statement of qualifications 2018...brown & kysar, inc. statement of qualifications 2018 brown...

19
BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 www.bki.cc

Upload: others

Post on 17-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

STATEMENT OF QUALIFICATIONS

2018

BROWN & KYSAR, INC.

1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604

360.687.3966 www.bki.cc

Page 2: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

2

About Brown & Kysar, Inc. (BKI)

Overview of Services

Engineering Project Experience

Planning

Transmission

Distribution

Substation

Generation

Civil, Environmental, Permitting, Real Estateand Water Systems

Your BKI Team (Organizational Chart)

Erik Kysar, P.E. – President

Scott M. Lindsay – Chief Executive Officer

Eddie Jackson – General Manager

Guy Colpron, P.E. – Director of Design

Byron Woltersdorf, P.E. – Director of Civil, Environmental,Permitting, Real Estateand Water Systems

Doug Rotella – Client Relations Technical Manager

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

TABLE OF CONTENTS

Page 3: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

3

We strive to be the premierfull-service engineeringconsulting partner for smalland midsize public utilities inthe Pacific Northwest.

Well-Respected History

Our firm started 33 years ago (1985) as Rex Brown Consulting Engineers(RBCE). RBCE was founded by Rex D. Brown, an amicable engineer fromTexas. Rex and his engineering staff developed a market niche servingthe needs of public utilities that had little or no engineering staff. Theynurtured small public utilities by promptly responding to their challengesand needs.

That tradition continues today on a larger scale. The business expanded in1990 when Rex hired Erik Kysar to complement his client-centeredapproach. Earning a strong reputation over the years, the firm waseventually bought by Erik in 2006. Erik became both principal and owner,changing the firms name honoring Rex’s legacy - Brown & Kysar, Inc. (BKI).

Our Approach (Power in Partnership)

BKI continues to serve public power in the Northwest by providinghands on, practical engineering, permitting and planning solutions. Broad Industry Insights – We leverage our industry knowledge and

contacts on behalf of our partners to provide perspective for informeddecision-making.

Service of Discovery – We listen to our partners to identify practicalsolutions that account for system, financial and political considerations.

Boots-on-the-Ground – We like to get our hands dirty and are alwaysavailable to support our partners no matter what the situation.

Broad Experience

BKI prides itself on employing multi-disciplinary individuals with a widevariety of experience. Our combined experience equates to more than 250years in the electric utility industry.

Over the past 32 years, BKI has performed numerous system planningstudies, electric distribution, transmission and substation design projectsfor public power utilities in Oregon and Washington. Since its founding,BKI has worked exclusively with Electric Cooperatives, Rural ElectricAssociation’s, Public/People’s Utility Districts and Municipalities who areand always have been the core of our customer base. Such a largenumber of successfully completed projects with numerous PacificNorthwest public utilities demonstrates the outstanding qualifications,specialized experience and technical competence of the BKI Team.

High Expectations

Through BKI’s discovery process, we work with our partners (clients) toclearly identify their problems and provide solutions that address theirspecific needs. Our experience helps us make informed design decisions,control both engineering and project costs and streamline schedules.

ABOUT BROWN & KYSAR

Page 4: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

4

The team at BKI has extensive experience with the following utility-related services. In addition, BKI always has at leastone engineer available for 24-hour emergency calls (360.687.3966). Our specialty is providing a broad range ofservices to a very niche market – the small public utilities with less than 50,000 meters.

Distribution- Route Selection- Right-of-way- Easement Procurement- Project Management- Permitting- Construction Administration- Construction Inspection- Surveying- Overhead- Staking- Underground- Materials Specification- Materials Procurement- Poles (All types)- Roadway Lighting- Residential & Commercial- Fiber Optic Infrastructure- Relaying & Protection- PLS-CADD - 3D Modeling- Sectionalizing Studies

Planning- System Comprehensive Plans- Long-Range Work Plans- Load Forecasts- Current Work Plans (CWPs)- Borrower’s Environmental

Reports (BERs)- USDA Rural Utility Service

(RUS) Documents- Permitting for Local, County,

State & Federal- Environmental Issues- System Modeling

Power Supply- Net Metering- Renewable Energy- BPA Rates- Small Generation (Hydro,

Wind, Solar)

Transmission- Route Selection- Right-of-way- Easement Procurement- Project Management- Permitting- Poles- Overhead- Underground- Surveying Staking- PLS-CADD-3D Modeling- Materials Specification &Procurement

