$2,200,000.00 2021HSIP $2,200,000.00Construction $2,000,000.00

$2,682,000.00Total Cost $2,682,000.00$2,482,000.00

Project: H.013812 IHLES ROAD: W PRIEN LAKE - COUNTRY CLUBCALCASIEU 0.00 0.00000-10 IHLES RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

ROADWAY WIDENINGCITY OF LAKE CHARLES TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$532,400.00 2022LOCAL $0.00Construction $484,000.00

$7,997,000.00 2022STP<200K $6,397,600.00$7,270,000.00

$8,529,400.00Total Cost $6,397,600.00$7,754,000.00

Project: H.013870 ENTERPRISE OVERLAY: 12TH ST TO BROAD ST.CALCASIEU 0.00 0.00000-10 ENTERPRISE BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

PATCH, OVERLAY AND MILLCITY OF LAKE CHARLES TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,210,000.00 2022STP<200K $968,000.00Construction $1,100,000.00

$1,210,000.00Total Cost $968,000.00$1,100,000.00

Project: H.014370 POST OAK ROAD: DIVISION RD TO BURTON STCALCASIEU 0.00 0.00000-10 POST OAK RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

CALCASIEU 0.00 0.00000-10 N POST OAK RD

Urbanized Area: LAKE CHARLES

Work TypeType ImprovementRemarks

OVERLAYCITY OF SULPHUR TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$880,000.00 2021STP<200K $704,000.00Construction $800,000.00

$880,000.00Total Cost $704,000.00$800,000.00

Page 45 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 46: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MONROE

Project: H.007289 KANSAS LANE EXTENSIONOUACHITA 0.00 0.00000-37 KANSAS LANERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 80 OUACHITA 1.65 1.85002-01

US 80 OUACHITA 1.85 2.18002-01

US 165 OUACHITA 1.89 2.20016-01

LA 840-6 OUACHITA 0.63 0.87837-23

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

ASPHALT NEW PAVEMENT742-37-0016;US 80 - US 165. R/W & UTIL BY CITY, DEMO / HIGH PRIORITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$650,000.00 2020STP<200K $520,000.00Utility Relocation $650,000.00

$650,000.00Total Cost $520,000.00$650,000.00

Project: H.007300 KANSAS LANE-GARRETT RD CONNECTORLA 594 OUACHITA 3.05 3.84326-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-20 OUACHITA 21.08 21.91451-06

OUACHITA 0.00 0.00000-37 GARRETT RD

OUACHITA 0.00 0.00000-37 KANSAS LN

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

RD CONNECTOR & INTERCHANGE IMPRVMNT742-37-0028;4TH FUND SOURCE US $300K

STP<200K, ADD WHEN PROJECT CONVERTED TO

ERP

INTERMODAL CONNECTOR,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,430,000.00 2020DEMO $2,744,000.00Right of Way $3,430,000.00

$1,912,269.00 2020DEMO $1,529,815.20Utility Relocation $1,912,269.00

$7,339,336.40 2021DEMO $5,871,469.12Construction $6,672,124.00

$5,958,627.40 2021NHPP $4,766,901.92$5,416,934.00

$6,383,714.70 2021STBONDS $6,383,714.70$5,803,377.00

$12,411,373.70 2021STPFLEX $9,929,098.96$11,283,067.00

$37,435,321.20Total Cost $31,224,999.90$34,517,771.00

Project: H.008221 LA 134 IMPROVEMENTS AT US 165LA 134 OUACHITA 0.00 0.43837-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

OUACHITA 0.00 0.00000-37 KEYSTONE RD

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

REALIGN THE INTERSECTION OF LA 134 & US 165, CAPACITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$200,000.00 2018STPFLEX $160,000.00Right of Way $200,000.00

$350,000.00 2019STPFLEX $280,000.00Utility Relocation $350,000.00

$3,600.00 2017STPFLEX $2,880.00Design (Engineering) $3,600.00

$2,557,500.00 2019STPFLEX $2,046,000.00Construction $2,325,000.00

$3,111,100.00Total Cost $2,488,880.00$2,878,600.00

Page 46 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 47: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MONROE

Project: H.011724 COLEMAN AVENUE REHABILITATIONOUACHITA 0.00 0.00000-37 COLEMAN AVENUERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

REHABILITATION, PATCH AND OVERLAYWEST MONROE WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$228,800.00 2022STP<200K CITY OF WEST MONROE$183,040.00Construction $208,000.00

$228,800.00Total Cost $183,040.00$208,000.00

Project: H.011739 US 165 SOUTH LIGHTINGUS 165 OUACHITA 5.17 5.94015-31Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

LIGHTINGCITY OF MONROE WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$731,500.00 2019STP<200K CITY OF MONROE$585,200.00Construction $665,000.00

$731,500.00Total Cost $585,200.00$665,000.00

Project: H.012626 LA 838: DRAINAGE IMPROVEMENTSLA 838 OUACHITA 2.72 2.80837-14Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$115,500.00 2022STPFLEX $92,400.00Construction $105,000.00

$115,500.00Total Cost $92,400.00$105,000.00

Project: H.013392 MANE STREET REHABILITATION PHASE 2OUACHITA 0.00 0.00000-37 MANE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

MILL AND OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$782,821.60 2021STP<200K CITY OF WEST MONROE$626,257.28Construction $711,656.00

$782,821.60Total Cost $626,257.28$711,656.00

Page 47 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 48: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MONROE

Project: H.013394 MANE STREET REHABILITATION PHASE 1OUACHITA 0.00 0.00000-37 MANE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

RECONSTRUCT 2-LANE ROADWAYCITY OF WEST MONROE TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,500.00 2019STP<200K CITY OF WEST MONROE$2,000.00Environmental $2,500.00

$682,000.00 2020STP<200K CITY OF WEST MONROE$545,600.00Construction $620,000.00

$684,500.00Total Cost $547,600.00$622,500.00

Project: H.013395 PARKWOOD DR REHAB: GLENWOOD - LA 143OUACHITA 0.00 0.00000-37 PARKWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

ASPHALT OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,500.00 2019STP<200K CITY OF WEST MONROE$2,000.00Environmental $2,500.00

$822,800.00 2020STP<200K CITY OF WEST MONROE$658,240.00Construction $748,000.00

$825,300.00Total Cost $660,240.00$750,500.00

Project: H.013398 COLEMAN AVE REHABILITATIONOUACHITA 0.00 0.00000-37 COLEMAN AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

ASPHALT OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$346,515.40 2022STP<200K CITY OF WEST MONROE$277,212.32Construction $315,014.00

$346,515.40Total Cost $277,212.32$315,014.00

Project: H.013400 NATCHITOCHES ST REHAB: TRENTON - N 7THOUACHITA 0.00 0.00000-37 NATCHITOCHES STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

ASPHALT OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,500.00 2019STP<200K CITY OF WEST MONROE$2,000.00Environmental $2,500.00

$70,157.00 2019STP<200K CITY OF WEST MONROE$56,125.60Design (Engineering) $70,157.00

$643,109.50 2021STP<200K CITY OF WEST MONROE$514,487.60Construction $584,645.00

$715,766.50Total Cost $572,613.20$657,302.00

Page 48 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 49: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MONROE

Project: H.013401 CROSELY ST REHAB: TRENTON - N 7THOUACHITA 0.00 0.00000-37 CROSLEY STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

ASPHALT OVERLAYCITY OF WEST MONROE TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,500.00 2020STP<200K CITY OF WEST MONROE$2,000.00Environmental $2,500.00

$41,955.00 2020STP<200K CITY OF WEST MONROE$33,564.00Design (Engineering) $41,955.00

$385,000.00 2022STP<200K CITY OF WEST MONROE$308,000.00Construction $350,000.00

$429,455.00Total Cost $343,564.00$394,455.00

Project: H.013518 OTIS STREET REHABILITATIONOUACHITA 0.00 0.00000-37 OTIS STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

OUACHITA 0.00 0.00000-37 OTIS ST

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

REHABILITATIONCITY OF MONROE TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$448,329.20 2021STP<200K CITY OF WEST MONROE$358,663.36Construction $407,572.00

$448,329.20Total Cost $358,663.36$407,572.00

Project: H.013776 WELL ROAD (NEW NATCH. RD - I-20 INT.)OUACHITA 0.00 0.00000-37 WELL RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

MILL, PATCH AND OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$731,352.66 2020STP<200K $585,082.13Construction $664,866.05

$731,352.66Total Cost $585,082.13$664,866.05

Project: H.013791 HADLEY ST (U.S. HWY 165 - NUTLAND RD)OUACHITA 0.00 0.00000-37 HADLEY STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

REHABILITATIONOUACHITA PARISH POLICE JURY TO PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$771,878.80 2020STP<200K $617,503.04Construction $701,708.00

$771,878.80Total Cost $617,503.04$701,708.00

Page 49 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 50: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MONROE

Project: H.013796 TANGLEWOOD DRIVE (LA 15 - DELLWOOD DR.)OUACHITA 0.00 0.00000-37 TANGLEWOOD DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

MILL, PATCH AND OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$661,100.00 2020STP<200K $528,880.00Construction $601,000.00

$661,100.00Total Cost $528,880.00$601,000.00

Project: H.013798 HARRELL ROAD (US 80 - ARKANSAS RD)OUACHITA 0.00 0.00000-37 HARRELL RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

MILL, PATCH AND OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,857,872.50 2020STP<200K $1,486,298.00Construction $1,688,975.00

$1,857,872.50Total Cost $1,486,298.00$1,688,975.00

Project: H.013802 GARRETT ROAD ( LA 15 - AUSTIN ST.)OUACHITA 0.00 0.00000-37 GARRETT RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

REHABILITATIONOUACHITA PARISH POLICE JURY TO PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$682,000.00 2020STP<200K $545,600.00Construction $620,000.00

$682,000.00Total Cost $545,600.00$620,000.00

Project: H.013803 RICHWOOD RD NO. 2 (US 165 - BROWN ST)OUACHITA 0.00 0.00000-37 RICHWOOD RD NO 2Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

OVERLAYOUACHITA PARISH POLICE JURY PROVIDING

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,281,500.00 2021STP<200K $1,025,200.00Construction $1,165,000.00

$1,281,500.00Total Cost $1,025,200.00$1,165,000.00

Page 50 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 51: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MONROE

Project: H.013804 WALL WILLIAMS (GOOD HOPE - WHITES FERRY)OUACHITA 0.00 0.00000-37 WALL WILLIAMS RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

OVERLAYOUACHITA PARISH POLIC JURY TO PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,473,780.00 2021STP<200K $1,179,024.00Construction $1,339,800.00

$1,473,780.00Total Cost $1,179,024.00$1,339,800.00

Project: H.013805 FINKS'S HIDE-A-WAY: BARKLEY - BAYOU OAKSOUACHITA 0.00 0.00000-37 FINKS HIDEAWAY RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

MILL, PATCH AND OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,697,080.00 2021STP<200K $1,357,664.00Construction $1,542,800.00

$1,697,080.00Total Cost $1,357,664.00$1,542,800.00

Project: H.014347 S GRAND ST: ORANGE ST - STANDIFER AVEOUACHITA 0.00 0.00000-37 S GRAND STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

MILL, PATCH & OVERLAYCITY OF MONROE TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,980,000.00 2022STP<200K $1,584,000.00Construction $1,800,000.00

$1,980,000.00Total Cost $1,584,000.00$1,800,000.00

Project: H.014348 LEE AVENUE: JACKSON ST - STANDIFER AVEOUACHITA 0.00 0.00000-37 LEE AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

MILL, PATCH & OVERLAYCITY OF MONROE TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,090,000.00 2022STP<200K $1,672,000.00Construction $1,900,000.00

$2,090,000.00Total Cost $1,672,000.00$1,900,000.00

Page 51 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 52: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MONROE

Project: H.014397 ROWLAND ROAD: LA 139 - LA 594OUACHITA 0.00 0.00000-37 ROWLAND RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MONROE

Work TypeType ImprovementRemarks

MILL, PATCH & OVERLAYOUACHITA PARISH POLICE JURY TO PROVIDE

THEMATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,804,000.00 2021STP<200K $1,443,200.00Construction $1,640,000.00

$1,804,000.00Total Cost $1,443,200.00$1,640,000.00

Page 52 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 53: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.010962 I-10: CABLE BARRIER (LAFAYETTE/ACADIA)I-10 ACADIA 0.00 14.11450-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-10 LAFAYETTE 0.00 13.98450-05

I-10 ACADIA 14.11 16.00450-04

I-10 ACADIA 16.00 21.30450-04

I-10 ACADIA 21.30 25.09450-04

I-10 ACADIA 25.09 27.13450-04

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

INSTALL MEDIAN CABLE BARRIER, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$510,000.00 2017HSIP $510,000.00Design (Engineering) $510,000.00

$11,349,800.00 2020HSIP $11,349,800.00Construction $10,318,000.00

$11,859,800.00Total Cost $11,859,800.00$10,828,000.00

Project: H.012174 I-10:JEFF DAV PL-I-49 (OGFC/SLAB REPAIR)I-10 ACADIA 0.00 27.14450-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-10 LAFAYETTE 0.00 9.78450-05

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

OGFC, APPROACH SLAB & EMBANKMENT SLIDE REPAIR &

RELATED

, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$22,000,000.00 2022FREIGHT-HY $19,800,000.00Construction $20,000,000.00

$22,000,000.00Total Cost $19,800,000.00$20,000,000.00

Project: H.009892 LDRR (NEW IBERIA) US 90 FRUS 90 IBERIA 8.60 8.60424-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

NEW XING PER DISTRICT 03 & NEW IBERIA, RAILROADS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$30,000.00 2022STP>200K $24,000.00Utility Relocation $30,000.00

$100,000.00 2021STP>200K $80,000.00Design (Engineering) $100,000.00

$130,000.00Total Cost $104,000.00$130,000.00

Project: H.011988 LA 86: BYU TECHE MB REHAB(DUPERIER)(HBI)LA 86 IBERIA 0.00 0.20237-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Page 53 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 54: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.011991 LA 86: BYU TECHE MB REHAB (DASPIT)(HBI)LA 86 IBERIA 0.00 0.50400-31Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.012738 LA 344: BAYOU TECHE MB RH(MORBIHAN)(HBI)LA 344 IBERIA 0.20 0.40823-14Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

MOVABLE BRIDGE REHABILITATION, STR 006200 (HISTORIC BRIDGE IMPROVEMENT -

HBI)

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.012792 LA 675 @ AIRPORT RD ROUNDABOUTLA 675 IBERIA 0.30 0.40823-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 90 IBERIA 6.20 6.30424-04

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

ROUNDABOUTIBERIA PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$64,000.00 2021STP>200K $51,200.00Right of Way $64,000.00

$2,750,000.00 2022STP>200K IBERIA PARISH$2,200,000.00Construction $2,500,000.00

$2,814,000.00Total Cost $2,251,200.00$2,564,000.00

Project: H.013522 S LEWIS ST WIDENINGIBERIA 0.00 0.00000-23 S LEWIS STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

CONTINUOUS TURN LANEIBERIA PARISH TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2022STP>200K IBERIA PARISH$40,000.00Right of Way $50,000.00

$60,000.00 2022STP>200K IBERIA PARISH$48,000.00Utility Relocation $60,000.00

$142,855.00 2021STP>200K IBERIA PARISH$114,284.00Design (Engineering) $142,855.00

$2,191,455.20 2022STP>200K IBERIA PARISH$1,753,164.16Construction $1,992,232.00

$2,444,310.20Total Cost $1,955,448.16$2,245,087.00

Page 54 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 55: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.014576 LA 31: LA 182 - 0.933 MI. N. LA 92LA 31 IBERIA 0.18 2.70056-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 31 ST MARTIN 0.00 4.01056-02

LA 31 ST MARTIN 4.01 4.97056-02

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

PATCH, MILL, ASPHALT OVERLAY, PRESERVATION, NON-INTERSTATE ON STP SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$10,340,000.00 2022STPFLEX $8,272,000.00Construction $9,400,000.00

$10,340,000.00Total Cost $8,272,000.00$9,400,000.00

Project: H.003459 I-49 INTERCH:LA726/LA98/PONT DES MOUTONI-49 LAFAYETTE 4.36 4.62455-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 726 LAFAYETTE 0.77 1.03828-44

LAFAYETTE 0.00 0.00000-28 W PONT DES MOUTON RD

LAFAYETTE 0.00 0.00000-28 E PONT DES MOUTON RD

LAFAYETTE 0.00 0.00000-28 HECTOR CONNOLY RD

LA 98 LAFAYETTE 6.85 7.09391-02

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

INTERCHANGE IMPROVEMENTS455-01-0054 AND 828-44-0015, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$18,000.00 2020HSIP $16,200.00Right of Way $18,000.00

$71,000.00 2020HSIP $63,900.00Utility Relocation $71,000.00

$2,200.00 2018SATRANS $0.00Design (Engineering) $2,200.00

$1,677,500.00 2021HSIP $1,509,750.00Construction $1,525,000.00

$1,768,700.00Total Cost $1,589,850.00$1,616,200.00

Project: H.007233 LAFAYETTE MPO NON STATE PVT MARKINGLAFAYETTE 0.00 0.00000-28Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

PAVEMENT MARKINGS742-28-0007, USE LOCAL AS MATCH URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,397,000.00 2020STP>200K $1,117,600.00Construction $1,270,000.00

$1,397,000.00Total Cost $1,117,600.00$1,270,000.00

Page 55 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 56: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.009500 2040PLAN IMPLEMENTATION&I-49 ACTION PLANLAFAYETTE 0.00 0.00000-28 2040 PLAN IMPLEMENTATIONRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

PLAN IMPLEMENTATION AND ACTION PLAN, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$350,000.00 2019STP>200K ACADIANA MPO$280,000.00Design (Engineering) $350,000.00

$350,000.00 2020STP>200K ACADIANA MPO$280,000.00$350,000.00

$350,000.00 2021STP<200K ACADIANA MPO$280,000.00$350,000.00

$350,000.00 2022STP<200K ACADIANA MPO$280,000.00$350,000.00

$1,400,000.00Total Cost $1,120,000.00$1,400,000.00

Project: H.009997 US 167: JOHNSTON ST IMPROVEMENTSUS 167 LAFAYETTE 7.15 8.14080-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

ACCESS MANAGEMENT AND OTHER SAFETY

COUNTERMEASURES

STUDY FUNDED WITH SAFETY TRANSFER

FUNDS, USE TTF AS MATCH FOR THIS PHASE

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$308,656.00 2012SATRANS $0.00Feasibility $308,656.00

$71,449.00 2017HSIPPEN $71,449.00Environmental $71,449.00

$71,449.00 2017NHPP $57,159.20$71,449.00

$71,449.00 2017STPFLEX $57,159.20$71,449.00

$1,391,186.33 2021HSIPPEN $1,391,186.33Right of Way $1,391,186.33

$1,391,186.34 2021NHPP $1,112,949.07$1,391,186.34

$1,391,186.33 2021STPFLEX $1,112,949.06$1,391,186.33

$1,750,000.00 2021HSIPPEN $1,750,000.00Utility Relocation $1,750,000.00

$1,750,000.00 2021NHPP $1,400,000.00$1,750,000.00

$1,750,000.00 2021STPFLEX $1,400,000.00$1,750,000.00

$219,130.67 2017HSIPPEN $219,130.67Design (Engineering) $219,130.67

$219,130.66 2017NHPP $175,304.53$219,130.66

$219,130.67 2017STPFLEX $175,304.54$219,130.67

$3,314,349.50 2022HSIPPEN $3,314,349.50Construction $3,013,045.00

$3,314,349.50 2022NHPP $2,651,479.60$3,013,045.00

$1,809,292.10 2022STP>200K $1,447,433.68$1,644,811.00

$1,505,057.40 2022STPFLEX $1,204,045.92$1,368,234.00

$20,547,002.50Total Cost $17,539,900.30$19,643,089.00

Project: H.011832 US 90: CAMERON ST. OVERLAYUS 90 LAFAYETTE 5.14 7.04003-11Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 90 LAFAYETTE 7.04 8.49003-11

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

MILL AND OVERLAY WITH TURN LANE, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,818,000.00 2020STP>200K $1,454,400.00Right of Way $1,818,000.00

$150,000.00 2021STP>200K $120,000.00Utility Relocation $150,000.00

$2,970,000.00 2021STP>200K-E CITY OF SCOTT$2,376,000.00Construction $2,700,000.00

$4,938,000.00Total Cost $3,950,400.00$4,668,000.00

Page 56 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 57: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.011833 ST. MARY STREET SIDEWALKSLAFAYETTE 0.00 0.00000-28 ST. MARY STREETRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

SIDEWALKSCITY OF SCOTT PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$141,026.00 2021STP>200K $112,820.80Design (Engineering) $141,026.00

$1,960,200.00 2022STP>200K CITY OF SCOTT$1,568,160.00Construction $1,782,000.00

$2,101,226.00Total Cost $1,680,980.80$1,923,026.00

Project: H.011990 LA 92: VERMILION RVR MB RH (MILTON)(HBI)LA 92 LAFAYETTE 0.00 0.30213-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.012018 ADAPTIVE TRAFFIC SIGNAL DESIGN AND IMPLAFAYETTE 0.00 0.00000-28 VARIOUS LAFAYETTE STREETSRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

ADAPTIVE SIGNAL IMPLEMENTATIONLAFAYETTE CONSOLIDATED GOV'T PROVIDING

MATCH ON LOCAL ROADS,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$7,894,371.10 2020STP>200K LCG$7,104,933.99Construction $7,176,701.00

$7,894,371.10Total Cost $7,104,933.99$7,176,701.00

Project: H.012231 BERTRAND DRIVE STREETSCAPELA 3025-S LAFAYETTE 0.00 0.47828-38Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

ENHANCEMENTSLAFAYETTE CONSOLIDATED GOVERNMENT WILL

PROVIDE MATCH.,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$8,158.00 2017STPFLEX LCG$6,526.40Feasibility $8,158.00

$918,500.00 2021STP>200K LCG$734,800.00Construction $835,000.00

$640,750.00 2021TAP>200K $512,600.00$582,500.00

$1,567,408.00Total Cost $1,253,926.40$1,425,658.00

Page 57 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 58: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.012304 LCG ROAD OVERLAY PROGRAMLAFAYETTE 0.00 0.00000-28 BEAU BASSIN RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LAFAYETTE 0.00 0.00000-28 BENOIT RD

LAFAYETTE 0.00 0.00000-28 GOURMET RD

LAFAYETTE 0.00 0.00000-28 JENKINS RD

LAFAYETTE 0.00 0.00000-28 JOLI RD

LAFAYETTE 0.00 0.00000-28 PREJEAN RD

LAFAYETTE 0.00 0.00000-28 ROBLEY DR

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

OVERLAY AND REHABILITATELAFAYETTE CONSOLIDATED GOVERNMENT WILL

PROVIDE MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$273,190.00 2018STPFLEX $218,552.00Design (Engineering) $273,190.00

$3,960,000.00 2020STPFLEX LCG$3,168,000.00Construction $3,600,000.00

$4,233,190.00Total Cost $3,386,552.00$3,873,190.00

Project: H.012861 PREJEAN ROAD PAVEMENT PRESERVATIONLAFAYETTE 0.00 0.00000-28 PREJEAN RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

OVERLAYCITY OF CARENCRO WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$41,000.00 2018STP>200K CITY OF CARENCRO$32,800.00Design (Engineering) $41,000.00

$382,800.00 2020STP>200K CITY OF CARENCRO$306,240.00Construction $348,000.00

$423,800.00Total Cost $339,040.00$389,000.00

Project: H.012864 LA 94/CARMEL DRIVE SIDEWALKSLA 94 LAFAYETTE 0.31 1.76080-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

CONSTRUCTION OF SIDEWALKSLAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$542,999.60 2022STP>200K LCG$434,399.68Construction $493,636.00

$542,999.60Total Cost $434,399.68$493,636.00

Project: H.012866 SOUTH COLLEGE RD (LA 3025) SIDEWALKSLA 3025 LAFAYETTE 0.00 1.63828-23Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

