steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. ·...

107
Steam turbine power generation arrangement overview and vibration type and location Sensor type Tag initial ID D-xxxx Eddy current, vibration signal was retreived from vibration console and captured by Bentley Nevada ADRE DAIU-208 and Technekon STD-3300 V-xxxx Velocity, vibration signal was retreived from vibration console and captured by Bentley Nevada ADRE DAIU-208 and Technekon STD-3300 A-xxxx Acceleration, separated ICP vibration sensor, signal was detected by Portable vibration analyzer, Technekon STD-3300 Steam tutbine and HS pinion shaft speed, 5791 RPM Gear, HS gear 43 T X-spectrum X-spectrum X-spectrum X-spectrum Gear, LS gear 166 T Y-spectrum Y-spectrum Y-sepctrum Y-spectrum Gen and LS shaft speed 1500 rpm Orbit Orbit Orbit Orbit Gear service factor AGMA 421-06>1.3 Waterfall 160-5791rpm Waterfall 160-5791rpm Waterfall 160-5791rpm Waterfall 160-5791rpm Power 43 MW Waterfall 0-160 rpm Waterfall 0-160 rpm Waterfall 0-160 rpm Waterfall 0-160 rpm DC gap 160-5791 rpm DC gap 160-5791 rpm DC gap 160-5791 rpm DC gap 160-5791 rpm Please move cursor over the Text block DC gap 0-160 rpm DC gap 0-160 rpm DC gap 0-160 rpm DC gap 0-160 rpm to see vibration details Trend 160-5791 rpm Trend 160-5791 rpm Trend 160-5791 rpm Trend 160-5791 rpm Trend 0-160 rpm Trend 0-160 rpm Trend 0-160 rpm Trend 0-160 rpm HS-NDE HS-DE Waveform Waveform Spectrum Spectrum Waveform Waveform Waveform Waveform Spectrum Spectrum Spectrum Spectrum LS-DE LS-NDE Waveform Waveform Spectrum Spectrum C C' Turning motor Oil pump NDE-1 DE-1 DE-2 NDE-2 A A' Top view Top view A A' C C' B B' HS LS NDE-3 DE-3 DE-4 NDE-4 B B' X Y Y X D D' D D'

Upload: others

Post on 01-Jun-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

Steam turbine power generationarrangement overview and vibration type and location

Sensor type Tag initial IDD-xxxx Eddy current, vibration signal was retreived from vibration console and captured by Bentley Nevada ADRE DAIU-208 and Technekon STD-3300V-xxxx Velocity, vibration signal was retreived from vibration console and captured by Bentley Nevada ADRE DAIU-208 and Technekon STD-3300A-xxxx Acceleration, separated ICP vibration sensor, signal was detected by Portable vibration analyzer, Technekon STD-3300

Steam tutbine and HS pinion shaft speed, 5791 RPMGear, HS gear 43 T X-spectrum X-spectrum X-spectrum X-spectrumGear, LS gear 166 T Y-spectrum Y-spectrum Y-sepctrum Y-spectrumGen and LS shaft speed 1500 rpm Orbit Orbit Orbit OrbitGear service factor AGMA 421-06>1.3 Waterfall 160-5791rpm Waterfall 160-5791rpm Waterfall 160-5791rpm Waterfall 160-5791rpmPower 43 MW Waterfall 0-160 rpm Waterfall 0-160 rpm Waterfall 0-160 rpm Waterfall 0-160 rpm

DC gap 160-5791 rpm DC gap 160-5791 rpm DC gap 160-5791 rpm DC gap 160-5791 rpmPlease move cursor over the Text block DC gap 0-160 rpm DC gap 0-160 rpm DC gap 0-160 rpm DC gap 0-160 rpmto see vibration details Trend 160-5791 rpm Trend 160-5791 rpm Trend 160-5791 rpm Trend 160-5791 rpm

Trend 0-160 rpm Trend 0-160 rpm Trend 0-160 rpm Trend 0-160 rpm

HS-NDE HS-DEWaveform WaveformSpectrum Spectrum

Waveform Waveform Waveform WaveformSpectrum Spectrum Spectrum Spectrum

LS-DE LS-NDEWaveform WaveformSpectrum Spectrum

C

C'

Turning motor

Oil pump

NDE-1DE-1DE-2NDE-2A

A'

Top view

Top viewA A'

C C'

B B'

HS

LS

NDE-3DE-3DE-4NDE-4

B

B'

X Y

YX

D D'

D

D'

Administrator
Text Box
Home
Administrator
Text Box
Waterfall
Administrator
Text Box
Waterfall
Administrator
Text Box
Waterfall
Administrator
Text Box
Waterfall
Administrator
Text Box
click
Administrator
Text Box
Resolution 0,156 Hz/line
Administrator
Text Box
Resolution 10 Hz/line
Administrator
Text Box
Administrator
Text Box
Resolution 1,25 Hz/line
Administrator
Text Box
Resolution 1,25 Hz/line
Administrator
Text Box
Technekon STD-3300
Administrator
Rectangle
Administrator
Rectangle
Administrator
Text Box
Photo tool used
Page 2: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

