STATE STATE STATE TRANSPORTATION TRANSPORTATION TRANSPORTATION COMMISSION COMMISSION COMMISSION Public Hearing Testimony for the 2011 Twelve Year Program Revised December 28, 2009 Summary of Public Participation

Upload: others

Post on 27-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

STATE STATE STATE

TRANSPORTATIONTRANSPORTATIONTRANSPORTATION

COMMISSIONCOMMISSIONCOMMISSION

Public Hearing Testimony for the

2011 Twelve Year Program

Revised December 28, 2009

Summary of Public Participation

Page 2: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner                                                                                                                 Revised 12/28/2009 

 

Page 3: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

i

Sample Report and Format Instructions This list reflects project requests or comments regarding the 2011 Twelve Year Program submitted at public hearings and through other written and electronic submissions to the State Transportation Commission during the fall of 2009. This list is sorted alphabetically by Planning Organization. Below is a sample of the State Transportation Commission Public Hearing Testimony list. Requested Presented Project PE FD UTL ROW CON Total Total Action ID Program Estimated $000 $000 DVRPC MPO Chester Ms. Judy L. DiFilippo, Chairman Chester County Planning Commission French Creek Parkway Support 57659 1 1 2 2 $23,850 $45,300 Stated in the upper left corner of every page is the name of the Planning Partner. The County for which the testimony pertains is located along the left side of the page. The next line in the body of the report contains the name and organization of the testifier. After each testifier are a specific project(s) requests or comments. Each project is listed with six pieces of information placed in separate columns on the report. These are:

REQUESTED ACTION – Is the action that the testifier would like to see happen to the project regarding its status in the Twelve Year Program. General categories of action are added, retain, advance, oppose, delete, and support.

PRESENTED - If the Project was presented at a Scheduled Public Hearing a check is printed.

PROJECT ID - Is a unique number given to a project list in the currently approved Twelve Year Program and the applicable project inventory system.

CURRENT TYP PERIOD/ PE, FD, UTL, ROW, CON – Columns representing the following: PE= Preliminary Engineering, FD= Final Design, UTL= Utilities, ROW= Right-of-Way, CON= Construction phases of the project displayed in which period 1st , 2nd or 3rd four years of the currently approved Twelve Year Program the phase is scheduled (if applicable).

TOTAL PROGRAM $(000) -The total cost in thousands of the project in the current approved Twelve Year Program.

TOTAL ESTIMATED $(000) -The total estimated cost in thousands of the project as provided by the Testifier or from PennDOT’s Multi-Modal Project Management System

Page 4: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

Table of Contents Adams RPO   ‐‐‐   1Altoona MPO   ‐‐‐   2Centre MPO   ‐‐‐   3DVRPC MPO   ‐‐‐   5Erie MPO   ‐‐‐   18Franklin RPO   ‐‐‐   20Harrisburg MPO   ‐‐‐   21Johnstown MPO   ‐‐‐   23Lancaster MPO   ‐‐‐   24Lebanon MPO   ‐‐‐   25Lehigh Valley MPO   ‐‐‐   25NEPA RPO   ‐‐‐   26North Central RPO   ‐‐‐   31Northern Tier RPO   ‐‐‐   32Northwest RPO   ‐‐‐   33Reading MPO   ‐‐‐   37Scranton ‐ Wilkes Barre MPO   ‐‐‐   39SEDA COG RPO   ‐‐‐   41Shenango Valley MPO   ‐‐‐   45Southern Alleghenies RPO   ‐‐‐   46SPC MPO   ‐‐‐   47Williamsport MPO   ‐‐‐   53York MPO   ‐‐‐   54

Revised 12/28/2009

Page 5: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Adams RPO

AdamsMr. John Lawver, Borough Manager Borough of GettysburgGettysburg Gateway Transportation Improvements

Support   $7,000

Mr. John Lerew, Chairman Adams County Planning CommissionPriority Projects for Adams County Support  

PA 116 Corridor Support  

US 15/30 Interchange Support  

US Route 15 Corridor Support  

US Route 30 Corridor Support  

Mr. Richard Schmoyer, AICP, Director Office of Planning and DevelopmentRegional Overview Support  

Mr. George A. Weikert, Commissioner Adams CountyReplace an orphan bridge (Belmont Road Bridge) Support   $1,200

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 1 of 54

Page 6: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Altoona MPO

BlairSenator John H. Eichelberger, Jr., State Senator 30th Senatorial District30th Senatorial District Transportation Priorities Support  

Mr. Joe  Hurd, President/CEO Blair County Chamber CommerceAltoona Transportation Improvement Project Support  

Park Avenue Connector Support  

Plank Road Interchange Support  

Mr. Karl R. King, Greenway Coordinator Allegheny Ridge Corp. For Allegheny Ridge Corp.Enhancement Program Restoration Support  

Ms. Bonnie T. Lewis, Township Manager Logan Township For Logan TownshipPark Avenue Connector Support 22150 1 $7,410 $25,122

Mr. David McFarland, III, AICP,GISP, Interim Director Blair County Planning CommissionPriority Projects Support  

Mr. Patrick  M. Miller, Executive VP Altoona‐Blair County Development  Corp.Downtown Altoona Parking Garage Support   $7,000

Hollidaysburg Car Shop Access Improvement Project

Support   $5,000

Mr. Eric B. Prendergast, Supervisor/Roadmaster Blair TownshipNewry Lane Bike/Pedestrian Path Support   $35

Mr. Phillip D. Sipes, Vice President Innovative Consulting Group For Blair Co Chamber of CommerceAltoona Pedestrian Facility Improvements Support   $250

Altoona Transportation Improvement Project Support 62166 1 $100 $67,306

Park Avenue Connector Support 70035 1 11 $824 $20,964

Plank Road Interchange Support 22146 1 $12,897 $16,699

Mr. Eric Wolf, General Manager AMTRANAltoona Blair County Dev Corp & Blair County Chamber Commerce

Support  

Statewide Continuation of Act 44 Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 2 of 54

Page 7: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Centre MPO

Mr. Thomas P. Zilla, Senior Transportation Planner Centre County MPOState of the Transportation System  

CentreMr. Dan Abruzzo, P.E., VP of Government Affairs CBICCAirport Connector Road ‐ From I‐99 Support  

Rt 322 between Seven Mountains and Mount Nittany

Support  

Mr. Adam Brumbaugh, Township Manager College TownshipMillbrook Marsh Bikeway Support  

Park Avenue Corridor Improvements Support  

Mr. Douglas J. Erickson, Township Manager Patton Township For Patton TownshipWaddle Road Support 83541 1 $3,000 $18,250

Ms. Elizabeth A. Goreham, Council President Borough of State CollegeIntermodal Transportation Center Support  

Mr. Ray Gutshall, Supervisor/Head Roadmaster Marion Township For Marion TownshipRoute 26 Lick Run Bridge Support   $1,800

Route 26 Section 147(Jacksonville Road) Betterment

Support 85965 1 $250 $250

RT 26 (Jacksonville Road/Walnut Street) Betterment

Support  

SR 80 Section B18 I‐99/I‐80 Support 3142 $131,874

SR80 Section A18‐I‐80/Rt 26 (Exit 163) Oppose 51466 $50,310

Mr. Albert G. Horvath, Senior VP for Finance Pennsylvania State UniversityI‐80/I‐99 Interchange Support  

Keystone West Corridor Support  

Millbrook Marsh Bikeway Support   $3,400

Park Avenue Corridor Improvements Support  

Public Transportation Improvements Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 3 of 54

Page 8: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ Centre MPO

CentreMr. Albert G. Horvath, Senior VP for Finance Pennsylvania State UniversityU.S. 322 from Seven Mtns to Mt. Nittany Expressway

Support  

University Park Airport Access Support  

Ms. Betsey Howell, Executive Director Central PA Convention & VisitorsPark Avenue Corridor Improvements Support  

Mr. James Meyer, Director Centre County Airport AuthorityAirport Connector Road Support  

Mr. John C. Spychalski, Chairman Centre Area Transp. AuthorityPublic Transportation Funding Support  

Mr. Richard J. Wisniewski, President/CEO Mount Nittany Medical CenterWidening of Park Avenue Support  

Mr. Ronald J. Woodhead, Director Centre Region Parks & RecreationMillbrook Marsh Bikeway Support  

Mr. Thomas P. Zilla, Senior Transportation Planner Centre County MPORoute 322 Corridor Safety Improvements Support 78994 1 1 11 1 $2,537 $2,475

SR 80 Sec A18 I‐80/SR 26 Local Access Interchange

Support 51466 $50,310

SR 80 Sec B18 I‐99/I‐80 High Speed Interchange Support 3142 $131,874

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 4 of 54

Page 9: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

DVRPC MPO

BucksMr. Jeff Bartlett, Managing Director Bristol TownshipUS Route 13 Redevelopment Phase 2 Support   $2,300

Ms. Marilyn J. Becker, Mayor Chalfont Borough CouncilBristol Road Extension Support 12923 1 2 22 2 $17,750 $16,900

Ms. Eileen M. Bradley, Township Manager New Britain Township For New Britain TownshipBristol Road Extension Support 12923 1 2 22 2 $17,750 $16,900

Ms. Lynn T. Bush, Executive Director Bucks County Planning Commission For Bucks CountyBristol Road Extension Project Support 12923 1 2 22 2 $17,750 $16,900

PA Turnpike / I‐95 Interchange Support 13347 1 $6,129 $1,126,880

Route 13 Project Support 47392 1 11 2 $31,045 $35,100

Mr. Joseph Czajkowski, Township Manager Newtown TownshipNewtown‐Yardley Road Support 57639 $1,000

