step 1: future concept aircraft - world atm congress programme... · 2014. 3. 17. · easa european...
TRANSCRIPT
-
1
Step 1: Future Concept Aircraft
Better for everyone
http://d1jqu7g1y74ds1.cloudfront.net/wp-content/uploads/2011/03/boeing-icon-ii.jpghttp://d1jqu7g1y74ds1.cloudfront.net/wp-content/uploads/2011/03/airbus-lead03.jpg
-
2
Step 2: Involve the industry
Keep everybody happy!!!
-
3
Step 3: Output – Final Aircraft Type
-
4
ATM in Europe - now
Europe Current
Geographic Area (m km2) 11.5 Nr. of en route ANSPs 37 Number of ATCOs in Ops. 17,200 Total staff 58,000 Flight hours (m) 14.2 Nr. of en route centres 63
-
5
ATM in Europe 2034
Europe Current 2034 2034 V Current Geographic Area (m km2) 11.5 11.5 0% Nr. of en route ANSPs 37 42 14% Number of ATCOs in Ops. 17,200 25,000 45% Total staff 58,000 83,000 43% Flight hours (m) 14.2 118.5 30% Nr. of en route centres 63 72 14%
Costs
?
-
6
The Virtual Centre Model
-
Questions?
Step 1: �Future Concept AircraftStep 2: �Involve the industry Step 3: �Output – Final Aircraft TypeATM in Europe - nowATM in Europe 2034The Virtual Centre ModelSlide Number 7