state of north carolina division of highways b … 6 letting/8-15-2018/df0023… · 15.08.2018 ·...
TRANSCRIPT
AUGUST 15, 2018
JULY 31, 2017
ALEX HENDERSON
CUMBERLAND COUNTY
US 401 (RAMSEY STREET) AT SR 2523 (BIENVILLE DRIVE)
GRADING, DRAINAGE, WIDENING, PAVING, AND
PAVEMENT MARKINGS
D
T
V
=
=
=
=
=
%
MPH
ADT
ADT
% *
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION
NO.TOTALSHEETS
N.C.SHEET
1
DESIGN DATA Prepared in the Office of:
DIVISION OF HIGHWAYS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
DF00230
PLANS
PROFILE (VERTICAL)
LOCATION:
TYPE OF WORK:
09/08/99
W-5706BDIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
0
00
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amse
y
St) at
Bie
nville\
Road
way\
Proj\
W-5706
B_
Rdy
_tsh.d
gn
$$$$
US
ER
NA
ME$$$$
CO
NT
RA
CT:
TIP P
ROJE
CT:
W-5706B
AR
TM
E
N
N
A
S
O H
DE
P
TOF TRA
SPO
RT
TIO
N
TA
TE
OF N RTC
A
RO
LIN
A
Carv
ers
Creek
Wolk
point
Dr.
Lou
Dr.
RachelRd.
Farm Rd.
Palestine Rd.
Slocomb Rd.
McBryde
St.
Norfolk
Southern
Corporation
Ra
msey
St.
401
(N.T.S.)VICINITY MAP
401Currin
Lake
LIMITSPROJECT
Ch.
Palestine
ElliotBridge
Rd.
Elliot
2038
2018 15,000
24,500
50
5
55
* TTST =2% DUAL =3%
FUNC CLASS =
MINOR ARTERIAL
44852.1.2
44852.2.2
44852.3.2
P.E.
ROW/UTIL
CONST.
4
-L- STA. 12+15.00
BEGIN TIP PROJECT W-5706B
-L- STA 23+55.00
END TIP PROJECT W-5706B
TO SR 1607 (ELLIOT BRIDGE RD.)TO I-295-L- US 401 (RAMSEY ST.)
-Y- SR 2523 (BIE
NVIL
LE
DR.)
HSIP-0401(280)
HSIP-0401(280)
HSIP-0401(280)
TOTAL LENGTH OF TIP PROJECT W-5706B = 0.216 MI50 1002550
50 25 50 100
5 10510
431 Transportation Dr., Fayetteville NC, 28301
FINAL PLANS
2018 STANDARD SPECIFICATIONS
JOHN GAUTHIER
-Y- STA. 11+50.00
BEGIN CONSTRUCTION
NAD 83 2011
This electronic collection of documents is provided
for the convenience of the user
and is Not a Certified Document –
The documents contained herein were originally issued
and sealed by the individuals whose names and license
numbers appear on each page, on the dates appearing
with their signature on that page.
This file or an individual page
shall not be considered a certified document.
Existing Edge of Pavement
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing Metal Guardrail
Existing Cable Guiderail
Proposed Guardrail
Equality Symbol
Pavement Removal
Existing Right of Way Marker
Existing Right of Way Line
h
Existing Control of Access
C
F
Existing Easement Line
HYDROLOGY:
Stream or Body of Water
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;
z
v
W
KProposed Lateral, Tail, Head Ditch
False Sump
Proposed Cable Guiderail
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Paved Ditch Gutter
UTILITIES:
ROADS AND RELATED FEATURES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power Manhole
Power Line Tower
Power Transformer
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}
T
p
Q
l
]
/
b
H-Frame Pole O O
POWER:
TELEPHONE:
Telephone Cell Tower
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
4
I
H
a
TV:
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
|
I]
GAS:
Gas Valve
Gas Meter n
c
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
d
o
A/G Water
Above Ground Gas LineA/G Gas
Above Ground Water Line
Above Ground Sanitary SewerA/G Sanitary Sewer
MISCELLANEOUS:
Utility Pole OF
S3
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
?
CONC
CONC WW
v
v
Drainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer Manhole m
U/G Tank; Water, Gas, Oil
A/G Tank; Water, Gas, Oil
BOUNDARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Monument
Existing Fence Line
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
g
F
123
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
BUILDINGS AND OTHER CULTURE:
Area Outline
Gas Pump Vent or U/G Tank Cap
Church
School
Dam
Sign
Small Mine
Well
V
M
WW
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
Woods Line
Orchard
Vineyard
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
S
FLOW
*S.U.E. = Subsurface Utility Engineering
WLB
EIP
B
ECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cemetery
EXISTING STRUCTURES:
Parcel / Sequence Number
E
AATUR
End of Information E.O.I.