TREND PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1POINT: Channel 2

45 Left45 Right

DIRECTDIRECT

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

0

20

40

60

80

10:1923JUL2013

10:2123JUL2013

10:2323JUL2013

10:2523JUL2013

10:2723JUL2013

10:2923JUL2013

10:3123JUL2013

TIME: 30 Secs /div

0

20

40

60

80

100

1.04 micro m pp0.980 micro m pp23JUL201310:18:24.0

POINT: Channel 3POINT: Channel 4

45 Left45 Right

DIRECTDIRECT

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

0

20

40

60

80

10:1923JUL2013

10:2123JUL2013

10:2323JUL2013

10:2523JUL2013

10:2723JUL2013

10:2923JUL2013

10:3123JUL2013

TIME: 30 Secs /div

0

20

40

60

80

100

1.04 micro m pp0.914 micro m pp23JUL201310:18:24.0

POINT: Channel 5POINT: Channel 6

45 Left45 Right

DIRECTDIRECT

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

0

50

100

150

10:1923JUL2013

10:2123JUL2013

10:2323JUL2013

10:2523JUL2013

10:2723JUL2013

10:2923JUL2013

10:3123JUL2013

TIME: 30 Secs /div

0

20

40

60

1.04 micro m pp0.914 micro m pp23JUL201310:18:24.0

POINT: Channel 7POINT: Channel 8

45 Left45 Right

DIRECTDIRECT

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

0

50

100

150

200

10:1923JUL2013

10:2123JUL2013

10:2323JUL2013

10:2523JUL2013

10:2723JUL2013

10:2923JUL2013

10:3123JUL2013

TIME: 30 Secs /div

0

50

100

0.914 micro m pp0.914 micro m pp23JUL201310:18:24.0

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-NDE-1
Administrator
Text Box
0 rpm
Administrator
Text Box
Started
Administrator
Text Box
160 rpm
Administrator
Text Box
D-DE-1
Administrator
Text Box
D-DE-2
Administrator
Text Box
D-NDE-2
Administrator
Text Box
Home
Administrator
Line
Administrator
Line
Administrator
Text Box
0 rpm
Administrator
Line
Administrator
Text Box
160 rpm
Administrator
Text Box
Non-subtract slow roll
Administrator
Text Box
See waterfall
Administrator
Rectangle
Page 3: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

TREND PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1POINT: Channel 2

45 Left45 Right

GAPGAP

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

-10

-8

-6

-4

-2

0

10:1923JUL2013

10:2123JUL2013

10:2323JUL2013

10:2523JUL2013

10:2723JUL2013

10:2923JUL2013

10:3123JUL2013

TIME: 30 Secs /div

-10

-8

-6

-4

-2

0

-10.2 Volts-10.1 Volts23JUL201310:18:24.0

POINT: Channel 3POINT: Channel 4

45 Left45 Right

GAPGAP

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

-8

-6

-4

-2

0

10:1923JUL2013

10:2123JUL2013

10:2323JUL2013

10:2523JUL2013

10:2723JUL2013

10:2923JUL2013

10:3123JUL2013

TIME: 30 Secs /div

-8

-6

-4

-2

0

-8.59 Volts-9.47 Volts23JUL201310:18:24.0

POINT: Channel 5POINT: Channel 6

45 Left45 Right

GAPGAP

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

-10

-8

-6

-4

-2

0

10:1923JUL2013

10:2123JUL2013

10:2323JUL2013

10:2523JUL2013

10:2723JUL2013

10:2923JUL2013

10:3123JUL2013

TIME: 30 Secs /div

-10

-8

-6

-4

-2

0

-11.5 Volts-11.5 Volts23JUL201310:18:24.0

POINT: Channel 7POINT: Channel 8

45 Left45 Right

GAPGAP

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

-10

-8

-6

-4

-2

0

10:1923JUL2013

10:2123JUL2013

10:2323JUL2013

10:2523JUL2013

10:2723JUL2013

10:2923JUL2013

10:3123JUL2013

TIME: 30 Secs /div

-10

-8

-6

-4

-2

0

-10.7 Volts-10.4 Volts23JUL201310:18:24.0

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
NDE-1, X-Y
Administrator
Text Box
Started
Administrator
Text Box
DE-1, X-Y
Administrator
Text Box
DE-2, X-Y
Administrator
Text Box
NDE-2, X-Y
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
0 rpm
Administrator
Text Box
160 rpm
Administrator
Text Box
Home
Administrator
Text Box
Click here to see shaft center position
Administrator
Text Box
Click here to see shaft center position
Administrator
Text Box
Click here to see shaft center position
Administrator
Text Box
Click here to see shaft center position
Administrator
Rectangle
Page 4: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1POINT: Channel 2

45 Left45 Right

REF: -10.2 Volts REF: -10.1 Volts

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

20 micro m /div

-100

0

100

200

300

-200 -100 0 100 200

(not orbit or polar plot) UP

00(0, 0)

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
0 rpm
Administrator
Text Box
160 rpm
Administrator
Text Box
Back
Administrator
Text Box
NDE-1
Administrator
Line
Administrator
Rectangle
Page 5: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 3POINT: Channel 4

45 Left45 Right

REF: -8.59 Volts REF: -9.47 Volts

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

20 micro m /div

-100

0

100

200

300

-200 -100 0 100 200

(not orbit or polar plot) UP

00(0, 0)

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
DE-1
Administrator
Text Box
Back
Administrator
Text Box
0 rpm at 0th minute
Administrator
Text Box
0 rpm at 10th minute
Administrator
Text Box
0 rpm started to 160 rpm
Administrator
Line
Administrator
Text Box
160 rpm
Administrator
Line
Administrator
Rectangle
Page 6: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 5POINT: Channel 6

45 Left45 Right

REF: -11.5 Volts REF: -11.5 Volts

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

20 micro m /div

-100

0

100

200

300

-200 -100 0 100 200

(not orbit or polar plot) UP

00(0, 0)

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
DE-2
Administrator
Text Box
0 rpm
Administrator
Text Box
160 rpm
Administrator
Text Box
Back
Administrator
Text Box
0 rpm
Administrator
Rectangle
Page 7: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 7POINT: Channel 8