Ms. Brandi Eng‐Rohrbach,Bethlehem & Stony Creek Branch Rail Restoration

Support   $200,000

Mr. Jon P. Frey,SEPTA R8 Newtown Commuter Rail reactivation Support   $100,000

Mr. Paul R. Iverson,SEPTA R8 FOX CHASE‐NEWTOWN RAIL SERVICE Support   $150,000

Ms. Marilyn Jacobson, Council Member Chalfont Borough CouncilBristol Road Extension Support 12923 1 2 22 2 $17,750 $16,900

Mr. Peter LaMontagne, Council Member New Britain Borough For New Britain BoroughBristol Road Extension Project Support 12923 1 2 22 2 $17,750 $16,900

Ms. Stephanie J. Mason, Township Manager Doylestown TownshipEaston Road / South Main Street (SR 1001) Support   $725

Lower State Road (SR 3003) & Wells Road Support   $1,000

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 5 of 54

Page 10: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

BucksMs. Stephanie J. Mason, Township Manager Doylestown TownshipLower State Road (SR 3003) Safety Improvements

Support   $2,200

Senator Robert M. Tomlinson, 6th District Senate of PennsylvaniaClosing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose  

PA Turnpike / I‐95 Interchange Support  

Rt. 13 Bristol Pike Traffic Calming Support 47392 1 11 2 $31,045 $35,100

Street Road and I‐95 Interchange Support  

ChesterMr. James  M. Bruton, Borough Council Vice President Borough of Downingtown For Borough of DowningtownBoot Road Extension Bridge over Brandywine Creek

Support 83710 1 11 1 $3,279 $3,539

Mr. Barry Cassidy, Director Main Street CDC For Borough of PhoenixvilleGreenline rail project Support   $300

Ms. Barbara  H. Cohen, Vice‐Chair Schuylkill Twp Board of SupervisorsToonerville Trolley Trail Support   $4,000

Ms. Judy L. DiFilippo, Chairman Chester County Planning CommissionRoute 3 Transit Signal Priority Support   $3,000

Chester Valley Trail Support 14675 1 $18,489 $19,033

Coatesville Train Station Support 71195 $350

Downingtown Revitalization/Boot Rd. Extension Support 83710 1 11 1 $3,279 $3,539

Downingtown Train Station Support   $10,000

French Creek Parkway Support 57659 1 1 2 2 $23,850 $45,300

Keystone/R5 Rail Station Upgrades Support  

Northern Relief Route/Fillmore Street Extension Support   $2,800

PA 10 Corridor Safety Improvements Support   $7,000

PA 100 Corridor Safety Improvements Support 80042 1 $90 $1,800

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 6 of 54

Page 11: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

ChesterMs. Judy L. DiFilippo, Chairman Chester County Planning CommissionPA 100: Exton to Lionville Support 14580 $65,050

PA 100: Ludwig’s Corner Support 47978 $4,100

PA 252 Underpass at U.S. 30 Support 85062 1 $150 $150

PA 41 Corridor Safety Improvements Support 14484 1 1 $10,000 $58,196

PA 896 Corridor Safety Improvements Support 85949 1 11 1 $3,875 $3,875

Paoli Transportation Center Support 60574 1 $8,253 $50,000

R6 Extension: Norristown to Wyomissing Support   $500,000

Schuylkill River Trail Support 59434 1 1 2 $12,750 $5,830

SEPTA R5 Rail Extension: Thorndale to Atglen Support   $30,000

U.S. 1 Partnership: Longwood to Kennett Bypass Support 14541 1 $3,800 $4,250

U.S. 1 Reconstruction: Maryland to Schoolhouse Road

Support 14580 $65,050

U.S. 202 Section 100 Support 15385 1 $10,000 $288,836

U.S. 202 Section 300 Support 64494 1 $102,200 $102,200

U.S. 30 Coatesville‐Downingtown Bypass Interchanges

Support 14532 1 $4,250 $256,200

U.S. 422 Reconstruction (North Coventry) Support 64222 11 2 $70,255 $68,429

U.S. 422 Valley Forge (River Crossing Complex) Support 70197 1 $4,000 $115,200

Various Critical Bridges Support  

Various Critical Intersections Support  

Mr. Brian DiSabatino, Vice President Chamber of Business and IndustryConstruction and Widening of U.S. 202 Section 300

Support  

Ms. Dee Durham, Executive Director S.A.V.E.Route 41 SAMI Roundabout at Old Baltimore Pike

Support 14613 1 11 1 $4,750 $5,136

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 7 of 54

Page 12: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

ChesterMs. Dee Durham, Executive Director S.A.V.E. For Chandler Mill Bridge ConsortiumChandler Mill Bridge Support  

Mr. Jeffrey T. Goggins, Senior Managing Director Trammell Crow CompanySR 29 Section AL2 Project Support 70227 1 $10,740 $7,230

Mr. Richard Heany, Exec. Vice President O'Neill PropertiesChester County Priorities Support  

Mr. Mike Herron, Executive Director TMACCChester County Improvements Support  

Mr. P. Timothy Phelps, President Tri County Chamber of CommerceChester County 's Priority Projects. Support  

DelawareMs. Jane Billings, Borough Manager Borough of Swarthmore For Swarthmore Town Center WestSwarthmore Town Center West Support   $2,416

Mr. John  E. Pickett, Planning Director Delaware County CouncilDelaware County Council Transportation Priorities

Support  

Adoption of a Complete Streets Policy Support  

Elimination of Hwy Occupancy Permit for Bike Lanes

Support  

MontgomeryMs. Caren Andrews, Borough Manager Borough of West ConshohockenFront Street/Balligomingo Road Realignment Support 16688 1 $5,225 $6,095

Matsonford Road Phase II Project Support  

Montgomery County Planning Commission/SVTC Support  

Schuylkill Expressway (I‐76)/Matsonford Road Inter

Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 8 of 54

Page 13: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

MontgomeryMr. Leo D. Bagley, Assistant Director Montgomery County  Planning CommissionMontgomery County Funding Initiatives Support  

Mr. Donald E. Berger, Jr. , Township Manager The Township of SpringfieldSpringfield Township Priority Projects Support  

Representative Tim Briggs, 149th Legislative District PA House of RepresentativesU.S. 422 Corridor Coalition Support  

Mr. Mike  Caldwell, Superintendent National Park Svc Valley ForgeU.S. 422 Corridor Coalition Support  

Mr. Douglas C. Cleland, Township Manager Township of Lower MerionArdmore Transit Center Support  

Conshohocken State Road/Mill Creek Road Reconstruction

Support  

Montgomery Ave Closed‐Loop Signal System Support  

Montgomery County Planning Commission Projects

Support  

Pennswood Road Bridge and Union Avenue Bridge

Support  

Rock Hill Road/Belmont Avenue Corridor Improvement

Support  

Mr. Donald D. Delamater, Township Manager East Norriton TownshipEast Norriton Township Priority Projects Support  

Germantown Pike Widening Support  

Senator Andrew E. Dinniman, 19th District Senate of PennsylvaniaU.S. 422 Corridor Coalition Support  

Mr. David Dodies, Manager Upper Moreland Township For Upper Moreland TownshipPA Turnpike Ramp under PA RT 611 Support   $3,500

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 9 of 54

Page 14: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

MontgomeryRepresentative Paul J. Drucker, 157th Legislative District PA House of RepresentativesU.S. 422 Corridor Coalition Support  

Mr. Robert A. Fieo, Supervisor Upper Providence Township For Upper Providence TownshipU.S. Route 422/Oaks Interchange Improvements Support   $2,913

Mr. Robert A. Ford, Township Manager Towamencin TownshipBustard Road Realignment Support   $5,270

PA 363, Valley Forge Road Support   $15,000

Mr. David Forrest,  SVTC For SVTCSVTC Priority Projects Support  

Mr. David R. Forrest, Municipal Administrator Municipality of NorristownChester Valley Trail Extension Support 16705 1 1 1 $9,826 $10,545

Lafayette Street Extension Support 57858 1 $2,400 $21,635

Lafayette Street‐Ford to Conshohocken Road Support 79863 $24,000

Lafayette Street‐US 202 Dannehower Bridge Interchange

Support 79864 1 $2,405 $13,400

Lower Farm Road/Hospital Bridge (Over Stony Creek)

Support 16631 $1,440

Ridge Pike, Norristown Municipality to Butler Pike

Support 48175 1 1 3 $10,612 $37,376

US 202, Section 500 Support 16665 1 11 $2,400 $8,616

Mr. James E. Gardner, Borough Manager/Police Chief Borough of HatboroNorth York Road (Rt 263) Northern Gateway Support   $927

Mr. Andrew Haines, Manager Hatfield Township For Hatfield TownshipCounty Line Road at Bethlehem Pike Intersection Realignment

Support   $7,500

Ms. Kathy A. Hampton,   For CommunityBike and Walking Trails Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 10 of 54

Page 15: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

MontgomeryMr. Trevor  Hart, Chairman Perkiomen Valley Chamber CommerceGermantown Pike to Ridge Pike (SR 4031) to PA 29

Support  

Northern Relief Route/Fillmore Street Extension Support  

S. Park Ave/Eagleville Rd/Crawford Rd in Lower Providence

Support  

Toonerville Trolley Trail Support  

U.S. 422 Corridor Coalition Support  

Mr. Bryan T. Havir, Assistant Township Manger Cheltenham TownshipGlenside Revitalization and Circulation Study Support   $600

Mr. Rob Henry, Executive Director GVF TransportationU.S. 422 River Crossing Complex Support  

Ms. Carmen S. Italia, Jr. , President MCEDCTransportation Projects in Montgomery County Support  

