stf phase 2 plan h. hayano, 09042008. stf phase 2 accelerator layout cavities: 2 capture cavities...

Download STF phase 2 plan H. Hayano, 09042008. STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities

If you can't read please download the document

Upload: ashlie-mccormick

Post on 17-Jan-2018

228 views

Category:

Documents


0 download

DESCRIPTION

Cavity preparation area, to install DESY/FNAL pre-tuning machine Laser room planned, to install IAP laser. STF phase2 expansion of module assembly area, EP area, clean-room

TRANSCRIPT

STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities for ILC cryomodules cryomodule: 3 ILC cryomodules, 9 cavities, 8 cavities with SC-Quad+correction dipoles+BPM, 9 cavities power source: 10MW MBK + bouncer modulator + Linear PDS + ATCA base LLRF e- beam by FNAL RFgun + IAP laser : 3.2nC x 2625 bunches, 9mA, 5Hz, will be accelerated up to 850MeV Cavity preparation area, to install DESY/FNAL pre-tuning machine Laser room planned, to install IAP laser. STF phase2 expansion of module assembly area, EP area, clean-room 12m module will be transported by truck to the new carry-in hall, and crane down into tunnel. STF Tunnel Layout New carry-in hall with crane Capture cavity modules (2 cavities) 12m long Cryomodules (3 connected) RF gun X-ray generation experiment (compact light source accelerator ) inclusion in STF phase 2 Quantum Beam Accelerator X-ray generation experiment in 2012 Details of cavity process delivery (1) receiving inspection, surface inspection, surface repair (2) EP1(150m , surface inspection, surface repair (3) anneal (750 (4) pre-tuning (5) EP2(20m , antenna installation, 120 baking (6) installation into VT-hanging support (7) VT First (8) Cavity dismount, surface inspection, repair (9) pre-tuning (10) EP2(20m , antenna installation, 120 baking (11) installation into VT-hanging support (12) VT second OK ( 35MV/m) NG (