SHEET NO.PROJECT REFERENCE NO.
1BW-5706B
Abandoned According to Utility Records
WLB
EAB
EPB
RW
RW
RW
CA
E
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
Wetland
TUE
DUE
AUE
CRProposed Curb Ramp
CONVENTIONAL PLAN SHEET SYMBOLS
Underground Storage Tank, Approx. Loc.
Geoenvironmental Boring
CA
HPBExisting Historic Property Boundary
U/G Power Line LOS B (S.U.E.*)
U/G Power Line LOS C (S.U.E.*)
U/G Power Line LOS D (S.U.E.*)
P
U/G Telephone Cable LOS B (S.U.E.*)
U/G Telephone Cable LOS C (S.U.E.*)
U/G Telephone Cable LOS D (S.U.E.*)
T
U/G Telephone Conduit LOS B (S.U.E.*)
U/G Telephone Conduit LOS C (S.U.E.*)
U/G Telephone Conduit LOS D (S.U.E.*)
TC
U/G Fiber Optics Cable LOS B (S.U.E.*)
U/G Fiber Optics Cable LOS C (S.U.E.*)
U/G Fiber Optics Cable LOS D (S.U.E.*)
T FO
U/G Water Line LOS B (S.U.E*)
U/G Water Line LOS C (S.U.E*)
U/G Water Line LOS D (S.U.E*)
W
U/G TV Cable LOS B (S.U.E.*)
U/G TV Cable LOS C (S.U.E.*)
U/G TV Cable LOS D (S.U.E.*)
TV
U/G Fiber Optic Cable LOS B (S.U.E.*)
U/G Fiber Optic Cable LOS C (S.U.E.*)
U/G Fiber Optic Cable LOS D (S.U.E.*)
TV FO
U/G Gas Line LOS B (S.U.E.*)
U/G Gas Line LOS C (S.U.E.*)
U/G Gas Line LOS D (S.U.E.*)
G
SS Forced Main Line LOS B (S.U.E.*)
SS Forced Main Line LOS C (S.U.E.*)
SS Forced Main Line LOS D (S.U.E.*)
FSS
Utility Unknown U/G Line LOS B (S.U.E.*)
U/G Test Hole LOS A (S.U.E.*)
STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS
Note: Not to Scale
UST
Contaminated Site: Known or Potential
Known Contamination Area: Soil
Potential Contamination Area: Soil
Known Contamination Area: Water
Potential Contamination Area: Water
Primary Horiz Control Point
Primary Horiz and Vert Control Point
Secondary Horiz and Vert Control Point
Exist Permanent Easment Pin and Cap
New Permanent Easement Pin and Cap
Vertical Benchmark
New Right of Way Line
Concrete or Granite R/W Marker
New Right of Way Line with
Concrete C/A Marker
New Control of Access Line with
New Control of Access
New Temporary Construction Easement
New Temporary Drainage Easement
New Permanent Drainage Easement
New Permanent Drainage / Utility Easement
New Permanent Utility Easement
New Temporary Utility Easement
New Aerial Utility Easement
12/2/2016
Computed Property CornerRIGHT OF WAY & PROJECT CONTROL:
New Right of Way Line with Pin and Cap
SHEET NO.PROJECT REFERENCE NO.
2A-1W-5706B
6/2/99
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
Proj\
W-5706
B_
Rdy_typ.d
gn
$$$$
US
ER
NA
ME$$$$
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
CL
GRADEPOINT
GRADE TO THIS LINE
0.08 0.08
TYPICAL SECTION NO.
12' 12' 12'
2'PS
2'PS
6'
EXIST EXIST
1
-L- STA 15+47.91 TO -L- STA 20+21.91
PROJECT NOTES
MILLING AT PAVEMENT TIE-INS
EXISTING CONCRETE PAVEMENT OR
NON-RESURFACEABLE BRIDGE DECKS
OF SURFACE COURSE
MILL EXISTING PAVEMENT
BEGINNING OR ENDING OF MAP,
APPROX. THICKNESS
operation. Structures. Resurfacing will be accomplished at the same time as the milling Carolina Department of Transportation Standard Specifications for Roads andPerform the work in accordance with Section 607 of the January 2012 North
of each resurfacing map.where the bridge will not be resurfaced, and at the beginning and ending pointLocations shall include ties into existing concrete pavement, at bridge approaches
with the following sketch as directed by the Engineer.For surface mixes over 1" in thickness, mill the existing pavement in acoordance
NOTES TO CONTRACTOR
75'
COURSESURFACE
EXISTING
FINAL PAVEMENT DESIGN
3:1
SEE X-SECTIONS
TRANSITION FROM EXISTING (-L- STA 12+15.00) TO -L- STA 15+47.91
SEE X-SECTIONS
TRANSITION FROM -L- STA 20+21.91 TO EXISTING (-L- STA 23+55.00)
9' W/GR
6'
2:1 TO 3:1
2:1 TO 3:1
7' TO 12'
VAR
910-364-0606, 14 DAYS PRIOR TO FINAL PLACEMENT.