Mr. Brian Keaveney, Township Engineer Pennoni Associates Inc. For Lower Merion TownshipArdmore Transit Center Support 73214 1 $6,756 $41,000

Conshohocken State Road/Mill Creek Road Reconstruction

Support   $1,200

Rock Hill Road/Belmont Avenue Corridor Improvement

Support 64795 1 2 2 $19,700 $18,700

Mr. Daniel K. Kerr, Township Manager Limerick TownshipSanatoga Interchange / Airport Road Improvements

Support   $13,900

Mr. David G. Kraynik, SMTC Township of CheltenhamBethlehem Pike Roadway and Streetscape Improvements

Support  

Fort Washington Office Park Reconstruction Support  

Glenside Commercial District/Arcadia University Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 11 of 54

Page 16: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

MontgomeryMr. David G. Kraynik, SMTC Township of CheltenhamGlenside Streetscape & Traffic Calming, Ph. III Support  

SMTC Transportation Improvement Update Support  

Senator Daylin Leach, 17th District Senate of PennsylvaniaProjects in Delaware & Montgomery Counties Support  

Mr. Paul A. Leonard, Chairman SE Montgomery County Trans CoalitionSE Montco Trans. Coalition Priority Projects Support  

Bethlehem Pike Roadway and Streetscape Improvements

Support   $555

Bethlehem Pike Roadway and Streetscape Improvements

Support  

Fort Washington Office Park Reconstruction Support  

Glenside Commercial District/Arcadia University Support  

Glenside Streetscape & Traffic Calming, Ph. III Support  

SMTC Improvement Project Update Support  

Mr. Paul A. Leonard, Township Manager Upper Dublin TownshipFort Washington Office Park Reconstruction Support   $38,700

Upper Dublin Twp Priority Projects Support  

SMTC Projects Support  

Welsh Road ‐ Twining to Blair Mill Support   $5,500

Mr. Stephen B. Lester, President GVF Transportation For GVF TransportationGVF Transportation Priority Projects Support  

Ms. Phyllis C. Lieberman, Township Manager Whitpain TownshipMontgomery County Priority Projects Support  

Mr. Christopher J. Loschiavo, Director of Public Works Plymouth TownshipBrook Road Bridge Project Support  

Butler Pike Bypass Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 12 of 54

Page 17: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

MontgomeryMr. Christopher J. Loschiavo, Director of Public Works Plymouth TownshipLafayette Street Corridor Project Support  

Montgomery County Planning Commission/Greater Valley Forge

Support  

Ridge Pike Improvement Project Support  

Turnpike Projects Support  

Ms. Karen E. Madden, Township Manager West Norriton TownshipPA 363 Interchange Reconstruction Support 64796 1 11 1 $14,955 $15,000

Schuylkill River Trail Bridge o/ the Schuylkill River Support 16703 1 1 11 1 $7,538 $2,000

U.S. 422 Bridge over the Schuylkill River Support 70197 1 $4,000 $115,200

U.S. 422/PA 23 Interchange & North Gulph Rd. Improvement

Support 66952 1 11 1 $12,153 $19,350

Mr. F. Lee Mangan, Borough Manager Lansdale BoroughLansdale Station Pedestrian Tunnel Support   $4,000

Mr. Thomas  K. McHugh,Reactivation of R8 Commuter Rail Service Support  

Mr. Richard Mellor, Manager Lower Moreland Township For Lower Moreland TownshipRed Lion and Philmont Avenue Support   $2,500

Ms. Patricia A. Moir, Executive Director Suburban Transit Network, Inc.Chester & Montgomery County Support Improvements

Support  

Mr. John B. Nagel, Township Manager Montgomery TownshipCounty Line Road Widening Support 64779 1 11 $4,700 $16,760

Limekiln Pike Bridge Support 15769 11 1 $4,955 $5,505

U.S. 202, 5‐Points Intersection (Sec. 71A) Support 63493 2 $3,994 $6,100

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 13 of 54

Page 18: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

MontgomeryMr. P. Timothy Phelps, President Tri County Chamber of CommerceGermantown Pike to Ridge Pike (SR 4031) to PA 29

Support  

S. Park Ave/Eagleville Rd/Crawford Rd in Lower Providence

Support  

Sanatoga Interchange Ramps Support  

Toonerville Trolley Trail Support  

U.S. Route 422 Corridor Coalition Support  

Mr. Delton Plank, Manager Lower Salford Township For Lower Salford TownshipOak Drive Extension Support   $3,500

Senator John C. Rafferty, Jr., 44th District Senate of PennsylvaniaU.S. 422 Corridor Coalition Support  

Ms. Marcene W. Rogovin, Chairman Schuylkill Valley Trans CoalitionBrook Road Bridge Project Support  

Butler Pike Bypass Support  

Conshohocken State Road/Mill Creek Road Reconstruction

Support  

Germantown Pike Widening & Intersection Improvements

Support  

I‐76/Matsonford Road Phase 2 Improvements Support  

PA 73, Skippack Pike (US 202 to Butler Pike) Support  

Schuylkill Valley Transportation Coalition Support  

Mr. Stuart J. Rubin,SEPTA Parking Garage Oppose  

Mr. Mike  Santillo, Chairman Upper Merion Trans Authority422 Corridor Coalition Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 14 of 54

Page 19: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

MontgomeryMr. Piero A. Sassu, Board of Supervisors Chairman Lower Providence TownshipGermantown Pike to Ridge Pike (SR 4031) to PA 29

Support  

S. Park Ave/Eagleville Rd/Crawford Rd Improvement

Support  

U.S. 422 Corridor Coalition Support  

Mr. Scott  Sibley, Chairman Upper Merion TownshipU.S. 422 Corridor Coalition Support  

Mr. Christopher R. Van de Velde, Township Manager Whitemarsh TownshipRidge Pike‐Butler Pike to Philadelphia/Montgomery County Line

Support 16577 22 2 $30,900 $23,146

Schuylkill Valley Transportation Coalition Project Support  

Mr. Ronald G. Wagenmann, Chairman US 422 Corridor Coalition For US 422 Corridor CoalitionU.S. 422 Corridor Coalition Priority Projects Support  

PhiladelphiaMs. C Blazic,SEPTA Projects‐Parking garage at the Jenkintown Oppose  

Mr. Lawrence & Carolyn Brick,Issues with Public Transportation Support  

Mr. Richard G. Burnfield, CFO/Treasurer SEPTAVarious SEPTA Projects Support   $990,000

Mr. Dave Campbell,SEPTA Frankford Junction Station EI & R‐7 Lines Support  

Mr. William Q. Cellini Jr.,R1 Glenside SEPTA Regional Rail Line Support  

Ms. Barbara Cicalese,Rt. 23 Repair Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 15 of 54

Page 20: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

PhiladelphiaMs. Rina Cutler, Deputy Mayor Trans & Utl City of PhiladelphiaAddressing high cost‐high impact projects Support  

Investing in livability Support  

Proposed Statewide use of Red Light Enforcement System Revenues

Oppose  

Supporting Transit Support  

Mr. Chris Erb,Improve Capacity on I‐76. Support  

Link Roosevelt Blvd to the Betsy Ross Bridge Support  

Senator Lawrence M. Farnese, Jr., 1st District Senate of PennsylvaniaBroad Street Line to the Navy Yard Support  

Light‐Rail Line along Columbus Boulevard Support  

Trackless Trolley Service Routes 29 & 79 S Phila Support  

Mr. Kevin Haney,Roosevelt Boulevard U.S. ‐1, Philadelphia Support  

Mr. Mark F. Harris, Community Liaison Cathedral Park AssociationIntersection of 52nd & Lancaster (Cathedral Park) Support 57898 1 $2,980 $2,995

Mr. Paul R. Iverson,SEPTA Project Support  

Mr. Rob Kettell, Citizen1‐95 Interchange Improvement Support  

Modes of Transportation Support  

Mr. Paul Kuzma, CitizenUpper Peach Street at I 90 Support  

Mr. Paul R. Levy, President & CEO Center City DistrictDilworth Plaza Improvements Support   $45,000

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 16 of 54

Page 21: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ DVRPC MPO

PhiladelphiaMs. Susan  Patrone,  Passyunk Square Civic Assoc.Trackless Trolley Restoration Support  

Dr. Don Shanis, Deputy Executive Director DVRPCRegional Overview Support  

Mr. Joseph R. Syrnick, President & CEO Schuylkill River Development Corp.Schuylkill River Trail Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 17 of 54

Page 22: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Erie MPO

ErieMr. David  L. Anthony, Manager Washington Township For Washington TownshipUpgrades to the U.S. 6N corridor Support   $8,000

Mr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Harborcreek TownshipAshton Road Bridge Replacement Project Support   $1,000

Bartlett Road Bridge Replacement Project Support   $750

Brickyard Road Bridge Replacement Project Support   $750

Carbury Road Bridge Replacement Project Support   $750

Depot Street Bridge Replacement Project Support   $750

Dewey Road Bridge Replacement Project Support   $1,500

Elmwood Road Bridge Replacement Project Support   $750

Hardscrabble Road Bridge Replacement Project Support   $750

Kane Hill Road Bridge Replacement Project Support   $750

Leet Road Bridge Replacement Project Support   $1,000

Malbett Place Bridge Replacement Project Support   $1,000

Mill Run Bridge Replacement Support   $1,000

Old Ridge Road Bridge Removal Project Support   $500

Old Route 89 Bridge Replacement Project Support   $750

Old Sterrettania Road Bridge Replacement Project

Support   $1,000

Pleasant Street Bridge Replacement Project Support   $750

Sherrod Hill Road Bridge Replacement Project Support   $1,000

South Hazel Street Bridge Replacement Project Support   $1,000

Wilson Road Bridge Replacement Project Support   $750

Mr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Troy TownshipBort Road Bridge Replacement Project Support   $1,500