- Geotechnical Engineering- Structural Engineering

Construction Admin.- On-site Inspections- Field Staking- Contract Coordination- Construction Surveying- Programming- Testing- Commissioning- Real Estate Issues

Substations- Spill Containment- Transformers- Bus Work- Structural Design- Site Selection & Procurement- Geotechnical Engineering- Surveying- Civil Engineering- Steel Detailing- Concrete Design- Material Specification- Land Use Planning

Utility Development- Long-Range Work Plans- Load Forecasts- Strategic Planning

Operations- Power Quality- Coordination Studies- Arc Flash Incident Energy Studies- Joint Use Agreements- Real Estate Issues- Vegetation Management- Geographical Information

Systems (GIS)- Metering & Automatic Meter

Reading (AMR)- Supervisory Control & Data

Acquisition (SCADA)- Tools & Trucks- Equipment Maintenance- Line Crew Assignment Priorities- Standards Development

Environmental and Permitting- Federal/State/County/Local

Permits- DOT Permitting- Spill Prevention, Control and

Countermeasure (SPCC)

Civil Engineering- Land Use Planning- Mass Grading- Storm Water Facility Design- BMP Erosion Control Measures- Federal, State and Local Right of

Way

Water Systems- Reservoir Site Acquisition- Design- Project Management- Infrastructure Condition

Assessment Studies- Development Feasibility Studies- Equipment Replacement &

Upgrade Design

OVERVIEW OF SERVICES

Page 5: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

5

BKIhascompleted a wide variety of engineering projects for many clients. A few representative examples are shown onthe following pages. Note that these projects do not represent the entire scope of services offered, or the total numberof small public utilities served by BKI. Please see the preceding “Overview of Services” section for a comprehensive listof services provided, and the below list of clients (“partners”) BKI proudly serves.

Electric Cooperatives

Big Bend Central Electric Columbia Power Columbia REA Consumers Power, Inc. Douglas Harney Orcas Power & Light Parkland Light & Water Peninsula Light Salem Electric Surprise Valley Tanner Umatilla Wasco West Oregon Yakama Power

Public Utility Districts

Clallam County Clark Public Utilities Mason County No. 1 Northern Wasco Wahkiakum County

Municipalities

Bandon Cascade Locks Drain Ellensburg McMinnville Water & Light Milton

ENGINEERING PROJECT EXPERIENCE

Page 6: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

6

Long-Range Planning Study and Work Plan

As part of the USDA Rural Utility Services (RUS) loan applicationprocess, BKI completed a Long-Range Plan and Current Work Plan(CWP) for Harney Electric Cooperative. This involved a detailedsystem survey and full computer modeling of the utility’s system,development of recommendations and several written reports forsubmittal to the RUS. The CWP detailed over $40 M in long-rangefinancial investment, emphasizing proactive equipment replacement,reduction of power losses and increased capacity.

Partner: Harney Electric Cooperative, Inc. / Hines, ORContact: Brent Beverly – Operations ManagerPhone / Email: 541.573.2061 / [email protected]

2009-2023 System Planning Study

With projected steady load growth along with increasing pressures onreliability, Wahkiahum PUD needed a clear vision to guide decisionsfor the next 15 years. BKI completed a System Planning Study thatsets forth recommendations for both the Cathlamet and Grays Riverservice areas, including a new substation and several majorequipment replacements.

Partner: Wahkiahum County PUD / Cathlamet, WAContact: Dave Tramblie – General ManagerPhone / Email: 360.795.3266 / [email protected]

Electric System Long Range Plan

BKI developed an overall philosophy and general vision for the entireParkland Light & Water (PL&W) system for the next 10 years. Thiseffort resulted in a work plan, where all needed projects were identifiedand prioritized. The road map provided to the board and staff outlinedan understandable path forward. It gave a series of recommendedoptions to best address the needs of their community, while beingsensitive of financial considerations.

Partner: Parkland Light & Water / Parkland, WAContact: Susan Cutrell – General ManagerPhone / Email: 253.531.5666 / [email protected]

PLANNING

Page 7: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

7

T3ba’das to Manzanita Transmission Rebuild

The T3ba’das to Manzanita project was a 34.5kV to 115kV conversionthrough very difficult terrain. It was broken into three phases overseveral years due to funding constraints. In addition to design, thescope of work included geotechnical investigation, archeologicalinvestigation due to its location on tribal property and biologicalinvestigation since it is in the tide flats of Hood Canal. The footingdesign in the tide flats was especially challenging, since the soil wasvery poor up to 80 feet deep; the footing ended up as 40 deepcaissons essentially “floating” in the soil.