FOR SIGNS AND PAVEMENT MARKINGS, CONTACT TRAFFIC SERVICES
PAVEMENT MARKINGS.
UNIT FOR PROPOSED SIGNS AND PLACEMENT OF ALL
CONTRACTOR SHALL COORDINATE WITH LOCAL TRAFFIC SERVICES
EXIST
EXISTEXIST
2:1 TO
3:1
GRADE TO THIS LINE
REPLACEMENT, OR INSTALLATION OF SIGNS.
THERE WILL BE NO DIRECT PAY FOR THE RELOCATION, REMOVAL,
REPLACING, OR INSTALLING SIGNS AS DIRECTED BY THE ENGINEER.
THE CONTRACTOR IS RESPONSIBLE FOR RELOCATING, REMOVING,
*****SIGNING WILL BE INCIDENTAL TO THE PROJECT*****
12. Contractor shall provide driveway turnouts at all soil or gravel drives as directed by the Engineer.
Control of Access and Drainage Easements Per NCDOT Division 6 Special Provision in the contract.
11. The contractor shall be responsible for the permanent staking of all Proposed Right of Way,
10. Contractor to install Erosion Control devices as directed by the Engineer.
unless otherwise indicated on plans.
45' on center in tapers, and 10' on center in radii, and shall be set 3' off the edge of travelway,
9. Channelizing devices in work areas shall be spaced not greater than 50' on center in tangent areas,
directed by the Engineer.
8. During periods of construction inactivity, place cones/drums 3' from existing edge of pavement (travelway) as
7. Access to police and fire stations, fire hydrants, and hospitals shall be maintained at all times.
6. During periods of construction inactivity, the difference in elevation between lanes shall not exceed 1-1/2 inch.
5. The Contractor shall not be allowed to stop traffic for more than 5 minutes at a time in any one direction.
periods of construction inactivity.
4. A minimum of two-way, two-lane traffic (plus all existing left and right turn lanes) shall be maintained during
travelway that has been graded leaving no more than a 1" drop-off.
3. At the end of each workday, the Contractor shall be required to backfill any area adjacent to existing
2. Ingress and egress shall be maintained to all businesses and dwellings on the project.
1. The Contractor shall not work on both sides of the road simultaneously within the same area.
6'
IN CUBIC YARDS
WASTEBORROWUNDERCUTLOCATION EMBT+%
SUMMARY OF EARTHWORK
EXCAVATION
UNCLASSIFIED
310 1540
PROJECT TOTAL 325 1944
-L- 12+15.00 TO 23+55.00
-Y- 11+50.00 TO 12+04.65
SHOULDER BORROW
4
1619
15
400
5% TOP SOIL ON BORROW PIT 81
GRAND TOTAL 1700
SAY 1710
1230
11
400
WASTE IN LIEU OF BORROW -11 -11
APPROXIMATE QUANTITIES ONLY. GRADING WILL BE PAID AS LUMP SUM. SEE SPECIAL PROVISION.
10.5" 10.5"
5'~ ~
NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.
PAVEMENT SCHEDULE
EXISTING PAVEMENT.U
PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE,D1
TYPE I19.0B, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
C1PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD.
AT AN AVERAGE RATE OF 570 LBS. PER SQ. YD.
PROP. APPROX. 5" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,E1
AGGREGATE SHOULDER BORROW.T
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
23-J
UL-2018 13:5
0H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
Proj\
W-5706
B_
Rdy_psh_4.d
gn
$$$$
US
ER
NA
ME$$$$
8/17/99
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
W-5706B 4
REM
RET
W/ 4'-18" RCP CL IV
COLLAR AND EXTEND
INV = 237.35'
+21.01 38.80' LT
88'-18" RCP CL IV
INV = 237.85'
+08.83 44.04' LT
88'-18" RCP CL IV
W/ HEADWALL
W/ 4'-18" RCP CL IV
COLLAR AND EXTEND
GRADE TO DRAIN
29.5' BST NC HWY 401 (RAMSEY ST. SR 3950)
TO ELLIOT BRIGDE RD. ( SR 1607)TO RACHEL ST ( 1770 SR )
29.5' BST NC HWY 401 (RAMSEY ST. SR 3950)
T
C TTTC
18" RCP
24' B
ST
BIE
NVIL
LE
ST (S
R 2523)
WOODS
WOODS
WOODS WOODS
72" WD
ECM
16" DI D.A.T.U.R.