North Mill Street Bridge Replacement Project Support   $1,000

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 18 of 54

Page 23: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ Erie MPO

ErieMr. Jim Dible, President/CEO Erie Regional, ChamberPriority Projects  

Mr. John Elliot, Executive Director ECO  Dep. Corp. Erie CountyPriority Projects Support  

Mr. Thomas Hoffman, Chairman Erie Metropolitan Planning OrgRegional Overview Support  

Mr. Taras (TJ) Jemetz, Borough Manager Home Rule Borough of Edinboro For Edinboro Borough CouncilU.S. 6N Corridor Improvements, Edinboro Area Support   $6,750

Mr. Mark Kiddo, Township Commissioner Lawrence Park TownshipTraffic Light and School Crossing Sign Replacement

Support   $1,200

Mr. Chris Rodgers, Executive Director Erie Reg. Airport Auth.Airport Authority Priority Projects Support  

Mr. Ray Schreckengost, Executive Director E‐W Port AuthorityPort Authority ‐ Priority Projects Support  

Honorable Joseph E. Sinnott, Mayor City ErieSmart Transportation/Maintenance Needs Support  

Mr. Dennis G. Solensky, Executive Director Erie Metro Transit AuthorityAutomated Vehicle Location System Deployment Support 77115 $1,400

Construct Transit Operating Facility Support 77136 1 $21,933 $30,000

Highway Transit Corridor Real Time LCD Monitors Support 87067 1 1 11 1 $5,000 $5,000

Mr. Dennis J. Tomczak,Convention Center‐ RR Tracks to Lane for BFH Support  

Develop Downtown using Streetscape Program Support  

G.E. Bottleneck Rts. 20 & 5 Extend and Improve Support  

Improve Access to Presque Isle Support  

Update or Eliminate Outdated Traffic Signals Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 19 of 54

Page 24: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ Erie MPO

ErieMr. Jon Tushak, City Engineer City of Erie EngineeringWest 8th Street Rehabilitation Support   $4,100

Mr. Jake Welsh, Director Erie County Dep. PlanningRegional overview Support  

Mr. Gary L. White, Chairman Waterford Township For Waterford Township (Erie MPO)Niemeyer Road (T463) Covered Bridge Support   $985

Franklin RPO

FranklinMr. Geoff Lilja, Partner Antrim Business Park, LPExit 3 Interchange Improvements Support 87201 1 $4,250 $4,250

Mr. Phil Tarquino, Director County Planning CommissionRegional Overview Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 20 of 54

Page 25: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Harrisburg MPO

CumberlandMs. Stephanie J. Williams, Greenway/Open Space Coordinator. Cumberland County  Planning Dept.Cumberland Valley Rail Trail, Shippensburg Connect

Support   $1,250

Cumberland Valley Trail ‐ Carlisle Extension Support   $1,700

DauphinMr. Gary Bootay, Acting Executive Director PA Society. Advancement/DeafIssues for the Deaf on Public Transit Support  

Mr. Joseph  Gerdes, Executive Director Keystone State Railroad Assoc.Keystone State Railroad Association Support  

Ms. Ada Gil,Massive transportation to NYC Support  

Mr. Albert G. Horvath, Senior VP for Finance Pennsylvania State University5th Street/University Drive Support 76161 1 $4,956 $7,237

Mr. Mark K. Keller, Chairman HATS For HATSRegional Overview for HATS MPO Support  

Mr. Chauncey D. Knopp, Chair, Planning Commission Lower Swatara TownshipState Route 441 Corridor Improvements Support   $7,624

Mr. David  J. Morrison, Assistant to the President Harrisburg  Area Community CollegeWalnut Street Bridge Support   $6,000

Mr. Gary Myers, Township Manager Susquehanna TownshipU.S. 22 (Walnut St.)/Progress Ave. Support   $15,490

Mr. Ronald J. Paul, Township Manager Lower Swatara TownshipMeade Avenue (Formerly 5th St./University Dr.) Support 76161 1 $4,956 $7,237

Representative John D. Payne, 106th Legislative District PA House of RepresentativesAdditional Lanes North and South of Rudy Dininni bridge.

Support  

Milroy Road Underpass improvements Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 21 of 54

Page 26: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ Harrisburg MPO

DauphinRepresentative John D. Payne, 106th Legislative District PA House of RepresentativesRight‐turn lane from Middletown Road (SR2003) onto Service Connector Road (SR2034); Derry Twp

Support  

Route 322 Ramp Extensions (SR2003); Derry Twp Support  

Mr. Michael Pries, Chairman, Board of Supervisors Derry TownshipSR 743 Relocation Project Support 63284 1 $8,000 $9,640

Mr. John Quigley, Acting Secretary Dept. Conservation & Natural ResourcesBike Ped/Transportation Enhancements Support  

County Greenway Plans Support  

Historic Bridge Program Support  

Pennsylvania Greenways Support  

Regional/Statewide TIP for Trails Support  

Smart Transportation Support  

Transportation Enhancements Support  

Ms. Judith  L. Schwank, President/CEO 10 Thousand FriendsExpand Community Transportation Initiatives Support  

Extend Smart Transportation Principles Support  

Funding Formulas for Community & Surface Transport

Support  

Mobility and Connection between Metropolitan Markets

Support  

Mr. James Szymboski, AICP, Executive Director Tri‐County RPCRegional Overview Support  

PerryMr. Daniel Rapp, Borough Manager Borough of Duncannon For Borough of DuncannonApple Tree Alley Walk Support   $650

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 22 of 54

Page 27: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Johnstown MPO

CambriaMr. Chris Allison, Transportation Planner Cambria County Planning CommissionPriority Projects Support  

Red Mill Bridge Replacement Support  

US 22 CCIP. U.S. 219 Interchange to SR 4031 Interchange

Support  

Dean Bridge #11 over Clearfield Creek Support  

Gillespie Ave Bridge over Trout Run, Portage Boro

Support  

HAIDA Industrial Park Access Road East, Elder Twp

Support  

Haynes Street Bridge Replacement Support  

Industrial Park Rd Elton Rd (PA 756) Galleria Mall Support  

Iron St/Benshoff Hill Road, Middle Taylor Twp. Support  

Jamestown Arch Tunnel, Portage Twp Support  

Lorraine Road Nanty Glo Borough Support  

New Germany (Tower Road) Interchange Croyle Twp

Support  

PA 756 Elton Road Intersection Support  

Pine Street Bridge over Little Conemaugh River Support  

Portage St (PA 53) at Norfolk Southern Underpass

Support  

Sonman Ave Bridge over Trout Run, Portage Boro Support  

Troy Street Bridge over Emeigh Run, Susq. Twp Support  

Ms. Rose M. Lucey‐Noll, Executive Director Cambria County Transit AuthorityAct 44 Support  

Bus Replacements Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 23 of 54

Page 28: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Lancaster MPO

LancasterMr. Ray D'Agostino, Chairman Lancaster County TTACRegional Overview Support  

Mr. Fred D. Daum,  LAND For Lancaster  Alliance New DirectionRt. 23 and Road System of Eastern Lancaster County

Oppose  

Ms. Monica Forte,The Forgotten Fruitville Pike Support  

Mr. David  G. Greineder, Advocacy Director The Lancaster Chamber CommerceCapital Red Rose Corridor (Corridor One) Support  

Elizabethtown Train Station Renovation Project Support   $9,300

Keystone Corridor High Speed Rail Line Support  

Lancaster Train Station Renovation Project Support   $12,000

Route 23 DEIS Support  

Stimulus Funds Support  

TIGER App‐Harrisburg Pike Corridor Support  

Ms. Nancy Kingsley,  Hearing Loss Association/PANeed for Digital Signs Announcing Stops Support  

Honorable Scott Martin, Commissioner Lancaster CountyRegional Overview Support  

Mr. Douglas W. Plank,  ELA Group For Lancaster Chamber of CommerceRoute 23 Support  

Solutions for Transportation Funding Support  

Ms. Nancy Santaniello,The Forgotten Fruitville Pike Support  

Mr. Daniel S. Sweigart, Senior Advisory Council Member Lancaster Farmland TrustRoute 23 Improvement Project Oppose   $250,000

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 24 of 54

Page 29: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Lebanon MPO

LebanonMr. Jonathan  W. Fitzkee, Transportation Planner Lebanon County Planning Dept. For LEBCO MPOPA Route 72/ PA Route 419 Intersection Project Support   $2,000

Mr. Robert Sentz, Acting Director Lebanon County Planning Dept.Regional Overview Support  

Lehigh Valley MPO

LehighSenator David G. Argall, 29th District Senate of PennsylvaniaLehigh County Bridges Support  

Lehigh County Route 100/309 Intersection Support  

Northampton County Bridges Support  

Mr. Armand  V. Greco, Executive Director Lehigh & Northampton Transport For LANTALANTA Capital Improvement Plan 2011‐2014 Support   $50,775

Mr. Joseph Gurinko, AICP, Chief Transportation Planner Lehigh Valley Planning CommissionRegional Overview ‐ Lehigh and Northampton Counties

Support  

Ms. Anita  Kingsbauer,St. Luke's Riverside Access Drive Project Support   $8,211

Mr. Mark Witt,Issues with I‐79 and Land Use. Oppose  

Mr. Richard A. Young, Director of Public Works City of Allentown For City of AllentownAllen Street Safety Improvements Support   $900