45 Left45 Right

REF: -10.7 Volts REF: -10.4 Volts

MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

20 micro m /div

-100

0

100

200

300

-200 -100 0 100 200

(not orbit or polar plot) UP

00(0, 0)

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
NDE-2
Administrator
Text Box
0 rpm
Administrator
Text Box
back
Administrator
Text Box
0 rpm
Administrator
Text Box
160 rpm
Administrator
Line
Administrator
Rectangle
Page 8: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 LeftMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

10:30:13.1 16010:28:13.1 160

10:26:13.1 16010:24:13.1 160

10:22:13.1 16010:20:13.1 160

10:18:24.8 160 rpm

10:18:24.8

POINT: Channel 2 45 RightMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

10:30:13.1 16010:28:13.1 160

10:26:13.1 16010:24:13.1 160

10:22:13.1 16010:20:13.1 160

10:18:24.8 160 rpm

10:18:24.8

POINT: Channel 3 45 LeftMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

10:30:13.1 16010:28:13.1 160

10:26:13.1 16010:24:13.1 160

10:22:13.1 16010:20:13.1 160

10:18:24.8 160 rpm

10:18:24.8

POINT: Channel 4 45 RightMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

10:30:13.1 16010:28:13.1 160

10:26:13.1 16010:24:13.1 160

10:22:13.1 16010:20:13.1 160

10:18:24.8 160 rpm

10:18:24.8

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Home
Administrator
Text Box
D-NDE-1-X
Administrator
Text Box
D-NDE-1-Y
Administrator
Text Box
D-DE-1-X
Administrator
Text Box
D-DE-1-Y
Administrator
Polygon
Administrator
Text Box
0
Administrator
Polygon
Administrator
Polygon
Administrator
Polygon
Administrator
Text Box
Back
Administrator
Rectangle
Page 9: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 5 45 LeftMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

10:30:13.1 16010:28:13.1 160

10:26:13.1 16010:24:13.1 160

10:22:13.1 16010:20:13.1 160

10:18:24.8 160 rpm

10:18:24.8

POINT: Channel 6 45 RightMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

10:30:13.1 16010:28:13.1 160

10:26:13.1 16010:24:13.1 160

10:22:13.1 16010:20:13.1 160

10:18:24.8 160 rpm

10:18:24.8

POINT: Channel 7 45 LeftMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

10:30:13.1 16010:28:13.1 160

10:26:13.1 16010:24:13.1 160

10:22:13.1 16010:20:13.1 160

10:18:24.8 160 rpm

10:18:24.8

POINT: Channel 8 45 RightMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

10:30:13.1 16010:28:13.1 160

10:26:13.1 16010:24:13.1 160

10:22:13.1 16010:20:13.1 160

10:18:24.8 160 rpm

10:18:24.8

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-DE-2-X
Administrator
Text Box
D-DE-2-Y
Administrator
Text Box
D-NDE-2-X
Administrator
Text Box
D-NDE-2-Y
Administrator
Text Box
Home
Administrator
Polygon
Administrator
Polygon
Administrator
Polygon
Administrator
Polygon
Administrator
Rectangle
Page 10: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 LeftMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm

18:20:25.4

1.83@ 96 Hertz

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-NDE-1-X
Administrator
Text Box
Home
Administrator
Text Box
Click here to see D-NDE-1-Y
Administrator
Text Box
Back to trend
Administrator
Polygon
Administrator
Text Box
5791 rpm
Administrator
Text Box
Connect to next plot
Administrator
Oval
Administrator
Rectangle
Page 11: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 LeftMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm

18:26:31.1

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Connecting point
Administrator
Polygon
Administrator
Text Box
Back
Administrator
Oval
Administrator
Rectangle
Page 12: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 2 45 RightMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm

18:18:25.4

2.74@ 192 Hertz

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-NDE-1-Y
Administrator
Text Box
Back to D-NDE-1-X
Administrator
Text Box
Home
Administrator
Text Box
Back to trend
Administrator
Polygon
Administrator
Text Box
5791 rpm
Administrator
Oval
Administrator
Text Box
Connect to next plot
Administrator
Rectangle
Page 13: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 2 45 RightMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm

18:26:31.1

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Back
Administrator
Oval
Administrator
Text Box
Connecting point
Administrator
Polygon
Administrator
Rectangle
Page 14: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 3 45 LeftMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm

18:12:25.4

1.18@ 25 Hertz

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-DE-1-X
Administrator
Text Box
Home
Administrator
Text Box
Click here to see D-DE-1-Y
Administrator
Text Box
Back to trend
Administrator
Polygon
Administrator
Text Box
5791 rpm
Administrator
Oval
Administrator
Text Box
connect to next plot
Administrator
Rectangle
Page 15: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 3 45 LeftMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm

18:26:31.1

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Back
Administrator
Oval
Administrator
Text Box
connecting point
Administrator
Rectangle
Page 16: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 4 45 RightMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm

18:16:25.4

0.784@ 25 Hertz

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-DE-1-Y
Administrator
Text Box
Back to D-DE-1-X
Administrator
Text Box
Back
Administrator
Text Box
Back to trend
Administrator
Polygon
Administrator
Text Box
5791 rpm
Administrator
Oval
Administrator
Text Box
connect to next plot
Administrator
Rectangle
Page 17: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 4 45 RightMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm

18:26:31.1

COMMENTS

BENTLYNEVADA

R

Administrator
Oval
Administrator
Text Box
connecting point
Administrator
Text Box
Back
Administrator
Rectangle
Page 18: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 5 45 LeftMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm

18:16:25.4

10.1@ 96 Hertz

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-DE-2-X
Administrator
Text Box
Click to see D-DE-2-Y
Administrator
Text Box
Home
Administrator
Text Box
Back to trend
Administrator
Polygon
Administrator
Text Box
5791 rpm
Administrator
Oval
Administrator
Text Box
Connect to next plot
Administrator
Rectangle
Page 19: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 5 45 LeftMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm

18:26:31.1

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Back
Administrator
Oval
Administrator
Text Box
Connecting point
Administrator
Polygon
Administrator
Rectangle
Page 20: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 6 45 RightMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm

18:25:55.4

7.18@ 14 Hertz

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-DE-2-Y
Administrator
Text Box
Back to D-DE-2-X
Administrator
Text Box
Home
Administrator
Text Box
Back to trend
Administrator
Polygon
Administrator
Text Box
5791 rpm
Administrator
Oval
Administrator
Text Box
Connect to next plot
Administrator
Rectangle
Page 21: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 6 45 RightMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm

18:26:31.1

COMMENTS

BENTLYNEVADA

R

Administrator
Oval
Administrator
Text Box
connecting point
Administrator
Text Box
Back
Administrator
Polygon
Administrator
Rectangle
Page 22: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 7 45 LeftMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm

18:25:55.4

3.00@ 14 Hertz

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-NDE-2-X
Administrator
Text Box
Click to see D-NDE-2-Y
Administrator
Text Box
Home
Administrator
Text Box
Back to trend
Administrator
Polygon
Administrator
Text Box
5791 rpm
Administrator
Oval
Administrator
Text Box
Connect to next plot
Administrator
Rectangle
Page 23: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 7 45 LeftMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm

18:26:31.1

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Back
Administrator
Oval
Administrator
Text Box
Connecting point
Administrator
Polygon
Administrator
Rectangle
Page 24: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 8 45 RightMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm

18:25:55.4

3.53@ 14 Hertz

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-NDE-2-Y
Administrator
Text Box
Back to D-NDE-2-X
Administrator
Text Box
Home
Administrator
Text Box
Back to trend
Administrator
Polygon
Administrator
Text Box
5791 rpm
Administrator
Oval
Administrator
Text Box
Connect to next plot
Administrator
Rectangle
Page 25: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 8 45 RightMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz

0 100 200 300 400 500FREQUENCY: 20 Hertz/div

19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm

18:26:31.1

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Back
Administrator
Oval
Administrator
Text Box
Connecting point
Administrator
Polygon
Administrator
Rectangle
Page 26: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

TREND PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1POINT: Channel 2

45 Left45 Right

DIRECTDIRECT

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

0

5

10

15

20

17:3023JUL2013

17:4023JUL2013

17:5023JUL2013

18:0023JUL2013

18:1023JUL2013

18:2023JUL2013

TIME: 2 Mins /div

0

10

20

10.9 micro m pp10.6 micro m pp23JUL201317:29:25.0

POINT: Channel 3POINT: Channel 4

45 Left45 Right

DIRECTDIRECT

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

0

5

10

15

20

17:3023JUL2013

17:4023JUL2013

17:5023JUL2013

18:0023JUL2013

18:1023JUL2013

18:2023JUL2013

TIME: 2 Mins /div

0

5

10

15

20

8.49 micro m pp9.08 micro m pp23JUL201317:29:25.0

POINT: Channel 5POINT: Channel 6

45 Left45 Right

DIRECTDIRECT

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

0

20

40

60

17:3023JUL2013

17:4023JUL2013

17:5023JUL2013

18:0023JUL2013

18:1023JUL2013

18:2023JUL2013

TIME: 2 Mins /div

0

20

40

60

23.4 micro m pp18.4 micro m pp23JUL201317:29:25.0

POINT: Channel 7POINT: Channel 8

45 Left45 Right

DIRECTDIRECT

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

0

10

20

30

40

17:3023JUL2013

17:4023JUL2013

17:5023JUL2013

18:0023JUL2013

18:1023JUL2013

18:2023JUL2013

TIME: 2 Mins /div

0

5

10

15

20

25

39.2 micro m pp20.6 micro m pp23JUL201317:29:25.0

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
D-NDE-1-X-Y
Administrator
Text Box
D-DE-1-X-Y
Administrator
Text Box
D-DE-2-X-Y
Administrator
Text Box
D-NDE-2-X-Y
Administrator
Text Box
See waterfall-X
Administrator
Text Box
See waterfall-Y
Administrator
Text Box
See waterfall-X
Administrator
Text Box
See waterfall-Y
Administrator
Text Box
See waterfall-Y
Administrator
Text Box
See waterfall-X
Administrator
Text Box
See waterfall-X
Administrator
Text Box
See waterfall-Y
Administrator
Text Box
Home
Administrator
Line
Administrator
Text Box
5791 rpm
Administrator
Line
Administrator
Text Box
5100 rpm and lower
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
480 rpm
Administrator
Text Box
Crank mode
Administrator
Text Box
steam mode
Administrator
Line
Administrator
Rectangle
Page 27: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