CONSTRUCT SIDEWALKSLAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$42,596.00 2021STP>200K $34,076.80Design (Engineering) $42,596.00

$715,632.50 2021STP>200K LCG$572,506.00Construction $650,575.00

$758,228.50Total Cost $606,582.80$693,171.00

Page 58 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 59: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.012867 S LARRIVIERE RD: LA 92 - CHEMIN METAIRIELAFAYETTE 0.00 0.00000-28 S LARRIVIERE RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

ADD CENTER TURN LANECITY OF YOUNGSVILLE WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,422,200.00 2022STP>200K CITY OF YOUNGSVILLE$1,937,760.00Construction $2,202,000.00

$2,422,200.00Total Cost $1,937,760.00$2,202,000.00

Project: H.012868 FORTUNE ROAD PAVEMENT PRESERVATIONLAFAYETTE 0.00 0.00000-28 FORTUNE RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

OVERLAYCITY OF YOUNGSVILLE WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$30,000.00 2021STP>200K CITY OF YOUNGSVILLE$24,000.00Environmental $30,000.00

$100,000.00 2021STP>200K CITY OF YOUNGSVILLE$80,000.00Design (Engineering) $100,000.00

$1,122,000.00 2022STP>200K CITY OF YOUNGSVILLE$897,600.00Construction $1,020,000.00

$1,252,000.00Total Cost $1,001,600.00$1,150,000.00

Project: H.012869 LA 182(UNIV) @ LA 723(RENAUD) ROUNDABOUTLA 182 LAFAYETTE 1.56 1.60032-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 723 LAFAYETTE 6.06 6.08828-03

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

ROUNDABOUTLAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE

MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$166,200.00 2021STP>200K LCG$132,960.00Right of Way $166,200.00

$216,600.00 2020STP>200K $173,280.00Design (Engineering) $216,600.00

$382,800.00Total Cost $306,240.00$382,800.00

Project: H.012870 LA 93: I-10 RAMP - RENAUDLA 93 LAFAYETTE 0.56 0.86217-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

ADDING TURNING LANESCITY OF SCOTT WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$200,000.00 2021STP>200K CITY OF SCOTT$160,000.00Right of Way $200,000.00

$400,000.00 2021STP>200K $320,000.00Design (Engineering) $400,000.00

$2,853,400.00 2022STP>200K CITY OF SCOTT$2,282,720.00Construction $2,594,000.00

$3,453,400.00Total Cost $2,762,720.00$3,194,000.00

Page 59 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 60: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.012871 DETENTE ROAD PAVEMENT PRESERVATIONLAFAYETTE 0.00 0.00000-28 DETENTE RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

PRESERVATIONCITY OF YOUNGSVILLE WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$10,000.00 2021STP>200K CITY OF YOUNGSVILLE$8,000.00Environmental $10,000.00

$100,000.00 2021STP>200K CITY OF YOUNGSVILLE$80,000.00Design (Engineering) $100,000.00

$1,375,000.00 2021STP>200K CITY OF YOUNGSVILLE$1,100,000.00Construction $1,250,000.00

$1,485,000.00Total Cost $1,188,000.00$1,360,000.00

Project: H.013025 LA 182: JEANNE ST. TO WALKER RD.LA 182 LAFAYETTE 0.00 0.25032-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 90-Y LAFAYETTE 0.00 0.08004-01

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

CONSTRUCT RAISED MEDIAN, SIDEWALKS AND

INTERSECTION IMPROV

ACADIANA MPO PROVIDING MATCH FOR

FEASIBILITY PHASE, LAFAYETTE CONSOL. GOVT

(LCG) PROVIDING MATCH FOR OTHER PHASES

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$180,000.00 2022STP>200K $144,000.00Right of Way $180,000.00

$925,000.00 2021STP>200K $740,000.00Utility Relocation $925,000.00

$1,958,000.00 2022STBONDS $0.00Construction $1,780,000.00

$3,861,000.00 2022STP>200K $3,088,800.00$3,510,000.00

$6,924,000.00Total Cost $3,972,800.00$6,395,000.00

Project: H.013517 E ST PETER ST SIDEWALKSLAFAYETTE 0.00 0.00000-28 E SAINT PETER STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

SIDEWALKSCITY OF CARENCRO TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$72,000.00 2021STP>200K CITY OF CARENCRO$57,600.00Design (Engineering) $72,000.00

$221,879.90 2022STP>200K CITY OF CARENCRO$177,503.92Construction $201,709.00

$293,879.90Total Cost $235,103.92$273,709.00

Project: H.014008 SIMCOE STREET CORRIDOR STUDYLAFAYETTE 0.00 0.00000-28 SIMCOE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LAFAYETTE 0.00 0.00000-28 W SIMCOE ST

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

CORRIDOR PLANNING STUDYACADIANA MPO TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$550,000.00 2020STP>200K $440,000.00Feasibility $550,000.00

$550,000.00Total Cost $440,000.00$550,000.00

Page 60 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 61: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.014342 ACADIANA MPO PLANNING SERVICES 2021 2022LAFAYETTE 0.00 0.00000-28 PLANNING ACTIVITIES - NO ROADWAYRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

ADDITIONAL MPO PLANNING TASKS TO SUPPLEMENT UPWPACADIANA MPO TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$350,000.00 2020STP>200K $280,000.00Feasibility $350,000.00

$350,000.00Total Cost $280,000.00$350,000.00

Project: H.010601 I-10: LA 328 TO LA 347I-10 ST MARTIN 2.30 7.67450-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ST MARTIN 0.00 0.00000-50 MELVIN DUPUIS RD

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

INTERSTATE WIDENING AND REHABILITATION, CORRIDOR,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$90,000.00 2014STCASH $0.00Environmental $90,000.00

$1,200,000.00 2019NHPP $960,000.00Right of Way $1,200,000.00

$1,811,236.00 2014IM DISCR $1,630,112.40Design (Engineering) $1,811,236.00

$149,577.00 2014NHPP $134,619.30$149,577.00

$409,423.00 2014STBONDS $0.00$409,423.00

$21,043,000.00 2019FREIGHT-HY $18,938,700.00Construction $19,130,000.00

$59,367,000.00 2019NHPP $48,255,900.00$53,970,000.00

$84,070,236.00Total Cost $69,919,331.70$76,760,236.00

Project: H.011485 LA336-1: BAYOU TECHE BRIDGE REHAB (HBI)LA 336-1 ST MARTIN 0.00 0.23056-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

CLEANING AND PAINTING, AND STRUCTURAL REPAIRS, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$200,000.00 2017NHPP $160,000.00Feasibility $200,000.00

$501,000.00 2019NHPP $400,800.00Design (Engineering) $501,000.00

$5,225,000.00 2020NHPP $4,180,000.00Construction $4,750,000.00

$5,926,000.00Total Cost $4,740,800.00$5,451,000.00

Project: H.011995 LA 96:B TECHE MB RH(ST MARTINVILLE)(HBI)LA 96 ST MARTIN 0.05 0.25238-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Page 61 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 62: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.012618 LA 347 DRAINAGE IMPROVEMENTSLA 347 ST MARTIN 7.30 8.30056-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

RAISE ROAD X-SECTION AND/OR REPLACE SUBDRAINAGE

STRUCTURES

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$594,000.00 2022STPFLEX $475,200.00Construction $540,000.00

$594,000.00Total Cost $475,200.00$540,000.00

Project: H.012863 CYPRESS ISLAND HWY PAVEMENT PRESERVATIONST MARTIN 0.00 0.00000-50 CYPRESS ISLAND HWYRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

OVERLAYST. MARTIN PARISH WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,584.00 2020LOCAL $0.00Design (Engineering) $3,584.00

$57,757.00 2020STP>200K $46,205.60$57,757.00

$85,255.50 2021LOCAL ST MARTIN PARISH$0.00Construction $77,505.00

$1,278,828.10 2021STP>200K ST MARTIN PARISH$1,023,062.48$1,162,571.00

$1,425,424.60Total Cost $1,069,268.08$1,301,417.00

Project: H.013516 LA 353 PAVEMENT PRESERVATIONLA 353 ST MARTIN 0.00 3.52403-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

PAVEMENT PRESERVATIONDOTD TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,300,000.00 2022STP>200K $2,640,000.00Construction $3,000,000.00

$3,300,000.00Total Cost $2,640,000.00$3,000,000.00

Project: H.013819 LA 350: BAYOU TECHE MB RH (PARKS)(HBI)LA 350 ST MARTIN 0.00 0.40400-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

MOVABLE BRIDGE MECHANICAL, ELECTRICAL,

STRUCTURAL REHAB

, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$250,000.00 2021STPFLEX $200,000.00Design (Engineering) $250,000.00

$4,009,500.00 2022STPFLEX $3,207,600.00Construction $3,645,000.00

$4,409,500.00Total Cost $3,527,600.00$4,045,000.00

Page 62 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 63: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LAFAYETTE

Project: H.014415 LA 352 DRAINAGE IMPROVEMENTLA 352 ST MARTIN 0.00 1.00850-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

DRAINAGE IMPROVEMENT, OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Design (Engineering) $150,000.00

$2,200,000.00 2022STPFLEX $1,760,000.00Construction $2,000,000.00

$2,350,000.00Total Cost $1,880,000.00$2,150,000.00

Project: H.010353 US 167: ACCESS MANAGEMENT (LFT TURN LNS)US 167 VERMILION 10.07 10.54080-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 167 LAFAYETTE 0.00 4.88080-02

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

ACCESS MANAGEMENT, LEFT TURN LANES AND U-TURNS, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$14,630,000.00 2019HSIP $13,167,000.00Construction $13,300,000.00

$14,630,000.00Total Cost $13,167,000.00$13,300,000.00

Project: H.013515 LA 92: PAVEMENT PRESERVATIONLA 92 VERMILION 4.03 7.06213-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LAFAYETTE

Work TypeType ImprovementRemarks

PAVEMENT PRESERVATION AND TURN LANEDOTD TO PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,475,000.00 2021STP>200K $1,980,000.00Construction $2,250,000.00

$2,475,000.00Total Cost $1,980,000.00$2,250,000.00

Page 63 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 64: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

ALEXANDRIA

Project: H.011194 PINEVILLE ELEMENTARY SIDEWALKSUS 165-X RAPIDES 0.25 1.80015-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

RAPIDES 0.00 0.00000-40 PINEVILLE ELEM.

Urbanized Area: ALEXANDRIA

Work TypeType ImprovementRemarks

SIDEWALKS, SIGNING AND STRIPING, SAFETY, SAFE ROUTES TO SCHOOLS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$24,600.00 2017HSIPPEN $24,600.00Design (Engineering) $24,600.00

$243,540.00 2021HSIPPEN $243,540.00Construction $221,400.00

$268,140.00Total Cost $268,140.00$246,000.00

Project: H.012559 INDUSTRIAL PARK SITE ROAD REHABRAPIDES 0.00 0.00000-40 INDUSTRIAL PARK SITE RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: ALEXANDRIA

Work TypeType ImprovementRemarks

PATCHING, COLD PLANNING AND RESURFACINGCITY OF ALEXANDRIA PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$138,000.00 2020STP<200K CITY OF ALEXANDRIA$138,000.00Utility Relocation $138,000.00

$1,210,000.00 2020STP<200K CITY OF ALEXANDRIA$968,000.00Construction $1,100,000.00

$1,348,000.00Total Cost $1,106,000.00$1,238,000.00

Project: H.013452 HORSESHOE DRIVE ROADWAY IMPROVEMENTSRAPIDES 0.00 0.00000-40 HORSESHOE DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: ALEXANDRIA

Work TypeType ImprovementRemarks

ASPHALT REHABILITATIONCITY OF ALEXANDRIA TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,870,000.00 2019STP<200K CITY OF ALEXANDRIA$1,496,000.00Construction $1,700,000.00

$1,870,000.00Total Cost $1,496,000.00$1,700,000.00

Project: H.013887 RAPIDES AVE AND 3RD ST ROAD IMPROVEMENTSRAPIDES 0.00 0.00000-40 RAPIDES AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

RAPIDES 0.00 0.00000-40 RAPIDES AVE

RAPIDES 0.00 0.00000-40 N 3RD ST

RAPIDES 0.00 0.00000-40 N 3RD ST

Urbanized Area: ALEXANDRIA

Work TypeType ImprovementRemarks

REHABILITATIONCITY OF ALEXANDRIA TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,699,850.00 2022STP<200K $2,959,880.00Construction $3,363,500.00

$3,699,850.00Total Cost $2,959,880.00$3,363,500.00

Page 64 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 65: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

ALEXANDRIA

Project: H.014167 NORTH 16TH STREET BRIDGE REPLACEMENTRAPIDES 0.00 0.00000-40 N STRACENER STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: ALEXANDRIA

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENTCITY OF ALEXANDRIA TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,062,500.00 2021STP<200K $1,650,000.00Construction $1,875,000.00

$2,062,500.00Total Cost $1,650,000.00$1,875,000.00

Project: H.014311 ALEX BIKE/PED PLAN IMPLEMENTATIONPHASE 1RAPIDES 0.00 0.00000-40 DALLAS AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

RAPIDES 0.00 0.00000-40 DALLAS AVE

LA 1208-3 RAPIDES 9.81 11.47368-03

US 165-X RAPIDES 11.47 12.24368-03

US 165-X RAPIDES 0.00 0.14015-01

RAPIDES 0.00 0.00000-40 MASONIC DR

LA 28-X RAPIDES 0.00 1.36417-03

RAPIDES 0.00 0.00000-40 VERSAILLES BLVD

Urbanized Area: ALEXANDRIA

Work TypeType ImprovementRemarks

BIKE LANESCITY OF ALEXANDRIA PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$374,000.00 2021STP<200K $299,200.00Construction $340,000.00

$374,000.00Total Cost $299,200.00$340,000.00

Project: H.014521 ALEX MPO TRAVEL DEMAND MANAGEMENT 2020RAPIDES 0.00 0.00000-40 ALEX MPO TRAVEL DEMAND MANAGEMRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: ALEXANDRIA

Work TypeType ImprovementRemarks

CARPOOL/VANPOOL, OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2021STPFLEX $100,000.00Feasibility $100,000.00

$100,000.00Total Cost $100,000.00$100,000.00

Project: H.014536 COLLEGE DRIVE PAVEMENT REHABRAPIDES 0.00 0.00000-40 COLLEGE DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: ALEXANDRIA

Work TypeType ImprovementRemarks

ROADWAY REPAIRCITY OF PINEVILLE TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$770,000.00 2021STP<200K $616,000.00Construction $700,000.00

$770,000.00Total Cost $616,000.00$700,000.00

Page 65 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 66: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

ALEXANDRIA

Project: H.011960 DISTRICT 08 CONTROLLER UPGRADESDISTRICTWIDE 08 0.00 0.00000-98 DISTRICT 08 CONTROLLER UPGRADERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: ALEXANDRIA

Work TypeType ImprovementRemarks

UPGRADE OF EXISTING SIGNAL CONTROLLERS, OPER EFFICIENCY/MOTORIST ASSISTANCE, TRAFFIC

CONTROL DEVICES

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$449,570.00 2022STPFLEX $449,570.00Construction $408,700.00

$60,000.00 2020STPFLEX $60,000.00Design (Engineering) $60,000.00

$509,570.00Total Cost $509,570.00$468,700.00

Page 66 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 67: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HOUMA

Project: H.013493 WASHINGTON STREET SIDEWALKSASSUMPTION 0.00 0.00000-04 WASHINGTON STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

ADA COMPLIANT SIDEWALKSMATCH BY VILLAGE OF NAPOLEONVILLE, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$7,976.00 2021STP<200K VILLAGE OF NAPOLEONVILLE$6,380.80Design (Engineering) $7,976.00

$87,732.70 2022STP<200K VILLAGE OF NAPOLEONVILLE$70,186.16Construction $79,757.00

$95,708.70Total Cost $76,566.96$87,733.00

Project: H.013500 DR. MARTIN LUTHER KING PHASE 1ASSUMPTION 0.00 0.00000-04 DR MARTIN LUTHER KING DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

ADA COMPLIANT SIDEWALKSMATCH BY VILLAGE OF NAPOLEONVILLE, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$9,634.00 2021STP<200K VILLAGE OF NAPOLEONVILLE$7,707.20Design (Engineering) $9,634.00

$105,979.50 2022STP<200K VILLAGE OF NAPOLEONVILLE$84,783.60Construction $96,345.00

$115,613.50Total Cost $92,490.80$105,979.00

Project: H.013501 DR MARTIN LUTHER KING PHASE 2ASSUMPTION 0.00 0.00000-04 DR MARTIN LUTHER KING DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

ADA COMPLIANT SIDEWALKSMATCH BY VILLAGE OF NAPOLEONVILLE, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$9,635.00 2022STP<200K VILLAGE OF NAPOLEONVILLE$7,708.00Design (Engineering) $9,635.00

$105,979.50 2023STP<200K VILLAGE OF NAPOLEONVILLE$84,783.60Construction $96,345.00

$115,614.50Total Cost $92,491.60$105,980.00

Project: H.009320 ACADIAN ROAD ROUNDABOUTLA 20 LAFOURCHE 0.75 0.85065-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

5 LEGGED ROUNDABOUT, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,500,000.00 2020STP<200K $3,500,000.00Right of Way $3,500,000.00

$100,000.00 2020STP<200K $100,000.00Utility Relocation $100,000.00

$561,000.00 2014STP<200K CITY OF THIBODAUX$561,000.00Design (Engineering) $561,000.00

$5,080,053.00 2021HSIP CITY OF THIBODAUX$5,080,053.00Construction $4,618,230.00

$9,241,053.00Total Cost $9,241,053.00$8,779,230.00

Page 67 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 68: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HOUMA

Project: H.011915 AIRPORT CONNECTOR ROAD AND BRIDGELAFOURCHE 0.00 0.00000-29 AIRPORT CONNECTOR ROAD& BRIDGRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 3235 LAFOURCHE 4.43 5.07829-26

LA 1 LAFOURCHE 2.87 3.23064-04

LA 308 LAFOURCHE 3.04 3.16407-01

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

NEW BRIDGE AND NEW ROAD BETWEEN LA 308 AND LA

3235

LOCAL FUNDS LAFOURCHE PARISH GOVT&

GREATERLAFOURCHE PORT, GREATER

LAFOURCHE PORT COMMISSION BUILD GRANT

OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$22,583,000.00 2020EARMARK $18,066,400.00Construction $20,530,000.00

$13,090,000.00 2020LOCAL $0.00$11,900,000.00

$35,673,000.00Total Cost $18,066,400.00$32,430,000.00

Project: H.011962 LA 1: CO CANAL MB REHAB (LOCKPORT)(HBI)LA 1 LAFOURCHE 1.20 1.70064-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

MOVABLE BRIDGE REHABILITATION FEASIBILITY STUDY, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$175,000.00 2021STPFLEX $140,000.00Feasibility $175,000.00

$175,000.00Total Cost $140,000.00$175,000.00

Project: H.012447 LA 182: B LAFOURCHE MB RH(RACELAND)(HBI)LA 182 LAFOURCHE 0.00 0.06005-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

REPLACE EXISTING VERTICAL LIFT BRIDGE, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$22,000,000.00 2022STPFLEX $17,600,000.00Construction $20,000,000.00

$22,000,000.00Total Cost $17,600,000.00$20,000,000.00

Project: H.013250 US 90: LA 308 - 2.3 MI E LA 182US 90 LAFOURCHE 11.92 15.25424-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 90 LAFOURCHE 3.61 6.12005-07

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

MILL, PATCH, AND OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$7,810,000.00 2020NHPP $6,248,000.00Construction $7,100,000.00

$7,810,000.00Total Cost $6,248,000.00$7,100,000.00

Page 68 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 69: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HOUMA

Project: H.013269 AUDUBON AVE OVLY:LA 1 TO TERREBONNE P/LLAFOURCHE 0.00 0.00000-29 AUDUBON AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

ASPHALT OVERLAYCITY OF THIBODAUX WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$69,320.00 2021STP<200K CITY OF THIBODAUX$55,456.00Design (Engineering) $69,320.00

$516,318.00 2022STP<200K CITY OF THIBODAUX$413,054.40Construction $469,380.00

$585,638.00Total Cost $468,510.40$538,700.00

Project: H.013402 LA1 &LA308 PED & MULTIUSE PATH(LOCKPORT)LA 1 LAFOURCHE 1.34 2.00064-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LAFOURCHE 0.00 0.00000-29 E FONTINELLE ST

LA 308 LAFOURCHE 14.44 14.60407-90

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

SIDEWALK AND MULTIUSE PATHLAFOURCHE PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$25,000.00 2021STP<200K LAFOURCHE PARISH$20,000.00Environmental $25,000.00

$100,000.00 2022STP<200K $80,000.00Right of Way $100,000.00

$100,000.00 2022STP<200K $80,000.00Utility Relocation $100,000.00

$45,000.00 2021STP<200K LAFOURCHE PARISH$36,000.00Design (Engineering) $45,000.00

$242,000.00 2022STP<200K LAFOURCHE PARISH$193,600.00Construction $220,000.00

$512,000.00Total Cost $409,600.00$490,000.00

Project: H.013403 LA 20 & LA 304 SIDEWALK IMP (CHACKBAY)LA 304 LAFOURCHE 6.33 7.08829-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 20 LAFOURCHE 5.54 6.20065-06

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

ADA SIDEWALKSLAFOURCHE PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$40,000.00 2022STP<200K LAFOURCHE PARISH$32,000.00Design (Engineering) $40,000.00

$288,981.00 2022STP<200K LAFOURCHE PARISH$231,184.80Construction $262,710.00

$328,981.00Total Cost $263,184.80$302,710.00

Project: H.013404 LA 1 SIDEWALKS (CUT-OFF)LA 1 LAFOURCHE 6.41 6.62064-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 1 LAFOURCHE 5.26 5.60064-04

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

SIDEWALKSLAFOURCHE PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$18,000.00 2021STP<200K LAFOURCHE PARISH$14,400.00Design (Engineering) $18,000.00

$128,700.00 2022STP<200K LAFOURCHE PARISH$102,960.00Construction $117,000.00

$146,700.00Total Cost $117,360.00$135,000.00

Page 69 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 70: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HOUMA

Project: H.013429 DOWNTOWN THIBODAUX SIDEWALKSLAFOURCHE 0.00 0.00000-29 DOWNTOWN THIBODAUXRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LAFOURCHE 0.00 0.00000-29 FOCUS ST

LAFOURCHE 0.00 0.00000-29 SAINT PHILIP ST

LAFOURCHE 0.00 0.00000-29 SAINT LOUIS ST

LAFOURCHE 0.00 0.00000-29 GREEN ST

LAFOURCHE 0.00 0.00000-29 MARONGE ST

LAFOURCHE 0.00 0.00000-29 PATRIOT ST

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

ENHANCEMENTS - UPGRADE SIDEWALKS TO ADACITY OF THIBODAUX WILL PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$19,320.00 2021STP>200K $15,456.00Design (Engineering) $19,320.00

$212,520.00 2022STP<200K CITY OF THIBODAUX$170,016.00Construction $193,200.00

$231,840.00Total Cost $185,472.00$212,520.00

Project: H.013490 CENTRAL LAFOURCHE MULTI-USE PATH PH 1ALA 1 LAFOURCHE 5.09 7.09064-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 1 LAFOURCHE 7.09 7.47064-06

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

MULTI-USE PATHLAFOURCHE PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$250,000.00 2021STP<200K LAFOURCHE PARISH$200,000.00Environmental $250,000.00

$500,000.00 2022STP<200K LAFOURCHE PARISH$400,000.00Right of Way $500,000.00

$290,000.00 2022STP<200K LAFOURCHE PARISH$232,000.00Utility Relocation $290,000.00

$250,000.00 2021STP<200K LAFOURCHE PARISH$200,000.00Design (Engineering) $250,000.00

$1,320,000.00 2022STP<200K LAFOURCHE PARISH$1,056,000.00Construction $1,200,000.00