American Parkway Support 11443 1 11 1 $68,381 $62,709

Chapel Avenue Safety/Traffic Calming Improvements

Support   $1,000

Gordon Street Bridge Support   $4,500

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 25 of 54

Page 30: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

NEPA RPO

CarbonSenator David G. Argall, 29th District Senate of PennsylvaniaCarbon County Programmed Projects Support  

Ms. Judy Borger, Director Carbon County   Planning & DevelopmentPackerton Business Park ‐ SR 209 Entrance Support   $13,270

Replace Thomas J. McCall Memorial Bridge Support  

SR 443 Corridor Preliminary Engineer Study Support  

Mr. Jeffrey Box, President and CEO NEPARegional Overview Support  

Mr. Armand  V. Greco, Executive Director Lehigh & Northampton Transport For Carbon CountyCarbon County Transit Cap Improve Plan 2011‐2014

Support   $5,305

Representative Paul E. Kanjorski, 11th District Congress of the United StatesHauto Industrial Park Rd/Rt 54 Realignment/Relocate

Support  

Mr. Larry Malski Esq.,PA NE Reg. Railroad Authority Support  

MonroeMs. Peggy A. Howarth, Executive Director Monroe County Transp. Auth.Monroe County Transit Authority Priorities Support  

Act 44= Access for 393,725 in Monroe County Support   $2,000

Representative Paul E. Kanjorski, 11th District Congress of the United StatesMarshalls Creek Traffic Relief Project Support  

Northampton Community College Access Road Support  

Mr. Henry D. Pyatt, Downtown Manager EastBurg Community AllianceLackawanna Cutoff Passenger Rail Restoration Support   $551

Representative John J. Siptroth, 189th Legislative District PA House of RepresentativesProjects in Monroe and Pike Counties Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 26 of 54

Page 31: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ NEPA RPO

MonroeMr. John Woodling, Director Monroe County Planning Commission7th Street Over I‐80 Project Support   $5,000

Bridge over Pocono Cr. Replacement Support   $750

Clearance Increase on I‐80 Support  

County Bridge #9 Replacement Support   $750

Five Points Intersection Support   $3,450

Foundry Road/ County Bridge 8 Replacements Support   $750

Hypsy Gap Road Bridge Replacement Support   $500

I‐80 Traffic Relief Project Support  

Marshalls Creek Traffic Relief Project Support   $23,800

Metzgar Road Bridge Project Support   $750

PA 115/Weir Lake Road Project Support   $4,500

PA 611 Improvements Support   $15,920

PA 611 Improvements (2) Support   $21,150

Pedestrian Crossing at Franklin Hill Road Support   $150

Route 115 Astolat Rd. Project Support   $500

Silver Valley Rd. Bridge Replacement Support   $95

SR 191‐Stokes Avenue Intersection Realignment Support   $1,600

SR 196 Improvements Support   $500

SR 2024 Bridge Replacement Support   $1,100

SR 4008 Shoulder Project Support   $50

T‐221 Bridge Replacement Support   $750

T‐381/Lake Mineola Road Support  

T‐410 Bridge Replacement Support   $250

T‐420 Bridge Replacement Support   $250

T‐518 over Cranberry Creek Support   $750

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 27 of 54

Page 32: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ NEPA RPO

MonroeMr. John Woodling, Director Monroe County Planning CommissionT‐591 over Paradise Creek Support   $750

T‐610 over Broadhead Creek Support   $750

T‐850 Bridge Replacement Support   $750

U.S. 209/PA 115 & U.S. 209/PA 715 Intersection Improve

Support   $2,000

PikeMr. Mike Mrozinski, Assistant Planning Director Pike County Community PlanningI‐84 Emergency Access Support  

I‐84 Interchange Support  

Matamoras Borough Traffic Study Support  

Roemerville Road Traffic Study Support  

Route 402 Project Support  

Route 434 Well Road Project Support 47968 $4,270

Route 590 Project Support  

Route 6 in Milford Borough Support  

Route 739 Traffic Study Support  

Rt. 390 Project Support  

SR 1005‐ Twin Lakes Road Support  

SR 1013 Project Support  

SR 1017 Project Support  

SR 2001 Support 9397 1 3 $20,488 $27,828

SR 2003 Support  

SR 2006 Project Support  

SR 2017 Project Support  

SR 4001 Project Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 28 of 54

Page 33: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ NEPA RPO

PikeMr. Mike Mrozinski, Assistant Planning Director Pike County Community PlanningSR 4006 Project Support  

Towpath Road Traffic Study Support  

U.S. 209 Traffic Study Support  

Mr. Edward H. Sinon, Supervisor Greene Township, Pike CountyDitch Work Along Brinkhill Road Support   $100

Ditch Work Along Hemlock Grove Road Support   $100

Rebuild Ledgedale Road Support   $900

Resurface & Drainage Instillation Roemerville Road

Support   $800

Resurface & Shoulder Work Route 390 Support   $1,000

SchuylkillMr. Richard Carl, Executive Director Schuylkill Chamber of CommercePA 309 Improvements Support  

PA 54 Resurfacing Support  

PA 61 and Darkwater Road Intersection Support  

PA 61 and Liberty Street Improvements Support  

PA 61 Improvements Support  

PA 61 Restoration Support  

PA 924 Resurfacing Support  

Schuylkill ADA Ramp Installation Support  

SR 209 Betterment Improvements Support  

Widening of PA 61 Support  

Mr. Charles M. Ross, Director Schuylkill County  Planning CommissionCollins Street Bridge Support 57689 1 1 11 2 $3,983 $3,200

Deer Lake North Support 12613 1 $38,745 $56,161

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 29 of 54

Page 34: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ NEPA RPO

SchuylkillMr. Charles M. Ross, Director Schuylkill County  Planning CommissionLiberty Street‐Sr 61 Safety Improvements Support   $17,000

Market Street Bridge Support   $2,000

Mush‐Dahl Road Intersection Improvements. Support   $2,000

Pottsville PA 61 Intersection Improvements. Support   $2,000

Red Ridge Road Bridge Support   $2,000

Schuylkill Haven PA 61 Safety Improvements Support 72451 1 1 11 1 $11,600 $10,850

Sr 61 & Darkwater Road North to I‐81 Support   $500

SR. 209 Betterment‐Porter/Frailey Townships Support   $5,000

Tamaqua CBD Improvements Support 12443 1 1 1 $2,995 $6,195

WayneMr. Kurt Bauman, Government Services Manager NEPA AllianceSR 191 / SR 3004 Intersection Improvements Support   $995

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 30 of 54

Page 35: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

North Central RPO

Ms. Amy Kessler, Transportation  Planning Director SchuylkillState of the Transportation System  

Ms. Amy Kessler, Transportation Planning Director North CentralPriority Projects Support  

CameronMr. Larry A. DeYoung, V.P. Gov't Relations Western N.Y. & Pennsylvania RRBuffalo Line Tie & Surface project Support   $4,000

ElkMr. David J. Greene, Manager City of St. MarysSR 120 State Street Extension‐City of St Marys Support   $3,900

Mr. Matthew  G. Quesenberry, Director Elk County Planning Dept.Reopening of the Transportation Enhancement Program

Support  

McKeanMr. Martin M. Glesk, Executive Director Bradford Area Alliance For Continental 1Continental 1 Support   $650,000

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 31 of 54

Page 36: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Northern Tier RPO

BradfordMr. Rick Biery, Regional Planner Northern Tier RegionalRegional Overview Support  

SusquehannaMr. Rexford O. Catlin, CEO Endless Mountains Health Sys For Endless Mountains Health SysEndless Mountains Replacement Hospital Access Road

Support   $4,020

Mr. Stephen A. Fisk, Sr. Mgr. Business Development Canadian Pacific Rwy.Centralized Traffic Control System Support   $10,000

Positive Train Control System Support   $15,000

WyomingMr. Stephen A. Fisk, Sr. Mgr. Business Development Canadian Pacific Rwy.Nicholson Viaduct Rehabilitation Support   $30,000

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 32 of 54

Page 37: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Northwest RPO

ClarionMs. Christie Burkett, Township Secretary Millcreek Township Supervisors For Millcreek Township SupervisorsT‐561 Asbury Road Bridge over Little Millcreek Support   $835

Ms. Janey Corle, Borough Secretary Sligo Borough Council For Sligo Borough CouncilBlinking Traffic Signals Replacement Support   $8

Limestone Road Widening and Paving Support   $74

Madison Street Bridge Replacement Support   $775

Penn Street Ext. and Cul‐de‐Sac Support   $32

School Speed Limit Beacons Replacement Support   $7

Mr. John A. Corsini, Business Manager Union School District For Route 68 Improvement CommitteeReidsburg Bridge Support   $10,500

Route 68 Congestion Project Support   $19,500

Ms. Nancy K. Freenock, Borough Manager Clarion Borough For Clarion Borough CouncilCorbett Street Intersection Support   $150

Greenville Avenue Sidewalk Support   $250

South Sheridan Road Support   $55

Ms. Sharon K. Heeter, Borough Secretary Knox Borough For Knox Borough CouncilRoute 208 Retaining Wall Support   $1,500

Mr. Bill John,  Rte. 68 CommitteePriority Projects Support  

Mr. Richard McGarrity, Borough Secretary New Bethlehem Borough Council For New Bethlehem Borough CouncilPenn Street Project Support  

Smuckers Route 28 Access Project Support  

Wood Street Retaining Wall Support  

CrawfordDr. Roy Brant, Chairman CCPC Transportation CommitteePriority Projects Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 33 of 54

Page 38: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ Northwest RPO

CrawfordMr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Cussewago TownshipCrowther Road Bridge Replacement Project Support   $750