Partner: Mason County PUD No. 1 / Shelton, WAContact: Darin Hall – Electric SuperintendentPhone / Email: 360.877.5249 / [email protected]

Worden 115kV Transmission Line

The Worden tap is a double-circuit 115 kV transmission line to a newsubstation. The line is all self-supporting steel poles in poor soils witha full-length static and provisions for two fiber optic cables. The twoprimary challenges on this project were landowners with changingrequests very late in the design process, and the poor soilsnecessitating a challenging footing design to support the double-circuittransmission.

Partner: Columbia Rural Electric Association / Walla Walla, WAContact: Jeff Dietrich – Distribution EngineerPhone / Email: 509.526.4041 / [email protected]

Fields to Quinn River Transmission Line

The new 115kV, 52.5-mile transmission line replaces the existing 9.7-mile transmission line section from Fields Switching Station to FieldsSubstation. This section was replaced with H-Frame structures with nodistribution under build. The existing 42.8-mile line section from FieldsSubstation to Quinn River Substation was replaced with single-poletransmission structures utilizing line post insulation and distributionunder build. The under build utilized the existing 3/0 conductor whichwas moved from the existing structures to the new structures.Although the entire project area fell under the NESC Medium LoadingZone for overhead line loading, areas of concern were evaluated forhigher wind and ice loads.

Partner: Harney Electric Cooperative, Inc. / Hines, ORContact: Shane Sweet – Electrical EngineerPhone / Email: 541.573.2061 / [email protected]

TRANSMISSION

Page 8: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

8

DISTRIBUTION

Mitchell Distribution Feeder Rebuild

The BKI team managed the Mitchell distribution feeder rebuild project,including providing all qualified professional personnel, labor,supervision, equipment, materials and tools necessary to rebuildapproximately 25 miles of the 24.9kV feeder, associated tap lines andappurtenances.

Partner: Columbia Power Cooperative Association / Monument, ORContact: Troy Cox – General ManagerPhone / Email: 541.934.2311 / [email protected]

Redesign of I-84 Overhead Line Crossing

BKI redesigned the circuit for Northern Wasco PUD’s (NWPUD) I-84overhead crossing near US 197 after the line was damaged by aconstruction crew. The BKI team utilized PLS-CADD, AutoCAD andappropriate regulations for interstate highway crossing to optimize thedesign. Staking sheets and guying and anchoring guidelines weredrafted for NWPUD for their future use.

Partner: Northern Wasco PUD / The Dalles, ORContact: Paul Titus – Principal Engineer & Strategic Asset PlannerPhone / Email: 541.296.2226 / [email protected]

NW Hill Road Distribution Re-Design

As part of a road widening project within the city of McMinnville, BKIredesigned the existing 12.47kV distribution along the projects route.Part of the existing overhead distribution was converted tounderground distribution. BKI provided the overall electricaldistribution design, bill of materials and assistance with constructioninspections.

Partner: McMinnville Water & Light / McMinnville, ORContact: John Dietz – General ManagerPhone / Email: 503.472.6158 / [email protected]

Page 9: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

9

Multiple Substation Projects

There were multiple substation projects with the city of Centralia.Cook’s Hill and North Port were greenfield 20/27/33 MVA substations,including planning the size and location, design, specifications,bidding, relay and protection settings, transmission line, working withBonneville Power Administration (BPA) for the tap and metering, andfinal inspection and commissioning. Ford’s Prairie and Zimmermanwere major remodels, which included complete rebuilds of thesecondary sides, ground grid, oil containment, relaying and exitfeeders. The Yelm Hydro was a complete rebuild of a generator step-up station including transmission breaker with distance relaying,ground grid, oil spill containment, fault current analysis and generationprotection settings.

Partner: Centralia City Light / Centralia, WAContact: Don Kerlee - Chief Substation OperatorPhone / Email: 360.330.7512 / [email protected]

Multiple Substation Projects

There have been multiple substation projects with Wasco ElectricCooperative. Tygh Valley was a major remodel of an old BPAsubstation including a new power transformer, transmission breakeron a transmission tap, regulators, station service, protection recloser,settings, and ground grid. Pine Hollow was a complete removal andrebuild of another old BPA substation from the transmission high-sideto the exit feeders and everything in-between. Kah-Nee-Ta consistedof a new ground grid and feeder reclosers with the associated settings.The Muddy Ranch and Rosebush consisted of ground grid upgrades.Endersby is next to a sensitive watershed area, and therefore includeddetailed oil spill containment equipment along with new a new groundgrid with grounding wells, regulators, secondary bay and reclosers.