$2,610,000.00Total Cost $2,088,000.00$2,490,000.00

Project: H.013818 LA308:B LAFOUR MB RH(GOLDEN MEADOW)(HBI)LA 308 LAFOURCHE 0.00 0.30407-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

MOVABLE BRIDGE MECHANICAL, ELECTRICAL,

STRUCTURAL REHAB

, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$175,000.00 2021STPFLEX $140,000.00Feasibility $175,000.00

$175,000.00Total Cost $140,000.00$175,000.00

Page 70 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 71: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HOUMA

Project: H.013940 LA 648 & ACADIA ROAD INTERSECTION IMPROVLA 648 LAFOURCHE 0.21 0.22829-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LAFOURCHE 0.00 0.00000-29 N ACADIA RD

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

INTERSECTION IMPROVEMENTSCPDC(HOUMA MPO) TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$575,000.00 2022STP<200K $460,000.00Right of Way $575,000.00

$320,000.00 2021STP<200K $256,000.00Design (Engineering) $320,000.00

$3,828,000.00 2022STP<200K $3,062,400.00Construction $3,480,000.00

$4,723,000.00Total Cost $3,778,400.00$4,375,000.00

Project: H.012891 LA 300: BAYOU LALOUTRE BRIDGELA 300 ST BERNARD 8.60 8.80284-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENTUSE NFA AS MATCH; AC PHASE 6, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$143,000.00 2022STPFLEX $114,400.00Design (Engineering) $143,000.00

$750,000.00 2024STCASH $0.00Construction $600,000.00

$893,000.00Total Cost $114,400.00$743,000.00

Project: H.013116 LA 20 WIDEN: LA 307 - S. VACHERIELA 20 ST JAMES 0.00 2.56065-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 20 LAFOURCHE 10.98 11.53065-06

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

WIDENING LA 20 TO INCLUDE 8' SHOULDERS, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$7,626,655.30 2022HSIPPEN $7,626,655.30Construction $6,933,323.00

$7,626,655.30Total Cost $7,626,655.30$6,933,323.00

Project: H.011986 LA 58: B TERREBONNE MB RH(MONTEGUT)(HBILA 58 TERREBONNE 1.57 1.59247-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

FEASIBILITY STUDY - MOVABLE BRIDGE REHABILITATION

OR REPLACE

, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Page 71 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 72: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HOUMA

Project: H.012337 PROSPECT BLVD SIDEWALKSTERREBONNE 0.00 0.00000-55 PROSPECT BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

NEW SIDEWALKTERREBONNE PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$41,437.00 2018STP<200K TERREBONNE PARISH$33,149.60Design (Engineering) $41,437.00

$288,750.00 2019STP<200K TERREBONNE PARISH$231,000.00Construction $262,500.00

$330,187.00Total Cost $264,149.60$303,937.00

Project: H.012338 CIVIC CENTER SIDEWALKSTERREBONNE 0.00 0.00000-55 CIVIC CENTER BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

NEW SIDEWALKSTERREBONNE PARISH PROVIDING THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$46,083.00 2018STP<200K TERREBONNE PARISH$36,866.40Design (Engineering) $46,083.00

$248,600.00 2021STP<200K TERREBONNE PARISH$198,880.00Construction $226,000.00

$294,683.00Total Cost $235,746.40$272,083.00

Project: H.012339 LA 24 SIDEWALK REHABLA 24 TERREBONNE 0.00 0.40065-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 182 TERREBONNE 6.95 7.12005-05

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

SIDEWALK REHABILITATIONTERREBONNE PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$91,748.00 2018STP<200K TERREBONNE PARISH$73,398.40Design (Engineering) $91,748.00

$1,210,000.00 2021STP<200K TERREBONNE PARISH$968,000.00Construction $1,100,000.00

$1,301,748.00Total Cost $1,041,398.40$1,191,748.00

Project: H.013340 VALHI BLVD, MULTI-USE TRAIL, PHASE 1TERREBONNE 0.00 0.00000-55 VALHI BLVDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

MULTI-USE PATHTERREBONNE PARISH PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$99,700.00 2021STP<200K TERREBONNE PARISH$79,760.00Design (Engineering) $99,700.00

$1,070,322.00 2022STP<200K TERREBONNE PARISH$856,257.60Construction $973,020.00

$1,170,022.00Total Cost $936,017.60$1,072,720.00

Page 72 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 73: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HOUMA

Project: H.013453 BLUE BAYOU (LA 316) SIDEWALKSLA 316 TERREBONNE 0.93 1.41412-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HOUMA

Work TypeType ImprovementRemarks

SIDEWALKSTERREBONNE PARISH TO PROVIDE THE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$83,160.00 2022STP<200K TERREBONNE PARISH$66,528.00Right of Way $83,160.00

$37,378.00 2021STP<200K TERREBONNE PARISH$29,902.40Design (Engineering) $37,378.00

$138,151.20 2022STP<200K TERREBONNE PARISH$110,520.96Construction $125,592.00

$258,689.20Total Cost $206,951.36$246,130.00

Page 73 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 74: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SLIDELL

Project: H.000284 US 90: PEARL RIVER BRIDGES (HBI)US 90 ST TAMMANY 5.00 8.00006-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

NEW BRIDGES006-07-0048; PRIORITY BRIDGE PROJECT,

HISTORIC BRIDGE IMPROVEMENT (HBI)

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$15,000.00 2020STPFLEX $12,000.00Design (Engineering) $15,000.00

$15,000.00Total Cost $12,000.00$15,000.00

Project: H.000286 US 90: EAST PEARL RIVER MB REPLACEMENTUS 90 ST TAMMANY 0.00 0.18006-08Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 90 ST TAMMANY 8.25 8.44006-07

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT006-08-0031;STAGE 0 PROJECT, MS TO FUND

DETAIL LINE 4

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$5,490,000.00 2022STPFLEX LADOTD & MDOT$4,392,000.00Design (Engineering) $5,490,000.00

$5,490,000.00Total Cost $4,392,000.00$5,490,000.00

Project: H.000688 US 11 NORFOLK SOUTHERN RR OVERPASS (HBI)US 11 ST TAMMANY 0.40 0.81018-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT018-04-0049; PRIORITY BRIDGE PROJECT,

HISTORIC BRIDGE IMPROVEMENT (HBI)

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$320,000.00 2020STPFLEX $256,000.00Design (Engineering) $320,000.00

$320,000.00Total Cost $256,000.00$320,000.00

Project: H.004113 LA 3241: LA 435 TO LA 40/LA 41LA 3241 ST TAMMANY 11.63 16.76852-33Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 41 ST TAMMANY 6.73 6.76058-02

LA 41 ST TAMMANY 6.76 6.98058-02

LA 40 ST TAMMANY 0.00 0.07058-30

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

NEW 4-LANE852-33-0001;BL DATE 10-08 404 RE-SUBMITTED3-

96, SEE LONG TEXT FOR MATCH

TIME,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$4,460,000.00 2019NHPP $3,568,000.00Right of Way $4,460,000.00

$750,000.00 2019NHPP $600,000.00Utility Relocation $750,000.00

$38,500,000.00 2021STCASH $0.00Construction $35,000,000.00

$22,000,000.00 2021TIFIA $22,000,000.00$20,000,000.00

$65,710,000.00Total Cost $26,168,000.00$60,210,000.00

Page 74 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 75: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SLIDELL

Project: H.004435 LA 3241: LA 36 TO LA 435LA 3241 ST TAMMANY 3.53 11.69852-33Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

NEW 4-LANE852-33-0003;BL DATE 7-08, SEE LONG TEXT FOR

MATCH

TIME,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$5,528,000.00 2019NHPP $4,422,400.00Right of Way $5,528,000.00

$750,000.00 2019NHPP $600,000.00Utility Relocation $750,000.00

$53,020,000.00 2022STCASH $0.00Construction $48,200,000.00

$29,480,000.00 2022TIFIA $29,480,000.00$26,800,000.00

$88,778,000.00Total Cost $34,502,400.00$81,278,000.00

Project: H.004957 LA 3241:I-12/LA 434 INTERCHANGE TO LA 36LA 3241 ST TAMMANY 0.00 3.53852-33Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 434 ST TAMMANY 2.70 4.57852-12

LA 434 ST TAMMANY 4.57 5.56852-12

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

NEW 4-LANE852-33-0002;BL DATE 7-08, SEE LONG TEXT FOR

MATCH

TIME,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$4,650,000.00 2021NHPP $3,720,000.00Right of Way $4,650,000.00

$1,500,000.00 2021NHPP $1,200,000.00Utility Relocation $1,500,000.00

$6,150,000.00Total Cost $4,920,000.00$6,150,000.00

Project: H.011216 CITY OF SLIDELL PAVEMENT MARKINGSST TAMMANY 0.00 0.00000-52 VARIOUS LOCAL ROADSRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

PURCHASE AND INSTALL PAVEMENT MARKINGS ON 12

LOCAL ROADS

, SAFETY, LOCAL ROADS SAFETY

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$25,000.00 2018HSIPPEN $25,000.00Design (Engineering) $25,000.00

$413,600.00 2020STCASH $413,600.00Construction $376,000.00

$438,600.00Total Cost $438,600.00$401,000.00

Project: H.011775 US 11 & US 190 BICYCLE AND PED CROSSINGSUS 11 ST TAMMANY 5.16 5.17018-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

PED/BICYCLE CROSSWALKS, SIGNS AND SIGNALSCITY OF SLIDELL PROVIDES MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,210,000.00 2021STP<200K $968,000.00Construction $1,100,000.00

$1,210,000.00Total Cost $968,000.00$1,100,000.00

Page 75 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 76: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SLIDELL

Project: H.012812 US 190 @ NORTHSHORE & CAMP VILLEREUS 190 ST TAMMANY 18.18 19.05013-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ST TAMMANY 0.00 0.00000-52 NORTHSHORE BLVD

ST TAMMANY 0.00 0.00000-52 CAMP VILLERE RD

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

ROUNDABOUT INTERSECTION IMPROVEMENTSDOTD TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,160,000.00 2021STP<200K $2,528,000.00Right of Way $3,160,000.00

$870,000.00 2021STP<200K $696,000.00Utility Relocation $870,000.00

$557,000.00 2020STP<200K $445,600.00Design (Engineering) $557,000.00

$6,330,500.00 2022STP<200K $5,064,400.00Construction $5,755,000.00

$10,917,500.00Total Cost $8,734,000.00$10,342,000.00

Project: H.012856 NATCHEZ DRIVE REHABILITATIONST TAMMANY 0.00 0.00000-52 NATCHEZ DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

REHABILITATIONCITY OF SLIDELL WILL PROVIDE MATCH; TOLL

CREDITS AS MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$572,000.00 2021STP<200K CITY OF SLIDELL$572,000.00Construction $520,000.00

$572,000.00Total Cost $572,000.00$520,000.00

Project: H.012947 US 90:WEST PEARL BR WIRE ROPE REPL (HBI)US 90 ST TAMMANY 5.22 5.32006-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

WIRE ROPE REPLACEMENTHISTORIC BRIDGE IMPROVEMENT (HBI), OPER EFFICIENCY/MOTORIST ASSISTANCE, MOVABLE

BRIDGE REHABILITATION

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$440,000.00 2021STPFLEX $352,000.00Construction $400,000.00

$440,000.00Total Cost $352,000.00$400,000.00

Page 76 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 77: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SLIDELL

Project: H.013008 DIST62:ABC BR REPLACE ST TAM,WASH PARSLA 16 ST TAMMANY 0.00 0.10058-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 1129 ST TAMMANY 2.35 2.45279-02

LA 36 ST TAMMANY 0.20 4.70280-03

LA 450 ST TAMMANY 1.30 1.40852-07

LA 59 ST TAMMANY 0.60 0.70852-09

LA 434 ST TAMMANY 5.90 6.00852-12

LA 16 WASHINGTON 0.90 1.00058-04

LA 438 WASHINGTON 6.00 6.15275-02

LA 436 WASHINGTON 10.60 10.70859-08

LA 1072 WASHINGTON 3.30 4.15859-21

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$170,000.00 2021NFA $0.00Design (Engineering) $170,000.00

$940,000.00 2021STPFLEX $752,000.00$940,000.00

$1,110,000.00Total Cost $752,000.00$1,110,000.00

Project: H.013151 US 190(GAUSE BLVD) SIDEWALK IMPROVEMENTSUS 190 ST TAMMANY 0.00 0.66852-24Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

SIDEWALK IMPROVEMENTSCITY OF SLIDELL TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$588,500.00 2021STP<200K CITY OF SLIDELL$470,800.00Construction $535,000.00

$588,500.00Total Cost $470,800.00$535,000.00

Project: H.013381 LINDBERG DRIVE @ US 190(GAUSE BLVD)ST TAMMANY 0.00 0.00000-52 LINDBERG DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

TURN LANECITY OF SLIDELL TO PROVIDE MATCH; TOLL

CREDITS AS MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$303,600.00 2021STP<200K CITY OF SLIDELL$303,600.00Construction $276,000.00

$303,600.00Total Cost $303,600.00$276,000.00

Project: H.014011 N CARNATION ST PAVEMENT REHABST TAMMANY 0.00 0.00000-52 N CARNATION STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

PAVEMENT REHABCITY OF SLIDELL TO PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,760,000.00 2021STP<200K $1,408,000.00Construction $1,600,000.00

$1,760,000.00Total Cost $1,408,000.00$1,600,000.00

Page 77 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 78: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SLIDELL

Project: H.014142 US 190: DRAINAGE IMPROVEMENTS (LACOMBE)US 190 ST TAMMANY 11.00 11.20013-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$935,000.00 2021NHPP $748,000.00Construction $850,000.00

$935,000.00Total Cost $748,000.00$850,000.00

Project: H.014315 GRAFTON DRIVE PAVEMENT REHABILITATIONST TAMMANY 0.00 0.00000-52 GRAFTON DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

REHABILITATIONCITY OF SLIDELL TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$950,400.00 2022STP<200K $760,320.00Construction $864,000.00

$950,400.00Total Cost $760,320.00$864,000.00

Project: H.014317 CAREY ST PAVEMENT REHABILITATIONST TAMMANY 0.00 0.00000-52 CAREY STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

PAVEMENT REHABCITY OF SLIDELL TO PROVIDE MATCH; TOLL

CREDITS AS MATCH,

URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$550,000.00 2022STP<200K $440,000.00Construction $500,000.00

$550,000.00Total Cost $440,000.00$500,000.00

Project: H.014375 US 190W ROUNDABOUTS, SLIDELLUS 190 ST TAMMANY 19.66 19.68013-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 190 ST TAMMANY 19.93 19.94013-12

US 190 ST TAMMANY 20.18 20.19013-12

ST TAMMANY 0.00 0.00000-52 WESTMINSTER DR

ST TAMMANY 0.00 0.00000-52 CARROLL RD

ST TAMMANY 0.00 0.00000-52 MARIS STELLA ST

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

CONSTRUCT ROUNDABOUTSST. TAMMANY PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,710,000.00 2021STP<200K $2,968,000.00Right of Way $3,710,000.00

$1,000,000.00 2021STP<200K $800,000.00Utility Relocation $1,000,000.00

$6,682,500.00 2022STP<200K $5,346,000.00Construction $6,075,000.00

$11,392,500.00Total Cost $9,114,000.00$10,785,000.00

Page 78 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 79: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

SLIDELL

Project: H.014528 TERRACE AVE PAVEMENT REHABST TAMMANY 0.00 0.00000-52 TERRACE AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SLIDELL

Work TypeType ImprovementRemarks

MILL AND OVERLAY ROADWAYCITY OF SLIDELL TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$385,000.00 2022STP<200K $308,000.00Construction $350,000.00

$385,000.00Total Cost $308,000.00$350,000.00

Page 79 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 80: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MANDEVILLE / COVINGTON

Project: H.001344 US 190: LA 437 - US 190 BUS (PH 1)US 190 ST TAMMANY 1.23 2.13059-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MANDEVILLE / COVINGTON

Work TypeType ImprovementRemarks

WIDEN TO 4 LANES, NEW BRIDGE059-30-0008, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,960,000.00 2021STP<200K $3,168,000.00Right of Way $3,960,000.00

$200,000.00 2019STP<200K $160,000.00Utility Relocation $200,000.00

$1,000,000.00 2018STP<200K $800,000.00Design (Engineering) $1,000,000.00

$210,000.00 2018STPFLEX $168,000.00$210,000.00

$485,000.00 2018TCSP $388,000.00$485,000.00

$18,700,000.00 2021STP<200K $14,960,000.00Construction $17,000,000.00

$24,555,000.00Total Cost $19,644,000.00$22,855,000.00

Project: H.009460 ST. TAMMANY PARISH SIGNING & STRIPINGST TAMMANY 0.00 0.00000-52 DOVE PARK, HELENBURGRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MANDEVILLE / COVINGTON

Work TypeType ImprovementRemarks

SIGNAGE, SAFETY, LOCAL ROADS SAFETY

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$632,500.00 2019STCASH $0.00Construction $575,000.00

$632,500.00Total Cost $0.00$575,000.00

Project: H.010116 LA 1088 CORRIDOR STUDYLA 1088 ST TAMMANY 0.00 3.30852-11Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MANDEVILLE / COVINGTON

Work TypeType ImprovementRemarks

TRAFFIC STUDY ON LA 1088, OPER EFFICIENCY/MOTORIST ASSISTANCE, ACCESS

MANAGEMENT

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$60,000.00 2020STPFLEX $48,000.00Design (Engineering) $60,000.00

$60,000.00Total Cost $48,000.00$60,000.00

Project: H.010184 LA 59: CURVE REALIGN AND TUNNEL AT TRACELA 59 ST TAMMANY 4.94 5.28281-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ST TAMMANY 0.00 0.00000-52 EMILE STRAIN RD

ST TAMMANY 0.00 0.00000-52 TRAILS/BIKEWAYS

ST TAMMANY 0.00 0.00000-52 MARSHALL RD

Urbanized Area: MANDEVILLE / COVINGTON

Work TypeType ImprovementRemarks

REALIGN CURVE & PROVIDE A TUNNEL FOR TAMMANY

TRACE CROSSING

ENG & R/W BY ST TAMMANY PARISH, MATCH 15%

TOLL CREDITS & 5% TTF FOR TAP<200K

ENHANCEMENTS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,805,000.00 2019HSIP $2,524,500.00Construction $2,550,000.00

$1,650,000.00 2019TAP<200K $1,567,500.00$1,500,000.00

$4,455,000.00Total Cost $4,092,000.00$4,050,000.00

Page 80 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 81: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MANDEVILLE / COVINGTON

Project: H.011152 I-12: US 190 TO LA 59I-12 ST TAMMANY 9.96 13.22454-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MANDEVILLE / COVINGTON

Work TypeType ImprovementRemarks

ROADWAY WIDENING AND OVERLAY, BRIDGE

WIDENING/REPLACEMENT

SEE NOTES FOR MATCH, CAPACITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$62,700,000.00 2019NHPP $50,875,660.00Construction $57,000,000.00

$62,700,000.00Total Cost $50,875,660.00$57,000,000.00

Project: H.011260 US 190B @ JEFFERSON AVE. ROUNDABOUTUS 190-X ST TAMMANY 9.06 9.17013-10Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

ST TAMMANY 0.00 0.00000-52 N JEFFERSON AVE

ST TAMMANY 0.00 0.00000-52 S JEFFERSON AVE

Urbanized Area: MANDEVILLE / COVINGTON

Work TypeType ImprovementRemarks

ROUNDABOUT CONSTRUCTION, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$251,043.00 2015HSIP $251,043.00Design (Engineering) $251,043.00

$2,085,600.00 2021HSIP $2,085,600.00Construction $1,896,000.00

$2,336,643.00Total Cost $2,336,643.00$2,147,043.00

Project: H.011721 US 190/LA 22 IMPROVEMENTSLA 22 ST TAMMANY 0.00 0.10013-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 190 ST TAMMANY 0.10 0.38013-12

LA 22 ST TAMMANY 3.98 4.08261-06

Urbanized Area: MANDEVILLE / COVINGTON

Work TypeType ImprovementRemarks

INTERSECTION IMPROVEMENTSUSE TTF AS MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,520,000.00 2020STP<200K $2,816,000.00Construction $3,200,000.00

$3,520,000.00Total Cost $2,816,000.00$3,200,000.00

Project: H.013866 I-12: LA 21 TO US 190I-12 ST TAMMANY 6.67 10.06454-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: MANDEVILLE / COVINGTON

Work TypeType ImprovementRemarks

ROADWAY WIDENING INCLUDES BRIDGE

WIDENING/REPLACEMENT

ST. TAMMANY PARISH WILL PROVIDE MATCH, CAPACITY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$27,500,000.00 2020EARMARK $22,000,000.00Construction $25,000,000.00

$27,830,000.00 2020NHPP $22,264,000.00$25,300,000.00

$55,330,000.00Total Cost $44,264,000.00$50,300,000.00

Page 81 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 82: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

MANDEVILLE / COVINGTON

Project: H.013872 LA 22 @ LA 1085 ROUNDABOUTLA 22 ST TAMMANY 0.54 1.00261-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 1085 ST TAMMANY 0.00 0.20852-02

Urbanized Area: MANDEVILLE / COVINGTON

Work TypeType ImprovementRemarks

CONSTRUCT A ROUNDABOUTDOTD TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$250,000.00 2020STP<200K $200,000.00Right of Way $250,000.00

$150,000.00 2020STP<200K $120,000.00Utility Relocation $150,000.00

$1,100,000.00 2022STP<200K $880,000.00Construction $1,000,000.00

$1,500,000.00Total Cost $1,200,000.00$1,400,000.00

Page 82 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 83: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HAMMOND

Project: H.009425 LA 16 AMITE DRAINAGE IMPROVEMENTSLA 16 TANGIPAHOA 0.04 0.71047-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HAMMOND

Work TypeType ImprovementRemarks

DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$310,843.42 2014STPFLEX $248,674.74Design (Engineering) $310,843.42

$1,442,100.00 2022STPFLEX $1,153,680.00Construction $1,311,000.00

$1,752,943.42Total Cost $1,402,354.74$1,621,843.42

Project: H.010289 LA 22: ROUNDABOUT DUNSON/RIDGEDELL RDS.LA 22 TANGIPAHOA 2.61 2.84261-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

TANGIPAHOA 0.00 0.00000-53 RIDGEDELL RD AT DUNSON ROAD

Urbanized Area: HAMMOND

Work TypeType ImprovementRemarks

CONSTRUCT ROUNDABOUT @ LA 22/DUNSON/RIDGEDELL, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$521,000.00 2017HSIP $521,000.00Right of Way $521,000.00

$25,152.00 2016HSIP $25,152.00Design (Engineering) $25,152.00

$1,848,000.00 2022HSIP $1,848,000.00Construction $1,680,000.00

$2,394,152.00Total Cost $2,394,152.00$2,226,152.00

Project: H.011512 US 51 @ SYCAMORE ST AMITE CITY DRAINAGEUS 51 TANGIPAHOA 4.60 4.90017-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HAMMOND

Work TypeType ImprovementRemarks

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$110,000.00 2020STPFLEX $88,000.00Construction $100,000.00

$110,000.00Total Cost $88,000.00$100,000.00

Project: H.011519 LA 1063: GLENDALE DR - US 51 DRAINAGELA 1063 TANGIPAHOA 6.30 6.60853-34Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HAMMOND

Work TypeType ImprovementRemarks

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$35,000.00 2017STPFLEX $28,000.00Design (Engineering) $35,000.00

$247,500.00 2021STPFLEX $198,000.00Construction $225,000.00

$282,500.00Total Cost $226,000.00$260,000.00

Page 83 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 84: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HAMMOND

Project: H.013113 LA 22: LA 42 - YELLOW WATER RIVERLA 22 TANGIPAHOA 0.00 0.46261-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 22 TANGIPAHOA 0.46 3.33261-03

LA 22 LIVINGSTON 8.41 8.57261-02

Urbanized Area: HAMMOND

Work TypeType ImprovementRemarks

ADDING CONTINUOUS TURN LANEDOTD WILL PROVIDE THE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,300,000.00 2019STP<200K $2,640,000.00Construction $3,000,000.00