TREND PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1POINT: Channel 2

45 Left45 Right

GAPGAP

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

-10

-8

-6

-4

-2

0

17:3023JUL2013

17:4023JUL2013

17:5023JUL2013

18:0023JUL2013

18:1023JUL2013

18:2023JUL2013

TIME: 2 Mins /div

-8

-6

-4

-2

0

-9.69 Volts-9.35 Volts23JUL201317:29:25.0

POINT: Channel 3POINT: Channel 4

45 Left45 Right

GAPGAP

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

-6

-4

-2

0

17:3023JUL2013

17:4023JUL2013

17:5023JUL2013

18:0023JUL2013

18:1023JUL2013

18:2023JUL2013

TIME: 2 Mins /div

-8

-6

-4

-2

0

-7.69 Volts-8.47 Volts23JUL201317:29:25.0

POINT: Channel 5POINT: Channel 6

45 Left45 Right

GAPGAP

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

-10

-8

-6

-4

-2

0

17:3023JUL2013

17:4023JUL2013

17:5023JUL2013

18:0023JUL2013

18:1023JUL2013

18:2023JUL2013

TIME: 2 Mins /div

-10

-8

-6

-4

-2

0

-10.4 Volts-11.2 Volts23JUL201317:29:25.0

POINT: Channel 7POINT: Channel 8

45 Left45 Right

GAPGAP

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

-8

-6

-4

-2

0

17:3023JUL2013

17:4023JUL2013

17:5023JUL2013

18:0023JUL2013

18:1023JUL2013

18:2023JUL2013

TIME: 2 Mins /div

-8

-6

-4

-2

0

-8.84 Volts-9.84 Volts23JUL201317:29:25.0

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
NDE-1-X-Y
Administrator
Text Box
DE-1-X-Y
Administrator
Text Box
DE-2-X-Y
Administrator
Text Box
NDE-2-X-Y
Administrator
Text Box
Click here to see shaft center position
Administrator
Text Box
Click here to see shaft center position
Administrator
Text Box
Click here to see shaft center position
Administrator
Text Box
Click here to see shaft center position
Administrator
Text Box
Home
Administrator
Rectangle
Page 28: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1POINT: Channel 2

45 Left45 Right

REF: -9.69 Volts REF: -9.35 Volts

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

20 micro m /div

-100

0

100

200

300

-200 -100 0 100 200

(not orbit or polar plot) UP

00(0, 0)

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
time 17:29:34, 160 rpm
Administrator
Text Box
time 17:34:43, 360 rpm
Administrator
Text Box
time 17:59:40, 5100 rpm
Administrator
Text Box
time 18:22:34, 5719 rpm
Administrator
Text Box
Back
Administrator
Text Box
NDE-1-X-Y
Administrator
Polygonal Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Rectangle
Page 29: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 3POINT: Channel 4

45 Left45 Right

REF: -7.69 Volts REF: -8.47 Volts

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

20 micro m /div

-100

0

100

200

300

-200 -100 0 100 200

(not orbit or polar plot) UP

00(0, 0)

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Back
Administrator
Text Box
time 17:29:25, 160 rpm
Administrator
Text Box
time 17:34:43, 300 rpm
Administrator
Text Box
time 17:39:40, 1860 rpm
Administrator
Text Box
time 17:55:01, 3660 rpm
Administrator
Text Box
time 17:59:31, 4920 rpm
Administrator
Text Box
time 18:05:07, 5791 rpm
Administrator
Text Box
time 18:13:07, 57910
Administrator
Text Box
DE-1-X-Y
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Rectangle
Page 30: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 5POINT: Channel 6

45 Left45 Right

REF: -10.4 Volts REF: -11.2 Volts

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

20 micro m /div

-100

0

100

200

300

-200 -100 0 100 200

(not orbit or polar plot) UP

00(0, 0)

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Back
Administrator
Text Box
time 17:29:25, 160 rpm
Administrator
Text Box
time 17:45;31, 1860 rpm
Administrator
Text Box
time 18:00:34, 5100 rpm
Administrator
Text Box
time 18:09:34, 5791 rpm
Administrator
Text Box
time 18:22:31, 5791 rpm
Administrator
Text Box
DE-2-X-Y
Administrator
Rectangle
Page 31: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 7POINT: Channel 8

45 Left45 Right

REF: -8.84 Volts REF: -9.84 Volts

MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

20 micro m /div

-100

0

100

200

300

-200 -100 0 100 200

(not orbit or polar plot) UP

00(0, 0)