Partner: Wasco Electric Cooperative / The Dalles, ORContact: Casey McCleary – Operations ManagerPhone / Email: 541.380.3409 / [email protected]

Read Substation

Salem Electric performed a 15 kV switchgear upgrade utilizing anopen air main and transfer bus configuration. BKI performed electricaland civil design, contract documents, bid advertising / administration /opening / awarding, project management, inspection andcommissioning coordination / oversight.

Partner: Salem Electric Coop / Salem, ORContact: JB Phillips – Engineering ManagerPhone / Email: 503.362.3601 / [email protected]

Page 10: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

10

SUBSTATIONS

Riverbend Landfill Interconnection Study

BKI completed an interconnection study for the Riverbend Landfillmethane gas generation plant owned by Waste Management inMcMinnville, OR. The study was based on an initial plant size of 3.28MW with a rating of 4.1 MVA at 0.8 power factor. Maximum futurepeak generation was assumed to be 8.2 MW. System upgrades andoperational policy modifications were recommended to optimizeintegration of the generation source.

Partner: McMinnville Water & Light / McMinnville, ORContact: Scott Rosenbalm – Electrical Distribution SuperintendentPhone / Email: 503.472.6158 / [email protected]

Yelm Hydro Upgrades

Yelm Hydro is a run-of-the-river hydroelectric project on the NisquallyRiver. The plant contains three generators, nominally rated at 3MW,3MW and 6MW respectively. BKI’s scope of work consisted of multipleprojects over several years. One phase included the upgrade of allcontrols and protection at the hydro plant, including the protectioncoordination with BPA. Another included the BPA metering andmonitoring. A third consisted of developing as-built documents for theentire station. There were also multiple additional projects such assafety controls at the spillways, providing an alternate source of stationservice, etc.

Partner: Centralia City Light / Centralia, WAContact: Jerry Blue - Chief Powerhouse OperatorPhone / Email: 360.556.2372 / [email protected]

GENERATION

Page 11: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

11

CIVIL, ENVIRONMENTAL, PERMITTING,REAL ESTATE AND WATER SYSTEMS

The BKI team has provided civil engineering, environmental,permitting, real estate and water system services to numerouspublic utilities and municipalities in Washington and Oregon.These services have been provided as stand-alone projects oras part of larger engineering projects performed by BKI. Thefollowing is a small sampling of these projects:

CivilTanner Electric Cooperative - Tanner SubstationStructural Design of Support Steel and Concrete Foundations

Salem Electric Coop – Read SubstationStructural Design of Support Steel and Concrete Foundations

EnvironmentalSurprise Valley Electrification Corporation - RUS FundingBorrowers Environmental Report

Harney Electric Cooperative - Fields–Quinn River TransmissionLine and RUS Funding, Barrowers Environmental Report

Permitting & Real EstateColumbia Power Cooperative Association - Mitchell DistributionFeeder and Bureau of Land Management Permitting

Mason PUD #1 - Facility Site PlanZone Change, Type IV Forest Practices, Boundary LineAdjustment, Mason Environmental Permit, Development LandUse Permit, Construction Storm Water Pollution and PreventionPlan (SWPPP)

Mason PUD #1 - Facility Pole YardMass Grading Permit: Drainage, Stormwater Facilities, Stateand Local Permitting, Contractor Bid Preparation, Evaluationand Award Recommendations

Wahkiakum PUD - Pacific PUD IntertieWSDOT Right of Way Permitting with Variance

Water SystemsMason PUD #1 - Support for 42 Group A & B SystemsConstruction Planning, System Improvements, BudgetDevelopment and Engineering Support. Engineer of Record forall of the utilities water system operations while performing:water resource development, water system infrastructurecondition assessment and development feasibility studies,system wide replacement and upgrade design and constructionproject management.