$3,300,000.00Total Cost $2,640,000.00$3,000,000.00

Project: H.013520 BARRINGER DRIVE SIDEWALKSTANGIPAHOA 0.00 0.00000-53 BARRINGER DRRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HAMMOND

Work TypeType ImprovementRemarks

SIDEWALKSCITY OF PONCHATOULA WILL PROVIDE MATCH., URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$247,500.00 2021STP<200K CITY OF PONCHATOULA$198,000.00Construction $225,000.00

$247,500.00Total Cost $198,000.00$225,000.00

Project: H.013938 LA 3234 UNIVERSITY AVE SIDEWALKSLA 3234 TANGIPAHOA 0.42 1.51853-40Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: HAMMOND

Work TypeType ImprovementRemarks

SIDEWALKSMATCH PROVIDED BY TANGIPAHOA PARISH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,430,000.00 2022STP<200K $1,144,000.00Construction $1,300,000.00

$1,430,000.00Total Cost $1,144,000.00$1,300,000.00

Project: H.014048 S TANGIPAHOA ROADS - PAVEMENT REHABTANGIPAHOA 0.00 0.00000-53 RUFUS BANKSTON RDRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

TANGIPAHOA 0.00 0.00000-53 WARDLINE RD

TANGIPAHOA 0.00 0.00000-53 SISTERS RD

TANGIPAHOA 0.00 0.00000-53 N BAPTIST RD

TANGIPAHOA 0.00 0.00000-53 HAPPYWOODS RD

Urbanized Area: HAMMOND

Work TypeType ImprovementRemarks

PAVEMENT REHABTANGIPAHOA PARISH TO PROVIDE MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,200,000.00 2021STP<200K $1,760,000.00Construction $2,000,000.00

$2,200,000.00Total Cost $1,760,000.00$2,000,000.00

Page 84 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 85: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

HAMMOND

Project: H.014340 E. MINNESOTA PARK RD AT RANGE RDTANGIPAHOA 0.00 0.00000-53 E MINNESOTA PARK AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

TANGIPAHOA 0.00 0.00000-53 S RANGE RD

Urbanized Area: HAMMOND

Work TypeType ImprovementRemarks

INTERSECTION IMPROVEMENTTANGIPAHOA PROVIDING MATCH, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$2,750,000.00 2022STP<200K $2,200,000.00Construction $2,500,000.00

$2,750,000.00Total Cost $2,200,000.00$2,500,000.00

Page 85 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 86: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.013859 GUILLORY AVE: UP RR XING (OBERLIN)ALLEN 0.00 0.00000-02 GUILLORY AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

INSTALL SIGNALSMATCH BY RAILROAD, RAILROADS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$313,600.00 2021STCASH $0.00Construction $245,000.00

$313,600.00Total Cost $0.00$245,000.00

Project: H.010007 LA 70: PIERRE PASS MB REHAB (HBI)LA 70 ASSUMPTION 16.62 16.65232-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

CLEANING & PAINTING, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$146,581.00 2018STPFLEX $117,264.80Design (Engineering) $146,581.00

$825,000.00 2021STPFLEX $660,000.00Construction $750,000.00

$1,121,581.00Total Cost $897,264.80$1,046,581.00

Project: H.010443 LA 308: CURVE REALIGN AND SHOULDERSLA 308 ASSUMPTION 0.00 5.62407-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 308 ASSUMPTION 0.00 0.52407-08

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

REALIGN CURVE AND ADD SHOULDERS, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$440,600.00 2018HSIPPEN $440,600.00Right of Way $440,600.00

$180,000.00 2018HSIP $162,000.00Utility Relocation $180,000.00

$355,000.00 2012HSIP $319,500.00Design (Engineering) $355,000.00

$2,328,577.31 2019STCASH $0.00Construction $2,116,888.46

$3,304,177.31Total Cost $922,100.00$3,092,488.46

Project: H.013251 LA 114: X-DRAIN REPLACE WEST OF HESSMERLA 114 AVOYELLES 7.07 7.14145-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

REPLACE EXISTING CROSS DRAIN, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$67,000.00 2020STPFLEX $53,600.00Right of Way $67,000.00

$90,000.00 2020STPFLEX $72,000.00Utility Relocation $90,000.00

$448,800.00 2020STPFLEX $359,040.00Construction $408,000.00

$605,800.00Total Cost $484,640.00$565,000.00

Page 86 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 87: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.003184 I-10: TEXAS STATE LINE-E. OF COONE GULLYI-10 CALCASIEU 0.00 10.49450-91Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-10 CALCASIEU 0.93 0.99450-01

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

WIDEN TO 6 LANES450-91-0078, CORRIDOR,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$14,100.00 2014NHPP $11,280.00Environmental $14,100.00

$1,012,642.00 2014NHPP $911,377.80Design (Engineering) $1,012,642.00

$173,940,884.70 2020STCASH $0.00Construction $158,128,077.00

$174,967,626.70Total Cost $922,657.80$159,154,819.00

Project: H.001557 LA 4: BANKS SPRINGS - JCT. US 165LA 4 CALDWELL 18.21 19.70068-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

WIDENING & OVERLAY068-04-0030, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$380,000.00 2018HSIPPEN $380,000.00Right of Way $380,000.00

$81,000.00 2019HSIPPEN $81,000.00Utility Relocation $81,000.00

$169,057.00 2014HSIP $152,151.30Design (Engineering) $169,057.00

$1,540,000.00 2019HSIPPEN $1,540,000.00Construction $1,400,000.00

$2,170,057.00Total Cost $2,153,151.30$2,030,057.00

Project: H.013011 DIST58: ABC BR REPLACE CALDWELL PARISHLA 126 CALDWELL 3.72 5.57041-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 4 CALDWELL 1.84 4.20068-04

LA 127 CALDWELL 1.68 1.97127-04

LA 506 CALDWELL 7.20 7.30345-03

LA 506 CALDWELL 2.81 3.71345-04

LA 850 CALDWELL 0.70 0.75811-02

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$345,000.00 2021NFA $0.00Design (Engineering) $345,000.00

$800,000.00 2021STPFLEX $640,000.00$800,000.00

$1,145,000.00Total Cost $640,000.00$1,145,000.00

Page 87 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 88: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.009470 LA 82: SUPERIOR CANAL BRIDGE (HBI)LA 82 CAMERON 20.91 21.29194-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT - MOVEABLE BRIDGE, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$25,000.00 2019STPFLEX $20,000.00Feasibility $25,000.00

$25,000.00Total Cost $20,000.00$25,000.00

Project: H.012044 LA 384: ICWW MB REHAB (GRAND LAKE)(HBI)LA 384 CAMERON 0.00 0.20195-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.014288 LA 82:MERMENTAU MB REHAB(G CHENIER)(HBI)LA 82 CAMERON 0.00 0.30194-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

BRIDGE REHABILITATION / STRENGTHENINGHISTORIC BRIDGE IMPROVEMENT (HBI), PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$65,000.00 2020STPFLEX $52,000.00Design (Engineering) $65,000.00

$1,100,000.00 2021STPFLEX $880,000.00Construction $1,000,000.00

$1,165,000.00Total Cost $932,000.00$1,065,000.00

Project: H.013006 DIST58:ABC BR REPL CA,CO,FR,TN,LA PARISHLA 124 CATAHOULA 0.59 2.13143-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 126 CATAHOULA 2.13 2.80353-03

LA 568 CONCORDIA 7.95 8.05075-01

LA 135 FRANKLIN 6.20 6.30167-01

LA 577 FRANKLIN 2.00 2.05344-01

LA 605 TENSAS 9.30 9.40020-30

LA 569 TENSAS 0.00 0.05176-03

LA 772 LASALLE 1.00 1.10039-01

LA 127 LASALLE 1.00 1.05149-05

LA 778 LASALLE 1.70 1.80830-05

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$245,000.00 2021NFA $0.00Design (Engineering) $245,000.00

$905,000.00 2021STPFLEX $724,000.00$905,000.00

$1,150,000.00Total Cost $724,000.00$1,150,000.00

Page 88 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 89: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.006187 LA 15 @ DEER PARK (S OF LA 565 - LEVEE)LA 15 CONCORDIA 17.99 18.33177-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

LA 15 AT DEER PARK REALIGNMENT177-04-0033, SAFETY,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$58,000.00 2018HSIPPEN $58,000.00Environmental $58,000.00

$30,000.00 2018HSIPPEN $30,000.00Right of Way $30,000.00

$275,000.00 2018HSIPPEN $275,000.00Utility Relocation $275,000.00

$88,000.00 2019HSIPPEN $88,000.00Construction $80,000.00

$1,562,000.00 2019STCASH $0.00$1,420,000.00

$2,013,000.00Total Cost $451,000.00$1,863,000.00

Project: H.012910 DIST08:ABC BR REP GRAN, NATCH, WINN PARSUS 167 GRANT 14.30 14.40023-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 472 GRANT 5.02 7.90365-01

LA 119 NATCHITOCHES 0.20 0.35118-02

LA 1226 NATCHITOCHES 3.20 3.30359-01

LA 126 WINN 2.60 2.70091-07

LA 124 WINN 2.80 8.85125-01

LA 499 WINN 10.05 10.15126-02

LA 505 WINN 1.70 1.80321-02

LA 1229 WINN 0.86 1.76864-13

LA 1234 WINN 1.00 2.60864-14

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$675,000.00 2021NFA $0.00Design (Engineering) $675,000.00

$96,000.00 2021NHPP $76,800.00$96,000.00

$450,000.00 2021STPFLEX $360,000.00$450,000.00

$1,221,000.00Total Cost $436,800.00$1,221,000.00

Project: H.010155 US 90: RAIL SPUR REMOVAL SE OF LA 85US 90 IBERIA 17.71 18.33424-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

ROADWAY RECONSTRUCTION NO ADDED CAPACITYSTBONDS AND I-49 SOUTH UNCLAIMED

PROPERTY FUNDS AS MATCH,

RAILROADS, GRADE SEPARATION

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$18,000.00 2021STBONDS $0.00Right of Way $18,000.00

$13,000,000.00 2021STP<5K $13,000,000.00$13,000,000.00

$700,000.00 2019STP<5K $560,000.00Design (Engineering) $700,000.00

$507,650.00 2022DEMO $406,120.00Construction $461,500.00

$25,300,000.00 2022STP<5K $24,706,000.00$23,000,000.00

$39,525,650.00Total Cost $38,672,120.00$37,179,500.00

Page 89 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 90: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.011026 LA 182 WB: LASALLE ST. - VINE ST.LA 182 IBERIA 4.80 5.10004-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

DRAINAGE STRUCTURE REMOVAL AND REPLACEMENT,

ROADWAY WORK

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$1,100,000.00 2022STPFLEX $880,000.00Construction $1,000,000.00

$1,100,000.00Total Cost $880,000.00$1,000,000.00

Project: H.014191 LA 3195: BAYOU TECHE MB RH (NELSON)LA 3195 IBERIA 0.00 0.30823-44Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

FEASIBILITY STUDY OF MOVABLE BRIDGE REHAB, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.012588 I-10: ATCH BASIN BR - W BATON ROUGE P/LI-10 IBERVILLE 8.54 14.81450-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

GRADE RAISING, PRESERVATION, INTERSTATE

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$225,000.00 2020NHPP $202,500.00Design (Engineering) $225,000.00

$21,505,000.00 2021NHPP $19,354,500.00Construction $19,550,000.00

$21,730,000.00Total Cost $19,557,000.00$19,775,000.00

Project: H.013243 BYU PIGEON PONTOON BR ELEC WINCHES (HBI)LA 997 IBERVILLE 9.55 9.61230-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

MOVABLE BRIDGE MACHINERY REPAIRSUSE NFA AS MATCH, HISTORIC BRIDGE

IMPROVEMENT (HBI)

OPER EFFICIENCY/MOTORIST ASSISTANCE, MOVABLE

BRIDGE REHABILITATION

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$550,000.00 2022STPFLEX $440,000.00Construction $500,000.00

$550,000.00Total Cost $440,000.00$500,000.00

Page 90 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 91: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.012740 I-20: REPLACE FIVE OVERPASSES (LINCOLN)I-20 LINCOLN 1.80 2.00451-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

I-20 LINCOLN 17.75 17.80451-05

I-20 LINCOLN 19.00 19.20451-05

I-20 LINCOLN 4.60 4.80451-05

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENTS, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$750,000.00 2021NHPP $675,000.00Design (Engineering) $750,000.00

$750,000.00Total Cost $675,000.00$750,000.00

Project: H.014354 N MONROE ST: S SERVICE RD W - W PARK AVELINCOLN 0.00 0.00000-31 N MONROE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

REALIGNMENT/SIDEWALKS/MULTIUSE PATHCITY OF RUSTON TO PROVIDE MATCH, CITY OF

RUSTON BUILD GRANT

OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$6,022,500.00 2021EARMARK $4,818,000.00Construction $5,475,000.00

$6,022,500.00Total Cost $4,818,000.00$5,475,000.00

Project: H.014355 S MONROE ST, W TEX, W LA & OIL MILL STLINCOLN 0.00 0.00000-31 S MONROE STRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LINCOLN 0.00 0.00000-31 W TEXAS AVE

LINCOLN 0.00 0.00000-31 W LOUISIANA AVE

LINCOLN 0.00 0.00000-31 OILMILL ST

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

PAVEMENT PRESERVATION/SIDEWALKS/MULTIUSE PATHCITY OF RUSTON TO PROVIDE MATCH, CITY OF

RUSTON BUILD GRANT

OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$6,292,000.00 2021EARMARK $5,033,600.00Construction $5,720,000.00

$6,292,000.00Total Cost $5,033,600.00$5,720,000.00

Project: H.014356 LOUISIANA TECH RR MULTI-USE PATHLINCOLN 0.00 0.00000-31 W RAILROAD AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LINCOLN 0.00 0.00000-31 PORTIONS OF THE PATH NOT ALONG

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

MULTIUSE PATHCITY OF RUSTON TO PROVIDE MATCH, CITY OF

RUSTON BUILD GRANT

OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,960,000.00 2021EARMARK $3,168,000.00Construction $3,600,000.00

$3,960,000.00Total Cost $3,168,000.00$3,600,000.00

Page 91 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 92: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.014357 DAN RENEAU DR, S HOMER ST & W MISS AVELINCOLN 0.00 0.00000-31 W MISSISSIPPI AVERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LINCOLN 0.00 0.00000-31 S HOMER ST

LINCOLN 0.00 0.00000-31 DAN RENEAU DR

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

PAVEMENT PRESERVATION/SIDEWALKS/BIKE LANESCITY OF RUSTON TO PROVIDE MATCH, CITY OF

RUSTON BUILD GRANT

OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$6,099,500.00 2021EARMARK $4,879,600.00Construction $5,545,000.00

$6,099,500.00Total Cost $4,879,600.00$5,545,000.00

Project: H.011446 MOUND REST AREA RENOVATIONSMADISON 0.00 0.00000-33 I-20Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

REST AREA RENOVATION, OPER EFFICIENCY/MOTORIST ASSISTANCE, REST

AREAS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$500,000.00 2021NHPP $450,000.00Utility Relocation $500,000.00

$440,000.00 2021NHPP $396,000.00Design (Engineering) $440,000.00

$9,900,000.00 2021NHPP $8,910,000.00Construction $9,000,000.00

$10,840,000.00Total Cost $9,756,000.00$9,940,000.00

Project: H.012739 I-20 MRB AT VICKSBURG OVERLAY AND REHABI-20 MADISON 0.00 2.09451-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

BRIDGE REHABILITATION, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$500,000.00 2017NHPP $450,000.00Design (Engineering) $500,000.00

$500,000.00 2017OTHER $450,000.00$500,000.00

$23,650,000.00 2019NHPP $21,285,000.00Construction $21,500,000.00

$23,650,000.00 2019OTHER $0.00$21,500,000.00

$48,300,000.00Total Cost $22,185,000.00$44,000,000.00

Project: H.011613 US 425: DRAINAGE IMPROV AT EAST PINE AVEUS 425 MOREHOUSE 0.09 0.16038-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

SUBSURFACE DRAINAGE IMPROVEMENTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$320,000.00 2020NHPP $256,000.00Construction $320,000.00

$320,000.00Total Cost $256,000.00$320,000.00

Page 92 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 93: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.001271 CANE RIVER BRIDGE AT CHURCH STREETLA 1-X NATCHITOCHES 14.63 14.66053-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT053-04-0031;STAGE 0, CK POST ENVIRON DATES PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$16,586.00 2014STPFLEX $13,268.80Feasibility $16,586.00

$954,521.00 2014NHPP $763,616.80Environmental $954,521.00

$36,000.00 2022NHPP $28,800.00Right of Way $36,000.00

$125,000.00 2022NHPP $100,000.00Utility Relocation $125,000.00

$15,000.00 2014NHPP $12,000.00Design (Engineering) $15,000.00

$1,147,107.00Total Cost $917,685.60$1,147,107.00

Project: H.011615 LA 151: DRAINAGE IMPROV 0.02 MI N US 80LA 151 OUACHITA 0.02 0.04317-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

REMOVE AND REPLACE THE EXISTING DRAINAGE

STRUCTURE

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$66,000.00 2019STPFLEX $52,800.00Construction $60,000.00

$66,000.00Total Cost $52,800.00$60,000.00

Project: H.012063 LA 15: OLD RIVER NAV CANAL MB RH (HBI)LA 15 POINTE COUPEE 5.80 6.20177-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.014454 LA 15: BOEUF RIVER BRIDGE REPL (HBI)LA 15 RICHLAND 6.81 7.53026-09Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT (HBI), PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$27,000.00 2021STPFLEX $21,600.00Design (Engineering) $27,000.00

$6,270,000.00 2021STPFLEX $5,016,000.00Construction $5,700,000.00

$6,297,000.00Total Cost $5,037,600.00$5,727,000.00

Page 93 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 94: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.014195 LYDDY TURNPIKE: KCS RR XING (FISHER)SABINE 0.00 0.00000-43 LYDDY TPKERoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

INSTALL GATESMATCH FROM PARISH AND RAILROAD, RAILROADS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$487,500.00 2020STCASH $0.00Construction $390,000.00

$487,500.00Total Cost $0.00$390,000.00

Project: H.014141 LA 43: DRAINAGE IMPROVEMENTSLA 43 ST HELENA 0.50 1.00254-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

ADDITION OF CROSS DRAIN AND UPSIZING CULVERTS, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$82,500.00 2021STPFLEX $66,000.00Construction $75,000.00

$82,500.00Total Cost $66,000.00$75,000.00

Project: H.012066 LA 3213: GRAMERCY BRIDGE REHABILITATIONLA 3213 ST JAMES 0.00 0.57434-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

MAJOR BRIDGE REHABILITATION, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$315,500.00 2021STPFLEX $252,400.00Feasibility $315,500.00

$33,000,000.00 2023STPFLEX $26,400,000.00Construction $30,000,000.00

$500,000.00 2022STPFLEX $400,000.00Design (Engineering) $500,000.00

$33,815,500.00Total Cost $27,052,400.00$30,815,500.00

Project: H.014140 I-55 SERVICE ROAD: GRADE RAISINGI-55 ST JOHN 1.20 7.50452-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

GRADE RAISING TO PREVENT CONSTANT SUBMERSION OF

ROADWAY

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$4,180,000.00 2020STP<5K $3,344,000.00Construction $3,800,000.00

$4,180,000.00Total Cost $3,344,000.00$3,800,000.00

Page 94 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 95: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.000445 US 190: UPRR OVERPASS NEAR OPELOUSASUS 190 ST LANDRY 1.30 1.64012-13Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 190 ST LANDRY 4.30 4.65012-13

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

BRIDGE REHAB.REDECK & MAYBE WIDEN012-13-0101, WESTBOUND STRUCTURE

REPLACED,EASTBOUND STRUCTURE REHAB

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$207,000.00 2018NHPP $165,600.00Feasibility $207,000.00

$10,000.00 2018NHPP $8,000.00Utility Relocation $10,000.00

$30,690,000.00 2022NHPP $24,552,000.00Construction $27,900,000.00

$30,907,000.00Total Cost $24,725,600.00$28,117,000.00

Project: H.011549 US 190 EB: DRAINAGE IMPROVEMENTSUS 190 ST LANDRY 3.80 4.00012-12Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

REMOVE BASE & SURFACING, RECONSTRUCT AT HIGHER

ELEV

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$880,000.00 2022STPFLEX $704,000.00Construction $800,000.00

$880,000.00Total Cost $704,000.00$800,000.00

Project: H.013198 US 190 EB & WB: WALLIOR ST - LA 742US 190 ST LANDRY 1.22 6.80012-13Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 190 ST LANDRY 0.58 1.22012-13

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

MILL, PATCH, OVERLAY, AND TURNLANE ADDITIONS, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$13,145,000.00 2020NHPP $10,516,000.00Construction $11,950,000.00

$13,145,000.00Total Cost $10,516,000.00$11,950,000.00

Project: H.014378 LA 70: 7.90 MI S LA 997-8.83 MI S LA 997LA 70 ST MARTIN 13.19 14.28230-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

RAISE ROADWAY ELEVATION TO MITIGATE FLOODING, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$660,000.00 2021STPFLEX $528,000.00Construction $600,000.00

$660,000.00Total Cost $528,000.00$600,000.00

Page 95 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 96: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.011487 LA 182: BERWICK BAY BRIDGE REHAB (HBI)LA 182 ST MARY 0.00 0.71005-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRS, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$500,000.00 2018STPFLEX $400,000.00Design (Engineering) $500,000.00

$16,500,000.00 2021STPFLEX $13,200,000.00Construction $15,000,000.00

$17,000,000.00Total Cost $13,600,000.00$15,500,000.00

Project: H.011494 US 90: ATCHAFALAYA RIVER BRIDGE REHABUS 90 ST MARY 32.70 33.05424-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRS, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$500,000.00 2017NHPP $400,000.00Design (Engineering) $500,000.00

$31,900,000.00 2018NHPP $25,520,000.00Construction $29,000,000.00

$32,400,000.00Total Cost $25,920,000.00$29,500,000.00

Project: H.014280 US 90: BAYOU RAMOS REHAB. PHASE IIIUS 90 ST MARY 36.00 38.00424-05Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

STRENGTHENING DEFICIENT SUPERSTRUCTURE/GIRDERS, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$400,000.00 2021NHPP $320,000.00Design (Engineering) $400,000.00

$400,000.00Total Cost $320,000.00$400,000.00

Project: H.011997 LA 14X:VRMLN R MB RH(OLD ABBEVILLE)(HBI)LA 14-X VERMILION 0.00 0.30055-06Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021NHPP $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Page 96 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 97: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.011998 LA 14: VRMLN R MB RH(ABBEVILLE BYP)(HBI)LA 14 VERMILION 1.00 1.50055-30Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021NHPP $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.012000 LA 82:OLD ICC MB RH(LITTLE PRAIRIE)(HBI)LA 82 VERMILION 6.50 6.80207-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2021STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.012003 LA 330: BAYOU TIGRE MB REHAB (HBI)LA 330 VERMILION 4.20 4.40397-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATION, HISTORIC BRIDGE IMPROVEMENT (HBI) PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2019STPFLEX $120,000.00Feasibility $150,000.00

$150,000.00Total Cost $120,000.00$150,000.00

Project: H.014465 LA 82: VERMILION RIVER MB RH(PERRY)(HBI)LA 82 VERMILION 7.40 7.70194-07Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

MOVABLE BRIDGE REHABILITATIONHISTORIC BRIDGE IMPROVEMENT (HBI), PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$250,000.00 2021STPFLEX $200,000.00Design (Engineering) $250,000.00

$10,026,500.00 2022STPFLEX $8,021,200.00Construction $9,115,000.00

$10,276,500.00Total Cost $8,221,200.00$9,365,000.00

Page 97 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 98: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.014143 LA 121: CROSS DRAIN REPLACE LM 10.1LA 121 VERNON 10.03 10.11029-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

REPLACE EXISTING UNDERSIZED CROSS DRAIN, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$269,500.00 2022STPFLEX $215,600.00Construction $245,000.00

$269,500.00Total Cost $215,600.00$245,000.00

Project: H.012159 LA 430: LA 25 - LA 1069 DRAINAGELA 430 WASHINGTON 0.00 0.18859-26Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR

ASPHALT

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$275,000.00 2022STPFLEX $220,000.00Construction $250,000.00

$275,000.00Total Cost $220,000.00$250,000.00

Project: H.013928 BOGUE CHITTO SP MOUNTAIN BIKE TRAILWASHINGTON 0.00 0.00000-59 BOGUE CHITTO STATE PARKRoute: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

CONST. OF 17 MILES OF MOUNTAIN BIKE TRAILSNORTHSHORE OFF ROAD BICYCLING ASSC.