Fry Road Bridge Replacement Project Support   $750

Jay Road Bridge No. 2 Replacement Project Support   $750

Lake Road Bridge Replacement Project Support   $750

Middle Road Bridge Replacement Project Support   $750

Mr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Troy TownshipDeeter Hill Road Bridge Replacement Support   $750

Mr. Larry A. DeYoung, V.P. Gov't Relations Western N.Y. & Pennsylvania RRCrossing and drainage repairs Support   $1,000

Mr. Mike Forbes, Chairman Union Township BoardUnion Township Priority Projects Support  

Mr. Matt Gilara, GISP, ManagerRegional Overview Support  

Mr. Jack P. Lynch, Planning Director Crawford County Planning Commission For Crawford CountyCenter Road Bridge Replacement Support   $150

Deeter Hill Road Bridge Replacement Support   $150

Dotyville Bridge Replacement Project Support   $100

Hamilton Road Bridge Replacement Project Support   $100

Hogback Road Bridge Replacement Project Support  

Jay Road Bridge No. 2 Replacement Project Support   $100

Lake Road Bridge Replacement Project Support   $100

Plank Road Bridge Replacement Support   $150

Shermansville Road Bridge Replacement Support   $250

SR 408 Bridge over Thompson Run Support   $100

SR 408/Main St/ Walnut St Intersection Realign Support   $150

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 34 of 54

Page 39: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ Northwest RPO

CrawfordMr. Jack P. Lynch, Planning Director Crawford County Planning Commission For Port Meadville AirportConstruct Airport Access Road Support   $600

Mr. B J  Smith,Route 198/North Street Safety View Oppose   $12,300

Ms. C.J. Tisi, Transp. Committee Member Titusville Chamber of CommerceTitusville Intersections Project Support   $5,200,000

Trans Loading Facility Support   $2,100,000

Honorable Morris Waid, Commissioner Crawford CountyCrawford County ‐ Priority Projects Support  

ErieSenator Jane M. Earll, 49th  District Senate of PennsylvaniaErie Priorities Support  

Representative John R. Evans, 5th Legislative District PA House of Representatives5th Legislative District Priorities ‐Erie Crawford Support  

VenangoMs. Judith Downs, Executive Director Venango County  Regional  PlanningVenango County Priority Projects Support  

Ms. Barbara  E. Gross,Emlenton Hill Reconstruction Support  

Mr. John Phillips, Senior VP Oil Region AlliancePriority Projects Support  

Ms. Diane Prusaczyk, Secretary and Treasurer Utica Borough For Utica BoroughMill Creek Utica Bridge Support  

Ms. C.J. Tisi, Transp. Committee Member Titusville Chamber of CommerceJersey Railroad Bridge Project Support   $1,000,000

Rouseville, PA to Sportsman Curve Project on SR 8

Support 2277 1 1 1 2 $4,545 $4,550

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 35 of 54

Page 40: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ Northwest RPO

VenangoMs. C.J. Tisi, Transp. Committee Member Titusville Chamber of CommerceSportsman's Curve Project Support 2277 1 1 1 2 $4,545 $4,550

Vertical Curves at Kaneville, PA Support   $4,000,000

Ms. Barbara S. Warden, President Scrubgrass Grange #1705 For Scrubgrass GrangeEmlenton Hill Improvement Support 2226 1 1 11 2 $10,270 $12,340

Mr. Troy  A. Wood, Commissioner Venango CountyJackson Twp. Bridge Replacement Bridge 0503 Support   $9,000

Jackson Twp. Bridge Replacement Bridge 0803 Support   $550

Oil City Intersection Improvement Project Support  

Oilcreek Twp. Bridge Replacement Support   $1,045

Plum Twp. Bridge Replacement Support   $1,280

Plummer/Grandview Surface Improvement Project

Support  

Rouseville Intersection Turing Radius Support  

Sugarcreek Smart Growth Connectivity Project Support  

WarrenMr. Daniel Glotz, Director Warren County  Planning CommissionRetention of Enhancement Program Support  

North Road Bridge Replacement Support  

Stillwater Creek Bridge Replacement Support  

Tidioute Creek Bridge Replacement Support  

Way Road Bridge Replacement Support   $600

Widdlefield Run Bridge Replacement Support   $300

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 36 of 54

Page 41: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Reading MPO

BerksSenator David G. Argall, 29th District Senate of PennsylvaniaBerks County Programmed Projects Support  

Berks County Projects‐ Not Programmed Support  

Mr. Troy S. Bingaman, Township Manager Township of Exeter For Township of ExeterShelbourne Road & SR 562 Support   $1,600

Mr. J. Karl Hilgendorf, Citizen Boro Planning Commission/BOSS 2020422 Congestion Relief/Downtown Revitalization Support  

Mr. Christian  Y. Leinbach, Commissioner County of BerksRoute 222 North Support  

US 422 Corridor Improvement Project Support  

Mr. Dennis D. Louwerse,  BARTABARTA Overview and Act 44 Support  

Mr. Robert B. Ludgate, Borough Engineer Ludgate Engineering Corp For Borough of Sinking Spring422 Congestion Relief/Downtown Revitalization Support   $20,000

Mr. David  Meas, Business/Property Owner Hair on the Avenue422 Congestion Relief/Downtown Revitalization Support  

Senator Michael A. O'Pake, 11th District Senate of PennsylvaniaIntersections at SR 73 and 662 Support  

SR 222 Berks County between Reading/Allentown

Support  

Mr. Alan Piper,  Berks County Planning CommissionRegional Overview ‐ Berks County Support  

Mr. Mike  Santillo, Chairman Upper Merion Trans AuthorityChester Valley Trail Extension Support 14675 1 $18,489 $19,033

US 422 Berks County to Schuylkill River Support 14698 1 2 $13,295 $65,284

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 37 of 54

Page 42: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ Reading MPO

BerksMr. Randall W. Swan, Chairman, 222 North Task Force Berks Economic Partnership222 North; Berks County  and  portions of Lehigh County

Support 77027 1 $6,579 $183,000

Ms. Carolyn Williams, Borough Manager New Morgan BoroughSR 10 Widening Project Support 10331 1 1 11 1 $10,525 $12,425

Mr. James E. Yarger, Borough Resident Borough Planning Commission For Borough of Sinking Spring422 Congestion Relief/Downtown Revitalization Support   $20,000

Ms. Diane T. Yarger, Borough Resident Borough Zoning Board For Borough of Sinking Spring422 Congestion Relief/Downtown Revitalization Support   $20,000

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 38 of 54

Page 43: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Scranton‐Wilkes Barre MPO

LackawannaRepresentative Paul E. Kanjorski, 11th District Congress of the United StatesExpansion of Interstates 80 & 81 Support  

Lackawanna Cut‐Off Passenger Rail Service Restoration

Support  

Mr. Karl F. Pfeiffenberger Jr., Transportation Liaison Scranton Chamber of Commerce For Valley View Business ParkValley View Business Park Access Road Support 77544 $20,410

LuzerneSenator Lisa Baker,  PA SenatePA Senate D20 Support  

Representative Karen Boback, 117th Legislative District PA House of RepresentativesRt 239 Wading at RR Tracks Support 9214 1 2 $1,905 $1,950

Representative Mike Carroll, 118th Legislative District PA House of RepresentativesPriorities for Legislative District 118 Support  

Representative Paul E. Kanjorski, 11th District Congress of the United StatesBartoli Lane Bridge Support  

Extension of Route 424 Support  

Glen Avenue (Bridge) Replacement Support  

Nanticoke & Plymouth Township Bridge Preservation

Support  

Plymouth Township Bridge Replacement Support  

South Valley Parkway Project Support  

Water Street Bridge (Replacement) ‐City of Pittston

Support  

Widening of Route 93 Support  

Wilkes‐Barre/Scranton Int. Airport Intermodal Center

Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 39 of 54

Page 44: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ Scranton‐Wilkes Barre MPO

LuzerneMs. Mary M. Loughlin, Regional Coordinator Epilepsy Foundation of E. PATransportation for Epilepsy Sufferers Support  

Mr. Albert Mertz, President Operation OvercomeTransportation for People w/ Disabilities Support  

Ms. Donna Palermo, President Greater Hazleton C/CRt. 424 Beltway Extension Support 70457 $7,700

Rt. 924 Widening Support 73576 1 $15,154 $12,717

Ms. Donna Palermo, President Greater Hazleton C/C For Route 424 Beltway ExtensionI‐81/RT. 924 Interchange Support 9068 $7,100

Representative John J. Siptroth, 189th Legislative District PA House of RepresentativesProjects in Luzerne County Support  

Ms. Nancy Snee, Transportation Planner Luzerne County PlanningRegional Overview Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 40 of 54

Page 45: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

SEDA COG RPO

Mr. Vern Foreman, Supervisor Jackson TownshipPriority Projects Support  

Mr. Jim Saylor, PE, Transportation  Planning Director Program  Director SEDA‐COGState of the Transportation System  

Mr. Jim Saylor, PE, Transportation Planning Program  Director SEDA‐COGPriority Projects  

ClintonMr. Dan Harger, Transport Committee Chair Clinton County Economic PartnershipOverview Priority Projects for CCEP Support  

Beaver Dam Run Bridge Support 81409 1 1 11 1 $1,301 $1,159

Big Fishing Creek Bridge ‐ Section A05 Support 3864 1 2 22 2 $2,459 $1,984

Big Fishing Creek Bridge ‐ segment 0020/1020 Support 81393 1 2 22 2 $2,740 $2,805