Page 12: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

12

BKI Team LeadsOrganizational Chart

CEO

Scott Lindsay

General Manager

Eddie Jackson

Business Operations

Eddie Jackson

Director of BusinessDevelopment & Client

Relations

Scott Lindsay

Director of Design

Guy Colpron, PE

Director of Civil Engineering,Environmental Compliance,

Permitting, Real Estate,& Water Systems

Byron Woltersdorf, PE

Transmission, Distribution &Joint Use Lead

Dan Tuominen, PE

Substation Lead

Heather Cook

Protection & Controls Lead,Systems, & Planning Lead

Hamid Rezaei, PE

Operations Lead

Erik Kysar, PE

Page 13: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

13

THE BKI TEAM

Years of Experience

25

Education

B.S., Electrical Engineering

Portland State University, 1992

ERIK K YSAR , P.E .PRINCIPAL ADVISOR

Erik’s engineering and management career spans over twenty-five years. Hisprimary management vision is to establish and maintain a premier service-based consulting firm for small and mid-sized public utilities in the PacificNorthwest.

He has unique foresight from both his consulting and management experienceto assist and develop long-term visions, directions and philosophies for thefuture, helping public utilities understand their needs and develop a sustainableplan of action to address those needs.

Erik has been involved with virtually every project performed at Brown & Kysar,Inc. (BKI) to varying degrees. If BKI has designed it, Erik has been a part of it.Erik has recently focused his attention on working directly alongside theEngineers on the Design Team assisting with design work and mentoringpartner engineers. Erik truly embraces the opportunity to share his vast wealthof knowledge with others.

Areas of Expertise

Transmission Distribution Substations Permitting Contracts Construction Work Plans Coordination Studies Long Term Planning Studies Forecasting (Load, Financial) Feasibility Studies System Modeling & Design Interconnection Studies

Licensing

P.E., OregonP.E., WashingtonP.E., NevadaP.E., California

Page 14: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

14

THE BKI TEAM

Years of Experience

21

Education

B.S., Communications Management

University of Portland, 1993

SCOTT M. LINDSA YCHIEF EXECUTIVE OFFICER

Scott has been a public power advocate for much of the last 20 years. Hehas worked for the Northwest Public Power Association (NWPPA),Washington PUD Association (WPUDA), Energy Northwest, NorthernCalifornia Power Agency (NCPA), Transmission Agency of NorthernCalifornia (TANC) and many other public power organizations over hiscareer.

Scott brings strong industry relationships, insights and marketing capabilitiesto BKI. He is entrepreneurial in his approach to work and seeks to createmutually beneficial relationships among partners.

Scott leads BKI’s executive team and helps position BKI for future growth,drive its vision and works to maintain the high level of service BKI partnershave come to expect.

Areas of Expertise

Energy Legislative & Regulatory Policy Business Strategy Strategic Planning Association/Board Relations Industry Marketing/Networking Energy Technology Entrepreneurialism

Page 15: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

15

THE BKI TEAM

Years of Experience

19

Education

B.S., Electrical Engineering

Tennessee Technology University, 1998

EDDIE JA CK SONGENERAL MANAGER & PROJECT MANAGER

Eddie has extensive experience working with public utilities. He served thecity of Pulaski, TN for 14 years, beginning as a Design Engineer andobtained the role of Vice President of Engineering and Operations. Eddiewas responsible for the design of the entire system, as well as, budgetingand developing the system for future growth and maintenance.

Often working with a constrained budget, he guided the utility into the firstCAD drawings, standards, GIS mapping system, outage managementsystem, electronic relaying retrofits for the substations, fiber opticdeployment, system coordination and balancing, redundant capacity tiecircuits, system-wide reliability and critical load protection for the systemwhile meeting time and budget constraints.

Currently, Eddie is in charge of business operations for BKI and is focusedon increasing efficiencies and managing the budget.

Project Involvement

Clark Public Utilities Union Ridge-Enterprise Transmission Line Orion Subdivision Cedars Subdivision Underground McGillivray Blvd.

Northern Wasco County PUD I-97 Distribution Crossing Tie-Line Upgrade-Webber & 1st Street

Western Oregon Electric Cooperative Buxton distribution

Engineering Design Experience in Part Includes:

Acquire & Import Elevation Data for Route Model Line & Structures in PLS-CADD/POLE Point Load Drawings for Poles Overhead & Underground Construction Drawings Installation & Material Specifications Construction Administration Support

Areas of Expertise

Transmission Distribution Substations Systems Protection

Page 16: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

16

THE BKI TEAM

Years of Experience

27

Education

B.S., Electrical Engineering

Washington State University, 1988

GUY CO LPRON, P. E.DIRECTOR OF DESIGN, PRINCIPAL ENGINEER

Prior to coming to BKI, Guy was with Idaho Power for 27 Years. Guy wasthe Engineering Leader for Power Production Engineering andConstruction for 12 years and the Engineering Leader for SystemProtection and Communication Group for 6 years. He currently managesthe BKI design team and is the project manager for much of their work.

