status on clic long quadrupole prototype for stabilization studies (m. modena, cern –te/msc)
DESCRIPTION
Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC). “CLIC 6 th Stabilization Meeting’ on 9 June 2009”. Long (2-m) Main Beam Quadrupole prototype a remind…. Aim of this quadrupole prototype: - PowerPoint PPT PresentationTRANSCRIPT
Status on CLIC Long Quadrupole Prototype for Stabilization Studies
(M. Modena, CERN –TE/MSC)
“CLIC 6th Stabilization Meeting’ on 9 June 2009”
Long (2-m) Main Beam Quadrupole prototype
a remind….
Aim of this quadrupole prototype:
• Provide quickly a prototype for the stabilization studies
• Test different poles and coils assembly solutions (towards stabilization performances)
• Provide a magnet for developing and testing magnetic measurement system (very small and long magnet bore!)
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
2
a remind…. 3 assembly options
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
3
Quadrupole Cross-Section: Final EM Optimization
(Courtesy of A.Vorozhtsov)
a remind…. NOTE: a gap of 3 mm between iron poles and coils is left to test different solutions for coils support/dumping system
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
4
Quadrupole Prototype procurement Status:
• Copper conductor : Ordered (with Luvata- Finland)• Iron: Ordered (AFNOR C10 R type)• Tender Drawings: Completed this week• Coils Call for Tender: Send out hopefully this week to 3 Companies• Iron machining: Selecting potential bidders
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
5
Courtesy of R. Leuxe EN-MME
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
6
Courtesy of R. Leuxe EN-MME
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
7
Courtesy of R. Leuxe EN-MME
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
8
Courtesy of R. Leuxe EN-MME
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
9
Courtesy of R. Leuxe EN-MME
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
10
Courtesy of R. Leuxe EN-MME
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
11
Courtesy of R. Leuxe EN-MME
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
12
Courtesy of R. Leuxe EN-MME
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
13
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
14
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
15
“”CLIC
6th S
tabilization Meeting’ on 9 June 2009” M
. Modena – C
ER
N/T
E
16