WILL PROVIDE LOCAL MATCH, DCRT IS THE

PROJECT MANAGER

RECREATIONAL TRAILS PROGRAM,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$180,000.00 2021LOCAL NORTHSHORE OFF ROAD BICYCLING ASS.$0.00Construction $150,000.00

$24,000.00 2021RTP NORTHSHORE OFF ROAD BICYCLING ASS.$19,200.00$20,000.00

$204,000.00Total Cost $19,200.00$170,000.00

Project: H.001799 LA 531 OVERPASSI-20 WEBSTER 11.60 12.00451-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 531 WEBSTER 3.10 3.27111-02

LA 531 WEBSTER 3.27 3.50111-02

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENT451-03-0047;GEOM. STUDY UNDERWAY (E), PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$222,000.00 2021STPFLEX $192,600.00Utility Relocation $222,000.00

$495,000.00 2022NHPP $495,000.00Construction $450,000.00

$5,005,000.00 2022STPFLEX $4,103,000.00$4,550,000.00

$5,722,000.00Total Cost $4,790,600.00$5,222,000.00

Page 98 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 99: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.009513 LA 164: JCT. LA 163 TO JCT. US 371LA 164 WEBSTER 0.00 6.74122-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING &

RELATED WORK

, PRESERVATION, NON-INTERSTATE ON STP SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$3,520,000.00 2020STP<5K $2,816,000.00Construction $3,200,000.00

$3,520,000.00Total Cost $2,816,000.00$3,200,000.00

Project: H.012030 US371: KCS RR OVERPASSES HBIUS 371 WEBSTER 9.40 9.70027-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

LA 159 WEBSTER 13.10 13.40027-03

Urbanized Area: SMALL URBAN AREA

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENTS/REHABILITATION, STR. 019040 AND 018970 HISTORIC BRIDGE

IMPROVEMENT (HBI)

PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$175,000.00 2020STP<200K-E $140,000.00Design (Engineering) $175,000.00

$175,000.00Total Cost $140,000.00$175,000.00

Project: H.014236 LA 3008: BRIDGES NEAR COTTON VALLEYLA 3008 WEBSTER 0.12 7.25288-02Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

BRIDGE REPLACEMENTAC, USE NFA AS MATCH, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$400,000.00 2022FBROFF $320,000.00Design (Engineering) $400,000.00

$400,000.00Total Cost $320,000.00$400,000.00

Project: H.014146 US 190: HIGDON LN - 0.5 MI W OF LA 978US 190 W BATON ROUGE 11.01 13.19008-01Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

US 190 POINTE COUPEE 0.00 5.21008-02

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

MILL, STABILIZE BASE & SHOULDERS, ASPHALT OVERLAY, PRESERVATION, NON-INTERSTATE ON NHS SYSTEM

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$15,950,000.00 2021NHPP $12,760,000.00Construction $14,500,000.00

$15,950,000.00Total Cost $12,760,000.00$14,500,000.00

Page 99 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 100: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

NOT IN MPO AREA

Project: H.012780 LA 2: DRAINAGE IMPROVEMENTSLA 2 W CARROLL 0.20 0.30037-03Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

DRAINAGE IMPROVEMENT, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$343,895.86 2022STPFLEX $275,116.69Construction $312,632.60

$343,895.86Total Cost $275,116.69$312,632.60

Project: H.012157 LA 1228:CROSS DRAIN REPLACEMENT (WINN)LA 1228 WINN 1.66 1.90864-04Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: NA RURAL

Work TypeType ImprovementRemarks

REPLACE CROSS DRAINS AND RAISE ROADWAY TO

PREVENT FLOODING

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ROADWAY

FLOODING

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$60,000.00 2020STPFLEX $48,000.00Environmental $60,000.00

$42,000.00 2020STPFLEX $33,600.00Right of Way $42,000.00

$5,000.00 2021STPFLEX $4,000.00Utility Relocation $5,000.00

$1,320,000.00 2021STPFLEX $1,056,000.00Construction $1,200,000.00

$1,427,000.00Total Cost $1,141,600.00$1,307,000.00

Page 100 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 101: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000038 PLANNING, TRAINING AND RESEARCH 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Work TypeType ImprovementRemarks

HANDLED THROUGH OPERATING BUDGET, OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$0.00 2019CM $0.00Feasibility $0.00

$20,000.00 2019DEMO $16,000.00$20,000.00

$2,000,000.00 2019HSIPPEN $2,000,000.00$2,000,000.00

$50,000.00 2019LOCAL $0.00$50,000.00

$400,000.00 2019LTAP $200,000.00$400,000.00

$4,000,000.00 2019SPR MAND $3,200,000.00$4,000,000.00

$24,250,000.00 2019SPR OPT $19,400,000.00$24,250,000.00

$10,000,000.00 2019STCASH $0.00$10,000,000.00

$630,000.00 2019STP<200K $504,000.00$630,000.00

$15,500,000.00 2019STP<5K $12,400,000.00$15,500,000.00

$500,000.00 2019STP>200K $400,000.00$500,000.00

$50,000.00 2020CM $50,000.00$50,000.00

$1,500,000.00 2020HSIPPEN $1,500,000.00$1,500,000.00

$400,000.00 2020LTAP $200,000.00$400,000.00

$3,000,000.00 2020SPR MAND $2,400,000.00$3,000,000.00

$21,000,000.00 2020SPR OPT $16,800,000.00$21,000,000.00

$400,000.00 2020STCASH $0.00$400,000.00

$900,000.00 2020STP<200K $720,000.00$900,000.00

$15,000,000.00 2020STP<5K $12,000,000.00$15,000,000.00

$900,000.00 2020STP>200K $720,000.00$900,000.00

$50,000.00 2020STPFLEX $50,000.00$50,000.00

$7,500,000.00 2021CM $7,500,000.00$7,500,000.00

$60,000.00 2021DEMO $48,000.00$60,000.00

$1,000,000.00 2021HSIPPEN $1,000,000.00$1,000,000.00

$400,000.00 2021LTAP $200,000.00$400,000.00

$7,000,000.00 2021SPR MAND $5,600,000.00$7,000,000.00

$19,000,000.00 2021SPR OPT $15,200,000.00$19,000,000.00

$800,000.00 2021STCASH $0.00$800,000.00

$400,000.00 2021STP<200K $320,000.00$400,000.00

$6,500,000.00 2021STP<5K $5,200,000.00$6,500,000.00

$440,000.00 2021STP>200K $352,000.00$440,000.00

$450,000.00 2021STPFLEX-E $450,000.00$450,000.00

$50,000.00 2021TCP $50,000.00$50,000.00

$6,500,000.00 2022HSIPPEN $6,500,000.00$6,500,000.00

$400,000.00 2022LTAP $200,000.00$400,000.00

$9,000,000.00 2022NHPP $9,000,000.00$9,000,000.00

$7,000,000.00 2022SPR MAND $5,600,000.00$7,000,000.00

$19,000,000.00 2022SPR OPT $15,200,000.00$19,000,000.00

$400,000.00 2022STCASH $0.00$400,000.00

$400,000.00 2022STP<200K $320,000.00$400,000.00

$500,000.00 2022STP>200K $400,000.00$500,000.00

$187,350,000.00Total Cost $145,700,000.00$187,350,000.00

Page 101 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 102: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000039 ACCELERATED LOADING FACILITY 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Work TypeType ImprovementRemarks

CONSTRUCT TEST SECTIONS, OTHER / MISCELLANEOUS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$55,000.00 2019STPFLEX $44,000.00Construction $50,000.00

$55,000.00 2020STPFLEX $44,000.00$50,000.00

$55,000.00 2021STPFLEX $44,000.00$50,000.00

$55,000.00 2022STPFLEX $44,000.00$50,000.00

$220,000.00Total Cost $176,000.00$200,000.00

Project: L.000040 FEDERAL BRIDGE INSPECTION PROGRAMS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Work TypeType ImprovementRemarks

INSPECTIONS, RATINGS, LOAD FACTORS, PRESERVATION, BRIDGE (ON SYSTEM)

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$6,000,000.00 2019STPFLEX $4,800,000.00Feasibility $6,000,000.00

$200,000.00 2020DEMO $200,000.00$200,000.00

$300,000.00 2020NHPP $270,000.00$300,000.00

$4,500,000.00 2020STPFLEX $3,600,000.00$4,500,000.00

$1,000,000.00 2021FBROFF $800,000.00$1,000,000.00

$4,000,000.00 2021STPFLEX $3,200,000.00$4,000,000.00

$5,000,000.00 2022STPFLEX $4,000,000.00$5,000,000.00

$100,000.00 2019STPFLEX $80,000.00Design (Engineering) $100,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$550,000.00 2019STPFLEX $440,000.00Construction $500,000.00

$110,000.00 2020STPFLEX $88,000.00$100,000.00

$110,000.00 2021STPFLEX $88,000.00$100,000.00

$110,000.00 2022STPFLEX $88,000.00$100,000.00

$22,180,000.00Total Cost $17,814,000.00$22,100,000.00

Page 102 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 103: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000046 MISC STP ENHANCEMENT PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2020TAP<200K $40,000.00Design (Engineering) $50,000.00

$50,000.00 2020TAP<5K $40,000.00$50,000.00

$500,000.00 2020TAP>200K $400,000.00$500,000.00

$50,000.00 2020TAPFLEX $40,000.00$50,000.00

$50,000.00 2021TAP<200K $40,000.00$50,000.00

$50,000.00 2021TAP<5K $40,000.00$50,000.00

$50,000.00 2021TAP>200K $40,000.00$50,000.00

$50,000.00 2021TAPFLEX $40,000.00$50,000.00

$50,000.00 2022TAP<200K $40,000.00$50,000.00

$50,000.00 2022TAP<5K $40,000.00$50,000.00

$50,000.00 2022TAP>200K $40,000.00$50,000.00

$50,000.00 2022TAPFLEX $40,000.00$50,000.00

$550,000.00 2019LOCAL $0.00Construction $500,000.00

$1,650,000.00 2019STCASH $0.00$1,500,000.00

$550,000.00 2019TAP<200K $522,500.00$500,000.00

$1,100,000.00 2019TAP<5K $1,045,000.00$1,000,000.00

$825,000.00 2019TAP>200K $783,750.00$750,000.00

$1,100,000.00 2019TAPFLEX $1,045,000.00$1,000,000.00

$1,100,000.00 2020LOCAL $0.00$1,000,000.00

$3,300,000.00 2020STPENH $3,135,000.00$3,000,000.00

$550,000.00 2020TAP<200K $440,000.00$500,000.00

$550,000.00 2020TAP<5K $440,000.00$500,000.00

$4,400,000.00 2020TAP>200K $3,520,000.00$4,000,000.00

$1,100,000.00 2020TAPFLEX $880,000.00$1,000,000.00

$110,000.00 2021LOCAL $0.00$100,000.00

$1,650,000.00 2021STCASH $0.00$1,500,000.00

$385,000.00 2021STPENH $365,750.00$350,000.00

$2,200,000.00 2021TAP<200K $1,760,000.00$2,000,000.00

$1,430,000.00 2021TAP<5K $1,144,000.00$1,300,000.00

$4,400,000.00 2021TAP>200K $3,520,000.00$4,000,000.00

$1,650,000.00 2021TAPFLEX $1,320,000.00$1,500,000.00

$550,000.00 2022LOCAL $0.00$500,000.00

$330,000.00 2022STPFLEX $264,000.00$300,000.00

$4,400,000.00 2022TAP<200K $3,520,000.00$4,000,000.00

$2,750,000.00 2022TAP<5K $2,200,000.00$2,500,000.00

$3,300,000.00 2022TAP>200K $2,640,000.00$3,000,000.00

$770,000.00 2022TAPFLEX $616,000.00$700,000.00

$41,750,000.00Total Cost $30,001,000.00$38,050,000.00

Page 103 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 104: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000047 MISC NATIONAL TRAILS PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$150,000.00 2019RTP $120,000.00Feasibility $150,000.00

$240,000.00 2020RTP $192,000.00$240,000.00

$150,000.00 2021RTP $120,000.00$150,000.00

$150,000.00 2022RTP $120,000.00$150,000.00

$25,000.00 2019RTP $20,000.00Design (Engineering) $25,000.00

$25,000.00 2020RTP $20,000.00$25,000.00

$25,000.00 2021RTP $20,000.00$25,000.00

$25,000.00 2022RTP $20,000.00$25,000.00

$825,000.00 2019LOCAL $0.00Construction $750,000.00

$1,650,000.00 2019RTP $1,320,000.00$1,500,000.00

$660,000.00 2020LOCAL $0.00$600,000.00

$1,650,000.00 2020RTP $1,320,000.00$1,500,000.00

$550,000.00 2021LOCAL $0.00$500,000.00

$2,310,000.00 2021RTP $1,848,000.00$2,100,000.00

$550,000.00 2022LOCAL $0.00$500,000.00

$1,650,000.00 2022RTP $1,320,000.00$1,500,000.00

$10,635,000.00Total Cost $6,440,000.00$9,740,000.00

Project: L.000048 SCENIC BYWAYS OF LA 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$350,000.00 2019NSB $280,000.00Feasibility $350,000.00

$350,000.00 2020NSB $280,000.00$350,000.00

$350,000.00 2021NSB $280,000.00$350,000.00

$350,000.00 2022NSB $280,000.00$350,000.00

$350,000.00 2019NSB $280,000.00Design (Engineering) $350,000.00

$1,200,000.00 2019STCASH $0.00$1,200,000.00

$350,000.00 2020NSB $280,000.00$350,000.00

$350,000.00 2021NSB $280,000.00$350,000.00

$350,000.00 2022NSB $280,000.00$350,000.00

$1,100,000.00 2019LOCAL $0.00Construction $1,000,000.00

$275,000.00 2019NSB $275,000.00$250,000.00

$1,100,000.00 2019STCASH $0.00$1,000,000.00

$275,000.00 2019STPFLEX $275,000.00$250,000.00

$495,000.00 2020NSB $396,000.00$450,000.00

$495,000.00 2021NSB $396,000.00$450,000.00

$495,000.00 2022NSB $396,000.00$450,000.00

$8,235,000.00Total Cost $3,978,000.00$7,850,000.00

Page 104 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 105: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000049 INDIAN RESERVATION ROADS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$20,000.00 2019FLH $16,000.00Design (Engineering) $20,000.00

$20,000.00 2020FLH $16,000.00$20,000.00

$20,000.00 2021FLH $16,000.00$20,000.00

$20,000.00 2022FLH $16,000.00$20,000.00

$440,000.00 2019FLH $352,000.00Construction $400,000.00

$440,000.00 2020FLH $352,000.00$400,000.00

$440,000.00 2021FLH $352,000.00$400,000.00

$440,000.00 2022FLH $352,000.00$400,000.00

$1,840,000.00Total Cost $1,472,000.00$1,680,000.00

Project: L.000050 LA PUBLIC LANDS HIGHWAY PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$275,000.00 2019FLH $220,000.00Construction $250,000.00

$4,400,000.00 2020FLH $3,520,000.00$4,000,000.00

$1,100,000.00 2020STP<5K $880,000.00$1,000,000.00

$5,500,000.00 2021FLH $4,400,000.00$5,000,000.00

$5,500,000.00 2022FLH $4,400,000.00$5,000,000.00

$16,775,000.00Total Cost $13,420,000.00$15,250,000.00

Project: L.000051 OVERLAY OR SURFACE REPAIR ON INTERSTATE 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2019NHPP $45,000.00Environmental $50,000.00

$50,000.00 2020NHPP $45,000.00$50,000.00

$50,000.00 2021NHPP $45,000.00$50,000.00

$50,000.00 2022NHPP $45,000.00$50,000.00

$1,000,000.00 2019NHPP $900,000.00Design (Engineering) $1,000,000.00

$1,000,000.00 2020NHPP $900,000.00$1,000,000.00

$1,000,000.00 2021NHPP $900,000.00$1,000,000.00

$1,000,000.00 2022NHPP $900,000.00$1,000,000.00

$275,000.00 2019IM $247,500.00Construction $250,000.00

$11,000,000.00 2019NHPP $9,900,000.00$10,000,000.00

$275,000.00 2019STP<5K $247,500.00$250,000.00

$275,000.00 2019STP>200K $247,500.00$250,000.00

$825,000.00 2019STPFLEX $660,000.00$750,000.00

$550,000.00 2020DEMO $440,000.00$500,000.00

$16,940,000.00 2020NHPP $15,246,000.00$15,400,000.00

$1,650,000.00 2020STPFLEX $1,485,000.00$1,500,000.00

$33,000,000.00 2021NHPP $29,700,000.00$30,000,000.00

$33,000,000.00 2022NHPP $29,700,000.00$30,000,000.00

$101,990,000.00Total Cost $91,653,500.00$93,100,000.00

Page 105 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 106: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000053 STATEWIDE OVERLAY PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2019STPFLEX $40,000.00Environmental $50,000.00

$125,000.00 2020NHPP $100,000.00$125,000.00

$25,000.00 2020STPFLEX $20,000.00$25,000.00

$50,000.00 2021STPFLEX $40,000.00$50,000.00

$50,000.00 2022STPFLEX $40,000.00$50,000.00

$100,000.00 2019STPFLEX $80,000.00Right of Way $100,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$1,125,000.00 2019NHPP $1,000,000.00Utility Relocation $1,125,000.00

$475,000.00 2019STPFLEX $460,000.00$475,000.00

$500,000.00 2020LOCAL $0.00$500,000.00

$800,000.00 2020NHPP $640,000.00$800,000.00

$500,000.00 2020STPFLEX $400,000.00$500,000.00

$200,000.00 2021LOCAL $0.00$200,000.00

$350,000.00 2021NHPP $280,000.00$350,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$800,000.00 2022STPFLEX $640,000.00$800,000.00

$150,000.00 2019NHPP $120,000.00Design (Engineering) $150,000.00

$150,000.00 2019STPFLEX $120,000.00$150,000.00

$150,000.00 2020NHPP $120,000.00$150,000.00

$150,000.00 2020STPFLEX $120,000.00$150,000.00

$100,000.00 2021DEMO $80,000.00$100,000.00

$150,000.00 2021NHPP $120,000.00$150,000.00

$150,000.00 2021STPFLEX $120,000.00$150,000.00

$150,000.00 2022NHPP $120,000.00$150,000.00

$150,000.00 2022STPFLEX $120,000.00$150,000.00

$550,000.00 21HSIPPEN $550,000.00Construction $500,000.00

$3,300,000.00 2019HRRR $2,970,000.00$3,000,000.00

$275,000.00 2019HSIP $247,500.00$250,000.00

$11,000,000.00 2019NFA $0.00$10,000,000.00

$33,000,000.00 2019NHPP $26,400,000.00$30,000,000.00

$110,000.00 2019SATRANS $0.00$100,000.00

$16,500,000.00 2019STBONDS $0.00$15,000,000.00

$1,100,000.00 2019STCASH $0.00$1,000,000.00

$1,650,000.00 2019STP<200K $1,320,000.00$1,500,000.00

$6,600,000.00 2019STP<5K $5,280,000.00$6,000,000.00

$55,000,000.00 2019STPFLEX $44,000,000.00$50,000,000.00

$385,000.00 2020DEMO $308,000.00$350,000.00

$3,850,000.00 2020HRRR $3,465,000.00$3,500,000.00

$1,100,000.00 2020HSIP $990,000.00$1,000,000.00

$660,000.00 2020HSIPPEN $660,000.00$600,000.00

$550,000.00 2020LOCAL $0.00$500,000.00

$11,000,000.00 2020NFA $0.00$10,000,000.00

$82,500,000.00 2020NHPP $66,000,000.00$75,000,000.00

$5,500,000.00 2020STBONDS $0.00$5,000,000.00

$5,500,000.00 2020STCASH $0.00$5,000,000.00

$2,420,000.00 2020STGEN $0.00$2,200,000.00

$16,500,000.00 2020STP<200K $13,200,000.00$15,000,000.00

$10,615,000.00 2020STP<5K $8,492,000.00$9,650,000.00

$2,200,000.00 2020STP>200K $1,760,000.00$2,000,000.00

$71,500,000.00 2020STPFLEX $57,200,000.00$65,000,000.00

Page 106 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 107: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

$1,100,000.00 2021DEMO $880,000.00Construction $1,000,000.00

$550,000.00 2021HRRR $440,000.00$500,000.00

$2,200,000.00 2021HSIP $1,980,000.00$2,000,000.00

$550,000.00 2021HSIPPEN $550,000.00$500,000.00

$11,000,000.00 2021NFA $0.00$10,000,000.00

$66,000,000.00 2021NHPP $52,800,000.00$60,000,000.00

$5,500,000.00 2021STBONDS $0.00$5,000,000.00

$2,475,000.00 2021STCASH $0.00$2,250,000.00

$11,440,000.00 2021STP<5K $9,152,000.00$10,400,000.00

$57,750,000.00 2021STPFLEX $46,200,000.00$52,500,000.00

$1,100,000.00 2022DEMO $880,000.00$1,000,000.00

$2,200,000.00 2022HSIP $1,980,000.00$2,000,000.00

$11,000,000.00 2022NFA $0.00$10,000,000.00

$26,400,000.00 2022NHPP $21,120,000.00$24,000,000.00

$5,500,000.00 2022STBONDS $0.00$5,000,000.00

$1,100,000.00 2022STCASH $0.00$1,000,000.00

$1,650,000.00 2022STP<200K $1,320,000.00$1,500,000.00

$7,150,000.00 2022STP<5K $5,720,000.00$6,500,000.00

$66,000,000.00 2022STPFLEX $52,800,000.00$60,000,000.00

$630,880,000.00Total Cost $433,764,500.00$574,150,000.00

Project: L.000054 ROAD PREVENTIVE MAINTENANCE PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$400,000.00 2019STPFLEX $400,000.00Utility Relocation $400,000.00

$400,000.00 2020STPFLEX $400,000.00$400,000.00

$500,000.00 2021STPFLEX $500,000.00$500,000.00

$400,000.00 2022STPFLEX $400,000.00$400,000.00

$550,000.00 2019DEMO $550,000.00Construction $500,000.00

$550,000.00 2019NFA $0.00$500,000.00

$2,750,000.00 2019NHPP $2,200,000.00$2,500,000.00

$8,800,000.00 2019STPFLEX $7,040,000.00$8,000,000.00

$550,000.00 2020DEMO $440,000.00$500,000.00

$550,000.00 2020NFA $440,000.00$500,000.00

$1,650,000.00 2020NHPP $1,320,000.00$1,500,000.00

$2,475,000.00 2020STP<200K $1,980,000.00$2,250,000.00

$550,000.00 2020STP<5K $440,000.00$500,000.00

$10,450,000.00 2020STPFLEX $8,360,000.00$9,500,000.00

$550,000.00 2021NFA $495,000.00$500,000.00

$550,000.00 2021NHPP $440,000.00$500,000.00

$11,000,000.00 2021STPFLEX $8,800,000.00$10,000,000.00

$550,000.00 2022HSIP $495,000.00$500,000.00

$550,000.00 2022NFA $495,000.00$500,000.00

$4,400,000.00 2022NHPP $3,520,000.00$4,000,000.00

$3,850,000.00 2022STPFLEX $3,080,000.00$3,500,000.00

$52,025,000.00Total Cost $41,795,000.00$47,450,000.00

Page 107 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 108: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000055 RAILROAD CROSSING IMPROVEMENTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2019STCASH $40,000.00Feasibility $50,000.00

