![Page 1: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/1.jpg)
Stepping Towards Modular Integrated Construction
Goman HoArup Fellow, Director of Innovations
![Page 2: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/2.jpg)
Once upon a time….
We invented bricks and started to build multi-story buildings.
To build multi-story, we used “tower cranes”. At that time, the cranes were made of timber.
Credit: Grand Raids History & Special Collections, Archives, Grand Rapids Public Library, Grand Rapids, MI
![Page 3: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/3.jpg)
Now, we have heavy duty tower
cranes.
Is the method of construction
same as before?
![Page 4: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/4.jpg)
Can we make bigger bricks?
![Page 5: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/5.jpg)
![Page 6: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/6.jpg)
10
Victoria Hall, Wolverhampton, UK
The tallest modular building in Europe
![Page 7: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/7.jpg)
11
© Shop Architects
![Page 8: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/8.jpg)
Extensive Coordination with Multi-Disc Work
Structures +MEP +Architecture
![Page 9: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/9.jpg)
13
4D Production Sequencing
Production
Phase 1. Bathroom Pod Fabrication
Phase 2. Factory installation of Pod into Module
Phase 3. Factory Module MEP Work
Phase 4. Module Factory Finish Work
Phase 5. MatelineConnections in Field
![Page 10: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/10.jpg)
Embedded design data within model
• Intelligent “families”
• Parametric grouping
• Modular constraints require accurate representation of services and geometry
• Ability for:• Spec integration
• Equipment schedules
• Quantity scheduling
• Coordination
![Page 11: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/11.jpg)
CIC MiC Display Centre
![Page 12: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/12.jpg)
![Page 13: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/13.jpg)
![Page 14: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/14.jpg)
![Page 15: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/15.jpg)
Exhibition Space
![Page 16: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/16.jpg)
Elderly Home
![Page 17: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/17.jpg)
Hotel Room
![Page 18: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/18.jpg)
Hostel (e.g. Student)
![Page 19: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/19.jpg)
One Bedroom Unit
![Page 20: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/20.jpg)
Three Bedroom Unit
![Page 21: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/21.jpg)
26
Potential for MiC in Hong Kong
![Page 22: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/22.jpg)
Modular Construction in Hong
Kong: Drivers?
• Productivity greater efficiency
• Increases in labour costs
• Rapid development-Strong demand for
housing, student residence, nursing and
student home, etc
• Sufficiently large market/sector
• Advances in technology in design tools and
manufacturing process
• Safety
• Better risk control
• Improved Sustainability
• Weather condition
• Policy – incentive to encourage investment,
research, training.
![Page 23: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/23.jpg)
Modular ChallengesMind set, Investment & Design Issues
• Consumer confidence - Patchy track
record and perceived negatively
• Skeptical – long term flexibility
• Dimension and weight of units
• Robustness – vertical and horizontal
ties.
• Service interfaces
• Fire rating, Acoustic performance
• Current regulation constraints
![Page 24: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/24.jpg)
Typical Modular Arrangement
![Page 25: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/25.jpg)
Steel Floor Cassette Option
• 22~25mm Cement floor board
• 3~5 mm neoprene anti-squeak strips
provide damping
• steel joists
• standard cold-rolled steel edge beams
• foam concrete/ sound insulation
(optional)
• base protection board (optional)
Structural Floor System for Modular Construction
![Page 26: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/26.jpg)
Typical Floor and Ceiling Details
![Page 27: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/27.jpg)
Modular ChallengesFabrication, Erection & Maintenance
• Crane tonnage & on-site storage of modules
overnight
• Logistic and Access – dimension of units
controlled by traffic, road access.
• Waterproofing/Leakage control
• Maintenance crew familiar with the system
![Page 28: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/28.jpg)
• In HK, for vehicle not
exceeding the limit as listed in
table 2.2.1.1 do not require
escort and permit.
Transportation Table 2.2.1.1 Overall Dimensions of Vehicles
Vehicle Overall Length
(m)
Overall Width
(m)
Overall Height
(m)
Private Car 6.3 2.3 2
Taxi 6.3 2.3 2
Invalid Carriage 6.3 2.3 2
Light Bus 6.9 2.3 3
Bus
(i)Single Deck 12 2.5 3.5
(ii)Double Deck 12 2.5 4.6
Articulated 15 2.5 3.5
Light Goods Vehicle 10 2.5 3.5
Medium Goods Vehicle 11 2.5 4.6
Heavy Goods Vehicle
(i)Rigid 11 2.5 4.6
(ii)Articulated 16 2.5 4.6
Special Purpose Vehicle 12 2.5 4.6
Tricycle - 1.1 -
Trailer 13.5 2.5 4.6
Pedestrian-controlled Vehicle 4.3 1.6 -
Source : Transport Planning & Design Manual Vol 2, Transport Department, 2018
![Page 29: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/29.jpg)
Must modules be steel?
![Page 30: Stepping Towards Modular Integrated Constructioncic.hk/files/page/10307/20190129_ARUP.pdf2019/01/29 · Stepping Towards Modular Integrated Construction Goman Ho Arup Fellow, Director](https://reader034.vdocuments.site/reader034/viewer/2022042313/5edc7ad7ad6a402d66672776/html5/thumbnails/30.jpg)
How about concrete?