status of the t2k experiment

30
PARC PAC ‘07 Imperial College Dave Wark Status of the T2K Experiment Dave Wark Imperial/RAL J-PARC PAC KEK July 6, 2007

Upload: selma-gibson

Post on 31-Dec-2015

46 views

Category:

Documents


1 download

DESCRIPTION

Status of the T2K Experiment. J-PARC PAC KEK July 6, 2007. Dave Wark Imperial/RAL. 1R- m Energy spectrum. SuperK. SNO. Soudan II. MACRO. 71 ±5. 71 ±5. KamLAND. Evidence for n oscillations from…. Early Solar Neutrino Exps. MINOS. K2K. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Status of the T2K Experiment

Dave WarkImperial/RAL

J-PARC PACKEK

July 6, 2007

Page 2: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Evidence for oscillations from…

71±571±5

Early Solar Neutrino Exps.

SuperK

SNO Soudan II

MACRO

Has shown that neutrinos have mass and oscillate.

1R- Energy spectrum

K2K

KamLAND

MINOS

Page 3: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

ijijijij sandcwhere sin,cos

100

0cs

0sc

c0iδes

010

iδes0c

cs0

sc0

001

UUU

UUU

UUU

U 1212

1212

1313

1313

2323

2323

τ3τ2τ1

μ3μ2μ1

e3e2e1

li

ilil U If neutrinos have mass:

)E

LΔm.(θ)νP(ν eμ

222 271sin2sin

For three neutrinos:

Three Angles

The Maki-Nakagawa-Sakata-Pontecorvo Matrix

Page 4: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

ijijijij sandcwhere sin,cos

100

0cs

0sc

c0iδes

010

iδes0c

cs0

sc0

001

UUU

UUU

UUU

U 1212

1212

1313

1313

2323

2323

τ3τ2τ1

μ3μ2μ1

e3e2e1

li

ilil U If neutrinos have mass:

For three neutrinos:

)E

LΔm.(θ)νP(ν eμ

222 271sin2sin

Two mass differences

The Maki-Nakagawa-Sakata-Pontecorvo Matrix

Page 5: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

ijijijij sandcwhere sin,cos

100

0cs

0sc

c0iδes

010

iδes0c

cs0

sc0

001

UUU

UUU

UUU

U 1212

1212

1313

1313

2323

2323

τ3τ2τ1

μ3μ2μ1

e3e2e1

li

ilil U If neutrinos have mass:

For three neutrinos:

)E

LΔm.(θ)νP(ν eμ

222 271sin2sin

CP violating phase

The Maki-Nakagawa-Sakata-Pontecorvo Matrix

Page 6: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

A happy announcement…

Page 7: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

IAC07 T2K

Imperial College/RALDave Wark

Current knowledge of oscillation parameters.

12, m122 23, m23

2

Solar + KamLAND

SK +K2K+ MINOSMiniBooNE has failed to confirm the single piece of counterevidence

Page 8: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

IAC07 T2K

Imperial College/RALDave Wark

J.W.F. Valle, hep-ph/0410103

What about 13?

Page 9: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

ijijijij sandcwhere sin,cos

100

0cs

0sc

c0iδes

010

iδes0c

cs0

sc0

001

UUU

UUU

UUU

U 1212

1212

1313

1313

2323

2323

τ3τ2τ1

μ3μ2μ1

e3e2e1

li

ilil U If neutrinos have mass:

)E

LΔm.(θ)νP(ν eμ

222 271sin2sin

ELmmm

Pe

4/and/ where

sin2sincos

2sincos2sin2sincoscos2sin

sin2sin2sincossin2sin

sin2sin2sin

231

231

221

212

223

22

23121313

323121313

223

213

2

~0.03 /4And sin2213 < ~0.14

Three neutrino mixing.

Page 10: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

IAC07 T2K

Imperial College/RALDave Wark

disappearance

m232

sin22

What will T2K Add?

sin22

e appearance

First phase of a longer programme whichcould have sensitivity to CP violation!

Page 11: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Page 12: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

IAC07 T2K

Imperial College/RALDave Wark

Super Kamiokande Rebuild

Page 13: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Page 14: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Page 15: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Page 16: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Page 17: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Project Integration and Schedule

• 280m detector hall will not be fully available until February 2009, producing a severe challenge for the installation of the 280m detectors.

• As recommended by the PAC, we have formed an Integration Group of the detector engineers, organized by Alan Grant and Cormac Neeson, to do detailed planning of the detector installation.

• Meeting planned for July 10/11 at Imperial, 19 engineers will be in attendance.

Page 18: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Project Integration and Schedule

Page 19: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Project Integration and Schedule• Obviously such an integration programme is

complex and interconnected (and something could slip), however…

• Previously all installation was scheduled for Feb-March, now just the INGRID

• For beam commissioning only the INGRID and muon monitors are really needed, and these have few linkages to the other detectors.