Chatham Run Bridge on SR 1002 Support 3863 1 2 22 2 $1,503 $1,590

Engineering Study of SR 0120 Retaining Walls Support  

First Quality Products Tissue Plant Access Support  

Fishing Creek Bridge Decking SR 2004 (seg 82) Support  

Fishing Creek Bridge II Cedar Springs Support 3829 1 1 11 1 $2,940 $3,281

Fishing Creek Bridge Mill Hall Support 3821 1 2 22 2 $2,832 $2,360

Fishing Creek Bridge SR 477 Loganton Support  

Fishing Creek Deck Replacement Support 83018 1 1 $747 $1,062

Fishing Creek to Bald Eagle Creek Safety Improvement

Support 68723 1 $4,493 $5,806

Halls Run Bridge Replacement Support 69039 1 1 11 2 $2,009 $2,100

Hammersley Fork SR 144 Superstructure Support 83786 1 $1,773 $1,747

High Speed Interchange SR 220 & I‐80 Support   $6,500

Kettle Creek Deck Replacement Support 3854 1 1 $1,670 $1,426

Kettle Creek Road Retaining Wall Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 41 of 54

Page 46: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ SEDA COG RPO

ClintonMr. Dan Harger, Transport Committee Chair Clinton County Economic PartnershipKeystone Central Traffic Safety Study Support  

Lick Run One‐Lane Bridge Replacement Support  

Long Run Bridge Replacement SR 477 (40) Support 69041 1 11 1 $2,461 $2,620

Long Run Bridge SR 477 segment 30 Support  

Long Run Bridge SR 477 segment 80 Support  

Mill Run Bridge Replacement Support  

Montour Run Bridge Replacement Support  

Old Hill Road Bridge Support  

Rock Point Removal Kettle Creek Road Support  

Rote One‐Lane Bridge Replacement Support  

South Avis Access Road Support   $4,000

SR 1001 Safety Improvements Support 3850 1 $800 $12,278

SR 1008 (Cider Press Rd) Bridge Replacement Support  

SR 1024 N. Fairview Street Betterment Support  

SR 120 Red Hill Over Vertical Support  

SR 150 High / Bellefonte Ave Betterment Support  

SR 2004 Closed Fishing Creek Bridge Replacement

Support  

SR 2012 Love Run Box Support 73220 1 $151 $233

SR 220 & Auction Rd Intersection Bridge Support 76150 1 11 1 $7,981 $8,261

SR 477 Bridge over Dry Run ‐segment 50 Support 69042 1 1 11 1 $1,586 $1,393

SR 64 Widen & Straighten Curve Support  

Sugar Run Road Betterment Support  

Trout Run Bridge Alignment SR 4001 Support  

Two‐Mile Bridge & Road Alignment Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 42 of 54

Page 47: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ SEDA COG RPO

ClintonMr. Dan Harger, Transport Committee Chair Clinton County Economic PartnershipWest Branch Susquehanna Bridge Decking Support  

Young Women's Creek Bridge Decking ‐SR 120 Support  

ColumbiaRepresentative Paul E. Kanjorski, 11th District Congress of the United StatesPine Township Bridge Replacement Support  

JuniataMr. Don R. Woodward,Safety Improvement SR 35 & Black Log Road Support  

MifflinMr. Robert E. Dauer,  Meyer, Unkovic & Scott, LLP For Burnham Properties, LPU.S. 322 Burnham Interchange Improvements Support   $5,000

Mr. William A. Gomes, Director Mifflin County PlanningGeneral Studies Support  

SR4013 Winding Lane/Ferguson Valley Rd Intersection (Derry Twp)

Support  

T‐342 Knepp Road Bridge Repair (Menno Twp) Support  

T‐448 Havice Valley Road Bridge (Armagh Twp) Support  

T‐737 Alfarata Road Bridges (Decatur Twp) Support  

T‐738 Nolan Drive Bridge Support  

Mr. Nicholas Moraitis, President Moraitis PropertiesRt. 322‐‐Burnham interchange Support  

MontourMs. Amanda  Boyer, Director Montour County TransitMontour County Bridges Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 43 of 54

Page 48: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ SEDA COG RPO

NorthumberlandMr. Ronald Smith, Chairman Northumberland County AirportProposed Extension of Runway 8‐26 Support   $4,060

Proposed Extension of Runway 8‐26 Support   $921

SnyderMs. Virginia A. Zeiber, Administrator Middleburg BoroughCemetery Road Bridge Replacement Support   $600

UnionMr. John J. Del Vecchio, Community Planner Union County For Union CountyCentral Susquehanna Valley Throughway Support   $490,000

Dice Bridge Support   $750

Iddings Bridge Support 7500 1 1 1 $1,165 $1,270

Nogle Bridge Support 7540 1 $187 $556

Route 15 Route 44 Improvements Support  

T‐405 Bridge over Little Buffalo Creek Support 7469 $480

Mr. William J. Metzger, Sr.,Safety Improvements Rt 15 & Colonel John Kelly Rd.

Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 44 of 54

Page 49: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Shenango Valley MPO

MercerMr. Mark J. Corey, Township Engineer Mark J. Corey & Associates For Harborcreek TownshipBroadway Ave (Sr60) Improvements Phase I Support 1486 1 11 1 $12,597 $17,300

State St/Dutch Ln/Maple Dr Intersection Support 79932 1 $625 $788

Mr. Jeremy P. Coxe, Community Planner City Of HermitageBroadway Avenue (Sr60) Improvements ‐ Phase III

Support   $10,000

Shenango Valley Industrial Corridor ‐ Phase II Support 69966 22 2 $12,380 $10,500

State St (SR 3008) Intersection Improvements Support   $3,500

Mr. Dan Gracenin, Executive Director Mercer County  Regional Planning CommissionRegional Overview Support  

Mr. Mark A. Miller, Engineer Mercer County Bridge For Mercer CountyKelly Road Bridge (Dual) Support 1671 1 1 11 2 $3,866 $3,430

Mill Run Bridge Replacement Support 1692 1 1 11 2 $1,837 $1,646

Oak Hill Road Bridge Support 1887 1 11 2 $670 $570

Ohl Street Bridge Support 1745 1 1 11 2 $3,843 $3,610

Parker Road Bridge Support   $600

Race Street Bridge Support 1746 1 2 22 2 $2,867 $2,835

Redfoot Road Bridge Support 1938 1 11 1 $557 $515

Walnut Street Bridge Support 1694 1 11 1 $522 $480

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 45 of 54

Page 50: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Southern Alleghenies RPO

Mr. Fred Querry, Transportation  Program Manager Southern Alleghenies P&D CommissionRegional Overview Support  

FultonMs. Bonnie Mellott Keefer, Chair County of FultonGem Curve Area Improvements Support  

Intersection Improvement at SR 484 and SR 3001 Support  

Licking Creek Bridge on U.S. 30 at Harrisonville Support  

Runaway Truck Ramp on SR 16 Support  

HuntingdonMr. William W. Hoover, Commissioner Huntingdon CountyUS 22 and PA 453 Transportation Study Support   $300

Mr. Carl E. Lorence, Projects Manager Standing Stone Trail Club, Inc.Highway Underpass Route 22 Support  

SomersetMr. Michael J. Farrell, CEO Somerset Hospital For Somerset Hospital StreetscapeBorough of Somerset ‐ Streetscape Enhancements

Support   $708

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 46 of 54

Page 51: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

SPC MPO

Representative Mike Turzai, 28th Legislative District PA House of RepresentativesOverview Support  

AlleganyDr. James Hassinger, President/CEO SPCRegional Overview  

AlleghenyMr. Chad Amond, President Monroeville Area Chamber of CommerceMon Valley/Fayette Expressway Support  

Mr. Scott Anderson, Town Manager Township of PinePriority Projects For the Township of Pine Support  

Mr. Dean E. Bastianini, Township Manager Richland Township For Richland TownshipWiden SR 0008 at Ewalt Road for Turn Lanes Support   $2,550

Mr. Thomas E. Baxter IV, Executive Director Friends of the Riverfront For Friends of the RiverfrontWest Carson Street Viaduct Support 28126 1 1 11 1 $41,751 $23,300

Mr. Stephen S. Bland, Chief Executive Officer Port AuthorityImproved Public Transportation in Allegheny County

Support  

Mr. Robert  Borello,  RT 286 CommitteeRoute 286 Project Corridor Support 80508 $34,000

Mr. Tobias  M. Cordek, Town Manager Town of McCandless For Town of McCandlessRoute 19 @ Pine Creek Road Corridor Improvements

Support   $2,250

Mr. Kevin M. Creagh, Township Engineer Shaler Township For Shaler TownshipRt. 8 , Old Butler Plank Intersection Improvement Support   $1,885

Soose‐Parker Intersection Improvement Support   $700

Mr. James Dodaro, Member Board of Directors Port Authority Allegheny CountyMon Valley/Fayette Expressway Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 47 of 54

Page 52: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ SPC MPO

AlleghenyMr. Gerard Duke, Municipal Planner Municipality of Bethel ParkRoute 88 & Kings School Road/Logan Road (SR3010)

Support   $3,420

Mr. Stephen Feller, Municipal Manager Municipality of Mount LebanonCochran Road/Beverly Road Signal Upgrade Support   $1,310

Mr. Kevin M. Flannery, Borough Manager Borough of Sewickley For Borough of SewickleyOhio River Boulevard Signalization Project Support   $1,529

Mr. Fred J. Gurney, President and CEO MAGLEV, Inc.Pennsylvania High Speed Maglev Support   $5,250,000

Mr. Joseph Hoffman, Chief White Oak Police DepartmentLincoln Way Widening Project Support  

