status report iso/tc 67/sc 4/wg 6 “subsea equipment”€¦ · iso/tc 67/sc 4/wg 6 “subsea...

24
1 STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT” Presentation San Francisco 22.06.07

Upload: others

Post on 02-Aug-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

1

STATUS REPORTISO/TC 67/SC 4/WG 6

“SUBSEA EQUIPMENT”

Presentation San Francisco 22.06.07

Page 2: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

2

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• Terminology and definitions ISO 15926 N-172 rev 2 2006-08-29 NB! Summary doc. comments?

• Next amendment drilling loads including fatigue loads• New issues as subsea data management facilitating

“integrated” operation / subsea processing / Subsea to beach

Page 3: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

3

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• DIS comments resolved DIS ballot pending

Page 4: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

4

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Page 5: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

5

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• DIS ballot closed Feb. 2007 • Comments resolved • Amendment identified to stage “revision” in order

to progress the doc.

Page 6: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

6

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• Forwarded to SC 4 for further processing to DIS

Page 7: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

7

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• Preparing rev proposal will interface with IWOCS proposal to be forwarded. Ref. -7 and listed -14

• Control system will increase in importance in the future

Page 8: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

8

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• Revise with separate annex on IWOCX. This will require a task group including project leader and controls & operational expertise. Will interface with BOP controls document and -6

Page 9: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

9

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Page 10: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

10

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Page 11: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

11

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Page 12: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

12

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Page 13: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

13

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• Been struggling with accept criteria (different philosophy GOM & Europe)

• Have held several meetings to resolve issues and progress the document

Page 14: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

14

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• CD confirmed for late Nov. 2007• Awaiting input from GOM / API• Resource re-evaluation in August have had changes in

task group funding OK• Grey areas between documents has been identified and

will be clarified (Pig launch/service hubs and connectors)

Page 15: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

15

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• Proposed as annex for 13628-7

Page 16: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

16

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• New project leader being confirmed (delayed by Statoil/Hydro merger) previous project leader moved to a different company

• DNV will produce the first WD and funding for this is in place

Page 17: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

17

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

• Parts of meeting Tuesday next week will address this issue • Large overlap between the current proposal and ISO 20815• Uncertainty as to potentially having two documents with large overlap in the

ISO suit of documents guidance asked from SC 4 on this. Should a NWI be raised?

Page 18: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

18

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Materials issue in different documents

• Information as to the mandate for the WG and interfacing with existing groups that have material requirements in their documents was queried in the combined WG 6 and SC 17 meeting in Feb. 2007

• The 13628 series has material requirements in several documents and the hierarchy described is that substandard requirement s take priority if in conflict with 13628-1 “system”document.

Page 19: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

19

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Well integrity issues “well foundation”

• Several wells have been abandoned due to problems with well integrity (probable and confirmed fatigue problems)

• Revised drilling loads is worked by DNV to be updated in NORSOK U 001. These are planned to be proposed for amendment of 13628-1

• Reason for fatigue load inclusion is extended periods with rig on wells due to longer and more complex wells as well as increased intervention frequencies

• Result is an increasing deviation between surface and subsea equipment affected by these industry development

Page 20: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

20

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Well integrity issues “well foundation” Wave Motions

Vessel Offset

Surface Pressure Pump

Draw Works, Tension and StrokeSurface Equipment

Slick Joint

Tensioner SheavesTensioner Tension and Stroke

Tension Joint

Wave and Current Forces

Gravity

Outside Diameter

Riser Joints

Effective Tension

Bending Stiffness

External Pressure

Stress Joint

Subsea Equipment

Soil restraint

Bottom hole assy

Conducto

Downstrea

Exc

itatio

n zo

ne

Shea

r zo

ne

Crest Through (-Current Velocity

Dam

ping

zon

e

Upstream

Drill Floor

Page 21: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

21

Typical Riser Load on Wellhead

Page 22: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

22

Factors affecting ”bending” of normally critical riser sections and affecting permanent equipment

• Seabed conditions (bending below above seabed) casing cementing, temperature gradients

• Riser and BOP/LMR sizes & weights

• Flex joints stiffness (top/bottom)

• Tension & Vessel position• Vessel RAO data & Station

keeping• Environmental conditions

LOWERRISER

UPPERRISER

SoftSoil

Casing

Conductor

BOP

LMRP

LowerFlex-Joint

FirmSoil

Page 23: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

23

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Resent changes / extensions of earlier practices within the subsea sector of the industry

• Subsea processing being implemented & this has raised issues of what std’s and norms should be used for such systems/equipment?

• More frequent intervention on wells and “new” ways of intervening are maturing

• This put new requirements on permanent equipment to better facilitate such intervention

• Impact on the 13628 series of documents has to be reviewed • Safety authorities are focusing safety issues and he requirements

are different on the different continental shelves e. vessel requirements for well intervention vessels.

• Interfaces between the 13628 series and other WG’s and SC’sdocuments will increase in importance in the future as functionality increase in the subsea systems and intervention associated with these systems diversifies

Page 24: STATUS REPORT ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”€¦ · ISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT ... • Reason for fatigue load inclusion is extended periods with rig on

24

STATUS REPORTISO/TC 67/SC 4/WG 6 “SUBSEA EQUIPMENT”

Working Mode in the different groups• Some groups use teleconference and net

meetings with great success • Some issues are difficult to resolve without