• The neutrino spectrum can me measured with just the magnet, FGDs, and TPCs.

• We should therefore be able to make efficient use of the beam from day one.

Page 20: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

IAC07 T2K

Imperial College/RALDave Wark

Other Progress and Issues• The T2K Collaboration has adopted an

International Collaboration Agreement.• This replaces the provisional governing

structure of the collaboration with a governing arrangement fairly typical of international HEP projects:– Spokesman and International Co-Spokesman– Executive Committee and Institutional Board– Publication policy– Speakers bureau…

• We are forming new Working Groups for T2K-SK analysis and Global Analysis

Page 21: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

• Canada– Contributions:

• All the FGD except photosensors

• TPC mechanical and field cage, integration, gas system

• Slow Controls and Monitoring

• Cont. to Beamline: OTR Monitor, Remote handling for hot cell, beam position/profile monitors and vessel

– Funding situation: secured with yearly review

• France– Contributions:

• INGRID detector (LLR)

• TPC Micromegas and FE electronics (Dapnia)

• TPC BE electronics (LPNHE)

• Beamline quench detection system

• Power supply for the UA1 magnet

– Funding situation: secured.

Contributions and Funding by Country

Page 22: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

• Germany– Contributions:

• UA1 Magnet moving system

• TPC gas monitoring– Funding situation:

request submitted.

• Italy– Contributions:

• UA1 Magnet preparation

• TPC elements?– Very uncertain…

• Japan– Contributions:

• J-PARC• Most of SK, and the SK

rebuild and upgrades • Most of the T2K

beamline, target, and beam dump including beamline monitors and muon monitor

• Infrastructure for the 280m facility

• INGRID detector • FGD photosensors • SMRD FEE • Cont. to NA61

– Funding situation: secured, with additional funding from MEXT in form of competitive grants.

Contributions and Funding by Country

Page 23: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Contributions and Funding by Country• Poland

– Contributions:• Cont. to SMRD

• Cont. to NA61

– Funding situation: request submitted

• Russia– Contributions:

• Cont. to SMRD

– Funding situation: secured

• South Korea– Contributions:

• Beamline proton monitor electronics

– Funding situation: secured

• Spain– Contributions:

• TPC testing, calibration, and gas monitoring

• Cont. to UA1 magnet

– Funding situation: secured

• Switzerland– Contributions:

• Cont. to TPC mechanics, testing, and assembly

• Major contributions to NA61

• Major Cont. to UA1 magnet

– Funding situation: secured subject to annual review

Page 24: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

• United Kingdom– Contributions:

• BEE for ECAL/P0D /SMRD/INGRID• Cont. to beamline - beam

window, baffle, and engineering for target and dump design, target remote handling

• Basket/basket stand• ECAL (all)• FEE design for

P0D/SMRD/INGRID• DAQ for 280m• Cont. to UA1 magnet

– Funding situation: ~60% secured, funding for the Barrel and P0D ECALs deferred for decision this year.

• United States– Contributions:

• Cont. to SK, including upgrades, rebuild, and new SK electronics

• P0D (all)• Beamline - SC corrector

magnets, 2nd horn, monitor electronics and GPS

• Cont. to SMRD

– Funding situation: secured, with forward cash flow from institutions(!)

Contributions and Funding by Country

Page 25: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Overall funding situation…• Mostly good. The only major uncertainty for

committed items is the UK funding for the ECAL, which we should find out later this year.

• However:– There is no overall cash reserve or contingency for the

project.

– A number of items have been identified which fall in the cracks between commitments, the most notable of which is the magnet installation (precise cost estimates are not yet available for some of these items).

Page 26: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Magnet Installation

Page 27: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Magnet Installation

Page 28: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Page 29: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Overall funding situation…• Mostly good. The only major uncertainty for

committed items is the UK funding for the ECAL, which we should find out later this year.

• However:– There is no overall cash reserve or contingency for the

project.– A number of items have been identified which fall in

the cracks between commitments, the most notable of which is the magnet installation (precise cost estimates are not yet available for some of these items).

– We tried to cover this by extending the operating Common Fund forward two years into the construction period.

– This has not been immediately accepted by all funding agencies, and we are negotiating.

– The total amount is small compared to the project cost, but the last bit is always hardest to find…

Page 30: Status of the T2K Experiment

J-PARC PAC ‘07

Imperial College/RALDave Wark

Overall funding situation…• The situation with the final funding for

completion should properly be the remit for an International Finance Committee made up of representatives from the funding bodies.

• We would welcome help from KEK in rapidly forming such a committee to help us finalize funding arrangements for installation and integration.