state of patriot missiles

13
 UNCLASSIFIED Lower Tier Project Office Land of Opportunity! UNCLASSIFIED UNCLASSIFIED SS 3286 (1) 5/5/2011 11:15 AM  State of PATRIOT Presented to  AUSA Confe rence 26 April 2011 Distribution A: Approved for Public Release; Distribution Unlimited. SS 3286 (1) 5/5/2011 11:15 AM Lower Tier Project Office Land of Opportunity! 

Upload: taira-mai

Post on 07-Oct-2015

22 views

Category:

Documents


1 download

DESCRIPTION

Mr. Darryl J. Colvin Speaker Briefing_AUSA Missiles Conference.Briefing on the state of PATRIOT missile battalions, AUSA confrence.

TRANSCRIPT

 
 AUSA Conference
Distribution A: Approved for Public Release; Distribution Unlimited.
 
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (2) 5/5/2011 11:15 AM
LOWER TIER PROGRAM SPANS
THE ACQUISITION LIFE CYCLE
• PAC-3 (PATRIOT Advanced Capability 3) • PDB-X (Post Deployment Build Number) • REP-III (Radar Enhancement Phase 3) • RLCEU (Remote Launch Communications
Equipment Upgrade) • RS (Radar Set) • TCS (Tactical Command Station) • JTAGS (Joint Tactical Ground Station)
PAC-3
Pre-PAC-2
• PDB-5.5.3
• Growth Potential • Performance
MS-B CDR MS-C FRP
• GEM (Guidance Enhanced Missile) • GSE (Ground Support Equipment) • IAMD (Integrated Air & Missile Defense) • ICC (Information Coordination Central) • LRIP (Low Rate Initial Production) • LS (Launcher Station) • MAP (Modern Adjunct Processor) • PAC-2 (PATRIOT Advanced Capability 2)
Sweep-down Synch
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (3) 5/5/2011 11:15 AM
• Key Tenets
RECAP / Reset Rate / Efficiencies
Readiness (sustainment, reliability, obsolescence, and training base)
Software (modernization and personnel)
LTPO KEY TENETS & COST DRIVERS
 
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (4) 5/5/2011 11:15 AM
AIR AND MISSILE DEFENSE
CAS(06)LWDH_3-125-09 Ver 14 / FMS-PR (U)
PDB 9.0
FY08 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 & Beyond
GTA
Baseline (2009)
Sync 1 (2014)
Sync 2 (2016)
• Improved Combat ID
Sync 3 (2018)
• Fully Netted & Distributed
• Limited Netted Operations
Acronyms ALTBMD - Active Layer Tactical Ballistic
Missile Defense CRI - Cos t Re duct ion Init iat ive ECP-24 - G EM - G uid an ce En ha nc ed M is sile GSE - Ground Support Equipment HADM - High Al ti tude Debris Mi tiga tion HTK - Hit to Kill IAMD - Integra ted A ir & Missi le Defense ICD - Int erfa ce Control Docume nt IFC - Integrated Fire Control IFPC - Ind irect Fi re Protection Capabi li ty IO C - In it ia l O pe ra tio n Ca pa bi lit y IOT - Init ial Ope rat iona l Tes t MAP - Modern Adjunct Proce ssor   MSE - M is si le Se gme nt E nh an ce me nt MTBOMF - Meantime Between Operational
Mission Failure OIF - Operation Iraqi Freedom
OIF Fixes PDB-6.5 Software
• HADM
IFCNet
Sentinel
JLENS
•Launchers on Net
Provide Increased Performance Over Time  – At a Reduced Cost, Increased Reliability, and Effectiveness
Avenger IFPC
PATRIOT ROLE IN THE FORCE &
CAPABILITY TO FMS PARTNERS
Additional Partners Will Continue to Maintain and Strengthen PATRIOT Worldwide
CAS 32 ARDM 3_27_97 (U) Ver 33 (5 Oct 10)
11 Allied Partner Nations
(Readiness Rate 90% or Above)
 
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (6) 5/5/2011 11:15 AM
MSE 7-3 FLIGHT TEST
reliability scoring
and modeling
Engagement Control
Station (ECS)
Radar Set
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (7) 5/5/2011 11:15 AM
PATRIOT COST REDUCTION
 
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (8) 5/5/2011 11:15 AM
World Wide Pure
• Readiness (sustainment, reliability,
• RAM Mods and Spares
PATRIOT 30 Year
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (9) 5/5/2011 11:15 AM
• Modern Manstation (MMS)
 Assemblies
• MAP/PDB7
• Radar Data Processor (RDP) / PDB8
−  AN/TPX-57 IFF Full Capability
− 432 Total Modules to 12
• COMMO UPGRADES
− Increased Engagement Envelope / Defended Area
− Higher Performance Solid Rocket Motor 
− More Responsive Control Surfaces
• Enhanced Launcher Electronic System (ELES) − Upgrades Existing Launcher to Fire PAC-3 Missiles
− Facilitates Future Upgrades to MSE
• PATRIOT / Upper Tier Interoperability − Upper Tier Debris Mitigation
− Engagement Coordination
• Reconfigurable Table Top Trainer (RT3) − Replaces obsolete hardware with COTS based solution
− Runs tactical software
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (10) 5/5/2011 11:15 AM
• Radar Data Processor (RDP)
 – 432 total modules to 12
• Digital Track Via Missile (TVM)
 – 32 of 38 Module Types eliminated
 – 328 total modules eliminated
 – Replaces obsolete hardware with COTS based solution
 – Runs tactical software
• Modern Manstation (MMS)
 – Upgrade replaces 221 obsolete parts in 41 assemblies
 – Opportunity to reduce IAMD costs
FMS LIFT
Keep PATRIOT Relevant for Next 30 Years
 
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (11) 5/5/2011 11:15 AM
Background
reliability
to the 15KW generator 
to:
 – Reduce fuel consumption, sparing items,
maintenance times and costs associated with
generator repairs
Root Cause
than steady state
peak load with margin
 – Wet stacking results in increased generator
maintenance and eventually generator failure
LAUNCHER RELIABILITY
Launcher and Fire Unit RAM
 
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (12) 5/5/2011 11:15 AM
Solution
• Add a Power Distribution Unit/Control Logic
Assembly (PDU/CLA)
alternate power sources (solar, wind, etc.)
 – Supplements the 5KW generator with batteries to
provide peak power 
• Incorporates prognostics
accessible
 – Batteries keep the Launcher electronics alive
• Reduced fuel consumption
• Forward and backward compatible
• Same mounting pattern as current 15KW generator 
• Same Launcher interface cables as current 15KW
generator 
(cover removed to show batteries) 5KW Generator 
 
HYBRID GENERATOR
 
Lower Tier Project Office – Land of Opportunity!  UNCLASSIFIED UNCLASSIFIEDSS 3286 (13) 5/5/2011 11:15 AM
• Key Tenets
RECAP / Reset Rate / Efficiencies
Readiness (sustainment, reliability, obsolescence, and training base)
Software (modernization and personnel)
LTPO KEY TENETS & COST DRIVERS