$50,000.00 2020STCASH $40,000.00$50,000.00

$50,000.00 2021STCASH $40,000.00$50,000.00

$50,000.00 2022STCASH $40,000.00$50,000.00

$50,000.00 2019STCASH $40,000.00Environmental $50,000.00

$50,000.00 2020STCASH $40,000.00$50,000.00

$50,000.00 2021STCASH $40,000.00$50,000.00

$50,000.00 2022STCASH $40,000.00$50,000.00

$50,000.00 2019LOCAL $0.00Right of Way $50,000.00

$50,000.00 2019STCASH $40,000.00$50,000.00

$50,000.00 2020STCASH $40,000.00$50,000.00

$50,000.00 2021STCASH $40,000.00$50,000.00

$50,000.00 2022STCASH $40,000.00$50,000.00

$100,000.00 2019LOCAL $0.00Utility Relocation $100,000.00

$150,000.00 2019STCASH $120,000.00$150,000.00

$150,000.00 2020STCASH $120,000.00$150,000.00

$250,000.00 2021LOCAL $0.00$250,000.00

$2,000,000.00 2021STCASH $0.00$2,000,000.00

$150,000.00 2022STCASH $120,000.00$150,000.00

$100,000.00 2019STCASH $80,000.00Design (Engineering) $100,000.00

$100,000.00 2020STCASH $80,000.00$100,000.00

$100,000.00 2021STCASH $80,000.00$100,000.00

$100,000.00 2022STCASH $80,000.00$100,000.00

$880,000.00 2019HSIP $880,000.00Construction $800,000.00

$1,650,000.00 2019LOCAL $0.00$1,500,000.00

$8,250,000.00 2019STCASH $6,600,000.00$7,500,000.00

$1,650,000.00 2020LOCAL $0.00$1,500,000.00

$8,250,000.00 2020STCASH $6,600,000.00$7,500,000.00

$1,650,000.00 2021LOCAL $0.00$1,500,000.00

$8,250,000.00 2021STCASH $6,600,000.00$7,500,000.00

$1,650,000.00 2022LOCAL $0.00$1,500,000.00

$8,250,000.00 2022STCASH $6,600,000.00$7,500,000.00

$44,330,000.00Total Cost $28,440,000.00$40,650,000.00

Page 108 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 109: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000056 MISC HAZARD ELIMINATION AND SAFETY 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2019HSIP $90,000.00Feasibility $100,000.00

$300,000.00 2019HSIPPEN $300,000.00$300,000.00

$100,000.00 2020HSIP $90,000.00$100,000.00

$1,100,000.00 2020HSIPPEN $1,100,000.00$1,100,000.00

$350,000.00 2020STCASH $0.00$350,000.00

$100,000.00 2021HSIP $90,000.00$100,000.00

$800,000.00 2021HSIPPEN $800,000.00$800,000.00

$350,000.00 2021STCASH $350,000.00$350,000.00

$100,000.00 2022HSIP $90,000.00$100,000.00

$2,500,000.00 2022HSIPPEN $2,500,000.00$2,500,000.00

$500,000.00 2022STCASH $0.00$500,000.00

$150,000.00 2019HSIP $135,000.00Environmental $150,000.00

$50,000.00 2019HSIPPEN $50,000.00$50,000.00

$150,000.00 2020HSIP $135,000.00$150,000.00

$50,000.00 2020HSIPPEN $50,000.00$50,000.00

$50,000.00 2021HSIP $45,000.00$50,000.00

$150,000.00 2021HSIPPEN $150,000.00$150,000.00

$65,000.00 2021SATRANS $0.00$65,000.00

$150,000.00 2022HSIP $135,000.00$150,000.00

$50,000.00 2022HSIPPEN $50,000.00$50,000.00

$2,000,000.00 2019HSIP $1,800,000.00Right of Way $2,000,000.00

$1,000,000.00 2019HSIPPEN $1,000,000.00$1,000,000.00

$100,000.00 2019SATRANS $0.00$100,000.00

$500,000.00 2019STCASH $0.00$500,000.00

$3,750,000.00 2020HSIP $3,375,000.00$3,750,000.00

$500,000.00 2020HSIPPEN $500,000.00$500,000.00

$500,000.00 2020STCASH $0.00$500,000.00

$3,000,000.00 2021HSIP $2,700,000.00$3,000,000.00

$1,000,000.00 2021HSIPPEN $1,000,000.00$1,000,000.00

$100,000.00 2021SATRANS $0.00$100,000.00

$100,000.00 2021STCASH $0.00$100,000.00

$2,000,000.00 2022HSIP $1,800,000.00$2,000,000.00

$1,000,000.00 2022HSIPPEN $1,000,000.00$1,000,000.00

$2,000,000.00 2019HSIP $1,800,000.00Utility Relocation $2,000,000.00

$1,000,000.00 2019HSIPPEN $1,000,000.00$1,000,000.00

$2,000,000.00 2020HSIP $1,800,000.00$2,000,000.00

$1,000,000.00 2020HSIPPEN $1,000,000.00$1,000,000.00

$1,500,000.00 2021HSIP $1,350,000.00$1,500,000.00

$1,300,000.00 2021HSIPPEN $1,300,000.00$1,300,000.00

$4,000,000.00 2021STCASH $0.00$4,000,000.00

$250,000.00 2021STPFLEX $200,000.00$250,000.00

$2,000,000.00 2022HSIP $1,800,000.00$2,000,000.00

$1,000,000.00 2022HSIPPEN $1,000,000.00$1,000,000.00

$500,000.00 2019HSIP $450,000.00Design (Engineering) $500,000.00

$200,000.00 2019HSIPPEN $200,000.00$200,000.00

$800,000.00 2019SATRANS $0.00$800,000.00

$500,000.00 2019STCASH $0.00$500,000.00

$400,000.00 2020HSIP $360,000.00$400,000.00

$450,000.00 2020HSIPPEN $450,000.00$450,000.00

$900,000.00 2021HSIP $810,000.00$900,000.00

$200,000.00 2021HSIPPEN $200,000.00$200,000.00

$500,000.00 2021STCASH $0.00$500,000.00

Page 109 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 110: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

$1,000,000.00 2022HSIP $900,000.00Design (Engineering) $1,000,000.00

$200,000.00 2022HSIPPEN $200,000.00$200,000.00

$19,525,000.00 2019HSIP $17,572,500.00Construction $17,750,000.00

$14,850,000.00 2019HSIPPEN $14,850,000.00$13,500,000.00

$275,000.00 2019NHPP $220,000.00$250,000.00

$275,000.00 2019SATRANS $0.00$250,000.00

$1,100,000.00 2019STCASH $0.00$1,000,000.00

$23,650,000.00 2020HSIP $21,285,000.00$21,500,000.00

$11,110,000.00 2020HSIPPEN $11,110,000.00$10,100,000.00

$3,850,000.00 2020SATRANS $0.00$3,500,000.00

$4,400,000.00 2020STCASH $0.00$4,000,000.00

$550,000.00 2020TAP<5K $522,500.00$500,000.00

$20,350,000.00 2021HSIP $18,315,000.00$18,500,000.00

$20,900,000.00 2021HSIPPEN $20,900,000.00$19,000,000.00

$1,100,000.00 2021STCASH $0.00$1,000,000.00

$5,500,000.00 2021STPFLEX $4,400,000.00$5,000,000.00

$550,000.00 2021TAP<5K $522,500.00$500,000.00

$25,850,000.00 2022HSIP $23,265,000.00$23,500,000.00

$22,000,000.00 2022HSIPPEN $22,000,000.00$20,000,000.00

$550,000.00 2022NHPP $440,000.00$500,000.00

$550,000.00 2022STCASH $0.00$500,000.00

$221,350,000.00Total Cost $189,557,500.00$205,265,000.00

Project: L.000057 SOFT SIDE SAFETY 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$250,000.00 2019HSIP $225,000.00Feasibility $250,000.00

$750,000.00 2019HSIPPEN $750,000.00$750,000.00

$475,000.00 2019STCASH $475,000.00$475,000.00

$100,000.00 2020HSIP $90,000.00$100,000.00

$1,375,000.00 2020HSIPPEN $1,375,000.00$1,375,000.00

$500,000.00 2020STCASH $0.00$500,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$2,900,000.00 2021HSIP $2,610,000.00$2,900,000.00

$750,000.00 2021HSIPPEN $750,000.00$750,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$2,900,000.00 2022HSIP $2,610,000.00$2,900,000.00

$750,000.00 2022HSIPPEN $750,000.00$750,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$11,050,000.00Total Cost $9,875,000.00$11,050,000.00

Page 110 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 111: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000060 LOCAL ROADS SAFETY PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2020HSIPPEN $100,000.00Feasibility $100,000.00

$160,000.00 2020STCASH $0.00$160,000.00

$146,000.00 2021HSIPPEN $146,000.00$146,000.00

$160,000.00 2021STCASH $0.00$160,000.00

$146,000.00 2022HSIPPEN $146,000.00$146,000.00

$160,000.00 2022STCASH $0.00$160,000.00

$10,000.00 2019HRRR $8,000.00Right of Way $10,000.00

$90,000.00 2019HSIPPEN $90,000.00$90,000.00

$100,000.00 2019STCASH $0.00$100,000.00

$50,000.00 2020HRRR $45,000.00$50,000.00

$500,000.00 2020HSIPPEN $500,000.00$500,000.00

$100,000.00 2021HRRR $90,000.00$100,000.00

$10,000.00 2022HRRR $9,000.00$10,000.00

$40,000.00 2022HSIP $36,000.00$40,000.00

$50,000.00 2022HSIPPEN $50,000.00$50,000.00

$50,000.00 2022STCASH $0.00$50,000.00

$10,000.00 2019HRRR $8,000.00Utility Relocation $10,000.00

$90,000.00 2019HSIPPEN $90,000.00$90,000.00

$100,000.00 2019STCASH $0.00$100,000.00

$100,000.00 2020HRRR $90,000.00$100,000.00

$100,000.00 2021HRRR $90,000.00$100,000.00

$10,000.00 2022HRRR $9,000.00$10,000.00

$40,000.00 2022HSIP $36,000.00$40,000.00

$50,000.00 2022HSIPPEN $50,000.00$50,000.00

$50,000.00 2022STCASH $0.00$50,000.00

$10,000.00 2019HRRR $8,000.00Design (Engineering) $10,000.00

$90,000.00 2019HSIPPEN $90,000.00$90,000.00

$100,000.00 2019STCASH $0.00$100,000.00

$50,000.00 2020HRRR $45,000.00$50,000.00

$200,000.00 2020HSIPPEN $200,000.00$200,000.00

$100,000.00 2020STCASH $0.00$100,000.00

$75,000.00 2021HRRR $67,500.00$75,000.00

$500,000.00 2021HSIPPEN $500,000.00$500,000.00

$200,000.00 2021STCASH $200,000.00$200,000.00

$10,000.00 2022HRRR $9,000.00$10,000.00

$40,000.00 2022HSIP $36,000.00$40,000.00

$250,000.00 2022HSIPPEN $250,000.00$250,000.00

$50,000.00 2022STCASH $0.00$50,000.00

$55,000.00 2019HRRR $44,000.00Construction $50,000.00

$495,000.00 2019HSIPPEN $495,000.00$450,000.00

$110,000.00 2019STCASH $0.00$100,000.00

$110,000.00 2020HRRR $99,000.00$100,000.00

$7,150,000.00 2020HSIPPEN $7,150,000.00$6,500,000.00

$330,000.00 2020STCASH $0.00$300,000.00

$110,000.00 2020STP>200K $88,000.00$100,000.00

$550,000.00 2021HRRR $495,000.00$500,000.00

$550,000.00 2021HSIP $495,000.00$500,000.00

$990,000.00 2021HSIPPEN $990,000.00$900,000.00

$110,000.00 2021LOCAL $0.00$100,000.00

$1,100,000.00 2021STP>200K $990,000.00$1,000,000.00

$27,500.00 2022HRRR $24,750.00$25,000.00

$1,512,500.00 2022HSIP $1,361,250.00$1,375,000.00

Page 111 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 112: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

$1,650,000.00 2022HSIPPEN $1,650,000.00Construction $1,500,000.00

$550,000.00 2022LOCAL $0.00$500,000.00

$550,000.00 2022STCASH $0.00$500,000.00

$20,047,000.00Total Cost $16,880,500.00$18,597,000.00

Project: L.000061 SAFE ROUTES TO PUBLIC PLACES PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$200,000.00 2019SR2S $200,000.00Feasibility $200,000.00

$680,000.00 2020SR2S $680,000.00$680,000.00

$80,000.00 2021HSIPPEN $80,000.00$80,000.00

$100,000.00 2021SR2S $100,000.00$100,000.00

$300,000.00 2021STCASH $0.00$300,000.00

$100,000.00 2022SATRANS $0.00$100,000.00

$80,000.00 2022SR2S $80,000.00$80,000.00

$600,000.00 2019HSIPPEN $600,000.00Design (Engineering) $600,000.00

$200,000.00 2019SATRANS $0.00$200,000.00

$200,000.00 2019SR2S $200,000.00$200,000.00

$100,000.00 2019STCASH $0.00$100,000.00

$250,000.00 2020HSIPPEN $250,000.00$250,000.00

$200,000.00 2020SATRANS $0.00$200,000.00

$150,000.00 2020SR2S $150,000.00$150,000.00

$500,000.00 2020STCASH $0.00$500,000.00

$100,000.00 2021HSIPPEN $100,000.00$100,000.00

$200,000.00 2021SATRANS $0.00$200,000.00

$300,000.00 2021SR2S $300,000.00$300,000.00

$200,000.00 2021STCASH $0.00$200,000.00

$400,000.00 2022HSIPPEN $400,000.00$400,000.00

$200,000.00 2022SATRANS $0.00$200,000.00

$100,000.00 2022SR2S $100,000.00$100,000.00

$200,000.00 2022STCASH $0.00$200,000.00

$2,805,000.00 2019HSIPPEN $2,805,000.00Construction $2,550,000.00

$1,100,000.00 2019SATRANS $0.00$1,000,000.00

$2,200,000.00 2019SR2S $2,200,000.00$2,000,000.00

$1,100,000.00 2019STCASH $0.00$1,000,000.00

$2,200,000.00 2020HSIPPEN $2,200,000.00$2,000,000.00

$1,100,000.00 2020SATRANS $0.00$1,000,000.00

$1,100,000.00 2020SR2S $1,100,000.00$1,000,000.00

$550,000.00 2020STCASH $0.00$500,000.00

$825,000.00 2021HSIP $742,500.00$750,000.00

$5,500,000.00 2021HSIPPEN $5,500,000.00$5,000,000.00

$275,000.00 2021LOCAL $0.00$250,000.00

$1,100,000.00 2021SATRANS $0.00$1,000,000.00

$1,100,000.00 2021SR2S $1,100,000.00$1,000,000.00

$1,100,000.00 2021STCASH $0.00$1,000,000.00

$1,100,000.00 2021STPFLEX $880,000.00$1,000,000.00

$3,850,000.00 2022HSIPPEN $3,850,000.00$3,500,000.00

$1,100,000.00 2022SATRANS $0.00$1,000,000.00

$2,200,000.00 2022SR2S $2,200,000.00$2,000,000.00

$35,745,000.00Total Cost $25,817,500.00$32,990,000.00

Page 112 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 113: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000062 MOTORIST ASSISTANCE PATROL (MAP) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2019NHPP $40,000.00Design (Engineering) $50,000.00

$50,000.00 2020NHPP $40,000.00$50,000.00

$50,000.00 2021NHPP $40,000.00$50,000.00

$50,000.00 2022NHPP $40,000.00$50,000.00

$275,000.00 2019CM $220,000.00Construction $250,000.00

$275,000.00 2019NHPP $220,000.00$250,000.00

$605,000.00 2019STP<200K $484,000.00$550,000.00

$605,000.00 2019STP>200K $484,000.00$550,000.00

$55,000.00 2020CM $44,000.00$50,000.00

$2,090,000.00 2020NHPP $1,672,000.00$1,900,000.00

$605,000.00 2020STP<200K $484,000.00$550,000.00

$2,585,000.00 2020STP>200K $2,068,000.00$2,350,000.00

$2,090,000.00 2021NHPP $1,672,000.00$1,900,000.00

$1,100,000.00 2021STP<200K $880,000.00$1,000,000.00

$3,080,000.00 2021STP>200K $2,464,000.00$2,800,000.00

$2,090,000.00 2022NHPP $1,672,000.00$1,900,000.00

$605,000.00 2022STP<200K $484,000.00$550,000.00

$1,980,000.00 2022STP>200K $1,584,000.00$1,800,000.00

$18,240,000.00Total Cost $14,592,000.00$16,600,000.00

Page 113 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 114: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000063 TRAFFIC CONTROL DEVICES PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$250,000.00 2019NHPP $250,000.00Feasibility $250,000.00

$250,000.00 2019STPFLEX $250,000.00$250,000.00

$150,000.00 2020NHPP $150,000.00$150,000.00

$1,150,000.00 2020STPFLEX $1,150,000.00$1,150,000.00

$350,000.00 2021NHPP $350,000.00$350,000.00

$350,000.00 2021STPFLEX $350,000.00$350,000.00

$350,000.00 2022NHPP $350,000.00$350,000.00

$350,000.00 2022STPFLEX $350,000.00$350,000.00

$1,050,000.00 2019NHPP $1,050,000.00Design (Engineering) $1,050,000.00

$50,000.00 2019NHPP-E $50,000.00$50,000.00

$250,000.00 2019STCASH $0.00$250,000.00

$400,000.00 2019STPFLEX $400,000.00$400,000.00

$600,000.00 2020NHPP $600,000.00$600,000.00

$300,000.00 2020STPFLEX $300,000.00$300,000.00

$600,000.00 2021NHPP $600,000.00$600,000.00

$300,000.00 2021STPFLEX $300,000.00$300,000.00

$300,000.00 2022NHPP $300,000.00$300,000.00

$600,000.00 2022STPFLEX $600,000.00$600,000.00

$550,000.00 2019HSIP $550,000.00Construction $500,000.00

$23,100,000.00 2019NHPP $23,100,000.00$21,000,000.00

$2,750,000.00 2019STCASH $0.00$2,500,000.00

$275,000.00 2019STP<5K $275,000.00$250,000.00

$7,150,000.00 2019STPFLEX $7,150,000.00$6,500,000.00

$110,000.00 2020HSIP $110,000.00$100,000.00

$5,500,000.00 2020HSIPPEN $5,500,000.00$5,000,000.00

$13,062,500.00 2020NHPP $13,062,500.00$11,875,000.00

$1,100,000.00 2020STCASH $0.00$1,000,000.00

$1,100,000.00 2020STP<5K $1,100,000.00$1,000,000.00

$5,500,000.00 2020STPFLEX $5,500,000.00$5,000,000.00

$550,000.00 2021HSIP $550,000.00$500,000.00

$12,100,000.00 2021HSIPPEN $12,100,000.00$11,000,000.00

$15,400,000.00 2021NHPP $15,400,000.00$14,000,000.00

$14,300,000.00 2021STPFLEX $14,300,000.00$13,000,000.00

$550,000.00 2022HSIP $550,000.00$500,000.00

$9,570,000.00 2022NHPP $9,570,000.00$8,700,000.00

$8,800,000.00 2022STPFLEX $8,800,000.00$8,000,000.00

$129,117,500.00Total Cost $125,017,500.00$118,075,000.00

Page 114 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 115: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000064 TRANSPORTATION SYSTEMS MANAGEMENT PROG 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$30,000.00 2020NHPP $24,000.00Environmental $30,000.00

$20,000.00 2020STPFLEX $16,000.00$20,000.00

$50,000.00 2021STPFLEX $40,000.00$50,000.00

$50,000.00 2022STPFLEX $40,000.00$50,000.00

$100,000.00 2019NHPP $80,000.00Right of Way $100,000.00

$40,000.00 2019STPFLEX $32,000.00$40,000.00

$125,000.00 2020STPFLEX $100,000.00$125,000.00

$50,000.00 2021STPFLEX $40,000.00$50,000.00

$50,000.00 2022STPFLEX $40,000.00$50,000.00

$100,000.00 2019NHPP $80,000.00Utility Relocation $100,000.00

$50,000.00 2019STPFLEX $40,000.00$50,000.00

$3,600,000.00 2020STPFLEX $2,880,000.00$3,600,000.00

$250,000.00 2021RAIL PD $250,000.00$250,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$50,000.00 2022STPFLEX $40,000.00$50,000.00

$50,000.00 2020STPFLEX $40,000.00Design (Engineering) $50,000.00

$500,000.00 2021NHPP $400,000.00$500,000.00

$2,750,000.00 2019NHPP $2,200,000.00Construction $2,500,000.00

$385,000.00 2019STCASH $0.00$350,000.00

$275,000.00 2019STP<200K $220,000.00$250,000.00

$550,000.00 2019STP<5K $440,000.00$500,000.00

$6,050,000.00 2019STPFLEX $4,840,000.00$5,500,000.00

$110,000.00 2020HSIPPEN $110,000.00$100,000.00

$4,400,000.00 2020NHPP $3,520,000.00$4,000,000.00

$1,100,000.00 2020STP<200K $880,000.00$1,000,000.00

$990,000.00 2020STP<5K $792,000.00$900,000.00

$5,225,000.00 2020STPFLEX $4,180,000.00$4,750,000.00

$550,000.00 2021HSIP $495,000.00$500,000.00

$7,150,000.00 2021NHPP $5,720,000.00$6,500,000.00

$110,000.00 2021STCASH $0.00$100,000.00

$220,000.00 2021STP<200K $176,000.00$200,000.00

$7,150,000.00 2021STPFLEX $5,720,000.00$6,500,000.00

$4,400,000.00 2022NHPP $3,520,000.00$4,000,000.00

$1,100,000.00 2022STP<200K $880,000.00$1,000,000.00

$5,500,000.00 2022STPFLEX $4,400,000.00$5,000,000.00

$53,230,000.00Total Cost $42,315,000.00$48,865,000.00

Page 115 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 116: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000065 ITS SYSTEMS (STATEWIDE) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$300,000.00 2019NHPP $240,000.00Feasibility $300,000.00

$300,000.00 2019STCASH $0.00$300,000.00

$350,000.00 2019STPFLEX $280,000.00$350,000.00

$150,000.00 2020NHPP $120,000.00$150,000.00

$500,000.00 2020STPFLEX $400,000.00$500,000.00

$200,000.00 2021NHPP $160,000.00$200,000.00

$400,000.00 2021STPFLEX $320,000.00$400,000.00

$200,000.00 2022NHPP $160,000.00$200,000.00

$500,000.00 2022STPFLEX $400,000.00$500,000.00

$1,150,000.00 2019NHPP $920,000.00Design (Engineering) $1,150,000.00

$600,000.00 2019STPFLEX $480,000.00$600,000.00

$1,500,000.00 2020NHPP $1,200,000.00$1,500,000.00

$2,000,000.00 2020STPFLEX $1,600,000.00$2,000,000.00

$1,000,000.00 2021NHPP $800,000.00$1,000,000.00

$2,000,000.00 2021STPFLEX $1,600,000.00$2,000,000.00

$1,000,000.00 2022NHPP $800,000.00$1,000,000.00

$2,000,000.00 2022STPFLEX $1,600,000.00$2,000,000.00

$8,800,000.00 2019NHPP $7,040,000.00Construction $8,000,000.00

$825,000.00 2019STPFLEX $660,000.00$750,000.00

$9,625,000.00 2020NHPP $7,700,000.00$8,750,000.00

$1,100,000.00 2020STCASH $0.00$1,000,000.00

$3,850,000.00 2020STPFLEX $3,080,000.00$3,500,000.00

$4,400,000.00 2021NHPP $3,520,000.00$4,000,000.00

$3,850,000.00 2021STPFLEX $3,080,000.00$3,500,000.00

$6,600,000.00 2022NHPP $5,280,000.00$6,000,000.00

$3,850,000.00 2022STPFLEX $3,080,000.00$3,500,000.00

$57,050,000.00Total Cost $44,520,000.00$53,150,000.00

Project: L.000067 INTERSTATE LIGHTING, ELECTRICAL PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$200,000.00 2019NHPP $160,000.00Design (Engineering) $200,000.00