COMMENTS

BENTLYNEVADA

R

Administrator
Text Box
Back
Administrator
Text Box
time 17:29:25, 160 rpm
Administrator
Text Box
time 17:36:37, 1560 rpm
Administrator
Text Box
time 18:00:01, 5100 rpm
Administrator
Text Box
time 18:10:25, 5791 rpm
Administrator
Text Box
NDE-2-X-Y
Administrator
Rectangle
Page 32: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-1-X
Administrator
Text Box
Back
Administrator
Rectangle
Page 33: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-1-X
Administrator
Text Box
Click to see waveform
Administrator
Text Box
Home
Administrator
Oval
Chick at "See detail"
Administrator
Text Box
See detail
Administrator
Text Box
Turbine, HS shaft, 96 Hz
Administrator
Text Box
2X..............3X.................................................................................................................. NX
Administrator
Text Box
639,96 Hz
Administrator
Line
Administrator
Rectangle
Page 34: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
Turbine, HS shaft 96 Hz
Administrator
Text Box
D-NDE-1-X
Administrator
Text Box
Back
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
50 Hz
Administrator
Line
Administrator
Rectangle
Page 35: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-1-Y
Administrator
Text Box
Back
Administrator
Rectangle
Page 36: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-1-Y
Administrator
Text Box
Click to see waveform
Administrator
Text Box
Home
Administrator
Oval
Click " See detail"
Administrator
Text Box
See detail
Administrator
Text Box
2X..............3X.................................................................................................................. NX
Administrator
Text Box
639,96 Hz
Administrator
Text Box
Turbine, HS shaft, 96 Hz
Administrator
Line
Administrator
Rectangle
Page 37: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-1-Y
Administrator
Text Box
Back
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
Turbine, HS shaft 96 Hz
Administrator
Text Box
50 Hz
Administrator
Rectangle
Page 38: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-1-X
Administrator
Text Box
Back
Administrator
Rectangle
Page 39: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-1-X
Administrator
Text Box
Click to see waveform
Administrator
Text Box
Home
Administrator
Oval
Click "See detail"
Administrator
Text Box
See detail
Administrator
Text Box
639,96 Hz
Administrator
Line
Administrator
Text Box
Turbine, HS shaft, 96 Hz
Administrator
Text Box
2X..............3X.................................................................................................................. NX
Administrator
Rectangle
Page 40: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-1-X
Administrator
Text Box
Back
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
50 Hz
Administrator
Text Box
Turbine, HS shaft 96 Hz
Administrator
Rectangle
Page 41: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-1-Y
Administrator
Text Box
Back
Administrator
Rectangle
Page 42: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-1-Y
Administrator
Text Box
Click to see waveform
Administrator
Text Box
Home
Administrator
Oval
Click at " See detail"
Administrator
Text Box
See detail
Administrator
Text Box
Typical vibration signsture
Administrator
Rectangle
Page 43: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-1-Y
Administrator
Text Box
Back
Administrator
Line
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
Turbine, HS shaft 96 Hz
Administrator
Text Box
50 Hz
Administrator
Rectangle
Page 44: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-2-X
Administrator
Text Box
Back
Administrator
Rectangle
Page 45: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-2-X
Administrator
Text Box
Click to see waveform
Administrator
Text Box
Home
Administrator
Oval
Click "See detail"
Administrator
Text Box
See detail
Administrator
Text Box
Typical vibration signsture
Administrator
Rectangle
Page 46: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-2-X
Administrator
Text Box
Back
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
14 Hz
Administrator
Text Box
50 Hz
Administrator
Text Box
75 Hz
Administrator
Text Box
Turbine, HS shaft 96 Hz
Administrator
Rectangle
Page 47: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-2-Y
Administrator
Text Box
Back
Administrator
Rectangle
Page 48: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-2-Y
Administrator
Text Box
Click to see waveform
Administrator
Text Box
Home
Administrator
Oval
Click "See detail"
Administrator
Text Box
See detail
Administrator
Text Box
Typical vibration signsture
Administrator
Rectangle
Page 49: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-2-Y
Administrator
Text Box
Back
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
14 Hz
Administrator
Text Box
50 Hz
Administrator
Text Box
75 Hz
Administrator
Text Box
Turbine, HS shaft 96 Hz
Administrator
Text Box
1,09 Hz to 1,33 Hz
Administrator
Rectangle
Page 50: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-2-X
Administrator
Text Box
Back
Administrator
Rectangle
Page 51: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-2-X
Administrator
Text Box
Click to see waveform
Administrator
Text Box
Home
Administrator
Text Box
See detail
Administrator
Rectangle
Page 52: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-2-X
Administrator
Text Box
Back
Administrator
Text Box
1,6 Hz
Administrator
Rectangle
Page 53: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-2-Y
Administrator
Text Box
Back
Administrator
Rectangle
Page 54: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-2-Y
Administrator
Text Box
Click to see waveform
Administrator
Text Box
Home
Administrator
Text Box
See detail
Administrator
Rectangle
Page 55: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-2-Y
Administrator
Text Box
Back
Administrator
Text Box
1,6 Hz
Administrator
Rectangle
Page 56: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-1-X
Administrator
Text Box
Back
Administrator
Text Box
See D-NDE-1-Y
Administrator
Text Box
Overall signal
Administrator
Text Box
Band pass filter 40-300 Hz, Running freq = 96 Hz
Administrator
Rectangle
Page 57: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-1-Y
Administrator
Text Box
Back
Administrator
Text Box
Overall signal
Administrator
Text Box
Band pass filter 40-300 Hz, Running freq = 96 Hz
Administrator
Rectangle
Page 58: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-1-X
Administrator
Text Box
Back
Administrator
Text Box
See D-DE-1-Y
Administrator
Text Box
Overall signal
Administrator
Text Box
Band pass filter 40-300 Hz, Running freq = 96 Hz
Administrator
Rectangle
Page 59: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-1-Y
Administrator
Text Box
Back
Administrator
Text Box
Overall signal
Administrator
Text Box
Band pass filter 40-300 Hz, Running freq = 96 Hz
Administrator
Rectangle
Page 60: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-2-X
Administrator
Text Box
Back
Administrator
Text Box
See D-DE-2-Y
Administrator
Text Box
Band pass filter 40-200 Hz, Running freq = 96 Hz
Administrator
Text Box
Overall signal
Administrator
Rectangle
Page 61: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-DE-2-Y
Administrator
Text Box
Back
Administrator
Text Box
Overall signal
Administrator
Text Box
Band pass filter 40-200 Hz, Running freq = 96 Hz
Administrator
Rectangle
Page 62: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-2-X
Administrator
Text Box
Back
Administrator
Text Box
See D-NDE-2-Y
Administrator
Text Box
Band pass filter 40-200 Hz, Running freq = 96 Hz
Administrator
Text Box
Overall signal
Administrator
Rectangle
Page 63: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
D-NDE-2-Y
Administrator
Text Box
Back
Administrator
Text Box
Overall signal
Administrator
Text Box
Band pass filter 40-200 Hz, Running freq = 96 Hz
Administrator
Rectangle
Page 64: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location

NDE-1

DE-1

DE-2

NDE-2

16 microns

4 microns

Notice. Sensor orientation 45°set up is not available, these images are attempted to rotate 45°.

DE-1 & NDE-1 Vibration signal was band pass filtered 40-300 Hz, while 1X is 96 Hz

DE-2 & NDE-2 Vibration signal was band pass filtered 40-300 Hz, while 1X is 96 Hz

Orbit plots are not subtracted slow roll. Only Band pass filter 40-300 Hz for DE-1 & NDE-1, and 40-200 Hz for DE-2 & NDE-2 Orbit group DE-1& NDE-1 and DE-2 & NDE-2 are not scale.