Project Involvement

Salem Electric Read Substation Conversion

Peninsula Light Company Purdy Substation Rebuild

West Oregon Electric Cooperative Bacona-John Lee Road Distribution Pihl Road Distribution

McMinnville Water & Light NW Hill Road Distribution Re-Design

Columbia Rural Electric Association System Wide Sectionalizing Plan, Phase 1

Engineering Design Experience in Part Includes:

Substations 15kV-138kV Automatic Voltage Regulators Power System Stabilizers Graphical User Interface Distributed Control Systems SCADA RTU’s - Protective Relaying System Modeling

Areas of Expertise

Substations Protection SCADA Generation

Licensing

P.E., OregonP.E., WashingtonP.E., Idaho

Page 17: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

17

THE BKI TEAM

Years of Experience

21

Education

B.S., Civil Engineering

Washington State University, 1996

BY RON WOLTER S DORF, P.E.DIRECTOR OF CIVIL ENGINEERING, ENVIRONMENTAL, PERMITTING,REAL ESTATE AND WATER SYSTEMS, PRINCIPAL ENGINEER

Byron has over 20 years of experience in planning, water systems and civilengineering projects, having served as an Engineer, Planner and Managerin both private consulting companies and public utilities. Since 2014, Byronhas led BKI’s Civil Engineering, Environmental, Permitting, Real Estateand Water Systems Team. Byron has a wide range of experience with civilengineering, water systems, permitting and environmental regulation, andhas administered and updated Spill Prevention, Control andCountermeasure and pollution control and mitigation plans for a variety ofprojects. He has also worked with utilities to develop Best ManagementPractices for erosion control of projects adjacent to water bodies.

Project Involvement

Mason County PUD #142 Group A & B systems with 2069 connections - Engineer of Recordfor the utilities water system operations while performing: waterresource development, water system infrastructure conditionassessment and development feasibility studies, and system widereplacement and upgrade design along with construction project mgColumbia Power Cooperative AssociationAlder Creek to Mitchell, 25 miles distribution line rebuild and relocation- performed Oregon Department of Transportation (ODOT) and Bureauof Land Management (BLM) permitting, ROW and easements.Harney Electric Cooperative, Inc.Field to Quinn River 52 miles transmission line, 52 miles - performedBER, RUS and BLM permitting, foundation and guying designNorthern Wasco County PUDWeber distribution wood pole replacement with wood and self-supporting steel poles - performed ROW, geotechnical and foundationdesignPeninsula Light CompanyFive projects performing Right of Way (ROW), environmental anderosion control permitting for overhead to underground conversions

Page 18: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

18

Areas of Expertise

Water Systems Land Use Civil Engineering Permitting

Licensing

P.E., OregonP.E., WashingtonP.E., Nevada

Easements and ROW’s Environmental Review Structural Design Mass Grading

Page 19: STATEMENT OF QUALIFICATIONS 2018...BROWN & KYSAR, INC. STATEMENT OF QUALIFICATIONS 2018 BROWN & KYSAR, INC. 1315 SE Grace Ave., Suite 201 Battle Ground, WA 98604 360.687.3966 BROWN

BROWN & KYSAR, INC.

19

THE BKI TEAM

Years of Experience

25

Education

B.S., Electrical Engineering

Arizona State University, 1988

DOUG ROTELLACLIENT RELATIONS TECHNICAL MANAGER

Doug was formerly the General Manager at Specialty Engineering for 8 yearsbefore joining the BKI team. Doug’s background includes working as anElectrical Designer, Project Manager, Power Plant Operator, LicensedJourneyman Electrician and Licensed Electrical Administrator. He now servesas a technical liason for BKI’s new business relationships.

Experience

Managing Field and Shop Services for Substation and DistributionElectric Apparatus

Electrical Construction Project Management Electrical Design Hands-On Electrical Maintenance, Installation and Construction

Ranging from Low Voltage To 35 kV in the Oil/Gas, Manufacturingand Power Industries

Diesel and Hydroelectric Plant Operation Working with Line Crews Supporting Operations Personnel

Areas of Expertise

Substation Maintenance Programs Construction Project Management Field Services Business Strategy Industry Marketing/Networking

Licensing

Electrical Administrator, WAJourney Level Electrician (EL01), WAGeneral Journeyman Electrician, ORElectrical Journeyman, AK