$500,000.00 2020NHPP $400,000.00$500,000.00

$800,000.00 2021NHPP $640,000.00$800,000.00

$400,000.00 2022NHPP $320,000.00$400,000.00

$4,400,000.00 2019NHPP $3,960,000.00Construction $4,000,000.00

$3,300,000.00 2020NHPP $2,970,000.00$3,000,000.00

$3,300,000.00 2021NHPP $2,970,000.00$3,000,000.00

$6,050,000.00 2022NHPP $5,445,000.00$5,500,000.00

$18,950,000.00Total Cost $16,865,000.00$17,400,000.00

Page 116 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 117: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000068 ACCESS MANAGEMENT PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Work TypeType ImprovementRemarks

, OPER EFFICIENCY/MOTORIST ASSISTANCE, ACCESS

MANAGEMENT

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$600,000.00 2019NHPP $480,000.00Feasibility $600,000.00

$400,000.00 2019STPFLEX $320,000.00$400,000.00

$300,000.00 2020NHPP $240,000.00$300,000.00

$900,000.00 2020STPFLEX $720,000.00$900,000.00

$1,650,000.00 2021NHPP $1,320,000.00$1,650,000.00

$150,000.00 2021STPFLEX $120,000.00$150,000.00

$500,000.00 2022NHPP $400,000.00$500,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$50,000.00 2019NHPP $40,000.00Environmental $50,000.00

$50,000.00 2019STPFLEX $40,000.00$50,000.00

$50,000.00 2020NHPP $40,000.00$50,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$50,000.00 2021NHPP $40,000.00$50,000.00

$50,000.00 2021STPFLEX $40,000.00$50,000.00

$50,000.00 2022NHPP $40,000.00$50,000.00

$50,000.00 2022STPFLEX $40,000.00$50,000.00

$100,000.00 2019HSIP $90,000.00Right of Way $100,000.00

$300,000.00 2019NHPP $240,000.00$300,000.00

$75,000.00 2019STCASH $0.00$75,000.00

$400,000.00 2019STPFLEX $320,000.00$400,000.00

$1,350,000.00 2020NHPP $1,080,000.00$1,350,000.00

$650,000.00 2020STPFLEX $520,000.00$650,000.00

$400,000.00 2021NHPP $320,000.00$400,000.00

$400,000.00 2021STPFLEX $320,000.00$400,000.00

$50,000.00 2022NHPP $40,000.00$50,000.00

$750,000.00 2022STPFLEX $600,000.00$750,000.00

$825,000.00 2019HSIP $742,500.00Utility Relocation $825,000.00

$25,000.00 2019NHPP $20,000.00$25,000.00

$950,000.00 2019STPFLEX $760,000.00$950,000.00

$200,000.00 2020NHPP $160,000.00$200,000.00

$1,000,000.00 2020STPFLEX $800,000.00$1,000,000.00

$200,000.00 2021NHPP $160,000.00$200,000.00

$800,000.00 2021STPFLEX $640,000.00$800,000.00

$200,000.00 2022NHPP $160,000.00$200,000.00

$200,000.00 2022STPFLEX $160,000.00$200,000.00

$250,000.00 2019HSIP $225,000.00Design (Engineering) $250,000.00

$500,000.00 2019NHPP $400,000.00$500,000.00

$750,000.00 2019STPFLEX $600,000.00$750,000.00

$1,100,000.00 2020NHPP $880,000.00$1,100,000.00

$6,500.00 2020SATRANS $0.00$6,500.00

$500,000.00 2020STPFLEX $400,000.00$500,000.00

$300,000.00 2021NHPP $240,000.00$300,000.00

$900,000.00 2021STPFLEX $720,000.00$900,000.00

$500,000.00 2022NHPP $400,000.00$500,000.00

$500,000.00 2022STPFLEX $400,000.00$500,000.00

$550,000.00 2019NHPP $440,000.00Construction $500,000.00

$1,925,000.00 2019STP<200K $1,540,000.00$1,750,000.00

$275,000.00 2019STPFLEX $220,000.00$250,000.00

Page 117 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 118: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

$1,100,000.00 2020HSIP $990,000.00Construction $1,000,000.00

$110,000.00 2020NHPP $88,000.00$100,000.00

$2,200,000.00 2020STCASH $0.00$2,000,000.00

$1,650,000.00 2020STP<200K $1,320,000.00$1,500,000.00

$6,875,000.00 2020STPFLEX $5,500,000.00$6,250,000.00

$1,650,000.00 2021HSIP $1,485,000.00$1,500,000.00

$8,525,000.00 2021NHPP $6,820,000.00$7,750,000.00

$110,000.00 2021STP<200K $99,000.00$100,000.00

$4,840,000.00 2021STPFLEX $3,872,000.00$4,400,000.00

$2,200,000.00 2022NHPP $1,760,000.00$2,000,000.00

$5,500,000.00 2022STPFLEX $4,400,000.00$5,000,000.00

$56,741,500.00Total Cost $43,971,500.00$53,331,500.00

Page 118 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 119: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000069 ROAD TRANSFER PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Work TypeType ImprovementRemarks

, ROAD TRANSFER,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$25,000.00 2020STPFLEX $20,000.00Environmental $25,000.00

$200,000.00 2019NFA $0.00Right of Way $200,000.00

$200,000.00 2019STPFLEX $160,000.00$200,000.00

$200,000.00 2020NFA $0.00$200,000.00

$200,000.00 2020STPFLEX $160,000.00$200,000.00

$200,000.00 2021NFA $0.00$200,000.00

$200,000.00 2021STPFLEX $160,000.00$200,000.00

$200,000.00 2022NFA $0.00$200,000.00

$200,000.00 2022STPFLEX $160,000.00$200,000.00

$200,000.00 2019NFA $0.00Utility Relocation $200,000.00

$500,000.00 2019STPFLEX $400,000.00$500,000.00

$200,000.00 2020NFA $0.00$200,000.00

$200,000.00 2020STPFLEX $160,000.00$200,000.00

$200,000.00 2021NFA $0.00$200,000.00

$200,000.00 2021STPFLEX $160,000.00$200,000.00

$200,000.00 2022NFA $0.00$200,000.00

$200,000.00 2022STPFLEX $160,000.00$200,000.00

$100,000.00 2019HSIP $90,000.00Design (Engineering) $100,000.00

$100,000.00 2019HSIPPEN $100,000.00$100,000.00

$100,000.00 2019NFA $0.00$100,000.00

$250,000.00 2019NHPP $200,000.00$250,000.00

$100,000.00 2019STPFLEX $80,000.00$100,000.00

$500,000.00 2020HSIP $450,000.00$500,000.00

$500,000.00 2020HSIPPEN $500,000.00$500,000.00

$500,000.00 2020NFA $0.00$500,000.00

$500,000.00 2020NHPP $400,000.00$500,000.00

$500,000.00 2020STPFLEX $400,000.00$500,000.00

$500,000.00 2021HSIP $450,000.00$500,000.00

$500,000.00 2021HSIPPEN $500,000.00$500,000.00

$500,000.00 2021NFA $0.00$500,000.00

$500,000.00 2021NHPP $400,000.00$500,000.00

$500,000.00 2021STPFLEX $400,000.00$500,000.00

$500,000.00 2022HSIP $450,000.00$500,000.00

$500,000.00 2022HSIPPEN $500,000.00$500,000.00

$500,000.00 2022NFA $0.00$500,000.00

$500,000.00 2022NHPP $400,000.00$500,000.00

$500,000.00 2022STCASH $0.00$500,000.00

$500,000.00 2022STPFLEX $400,000.00$500,000.00

$550,000.00 2019HSIP $495,000.00Construction $500,000.00

$550,000.00 2019HSIPPEN $550,000.00$500,000.00

$16,500,000.00 2019NFA $0.00$15,000,000.00

$7,700,000.00 2019NHPP $6,160,000.00$7,000,000.00

$6,600,000.00 2019STPFLEX $5,280,000.00$6,000,000.00

$550,000.00 2020HSIP $495,000.00$500,000.00

$550,000.00 2020HSIPPEN $550,000.00$500,000.00

$550,000.00 2020LOCAL $0.00$500,000.00

$16,500,000.00 2020NFA $0.00$15,000,000.00

$13,750,000.00 2020NHPP $11,000,000.00$12,500,000.00

$550,000.00 2020STP<200K $440,000.00$500,000.00

Page 119 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 120: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

$550,000.00 2020STP>200K $440,000.00Construction $500,000.00

$6,050,000.00 2020STPFLEX $4,840,000.00$5,500,000.00

$275,000.00 2021HSIP $247,500.00$250,000.00

$275,000.00 2021HSIPPEN $275,000.00$250,000.00

$2,750,000.00 2021LOCAL $0.00$2,500,000.00

$14,300,000.00 2021NFA $0.00$13,000,000.00

$275,000.00 2021NHPP $220,000.00$250,000.00

$275,000.00 2021STP<200K $220,000.00$250,000.00

$7,700,000.00 2021STPFLEX $6,160,000.00$7,000,000.00

$550,000.00 2022HSIP $495,000.00$500,000.00

$550,000.00 2022HSIPPEN $550,000.00$500,000.00

$550,000.00 2022LOCAL $0.00$500,000.00

$16,500,000.00 2022NFA $0.00$15,000,000.00

$7,700,000.00 2022NHPP $6,160,000.00$7,000,000.00

$7,700,000.00 2022STPFLEX $6,160,000.00$7,000,000.00

$142,525,000.00Total Cost $57,997,500.00$130,675,000.00

Project: L.000070 INTERSTATE REST AREA REHABILITATION 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$220,000.00 2019NHPP $198,000.00Construction $200,000.00

$1,320,000.00 2020NHPP $1,188,000.00$1,200,000.00

$1,320,000.00 2021NHPP $1,188,000.00$1,200,000.00

$1,320,000.00 2022NHPP $1,188,000.00$1,200,000.00

$4,180,000.00Total Cost $3,762,000.00$3,800,000.00

Project: L.000071 WEIGH STATION REHABILITATION / UPGRADE 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$65,000.00 2020NHPP $52,000.00Feasibility $65,000.00

$25,000.00 2021NHPP $20,000.00$25,000.00

$25,000.00 2022NHPP $20,000.00$25,000.00

$150,000.00 2020NHPP $120,000.00Design (Engineering) $150,000.00

$150,000.00 2021NHPP $120,000.00$150,000.00

$150,000.00 2022NHPP $120,000.00$150,000.00

$880,000.00 2010OTHER $0.00Construction $800,000.00

$2,310,000.00 2019NHPP $2,079,000.00$2,100,000.00

$880,000.00 2019OTHER $0.00$800,000.00

$550,000.00 2019STP<5K $440,000.00$500,000.00

$55,000.00 2020NHPP $49,500.00$50,000.00

$110.00 2020STP<5K $0.00$100.00

$55,000.00 2020STPFLEX $44,000.00$50,000.00

$1,375,000.00 2021NHPP $1,237,500.00$1,250,000.00

$55,000.00 2021STPFLEX $44,000.00$50,000.00

$550,000.00 2022NHPP $495,000.00$500,000.00

$55,000.00 2022STPFLEX $44,000.00$50,000.00

$7,330,110.00Total Cost $4,885,000.00$6,715,100.00

Page 120 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 121: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000072 MOVEABLE BRIDGE PROGRAM (ELEC/MECH) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2019STPFLEX $80,000.00Design (Engineering) $100,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$1,100.00 2019FBROFF $880.00Construction $1,000.00

$330,000.00 2019NHPP $264,000.00$300,000.00

$550,000.00 2019STCASH $0.00$500,000.00

$330,000.00 2019STP<200K $264,000.00$300,000.00

$1,540,000.00 2019STPFLEX $1,232,000.00$1,400,000.00

$826,100.00 2020FBROFF $660,880.00$751,000.00

$330,000.00 2020NHPP $264,000.00$300,000.00

$330,000.00 2020STP<200K $264,000.00$300,000.00

$2,695,000.00 2020STPFLEX $2,156,000.00$2,450,000.00

$1,100.00 2021FBROFF $880.00$1,000.00

$330,000.00 2021STP<200K $264,000.00$300,000.00

$1,870,000.00 2021STPFLEX $1,496,000.00$1,700,000.00

$1,100.00 2022FBROFF $880.00$1,000.00

$2,200,000.00 2022STPFLEX $1,760,000.00$2,000,000.00

$11,734,400.00Total Cost $8,947,520.00$10,704,000.00

Page 121 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 122: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000073 URGENT BRIDGE REPAIR/REPLACEMENT 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$10,000.00 2019NHPP $8,000.00Environmental $10,000.00

$10,000.00 2020NHPP $8,000.00$10,000.00

$10,000.00 2021NHPP $8,000.00$10,000.00

$10,000.00 2022NHPP $8,000.00$10,000.00

$10,000.00 2019NHPP $8,000.00Utility Relocation $10,000.00

$10,000.00 2020NHPP $8,000.00$10,000.00

$10,000.00 2021NHPP $8,000.00$10,000.00

$10,000.00 2022NHPP $8,000.00$10,000.00

$250,000.00 2019NHPP $200,000.00Design (Engineering) $250,000.00

$1,000,000.00 2019REIMB $0.00$1,000,000.00

$250,000.00 2019STPFLEX $200,000.00$250,000.00

$500,000.00 2020NHPP $400,000.00$500,000.00

$1,000,000.00 2020REIMB $0.00$1,000,000.00

$500,000.00 2020STPFLEX $400,000.00$500,000.00

$2,000,000.00 2021NHPP $1,600,000.00$2,000,000.00

$1,000,000.00 2021REIMB $0.00$1,000,000.00

$2,000,000.00 2021STPFLEX $1,600,000.00$2,000,000.00

$2,000,000.00 2022NHPP $1,600,000.00$2,000,000.00

$1,000,000.00 2022REIMB $0.00$1,000,000.00

$2,000,000.00 2022STPFLEX $1,600,000.00$2,000,000.00

$550,000.00 2019NHPP $440,000.00Construction $500,000.00

$4,400,000.00 2019REIMB $0.00$4,000,000.00

$550,000.00 2019STPFLEX $440,000.00$500,000.00

$1,100,000.00 2020NHPP $880,000.00$1,000,000.00

$4,400,000.00 2020REIMB $0.00$4,000,000.00

$1,100,000.00 2020STP<200K $880,000.00$1,000,000.00

$4,400,000.00 2020STPFLEX $3,520,000.00$4,000,000.00

$5,500,000.00 2021NHPP $4,400,000.00$5,000,000.00

$4,400,000.00 2021REIMB $0.00$4,000,000.00

$1,100,000.00 2021STP<200K $880,000.00$1,000,000.00

$4,400,000.00 2021STPFLEX $3,520,000.00$4,000,000.00

$5,500,000.00 2022NHPP $4,400,000.00$5,000,000.00

$4,400,000.00 2022REIMB $0.00$4,000,000.00

$5,500,000.00 2022STPFLEX $4,400,000.00$5,000,000.00

$60,880,000.00Total Cost $31,424,000.00$56,580,000.00

Page 122 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 123: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000074 BRIDGE PREVENTIVE MAINTENANCE PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$600,000.00 2019NHPP $480,000.00Design (Engineering) $600,000.00

$600,000.00 2019STPFLEX $480,000.00$600,000.00

$600,000.00 2020NHPP $480,000.00$600,000.00

$600,000.00 2020STPFLEX $480,000.00$600,000.00

$1,200,000.00 2021NHPP $960,000.00$1,200,000.00

$600,000.00 2021STPFLEX $480,000.00$600,000.00

$600,000.00 2022NHPP $480,000.00$600,000.00

$600,000.00 2022STPFLEX $480,000.00$600,000.00

$4,950,000.00 2019NHPP $3,960,000.00Construction $4,500,000.00

$275,000.00 2019STP>200K $220,000.00$250,000.00

$275,000.00 2019STPFLEX $220,000.00$250,000.00

$11,000,000.00 2020NHPP $8,800,000.00$10,000,000.00

$412,500.00 2020REIMB $0.00$375,000.00

$5,500,000.00 2020STPFLEX $4,400,000.00$5,000,000.00

$5,500,000.00 2021NHPP $4,400,000.00$5,000,000.00

$11,000,000.00 2021STPFLEX $8,800,000.00$10,000,000.00

$11,000,000.00 2022NHPP $8,800,000.00$10,000,000.00

$5,500,000.00 2022STPFLEX $4,400,000.00$5,000,000.00

$60,812,500.00Total Cost $48,320,000.00$55,775,000.00

Project: L.000075 BRIDGE PAINTING PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$500,000.00 2019NHPP $400,000.00Design (Engineering) $500,000.00

$500,000.00 2019STPFLEX $400,000.00$500,000.00

$500,000.00 2020NHPP $400,000.00$500,000.00

$500,000.00 2020STPFLEX $400,000.00$500,000.00

$500,000.00 2021NHPP $400,000.00$500,000.00

$500,000.00 2021STPFLEX $400,000.00$500,000.00

$500,000.00 2022NHPP $400,000.00$500,000.00

$500,000.00 2022STPFLEX $400,000.00$500,000.00

$275,000.00 2019NHPP $220,000.00Construction $250,000.00

$275,000.00 2019STPFLEX $220,000.00$250,000.00

$550,000.00 2020NHPP $99,000.00$500,000.00

$1,100,000.00 2020STPFLEX $880,000.00$1,000,000.00

$880,000.00 2021NHPP $704,000.00$800,000.00

$14,520,000.00 2021STPFLEX $11,616,000.00$13,200,000.00

$5,500,000.00 2022NHPP $4,400,000.00$5,000,000.00

$1,100,000.00 2022STPFLEX $880,000.00$1,000,000.00

$28,200,000.00Total Cost $22,219,000.00$26,000,000.00

Page 123 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 124: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000076 ON-SYSTEM BRIDGE PROGRAM w CE 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2019FBROFF $80,000.00Feasibility $100,000.00

$100,000.00 2019NHPP $80,000.00$100,000.00

$100,000.00 2019STPFLEX $80,000.00$100,000.00

$100,000.00 2020FBROFF $80,000.00$100,000.00

$100,000.00 2020NHPP $80,000.00$100,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$100,000.00 2021FBROFF $80,000.00$100,000.00

$100,000.00 2021NHPP $80,000.00$100,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$100,000.00 2022FBROFF $80,000.00$100,000.00

$100,000.00 2022NHPP $80,000.00$100,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$300,000.00 2019FBROFF $240,000.00Environmental $300,000.00

$400,000.00 2019NHPP $320,000.00$400,000.00

$300,000.00 2019STPFLEX $240,000.00$300,000.00

$300,000.00 2020FBROFF $240,000.00$300,000.00

$200,000.00 2020LOCAL $0.00$200,000.00

$400,000.00 2020NHPP $320,000.00$400,000.00

$300,000.00 2020STPFLEX $240,000.00$300,000.00

$300,000.00 2021FBROFF $240,000.00$300,000.00

$400,000.00 2021NHPP $320,000.00$400,000.00

$300,000.00 2021STPFLEX $240,000.00$300,000.00

$300,000.00 2022FBROFF $240,000.00$300,000.00

$1,000,000.00 2022NHPP $800,000.00$1,000,000.00

$300,000.00 2022STPFLEX $240,000.00$300,000.00

$1,000,000.00 2019FBROFF $800,000.00Right of Way $1,000,000.00

$500,000.00 2019NHPP $400,000.00$500,000.00

$1,000,000.00 2019STCASH $0.00$1,000,000.00

$500,000.00 2019STP<5K $400,000.00$500,000.00

$1,000,000.00 2019STPFLEX $800,000.00$1,000,000.00

$1,000,000.00 2020FBROFF $800,000.00$1,000,000.00

$1,000,000.00 2020NHPP $800,000.00$1,000,000.00

$3,000,000.00 2020STPFLEX $2,400,000.00$3,000,000.00

$1,600,000.00 2021FBROFF $1,280,000.00$1,600,000.00

$1,000,000.00 2021NHPP $800,000.00$1,000,000.00

$1,000,000.00 2021STP<5K $800,000.00$1,000,000.00

$2,000,000.00 2021STPFLEX $1,600,000.00$2,000,000.00

$1,000,000.00 2022FBROFF $800,000.00$1,000,000.00

$2,000,000.00 2022NHPP $1,600,000.00$2,000,000.00

$2,000,000.00 2022STPFLEX $1,600,000.00$2,000,000.00

$1,200,000.00 2019FBROFF $960,000.00Utility Relocation $1,200,000.00

$1,000,000.00 2019NHPP $800,000.00$1,000,000.00

$300,000.00 2019STP<5K $240,000.00$300,000.00

$2,500,000.00 2019STPFLEX $2,000,000.00$2,500,000.00

$500,000.00 2020FBROFF $400,000.00$500,000.00

$100,000.00 2020LOCAL $0.00$100,000.00

$1,000,000.00 2020NHPP $800,000.00$1,000,000.00

$100,000.00 2020STP<5K $80,000.00$100,000.00

$6,250,000.00 2020STPFLEX $5,000,000.00$6,250,000.00

$500,000.00 2021FBROFF $400,000.00$500,000.00

$250,000.00 2021NHPP $200,000.00$250,000.00

$1,250,000.00 2021STP<5K $1,000,000.00$1,250,000.00

Page 124 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 125: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

$2,000,000.00 2021STPFLEX $1,600,000.00Utility Relocation $2,000,000.00

$500,000.00 2022FBROFF $400,000.00$500,000.00

$2,000,000.00 2022NHPP $1,600,000.00$2,000,000.00

$1,500,000.00 2022STPFLEX $1,200,000.00$1,500,000.00

$250,000.00 2019FBROFF $200,000.00Design (Engineering) $250,000.00

$1,800,000.00 2019NHPP $1,440,000.00$1,800,000.00

$20,000.00 2019STCASH $0.00$20,000.00

$250,000.00 2019STP<5K-E $200,000.00$250,000.00

$500,000.00 2019STPFLEX $400,000.00$500,000.00

$600,000.00 2020FBR<200K-E $480,000.00$600,000.00

$3,250,000.00 2020FBROFF $2,600,000.00$3,250,000.00

$2,000,000.00 2020NHPP $1,600,000.00$2,000,000.00

$400,000.00 2020REIMB $0.00$400,000.00

$40,000.00 2020STCASH $0.00$40,000.00

$1,500,000.00 2020STP<5K $1,200,000.00$1,500,000.00

$4,450,000.00 2020STP<5K-E $3,560,000.00$4,450,000.00

$2,000,000.00 2020STPFLEX $1,600,000.00$2,000,000.00

$750,000.00 2021FBROFF $600,000.00$750,000.00

$150,000.00 2021LOCAL $0.00$150,000.00

$5,500,000.00 2021NFA $0.00$5,500,000.00

$2,000,000.00 2021NHPP $1,600,000.00$2,000,000.00

$200,000.00 2021REIMB $0.00$200,000.00

$750,000.00 2021STP<5K $600,000.00$750,000.00

$8,000,000.00 2021STPFLEX $6,400,000.00$8,000,000.00

$1,000,000.00 2022FBROFF $800,000.00$1,000,000.00

$2,000,000.00 2022NHPP $1,600,000.00$2,000,000.00

$2,000,000.00 2022STPFLEX $1,600,000.00$2,000,000.00

$8,800,000.00 2019FBROFF $7,040,000.00Construction $8,000,000.00

$275,000.00 2019HSIP $247,500.00$250,000.00

$6,600,000.00 2019NHPP $5,280,000.00$6,000,000.00

$550,000.00 2019REIMB $0.00$500,000.00

$13,200,000.00 2019STCASH $0.00$12,000,000.00

$275,000.00 2019STP<5K $220,000.00$250,000.00

$3,300,000.00 2019STP<5K-E $2,640,000.00$3,000,000.00

$62,370,000.00 2019STPFLEX $49,896,000.00$56,700,000.00

$13,200,000.00 2020FBROFF $10,560,000.00$12,000,000.00

$550,000.00 2020NFA $0.00$500,000.00

$147,400,000.00 2020NHPP $117,920,000.00$134,000,000.00

$19,800,000.00 2020NHPP-E $15,840,000.00$18,000,000.00

$1,100,000.00 2020REIMB $0.00$1,000,000.00

$30,800,000.00 2020STCASH $0.00$28,000,000.00

$17,600,000.00 2020STP<200K $14,080,000.00$16,000,000.00

$17,600,000.00 2020STP<5K $14,080,000.00$16,000,000.00

$50,600,000.00 2020STPFLEX $40,480,000.00$46,000,000.00

$3,300,000.00 2021DEMO $2,640,000.00$3,000,000.00

$33,000,000.00 2021FBROFF $26,400,000.00$30,000,000.00

$1,650,000.00 2021HSIP $1,485,000.00$1,500,000.00

$1,650,000.00 2021NFA $0.00$1,500,000.00

$49,500,000.00 2021NHPP $39,600,000.00$45,000,000.00

$550,000.00 2021OTHER $0.00$500,000.00

$1,100,000.00 2021REIMB $0.00$1,000,000.00

$1,650,000.00 2021STP<200K $1,320,000.00$1,500,000.00

$30,800,000.00 2021STP<5K $24,640,000.00$28,000,000.00

$34,100,000.00 2021STPFLEX $27,280,000.00$31,000,000.00

$11,000,000.00 2022DEMO $8,800,000.00$10,000,000.00

$550,000.00 2022ER $440,000.00$500,000.00

$22,000,000.00 2022FBROFF $17,600,000.00$20,000,000.00

$27,500,000.00 2022NHPP $22,000,000.00$25,000,000.00

Page 125 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 126: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

