status update and test results for run2b si sensors at ksu

23
Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 1 out of 23 Status update and Test results for Run2b Si sensors at KSU Sergey Korjenevski Kansas State University Dec 12, 2002 SiDet, Fermilab The Run 2b Silicon Tracker Workshop, Dec 12-13, 2002

Upload: easter

Post on 22-Jan-2016

29 views

Category:

Documents


0 download

DESCRIPTION

The Run 2b Silicon Tracker Workshop, Dec 12-13, 2002. Status update and Test results for Run2b Si sensors at KSU. Sergey Korjenevski Kansas State University Dec 12, 2002 SiDet, Fermilab. Outline. Stock Quality Tests status and results Irradiation studies status and results. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 1 out of 23

Status update and Test results for Run2b Si sensors

at KSUSergey Korjenevski

Kansas State UniversityDec 12, 2002

SiDet, Fermilab

The Run 2b Silicon Tracker Workshop, Dec 12-13, 2002

Page 2: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 2 out of 23

Outline

Stock Quality Tests status and results Irradiation studies status and

results

Page 3: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 3 out of 23

Stock @ KSU – 12/11/02

ELMA prototypes: L0 35 detectors

7 first batch (February 2002) 16 second batch (July 2002) 12 third batch (November 2002)

L1 11 detectors 4 + mech First batch all at Fermilab 7 second batch (September 2002) 4 third batch (November 2002)

HPK prototypes: L1 4 detectors 3 test structures L2 10 detectors 5 test structures

Updated Stock#data#.xls at html://www.phys.ksu.edu/~skorj/Dzero

Page 4: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 4 out of 23

Leakage Current Typical behavior example Breakdown

350V

0

100

200

300

400

500

600

700

800

900

1000

0 50 100 150 200 250 300 350 400 450Voltage (V)

Cu

rre

nt

(nA

)

L0 ELMA

Page 5: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 5 out of 23

L0 ELMA

Depletion Voltage Example

• Most of the prototypes have depletion point at around 25V

1\C^2 vs Voltage

0

1000

2000

3000

4000

5000

6000

7000

0 5 10 15 20 25 30 35 40 45Voltage (V)

1/C

^2

(1

/pF

)^2

Vdep=23V

???

Page 6: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 6 out of 23

L0 ELMA

Strip Measurements Strip Leakage current (random 9 sensors)

0

100

200

300

400

500

600

700

800

900

1000

0.001 0.01 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 10 100Current nA

Student?

Page 7: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 7 out of 23

L0 ELMA

0

50

100

150

200

250

300

350

400

450

0 10 20 30 40 50 60 70 80 90 100 1000Capacitance pF

Strip Measurements Coupling capacitance @ 1kHz

Cp-Q mode

Cs-Rs mode

Page 8: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 8 out of 23

L0 ELMA

Strip Measurements R poly

0

100

200

300

400

500

600

R KOhm

Page 9: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 9 out of 23

L1 ELMA

Leakage Current Breakdown ~350V 08,10 – no Bkdn, 12 – 800V

0

100

200

300

400

500

600

0 100 200 300 400 500 600 700

Cu

rre

nt

(nA

)

Page 10: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 10 out of 23

L1 ELMA

Depletion Voltage Example

• Most of the prototypes have depletion point at around 22V

0

500

1000

1500

2000

2500

0 20 40 60 80 100 120Voltage (V)

1/C

^2 (

1/p

F)^

2

Vdep=21V

???

Page 11: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 11 out of 23

L1 ELMA

Strip Measurements Strip Leakage current

1

10

100

1000

10000

0 0.01 0.05 0.1 0.15 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 10 100Current nA

Page 12: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 12 out of 23

L1 ELMA

Strip Measurements Coupling capacitance @ 1kHz and @ 100

Hz

1

10

100

1000

10000

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230Cac pF

Page 13: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 13 out of 23

L1 ELMA

Strip Measurements R poly

0

200

400

600

800

1000

1200

1400

500 600 700 800 900 1000 1100 1200 2000 3000 4000 10000R kOhm

Page 14: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 14 out of 23

L1 HPK

0

10

20

30

40

50

60

70

80

90

100

0 200 400 600 800 1000Voltage (V)

Cu

rre

nt

(nA

)

Leakage Current Breakdown once

Page 15: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 15 out of 23

L1 HPK

Depletion Voltage Easy to read

0

500

1000

1500

2000

2500

3000

0 50 100 150 200 250 300 350Voltage (V)

1/C

^2

(1

/pF

)^2

Vdep=118V

Page 16: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 16 out of 23

L1 HPK

Strip Measurements Strip leakage

1

10

100

1000

10000

0.001 0.01 0.05 0.1 0.5 1 2 3nA

Page 17: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 17 out of 23

L1 HPK

Strip Measurements Cac @ 1kHz Cp-Q mode

0

500

1000

1500

2000

2500

3000

20 40 60 80 100pF

Page 18: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 18 out of 23

L1 HPK

Strip Measurements Rpoly Inconsistency

Polysilicon HPK 01

400

600

800

1000

1200

1400

1600

0 50 100 150 200 250 300 350Strip #

Re

sis

tan

ce

KO

hm

Rpoly at 5V

Rpoly at 2V

Page 19: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 19 out of 23

HPK L2

Only one fully tested #052 Vdep = 101V at 21C Leakage 70 nA @ FDV No pinholes One leaky channel #317 Rpoly ~ 2.6 Mohm TOO HIGH!

Page 20: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 20 out of 23

Irradiation

4 sensors -- 2 L0 2 L1 Run 3 next Friday Freezer to store sensors between Runs

-18C; 16%

Cold chuck installed, though not turned on yet.

Page 21: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 21 out of 23

Irradiation

Preliminary: Current 0->1 1->2

L0_1-1d2 170 times 2.5 times L0_1-5d1 280 times 2.8 times L1-007ELM 800 times 1.7 times L1-020HPK 2200 times 1.6

times Depletion

L0_1-1d2 26 V -> 18 V -> 21 V L0_1-5d1 20 V -> 16 V -> 20 V L1-007ELM 21 V -> 18 V -> 22 V L1-020HPK 126 V -> 121 V -> 116 V

Page 22: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 22 out of 23

ELMA Depletion Uncertainty

1\C^2 vs Voltage

0

1000

2000

3000

4000

5000

6000

0 5 10 15 20 25 30 35 40Voltage (V)

1/C

^2 (

1/p

F)^

2

Page 23: Status update and Test results for Run2b Si sensors at KSU

Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, 2002 23 out of 23

Last Slide

QT stand Switch implementation should unify all

tests Input/Output format still an issue

Input file not really a problem Data Base is

Irradiation studies Cold chuck has to address high current Condensation may become a problem

All progress will be reported