Administrator
Text Box
Home
Administrator
Text Box
Move cursor above orbit plot, then click to see waveform
Page 65: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-HS-V-DE
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
GMF, 4150 Hz
Administrator
Text Box
See Acceleration signal
Administrator
Text Box
Home
Administrator
Rectangle
Page 66: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-HS-A-DE
Administrator
Text Box
Zoom
Administrator
Rectangle
Page 67: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-HS-A-DE
Administrator
Text Box
Back
Administrator
Text Box
Home
Administrator
Oval
Click "See detail"
Administrator
Text Box
See detail
Administrator
Rectangle
Page 68: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
GMF
Administrator
Oval
Administrator
Oval
Administrator
Oval
Administrator
Text Box
14Hz sidebands
Administrator
Oval
Administrator
Text Box
25 Hz sidebands
Administrator
Text Box
Home
Administrator
Rectangle
Page 69: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
25 Hz
Administrator
Text Box
1062 Hz
Administrator
Text Box
GMF, 4150 Hz
Administrator
Text Box
See band pass filter waveform
Administrator
Text Box
A-HS-V-DE
Administrator
Rectangle
Page 70: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
Overall signal
Administrator
Text Box
GMF 4150 Hz, band pass filter 4100-4200 Hz
Administrator
Text Box
Gen, LS shaft 25 Hz, band pass filter 0-100 Hz
Administrator
Text Box
A-HS-V-DE
Administrator
Text Box
Home
Administrator
Rectangle
Page 71: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-HS-V-NDE
Administrator
Text Box
See X axis log scale
Administrator
Text Box
See Acceleration signal
Administrator
Text Box
GMF 4150 Hz
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
2,5 Hz and lower
Administrator
Rectangle
Page 72: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-HS-V-NDE
Administrator
Text Box
GMF 4150 Hz
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
2,5 Hz and lower
Administrator
Text Box
See Acceleration signal
Administrator
Rectangle
Page 73: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-HS-A-NDE
Administrator
Text Box
GMF
Administrator
Text Box
GMF orders.... N
Administrator
Text Box
See detail
Administrator
Oval
Click "See detail"
Administrator
Text Box
Back
Administrator
Rectangle
Page 74: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
GMF
Administrator
Text Box
25 Hz sidebands
Administrator
Text Box
A-HS-A-NDE
Administrator
Text Box
Home
Administrator
Text Box
25 Hz sidebands
Administrator
Rectangle
Page 75: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Note
Marked set by Administrator
Administrator
Text Box
96 Hz
Administrator
Text Box
1062,5 Hz unknown
Administrator
Text Box
GMF
Administrator
Text Box
GMF...........N
Administrator
Text Box
Home
Administrator
Text Box
A-HS-A-NDE
Administrator
Text Box
See GMF waveform
Administrator
Rectangle
Page 76: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-HS-A-NDE
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
96 Hz
Administrator
Text Box
25 Hz
Administrator
Text Box
Overall
Administrator
Text Box
GMF, bandpass filter 4100-4200 Hz
Administrator
Text Box
Zoom
Administrator
Text Box
Home
Administrator
Rectangle
Page 77: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
Overall
Administrator
Text Box
GMF, bandpass filter 4100-4200 Hz
Administrator
Text Box
Home
Administrator
Text Box
A-HS-A-NDE
Administrator
Rectangle
Page 78: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-LS-V-DE
Administrator
Text Box
See X axis log scale
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
GMF
Administrator
Text Box
Home
Administrator
Text Box
Back
Administrator
Rectangle
Page 79: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-LS-V-DE
Administrator
Oval
Click "See detail"
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
GMF
Administrator
Text Box
See detail
Administrator
Text Box
Back
Administrator
Rectangle
Page 80: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
Home
Administrator
Text Box
GMF
Administrator
Text Box
25 Hz sideband
Administrator
Text Box
25 Hz sideband
Administrator
Text Box
A-LS-V-DE
Administrator
Text Box
Back
Administrator
Rectangle
Page 81: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-LS-V-DE
Administrator
Text Box
See GMF waveform
Administrator
Text Box
See spectrum detail
Administrator
Text Box
Home
Administrator
Rectangle
Page 82: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-LS-V-DE
Administrator
Text Box
Overall
Administrator
Text Box
GMF, bandpass filter 4100-4200 Hz
Administrator
Text Box
Gen, LS shaft 25 Hz, bandpass filter 0-100 Hz
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
96 Hz
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
25 Hz
Administrator
Text Box
Back
Administrator
Text Box
Home
Administrator
Rectangle
Page 83: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-LS-V-NDE
Administrator
Text Box
GMF
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
2,5 Hz or lower
Administrator
Text Box
See X axis in log scale
Administrator
Oval
Click "See detail"
Administrator
Text Box
See detail
Administrator
Rectangle
Page 84: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-LS-V-NDE
Administrator
Text Box
Gen, LS shaft 25 Hz
Administrator
Text Box
2,5 Hz or lower
Administrator
Text Box
GMF
Administrator
Oval
Click "See detail"
Administrator
Text Box
See detail
Administrator
Rectangle
Page 85: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
25 Hz sidebands
Administrator
Text Box
25 Hz sidebands
Administrator
Text Box
GMF
Administrator
Text Box
A-LS-V-NDE
Administrator
Text Box
Home
Administrator
Rectangle
Page 86: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-LS-A-NDE
Administrator
Text Box
GMF
Administrator
Text Box
See GMF waveform
Administrator
Text Box
Home
Administrator
Rectangle
Page 87: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
A-LS-A-NDE
