status iso/tc67

11
Status ISO/TC67 Dr. Ir. Andries Otter Chairman ISO/TC67 VIII International Conference "OilandGasStandard-2013” Nizhny Novgorod, 14-16 October 2013

Upload: simeon

Post on 15-Feb-2016

55 views

Category:

Documents


0 download

DESCRIPTION

Status ISO/TC67. Dr. Ir. Andries Otter Chairman ISO/TC67 VIII International Conference "OilandGasStandard-2013” Nizhny Novgorod, 14-16 October 2013. Introduction 2012/2013 Reflections Outlook. News. New P-members (both from O-status): - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Status ISO/TC67

Status ISO/TC67

Dr. Ir. Andries OtterChairman ISO/TC67

VIII International Conference "OilandGasStandard-2013” Nizhny Novgorod, 14-16 October 2013

Page 2: Status ISO/TC67

2

• Introduction• 2012/2013 Reflections• Outlook

Page 3: Status ISO/TC67

3

News

New P-members (both from O-status):• Thailand (Thai Industrial Standards Institute - TISI)• United Arab Emirates (Emirates Authority for

Standardization & Metrology – ESMA)New O-member:• Armenia (National Institute of Standards – SARM)New SC4 leadership:• Olivier Moghissi – chair• Ed Barrett – secretary (representing NACE International)

Page 4: Status ISO/TC67

4

34 Participating Members29 Observing Members

ISO/TC67 membership

Page 5: Status ISO/TC67

6

Our Vision

Global Standards Used Locally Worldwide

Page 6: Status ISO/TC67

7

What do we do?

http://info.ogp.org.uk/standards/downloads/StandardsIssued.pdf

Page 7: Status ISO/TC67

8

ISO/TC67 Goals

• Prepare standards required by the industry• Prepare standards that are adopted worldwide by

bodies such as ABNT (Brazil), API (USA), CEN (Europe), GOST R (Russian Federation), GSO (Gulf Region) and SAC (China)

• Prepare standards that are recognized by regulators• Publish standards that enable companies to minimize

their specifications• Deliver standards to the target dates on the agreed

work programme

Page 8: Status ISO/TC67

9

How do we work?ISO/TC67

Chair

ManagementCommittee

SC2Pipeline

transportationsystems

SC3Drilling and

completion fluids, and well cements

SC4Drilling and production equipment

SC5Casing, tubingAnd drill pipe

SC6Processing

equipment andsystems

SC7Offshore Structures

SC8Arctic

Operations

WG2Conformityassessment

WG4Reliability

engineering,and technology

WG5Aluminium

alloy pipes

WG7Materials for usein H2S containing

environments

WG8Materials, corro-

sion control, welding and NDE

WG10LNG installa-

tions and equipment

WG11Coating and

lining of structures& equipment

WG12CO2 aspects

Secretariat(NEN)

Page 9: Status ISO/TC67

12

Reflections on past 2 yearsSep 2011: plan to solve “fast-track” issue with API stallsJan 2012: significant part of the industry starts to withdraw

experts from ISO/TC67 activitiesMar 2012: request for clarification on regulations to EU & US

authorities by CEN resp. ANSI (N1203, N1199)Jun 2012: launch of OGP Interim Solution – all work groups work

under OGP umbrellaAug 2012: answer US authorities received (N1201)Oct 2012: answer EU authorities received (N1204)Nov 2012: ISO conclusion that process is safe and not infringing

embargo laws

Page 10: Status ISO/TC67

13

AchievementsOGP Interim solution (June 2012 – June 2013):• 68 work groups active with 1500+ experts registered• 18 draft standards published!• 14 new work items proposed and approved!• Excellent cooperation with ISO CS

MANY thanks to OGP & ISO and, please help toconvey our appreciation to the experts and ISO CS staff!

ISO/TC67 (see also report of the secretariat N1230):• 7 standards published in 2012 (target 18)• 5 documents published in 2013 (YTD); target is 13

– Includes ISO 27509 Corr 1 - thanks to all that helped to get this out quickly!

Page 11: Status ISO/TC67

14

Current status

• Transition to business-as-usual since June 2013• Several experts prefer to continue working under

OGP based on standard liaison arrangements: work groups have to decide.

• Cooperation with API yet to be re-established– ANSI (API) is still able to adopt ISO standards as US national standards