$2,200,000.00 2022REIMB $0.00Construction $2,000,000.00

$1,650,000.00 2022STP<200K $1,320,000.00$1,500,000.00

$32,312,500.00 2022STPFLEX $25,850,000.00$29,375,000.00

$734,492,500.00Total Cost $540,338,500.00$675,535,000.00

Project: L.000077 BRIDGE SCOUR ANALYSIS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2019NHPP $40,000.00Design (Engineering) $50,000.00

$50,000.00 2020NHPP $40,000.00$50,000.00

$50,000.00 2021NHPP $40,000.00$50,000.00

$50,000.00 2022NHPP $40,000.00$50,000.00

$55,000.00 2019NHPP $44,000.00Construction $50,000.00

$55,000.00 2020NHPP $44,000.00$50,000.00

$55,000.00 2021NHPP $44,000.00$50,000.00

$55,000.00 2022NHPP $44,000.00$50,000.00

$420,000.00Total Cost $336,000.00$400,000.00

Project: L.000078 OFF-SYSTEM BRIDGE REPLACEMENT PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$200,000.00 2019FBROFF $160,000.00Environmental $200,000.00

$200,000.00 2020FBROFF $160,000.00$200,000.00

$200,000.00 2021FBROFF $160,000.00$200,000.00

$200,000.00 2022FBROFF $160,000.00$200,000.00

$300,000.00 2019FBROFF $240,000.00Design (Engineering) $300,000.00

$250,000.00 2019STP<5K-E $200,000.00$250,000.00

$500,000.00 2020FBR<200K-E $400,000.00$500,000.00

$700,000.00 2020FBROFF $560,000.00$700,000.00

$2,700,000.00 2020STP<5K-E $2,160,000.00$2,700,000.00

$1,300,000.00 2021FBROFF $1,040,000.00$1,300,000.00

$200,000.00 2021STPFLEX $160,000.00$200,000.00

$1,400,000.00 2022FBROFF $1,120,000.00$1,400,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$13,750,000.00 2019FBROFF $11,000,000.00Construction $12,500,000.00

$1,650,000.00 2019STCASH $0.00$1,500,000.00

$275,000.00 2019STP<200K $220,000.00$250,000.00

$550,000.00 2019STPFLEX $440,000.00$500,000.00

$27,500,000.00 2020FBROFF $22,000,000.00$25,000,000.00

$2,750,000.00 2020STCASH $0.00$2,500,000.00

$22,000,000.00 2020STGEN $0.00$20,000,000.00

$2,200,000.00 2020STP<200K $1,760,000.00$2,000,000.00

$24,200,000.00 2021FBROFF $19,360,000.00$22,000,000.00

$1,100,000.00 2021STCASH $0.00$1,000,000.00

$22,000,000.00 2021STGEN $0.00$20,000,000.00

$24,200,000.00 2022FBROFF $19,360,000.00$22,000,000.00

$22,000,000.00 2022STGEN $0.00$20,000,000.00

$172,425,000.00Total Cost $80,740,000.00$157,500,000.00

Page 126 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 127: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000079 BRIDGE DISCRETIONARY PROGRAM 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$20,000.00 2019BDP $16,000.00Design (Engineering) $20,000.00

$20,000.00 2020BDP $16,000.00$20,000.00

$20,000.00 2021BDP $16,000.00$20,000.00

$20,000.00 2022BDP $16,000.00$20,000.00

$110,000.00 2019BDP $88,000.00Construction $100,000.00

$110,000.00 2020BDP $88,000.00$100,000.00

$110,000.00 2021BDP $88,000.00$100,000.00

$110,000.00 2022BDP $88,000.00$100,000.00

$520,000.00Total Cost $416,000.00$480,000.00

Project: L.000080 MISC FEDERAL DISCRETIONARY PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2019FLH $80,000.00Design (Engineering) $100,000.00

$100,000.00 2020FLH $80,000.00$100,000.00

$100,000.00 2021FLH $80,000.00$100,000.00

$100,000.00 2022FLH $80,000.00$100,000.00

$440,000.00 2019FLH $352,000.00Construction $400,000.00

$220,000.00 2019STP<5K $176,000.00$200,000.00

$110,000.00 2020FLH $88,000.00$100,000.00

$110,000.00 2021FLH $88,000.00$100,000.00

$110,000.00 2022FLH $88,000.00$100,000.00

$1,390,000.00Total Cost $1,112,000.00$1,300,000.00

Page 127 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 128: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000081 VARIOUS DEMO PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$200,000.00 2019DEMO $160,000.00Feasibility $200,000.00

$180,000.00 2020DEMO $144,000.00$180,000.00

$20,000.00 2020RAIL HE $20,000.00$20,000.00

$50,000.00 2020STCASH $0.00$50,000.00

$200,000.00 2021DEMO $160,000.00$200,000.00

$200,000.00 2022DEMO $160,000.00$200,000.00

$200,000.00 2019DEMO $160,000.00Environmental $200,000.00

$200,000.00 2020DEMO $160,000.00$200,000.00

$200,000.00 2021DEMO $160,000.00$200,000.00

$200,000.00 2022DEMO $160,000.00$200,000.00

$200,000.00 2019DEMO $160,000.00Right of Way $200,000.00

$200,000.00 2020DEMO $160,000.00$200,000.00

$200,000.00 2021DEMO $160,000.00$200,000.00

$200,000.00 2022DEMO $160,000.00$200,000.00

$200,000.00 2019DEMO $160,000.00Utility Relocation $200,000.00

$150,000.00 2020DEMO $120,000.00$150,000.00

$50,000.00 2020HSIP $50,000.00$50,000.00

$150,000.00 2021DEMO $120,000.00$150,000.00

$50,000.00 2021HSIP $45,000.00$50,000.00

$200,000.00 2022DEMO $160,000.00$200,000.00

$200,000.00 2019DEMO $160,000.00Design (Engineering) $200,000.00

$800,000.00 2020DEMO $640,000.00$800,000.00

$200,000.00 2021DEMO $160,000.00$200,000.00

$200,000.00 2022DEMO $160,000.00$200,000.00

$4,180,000.00 2019DEMO $3,344,000.00Construction $3,800,000.00

$1,320,000.00 2019STPFLEX $1,056,000.00$1,200,000.00

$3,850,000.00 2020DEMO $3,080,000.00$3,500,000.00

$1,650,000.00 2020HSIP $1,650,000.00$1,500,000.00

$3,850,000.00 2021DEMO $3,080,000.00$3,500,000.00

$1,650,000.00 2021HSIP $1,650,000.00$1,500,000.00

$5,500,000.00 2022DEMO $4,400,000.00$5,000,000.00

$26,650,000.00Total Cost $21,959,000.00$24,650,000.00

Page 128 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 129: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000082 MISC STATEWIDE TCSP PROJECTS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2019TCSP $40,000.00Right of Way $50,000.00

$50,000.00 2020TCSP $40,000.00$50,000.00

$50,000.00 2021TCSP $40,000.00$50,000.00

$50,000.00 2022TCSP $40,000.00$50,000.00

$50,000.00 2019TCSP $40,000.00Utility Relocation $50,000.00

$50,000.00 2020TCSP $40,000.00$50,000.00

$50,000.00 2021TCSP $40,000.00$50,000.00

$50,000.00 2022TCSP $40,000.00$50,000.00

$500,000.00 2019TCSP $400,000.00Design (Engineering) $500,000.00

$500,000.00 2020TCSP $400,000.00$500,000.00

$500,000.00 2021TCSP $400,000.00$500,000.00

$500,000.00 2022TCSP $400,000.00$500,000.00

$275,000.00 2019STP>200K $220,000.00Construction $250,000.00

$275,000.00 2019TCSP $220,000.00$250,000.00

$1,100,000.00 2020TCSP $880,000.00$1,000,000.00

$1,100,000.00 2021TCSP $880,000.00$1,000,000.00

$1,100,000.00 2022TCSP $880,000.00$1,000,000.00

$6,250,000.00Total Cost $5,000,000.00$5,900,000.00

Page 129 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 130: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000083 CONVERSION OF AC (INCLUDES DEBT SERVICE) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2019STPFLEX $80,000.00Feasibility $100,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$100,000.00 2019STPFLEX $80,000.00Environmental $100,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$100,000.00 2019STPFLEX $80,000.00Right of Way $100,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$100,000.00 2019STPFLEX $80,000.00Utility Relocation $100,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$100,000.00 2019STPFLEX $80,000.00Design (Engineering) $100,000.00

$100,000.00 2020STPFLEX $80,000.00$100,000.00

$100,000.00 2021STPFLEX $80,000.00$100,000.00

$100,000.00 2022STPFLEX $80,000.00$100,000.00

$11,000,000.00 2019NHPP $9,900,000.00Construction $10,000,000.00

$11,000,000.00 2019STPFLEX $8,800,000.00$10,000,000.00

$11,000,000.00 2020NHPP $9,900,000.00$10,000,000.00

$11,000,000.00 2020STPFLEX $8,800,000.00$10,000,000.00

$11,000,000.00 2021NHPP $9,900,000.00$10,000,000.00

$11,000,000.00 2021STPFLEX $8,800,000.00$10,000,000.00

$11,000,000.00 2022NHPP $9,900,000.00$10,000,000.00

$11,000,000.00 2022STPFLEX $8,800,000.00$10,000,000.00

$90,000,000.00Total Cost $76,400,000.00$82,000,000.00

Page 130 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 131: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000084 MODIFIED PROJECT AGREEMENT 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$250,000.00 2019STPFLEX $200,000.00Feasibility $250,000.00

$250,000.00 2020STPFLEX $200,000.00$250,000.00

$250,000.00 2021STPFLEX $200,000.00$250,000.00

$250,000.00 2022STPFLEX $200,000.00$250,000.00

$250,000.00 2019STPFLEX $200,000.00Environmental $250,000.00

$250,000.00 2020STPFLEX $200,000.00$250,000.00

$250,000.00 2021STPFLEX $200,000.00$250,000.00

$250,000.00 2022STPFLEX $200,000.00$250,000.00

$500,000.00 2019STPFLEX $400,000.00Right of Way $500,000.00

$500,000.00 2020STPFLEX $400,000.00$500,000.00

$500,000.00 2021STPFLEX $400,000.00$500,000.00

$500,000.00 2022STPFLEX $400,000.00$500,000.00

$500,000.00 2019STPFLEX $400,000.00Utility Relocation $500,000.00

$500,000.00 2020STPFLEX $400,000.00$500,000.00

$500,000.00 2021STPFLEX $400,000.00$500,000.00

$500,000.00 2022STPFLEX $400,000.00$500,000.00

$500,000.00 2019STPFLEX $400,000.00Design (Engineering) $500,000.00

$500,000.00 2020STPFLEX $400,000.00$500,000.00

$500,000.00 2021STPFLEX $400,000.00$500,000.00

$500,000.00 2022STPFLEX $400,000.00$500,000.00

$11,000,000.00 2019STPFLEX $8,800,000.00Construction $10,000,000.00

$11,000,000.00 2020STPFLEX $8,800,000.00$10,000,000.00

$11,000,000.00 2021STPFLEX $8,800,000.00$10,000,000.00

$11,000,000.00 2022STPFLEX $8,800,000.00$10,000,000.00

$52,000,000.00Total Cost $41,600,000.00$48,000,000.00

Project: L.000085 ADVANCED TRAFFIC MANAGEMENT CENTER 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$220,000.00 2019CM $176,000.00Construction $200,000.00

$220,000.00 2020CM $176,000.00$200,000.00

$220,000.00 2021CM $176,000.00$200,000.00

$220,000.00 2022CM $176,000.00$200,000.00

$880,000.00Total Cost $704,000.00$800,000.00

Page 131 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 132: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000087 STAGE 0 AND FEASIBILITY STUDIES 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$650,000.00 2019DEMO $520,000.00Feasibility $650,000.00

$250,000.00 2019HSIP $225,000.00$250,000.00

$300,000.00 2019HSIPPEN $300,000.00$300,000.00

$1,600,000.00 2019NHPP $1,280,000.00$1,600,000.00

$2,500,000.00 2019STCASH $2,500,000.00$2,500,000.00

$2,300,000.00 2019STPFLEX $1,840,000.00$2,300,000.00

$500,000.00 2020DEMO $400,000.00$500,000.00

$500,000.00 2020HSIP $450,000.00$500,000.00

$250,000.00 2020HSIPPEN $250,000.00$250,000.00

$1,500,000.00 2020NHPP $1,200,000.00$1,500,000.00

$500,000.00 2020STCASH $0.00$500,000.00

$1,750,000.00 2020STPFLEX $1,400,000.00$1,750,000.00

$400,000.00 2021FBROFF $320,000.00$400,000.00

$500,000.00 2021HSIP $450,000.00$500,000.00

$700,000.00 2021HSIPPEN $700,000.00$700,000.00

$900,000.00 2021NHPP $720,000.00$900,000.00

$250,000.00 2021STCASH $0.00$250,000.00

$1,600,000.00 2021STPFLEX $1,280,000.00$1,600,000.00

$500,000.00 2022HSIP $450,000.00$500,000.00

$1,000,000.00 2022HSIPPEN $1,000,000.00$1,000,000.00

$1,000,000.00 2022NHPP $800,000.00$1,000,000.00

$500,000.00 2022STCASH $0.00$500,000.00

$1,000,000.00 2022STPFLEX $800,000.00$1,000,000.00

$20,950,000.00Total Cost $16,885,000.00$20,950,000.00

Project: L.000092 DBE SUPPORTIVE SERVICES 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$300,000.00 2019DBE/SS $300,000.00Feasibility $300,000.00

$300,000.00 2020DBE/SS $300,000.00$300,000.00

$300,000.00 2021DBE/SS $300,000.00$300,000.00

$300,000.00 2022DBE/SS $300,000.00$300,000.00

$1,200,000.00Total Cost $1,200,000.00$1,200,000.00

Page 132 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 133: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000093 STATEWIDE CONGESTION MITIGATION 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Work TypeType ImprovementRemarks

, CONGESTION MITIGATION,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2019STPFLEX $100,000.00Feasibility $100,000.00

$100,000.00 2020STPFLEX $100,000.00$100,000.00

$100,000.00 2021STPFLEX $100,000.00$100,000.00

$100,000.00 2022STPFLEX $100,000.00$100,000.00

$100,000.00 2019CM $100,000.00Environmental $100,000.00

$100,000.00 2020CM $100,000.00$100,000.00

$100,000.00 2021CM $100,000.00$100,000.00

$100,000.00 2022CM $100,000.00$100,000.00

$100,000.00 2019CM $100,000.00Right of Way $100,000.00

$100,000.00 2020CM $100,000.00$100,000.00

$100,000.00 2021CM $100,000.00$100,000.00

$100,000.00 2022CM $100,000.00$100,000.00

$100,000.00 2019CM $100,000.00Utility Relocation $100,000.00

$100,000.00 2020CM $100,000.00$100,000.00

$100,000.00 2021CM $100,000.00$100,000.00

$100,000.00 2022CM $100,000.00$100,000.00

$100,000.00 2019CM $100,000.00Design (Engineering) $100,000.00

$100,000.00 2020CM $100,000.00$100,000.00

$100,000.00 2021CM $100,000.00$100,000.00

$100,000.00 2022CM $100,000.00$100,000.00

$275,000.00 2019CM $275,000.00Construction $250,000.00

$5,060,000.00 2020CM $5,060,000.00$4,600,000.00

$5,060,000.00 2021CM $5,060,000.00$4,600,000.00

$5,060,000.00 2022CM $5,060,000.00$4,600,000.00

$17,455,000.00Total Cost $17,455,000.00$16,050,000.00

Page 133 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 134: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000094 URBAN TRANSIT(INCL TRANSFER TO AGENCIES) 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Work TypeType ImprovementRemarks

, URBAN SYSTEMS,

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$50,000.00 2019STPFLEX $50,000.00Design (Engineering) $50,000.00

$2,100,000.00 2019TAP>200K $2,100,000.00$2,100,000.00

$50,000.00 2020STPFLEX $50,000.00$50,000.00

$50,000.00 2021STPFLEX $50,000.00$50,000.00

$50,000.00 2022STPFLEX $50,000.00$50,000.00

$2,200,000.00 2019CM $2,200,000.00Construction $2,000,000.00

$550,000.00 2019FB DISCR $550,000.00$500,000.00

$1,100,000.00 2019STP<200K $1,100,000.00$1,000,000.00

$1,100,000.00 2019STP>200K $1,100,000.00$1,000,000.00

$17,600,000.00 2019STPFLEX $17,600,000.00$16,000,000.00

$2,200,000.00 2020CM $2,200,000.00$2,000,000.00

$550,000.00 2020FB DISCR $550,000.00$500,000.00

$1,100,000.00 2020STP<200K $1,100,000.00$1,000,000.00

$1,100,000.00 2020STP>200K $1,100,000.00$1,000,000.00

$1,100,000.00 2020STPFLEX $1,100,000.00$1,000,000.00

$2,200,000.00 2021CM $2,200,000.00$2,000,000.00

$550,000.00 2021FB DISCR $550,000.00$500,000.00

$1,100,000.00 2021STP<200K $1,100,000.00$1,000,000.00

$1,100,000.00 2021STP>200K $1,100,000.00$1,000,000.00

$1,100,000.00 2021STPFLEX $1,100,000.00$1,000,000.00

$2,200,000.00 2022CM $2,200,000.00$2,000,000.00

$550,000.00 2022FB DISCR $550,000.00$500,000.00

$1,100,000.00 2022STP<200K $1,100,000.00$1,000,000.00

$1,100,000.00 2022STP>200K $1,100,000.00$1,000,000.00

$1,100,000.00 2022STPFLEX $1,100,000.00$1,000,000.00

$43,000,000.00Total Cost $43,000,000.00$39,300,000.00

Page 134 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 135: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000095 SPECIAL RULE-AREAS 5K OR LESS POPULATION 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$100,000.00 2019STP<5K $80,000.00Environmental $100,000.00

$100,000.00 2020STP<5K $80,000.00$100,000.00

$100,000.00 2021STP<5K $80,000.00$100,000.00

$100,000.00 2022STP<5K $80,000.00$100,000.00

$100,000.00 2019STP<5K $80,000.00Right of Way $100,000.00

$100,000.00 2020STP<5K $80,000.00$100,000.00

$100,000.00 2021STP<5K $80,000.00$100,000.00

$100,000.00 2022STP<5K $80,000.00$100,000.00

$100,000.00 2019STP<5K $80,000.00Utility Relocation $100,000.00

$100,000.00 2020STP<5K $80,000.00$100,000.00

$100,000.00 2021STP<5K $80,000.00$100,000.00

$100,000.00 2022STP<5K $80,000.00$100,000.00

$100,000.00 2019STP<5K $80,000.00Design (Engineering) $100,000.00

$100,000.00 2020STP<5K $80,000.00$100,000.00

$100,000.00 2021STP<5K $80,000.00$100,000.00

$100,000.00 2022STP<5K $80,000.00$100,000.00

$192,500.00 2019STP<5K $154,000.00Construction $175,000.00

$4,592,500.00 2020STP<5K $3,674,000.00$4,175,000.00

$1,100,000.00 2020STPFLEX $880,000.00$1,000,000.00

$4,592,500.00 2021STP<5K $3,674,000.00$4,175,000.00

$4,592,500.00 2022STP<5K $3,674,000.00$4,175,000.00

$16,670,000.00Total Cost $13,336,000.00$15,300,000.00

Page 135 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4

Page 136: STIP - Louisiana...$684,000.00 $684,000.00 $547,200.00 STP>200K 2019 CITY OF KENNER Utility Relocation $789,000.00 $789,000.00 $710,100.00 HSIP 2019 CITY OF KENNER $789,000.00 $789,000.00

STIPSTATE OF LOUISIANA

STIP Date 10/01/2018 STIP Version 2019 (Approved)

LINE ITEMS

Project: L.000096 FERRY BOAT MECH/ELECT/DISCR PROGRAMS 0.00 0.00-Route: Cntrl Section: Beg. Log Mile: End Log Mile: Parish: Non-State Road:

Urbanized Area: LINE ITEMS

Project Phase Project Cost YearFund SponsorTot Cost(w/CE&I+IDC) Federal Share

$800,000.00 2019FB DISCR $640,000.00Design (Engineering) $800,000.00

$10,000.00 2019STCASH $0.00$10,000.00

$10,000.00 2019STPFLEX $8,000.00$10,000.00

$10,000.00 2020FB DISCR $8,000.00$10,000.00

$10,000.00 2020STCASH $0.00$10,000.00

$10,000.00 2020STPFLEX $8,000.00$10,000.00

$10,000.00 2021FB DISCR $8,000.00$10,000.00

$10,000.00 2021STCASH $0.00$10,000.00

$10,000.00 2021STPFLEX $8,000.00$10,000.00

$10,000.00 2022FB DISCR $8,000.00$10,000.00

$10,000.00 2022STCASH $0.00$10,000.00

$10,000.00 2022STPFLEX $8,000.00$10,000.00

$6,600,000.00 2019FB DISCR $5,280,000.00Construction $6,000,000.00

$1,100,000.00 2019STCASH $0.00$1,000,000.00

$1,100,000.00 2019STPFLEX $880,000.00$1,000,000.00

$2,420,000.00 2020FB DISCR $1,936,000.00$2,200,000.00

$1,100,000.00 2020STCASH $0.00$1,000,000.00

$1,100,000.00 2020STPFLEX $880,000.00$1,000,000.00

$1,320,000.00 2021FB DISCR $1,056,000.00$1,200,000.00

$1,100,000.00 2021STCASH $0.00$1,000,000.00

$2,200,000.00 2021STPFLEX $1,760,000.00$2,000,000.00

$1,320,000.00 2022FB DISCR $1,056,000.00$1,200,000.00

$1,100,000.00 2022STCASH $0.00$1,000,000.00

$3,300,000.00 2022STP<5K-E $2,640,000.00$3,000,000.00

$2,200,000.00 2022STPFLEX $1,760,000.00$2,000,000.00

$26,870,000.00Total Cost $17,944,000.00$24,510,000.00

Page 136 of 136 Report Date: 2/12/2021 4:51:54AMVersion No: 1.16.4