Administrator
Text Box
Overall
Administrator
Text Box
GMF, bandpass filter 4100-4200 Hz
Administrator
Text Box
Home
Administrator
Rectangle
Page 88: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-NDE-3
Administrator
Text Box
GMF
Administrator
Text Box
GMF
Administrator
Text Box
GMF
Administrator
Text Box
3950 Hz, unknown
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
See detail
Administrator
Rectangle
Page 89: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-NDE-3
Administrator
Text Box
Signal seemed to be high pass filter at Bentley Nevada vibration console, thus no < 50 Hz signal appear.
Administrator
Text Box
3950 Hz, unknown
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Oval
Click "See detail"
Administrator
Text Box
See detail
Administrator
Rectangle
Page 90: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
GMF, 4150 Hz
Administrator
Text Box
50 Hz, from center frequency
Administrator
Text Box
50 Hz, from center frequency
Administrator
Line
Administrator
Text Box
3950 Hz
Administrator
Text Box
V-NDE-3
Administrator
Text Box
Home
Administrator
Rectangle
Page 91: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-NDE-3
Administrator
Text Box
Overall
Administrator
Text Box
GMF 4150 Hz, bandpass filter 4100-4200 Hz
Administrator
Text Box
Home
Administrator
Rectangle
Page 92: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-DE-3
Administrator
Text Box
Typical signal with V-NDE-3
Administrator
Text Box
1730 Hz
Administrator
Line
Administrator
Text Box
GMF, 2X
Administrator
Oval
Click "See detail"
Administrator
Text Box
See detail
Administrator
Text Box
See waveform to Spectrum
Administrator
Rectangle
Page 93: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
50 Hz side band the as V-NDE-3
Administrator
Text Box
V-DE-3
Administrator
Text Box
50 Hz, from center frequency
Administrator
Line
Administrator
Text Box
Home
Administrator
Rectangle
Page 94: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-DE-3
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
50 Hz
Administrator
Text Box
Overall
Administrator
Text Box
GMF 4150 Hz, bandpass filter 4100-4200 Hz
Administrator
Text Box
Zoom in m/S^2
Administrator
Rectangle
Page 95: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-DE-3
Administrator
Text Box
Overall
Administrator
Text Box
GMF 4150 Hz, bandpass filter 4100-4200 Hz
Administrator
Text Box
See waveform to spectrum
Administrator
Rectangle
Page 96: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-DE-3
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
50 Hz
Administrator
Line
Administrator
Text Box
GMF
Administrator
Text Box
Home
Administrator
Text Box
Back to spectrum
Administrator
Rectangle
Page 97: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-DE-4
Administrator
Text Box
Gen speed 25 Hz
Administrator
Text Box
2X
Administrator
Text Box
3X
Administrator
Text Box
4X
Administrator
Text Box
6X
Administrator
Text Box
8X
Administrator
Text Box
NX......
Administrator
Text Box
Frequency order with sideband ~ 6,88 - 7,03 Hz
Administrator
Text Box
See order and sideband
Administrator
Text Box
Back to V-NDE-4
Administrator
Rectangle
Page 98: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-DE-4
Administrator
Text Box
6,88-7,03 Hz
Administrator
Line
Administrator
Text Box
Gen speed 25 Hz
Administrator
Text Box
2X
Administrator
Text Box
3X
Administrator
Text Box
4X
Administrator
Text Box
Home
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
6,88-7,03 Hz
Administrator
Text Box
6,88-7,03 Hz
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
4,2 Hz
Administrator
Rectangle
Page 99: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-DE-4
Administrator
Oval
Administrator
Line
Administrator
Text Box
Gen speed 25 Hz
Administrator
Line
Administrator
Text Box
6,88-7,03 Hz
Administrator
Text Box
2X
Administrator
Text Box
3X
Administrator
Text Box
4X
Administrator
Text Box
NX......................................................................
Administrator
Text Box
See sideband detail
Administrator
Text Box
Other spectrum view
Administrator
Rectangle
Page 100: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-DE-4
Administrator
Text Box
See sideband
Administrator
Rectangle
Page 101: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-NDE-4
Administrator
Text Box
Typical vibration signature the same as V-DE-4
Administrator
Line
Administrator
Text Box
See Spectrum detail
Administrator
Rectangle
Page 102: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
Gen speed 25 Hz
Administrator
Text Box
2X
Administrator
Text Box
3X
Administrator
Text Box
4X
Administrator
Text Box
6X
Administrator
Text Box
8X......................NX
Administrator
Text Box
V-NDE-4
Administrator
Text Box
See detail
Administrator
Line
Administrator
Text Box
17,81 Hz
Administrator
Rectangle
Page 103: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
V-NDE-4
Administrator
Text Box
Home
Administrator
Line
Administrator
Text Box
6,88 - 7,03 Hz
Administrator
Line
Administrator
Text Box
17,81 Hz
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Line
Administrator
Text Box
6,88 - 7,03 Hz
Administrator
Text Box
6,88 - 7,03 Hz
Administrator
Rectangle
Page 104: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
See detail
Administrator
Text Box
V-NDE-4
Administrator
Rectangle
Page 105: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
Next
Administrator
Text Box
Bentley Nevada vibration console
Page 106: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
Next
Administrator
Text Box
Retrieve vibration data from Bentley Nevada buffered output, using Technekon STD-3300 portable data collector
Page 107: Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. · Steam turbine power generation arrangement overview and vibration type and location
Administrator
Text Box
Home
Administrator
Text Box
Vibration data was parallel retrieving with Technekon STD-3300 and ADRE DAIU-208.