Mr. Donald G. Hultberg, White Oak Engineering Rep. The EADS Group, Inc.SR 2013 Lincoln Way Widening Support  

Mr. Joe P. Kirk, Coordinator Expressway Partnership InitiativeMon Valley/Fayette Expressway Rt 51 to I‐376 Support   $3,800,000

Mr. Gary J. Klingman, Manager Township of FindlayAten Road Bridge Replacement Project Support   $3,500

Ms. Lois Liberman,Mon‐Fayette Toll Road Oppose  

North Bank Trail Support   $2,100

Mr. Christopher  Lochner, Municipal Manager Hampton TownshipRoute 8 & Duncan Road Support   $3,480

Mr. David McGuirk, President Citizens For Alt. New Toll RoadsMon‐Fayette, Southern Beltway Projects Oppose  

Mr. Adam J. McGurk, Executive Director Moon Transportation Authority For Moon Transportation AuthorityThorn Run Road Interchange Upgrade Support 86859 $118

University Boulevard Interchange Support   $43,100

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 48 of 54

Page 53: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ SPC MPO

AlleghenyRepresentative Daryl Metcalfe, 12th Legislative District PA House of RepresentativesRegional Overview Support  

Representative Tim  Murphy, Member, 18th District Congress of the United StatesAten Road Bridge Replacement Project Support   $35,000

Representative Mark Mustio, 44th Legislative District PA House of RepresentativesAten Road Bridge Replacement Project Support   $3,500

Mr. Geoff Nara, Chair, EconDev NAIOP For NAIOPSR 22/30 & SR 60 Interchange Support 65122 1 $16,025 $23,706

Mr. Dan Onorato, County Executive Allegheny CountyPriority Projects Support  

6th, 7th & 9th St. Bridge Rehab Support 76388 1 1 2 $9,016 $7,240

Allegheny County Bridge Preservation Line Item Support   $1,000

Allegheny County Bridge Repair Support 69839 1 $9,579 $19,000

Bower Hill Road Reconstruction Support   $10,000

Brownsville at Broughton Intersection Support 26690 1 $10,500 $17,180

Campbells Run Road Support 27219 $33,911

Carrie Furnace Hot Metal Bridge Extension Support   $10,000

Carrie Furnace Rail Fly‐Over project Support   $15,000

Chartiers Creek No. 6 Bridge Support 80025 $1,352

Dooker's Hollow Bridge Support 76393 1 1 1 2 $13,782 $8,700

Greensburg Pike Bridge (TL06) Support 27742 1 1 $14,210 $16,190

Homeville Viaduct Thompson Run #5 Rehab Support 76447 1 1 2 $6,487 $5,200

Jacks Run Bridge No. 1 Support 27799 1 $9,912 $11,560

Levi Bird Duff Bridge Rehabilitation Support 83124 1 1 1 2 $11,999 $10,350

Mansfield Bridge Support 69203 1 1 $33,083 $36,555

Rankin Bridge Support 27727 1 1 $33,900 $54,745

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 49 of 54

Page 54: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ SPC MPO

AlleghenyMr. Dan Onorato, County Executive Allegheny CountySouth 10th Street Bridge Support 79881 1 1 $22,497 $10,948

Mr. John Petro, Jr., President White Oak Borough CouncilLincoln Way Widening Project Support  

Senator John Pippy, Member, Senate of PA 37th Senatorial DistrictAten Road Bridge Replacement Project Support   $3,500

Ms. Joylette Portlock, W. PA Outreach Coordinator Citizens for PA's FutureTransportation priorities for the region Support  

Mr. Henry Posner III, Chairman Railroad Development Corp.High Speed Rail in Pennsylvania Support  

Ms. Kathryn L. Price,Mon‐Fayette, Southern Beltway Projects Oppose  

Ms. Mary Ellen Ramage, Secretary‐Manager Borough of Etna For Borough of EtnaDewey Street Bridge Superstructure Replacement

Support   $647

Mr. Luke Ravenstahl, Mayor City of Pittsburgh For City of PittsburghPittsburgh Comprehensive Transportation Plan Support   $1,500

Mr. Wilbur A. Steger, President CONSAD Research Corp.Alternative Hi‐Speed Rail Service Support  

Mr. John  Stephen, Executive Director Allegheny River Towns EnterpriseEtna/Sharpsburg Industrial Park Support   $350

Glenshaw Glass District (Route 8 Corridor) Support  

Riverfront and Community Trail Network Support  

Mr. Lisle Williams, P.E. EngineerMon Valley/Fayette Expressway Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 50 of 54

Page 55: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ SPC MPO

ArmstrongMr. Rodney D. Ruddock, Chairman Indiana County Commissioners For Citizens of Indiana CountyU.S. Route 422 Safety Improvements Project Support 25560 1 1 11 $4,195 $5,665

ButlerMr. Jerry A. Andree, Township Manager Cranberry Township For Cranberry TownshipFreedom Road Transportation Improvement Project

Support   $14,932

Mr. Duane A. McKee, Assistant Township Manager Cranberry Township For Cranberry TownshipFreedom Road Transportation Improvement Project

Support   $14,932

Representative Daryl Metcalfe, 12th Legislative District PA House of RepresentativesFreedom Road Transportation Improvement Project

Support  

I‐79/SR 3025 Seneca Missing Ramps Support  

SR 228 Crider's Corner East Support  

Mr. Ronald Olsen, Engineer Clinton Township, Butler CountySR0228/ SR 2005 Support 228 $62

Mr. Donald C. Pepe, Borough Manager Borough of Zelienople For Borough of ZelienopleZelienople Signal and Street Reconstruction Support   $2,400

Zelienople Southwest Connector Support   $23,000

FayetteMs. Pam Snyder, Chairman Greene County Commissioners For County of GreeneMasontown Bridge Support  

Mr. Vincent A. Vicites, Commissioner Fayette CountyPriority Projects Support  

Easy Street Intersection Support  

Route 40 Improvement Project Support  

State Route 21 Project Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 51 of 54

Page 56: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ SPC MPO

GreeneMr. John Kendralla, PPP Co‐Chairman Greene County  Planning Commission For County of GreeneAccess Road ‐ Greene County Airport Support  

Mt Morris Support  

Oak Forest Road Support   $5,000

Signage and Beautification Support  

Wisecarver Dam Access Improvements Support  

Ms. Pam Snyder, Chairman Greene County Commissioners For County of GreeneGreene River Trail Support  

Local Bridge Program Support  

Morrisville Bridge Structures Support  

SR 21 Improvements Support  

Mr. Bruce  Wermlinger, Borough Manager Waynesburg Borough For County of GreeneJackson Run Flood Control Project Support  

SR 218/Morgan Street Grade‐Separated Crossing Support  

Waynesburg Streetscape ‐ Phase 2 Support  

IndianaMr. Rodney D. Ruddock, Chairman Indiana County Commissioners For Citizens of Indiana CountyLocal Bridge Projects Support  

LawrenceMr. Anthony A. Mastrangelo, Mayor City of New Castle For City of New CastleBoyles Avenue Bridge Replacement Support   $1,000

WashingtonMr. Joseph A. Cerenzia, Director of Public Relations CONSOL Energy Inc.New Interchange on I‐70 near Zediker Station Road

Support   $18,000

Mr. James Prisk, P.E., Project Manager Trans AssociatesIntersection of SR 0088 & SR 0837 Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 52 of 54

Page 57: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

Continued ‐ SPC MPO

WashingtonMr. Thomas Rapp, Chairman Carroll TownshipIntersection of SR 0088 & SR 0837, Carroll Twp Support  

Mr. Ned Williams, E&C Committee Chairman Montour Trail CouncilIntersection Realignment SR 50 & SR 980 Support  

WestmorelandMs. Susan E. Bortz, Mayor Derry Borough, Mayor's Office For Borough of Derry, PADerry Bridge (Route 217 Bridge) Support 74251 1 1 11 2 $22,885 $18,450

Mr. Christopher J. Bova, Senior Planner Westmoreland County Planning For Westmoreland Co. CommissionersBaldridge Bridge ‐ Westmoreland County Owned Support   $3,800

Route 30 @ Jeannette Highway/Safety Improvements

Support 31872 1 1 $10,300 $14,900

Rt. 356/Freeport Bridge Support 31338 1 1 1 $60,987 $71,750

Slickville Road‐Local/Westmoreland County Support   $3,000

SR 130 Corridor: Harrison City‐Export Rd to PA TP Support 32117 $8,900

SR 136 Corridor from Swede Hill Road to Toll 66 Support 31802 $7,100

SR 22 Section B10 Support 31478 1 $19,500 $46,175

SR 31 from PTC Toll Plaza to SR 711 Intersection Support 57452 $6,500

Mr. Terry Daughenbaugh,  Westmoreland County  PlanningLaurel Valley Transportation Project Support 31828 $10,525

Williamsport MPO

LycomingMr. Mark Murawski, Transportation Planner Lycoming County Planning CommissionRegional Overview Support  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 53 of 54

Page 58: STATE TRANSPORTATION COMMISSION€¦ · Senator Robert M. Tomlinson, 6th District Senate of Pennsylvania Closing of RT 13 during Rt. 13 ‘S’ Bend Project, Oppose PA Turnpike

FDPE ROWUTL CON TotalProgram$000

TotalEstimated

$000

ProjectID

Requested Action

Presented:

York MPO

YorkMs. Felicia  S. Dell, Director York County Planning Commission For York County/ York Area MPOBringing It All Together ‐Regional Overview Support  

Mr. Joe Heffner, Assistant Director York County Planning Commission For Felicia Dell  , York County and  York Area MPORegional Overview  

2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009   ‐‐ Page 54 of 54