Status Report #2
Team 8January24, 2011
Zachery ChaneyMark Foresman
Ryan MertzWesley Richard
ATALIS is an automated alcohol inventory control system for use in bars and restaurants.
![Page 2: Status report 2](https://reader030.vdocuments.site/reader030/viewer/2022032619/55c047d0bb61ebc7398b467a/html5/thumbnails/2.jpg)
Overall Need
Bars and restaurants lose up to 30 percent of their inventory due to alcohol “shrinkage” because of a lack of accurate and reliable inventory tracking.
Project Milestones1. 19 January 2011 – Design dimensions finalized2. 01 February 2011 – Prototype stand holder completed3. 01 March 2011 – Prototype bottle stand completed 4. 01 April 2011 – Software fully implemented and
working5. 25 April 2011 – Project completed and demonstrated
![Page 3: Status report 2](https://reader030.vdocuments.site/reader030/viewer/2022032619/55c047d0bb61ebc7398b467a/html5/thumbnails/3.jpg)
Recently Completed Tasks
1. Ordered Force Sensors2. Tested Microcontroller with LED’s and
code3. Measured dimensions of an alcohol rack
that our product will be replacing4. Built prototype board and experimented
with different inner molding materials5. Contacted creator of similar system for
advice on RFID reader code
![Page 4: Status report 2](https://reader030.vdocuments.site/reader030/viewer/2022032619/55c047d0bb61ebc7398b467a/html5/thumbnails/4.jpg)
Ongoing/ Pending Tasks
Developing most workable/usable stand design for real world application
Construction of force sensor driving circuit
RFID reader testing Beginning stages of website
![Page 5: Status report 2](https://reader030.vdocuments.site/reader030/viewer/2022032619/55c047d0bb61ebc7398b467a/html5/thumbnails/5.jpg)
Website Template
![Page 6: Status report 2](https://reader030.vdocuments.site/reader030/viewer/2022032619/55c047d0bb61ebc7398b467a/html5/thumbnails/6.jpg)
Upcoming Tasks
Construction of stand Sensor testing and calibration Software implementation
![Page 7: Status report 2](https://reader030.vdocuments.site/reader030/viewer/2022032619/55c047d0bb61ebc7398b467a/html5/thumbnails/7.jpg)
Initial prototype construction and molding materials.
![Page 8: Status report 2](https://reader030.vdocuments.site/reader030/viewer/2022032619/55c047d0bb61ebc7398b467a/html5/thumbnails/8.jpg)
Functional Block Diagram
![Page 9: Status report 2](https://reader030.vdocuments.site/reader030/viewer/2022032619/55c047d0bb61ebc7398b467a/html5/thumbnails/9.jpg)
Project Schedule
![Page 10: Status report 2](https://reader030.vdocuments.site/reader030/viewer/2022032619/55c047d0bb61ebc7398b467a/html5/thumbnails/10.jpg)
Questions?