16" DI D.A.T.U.R.
8" D
I D.A.T.U.R.
T
T TINV=229.06'
INV=231.53'
18" R
CP
4' CONC HW
EIP
EIP EIP
10' S
OIL
10' S
OIL
S 01°56'25" W
213.61'
N 89°5
1'00" W
107.3
5'
N 89°5
1'00" W
599.9
8'
N 89°5
1'00" W
492.6
3'
100.0
0'
60.00'
EXIS
TIN
G
R/
W
EXIS
TIN
G
R/
W
EXISTING R/W
EXISTING R/W
N 02°04'00" E
180.00'
N 88°3
1'00" W
315.9
5'
N 89°0
6'0
0" W
341.9
3'
N 89°0
6'0
0" W
400.0
0'
S 01°15'00" W
108.00'
N 00°54'00" E
69.18'
N 89°0
6'0
0" W
58.0
7'
N 87°5
6'0
0" W
100.0
0'
EXISTING R/W
EXISTING R/W
RONALD BOGLEDB 2756 PG 273
N 89°4
7'3
2" W
180.0
0'
PB 41 PG 28
TILLMAN
EDITH
PG 21
DB 2276
DB 2133 PG 115
DB 9059 PG 688PB 43 PG 21
DB 9562 PG 700PB 44 PG 27
DB 6801 PG 36PB 44 PG 27
JERRY TAYLORDB 8798 PG 182
PERCY CURRINDB 6631 PG 211PB 111 PG 56
EDITH TILLMAN
DAVID PRESTON
MATTHEW GOSSARDJOSEPH MANSFIELD
DB 8868 PG 899PB 51 PG 43
K&J S PROPERTIES
DB 8297 PG 373
R O BURNS LLC
PB 125 PG 162
S 88°4
6'2
9" E
210.6
2'
D.A.T.U.R.D.A.T.U.R.
D.A.T.U.R.
D.A.T.U.R.
D.A.T.U.R.
D.A.T.U.R.
D.A.T.U.R.
D.A.T.U.R.D.A.T.U.R.
D.A.T.U.R.
INV=237.75'
INV=238.91'
WATER LINE STOPS
WOODS
100.0
0'
NCGS "HAUL"
N 89°5
1'00" W
419.9
8'
125' SIG
HT EAS
M'T
125' SIG
HT EAS
M'T
N 88°0
1'00" W
108.2
2'
N 87°5
0'3
5" W
100.0
0'
S
15' S
OIL
DB 5689PG 391PB 110 PG 21
DANIEL BOWMAN
DB 8297 PG 373
R O BURNS LLC
PB 125 PG 162
-Y- POT Sta. 10+00.00
-L- Sta. 19+59.69
-Y- POT Sta. 12+22.48 =
150' FULL
TURNOUT
DRWY
TURNOUT
DRWY
TURNOUT
DRWY
200' TAPER330' TAPER200' TAPER
PS2'
12'
12'
12'
PS2'
PS2'
12'12'12'
EXIS
T
EXIS
T
EXIST
-L- STA. 12+15.00
BEGIN TIP PROJECT W-5706B
-L- STA 23+55.00
END TIP PROJECT W-5706B
15+00
20+00
-L- POT Sta. 24+15.00
RR SPIKE IN BASE OF 8" PINE
ELEV. 243.97'
-L- STA 19+69.18 45.81' RT
BM #118.89' RT
-L- STA 14+62.30
ELEV 243.06'
E 2045000.9430
N 527265.6941
-BL- 2
20.79' RT
-L- STA 19+57.74
ELEV 242.07'
E 2045013.4436
N 527760.9842
-BL- 3
R=
40'
50' FULL
11'
PS2'
AT-1
330' TAPER
-L-
+17.9
1
+61.15
+51.91
GREU TL-3
-Y- STA. 11+50.00
BEGIN CONSTRUCTION
DRIVE WITHIN ROW AND EASEMENT
PLACE 3" INCIDENTAL STONE IN
2 3 4
5
1
EX. R/W
65' PDE/TCE
-L- +25.00
EX. R/W
65' PAE
-L- +60.00
EX. R/W
65' PDE/PAE
-L- +05.00
PERMANENT ACCESS EASEMENT FOR DRIVE
EX. R/W
60' TCE
-L- +70.00
EX. R/W
60' TCE
-L- +80.00
6 6
65' TCE/EX.
-L- +95.89
F F F
FF F
F F F F FF
F F
F
F F F
F F F F F F F F F F F FF F F
F F F F
FFFF
F
C
C C
CCC C
NAD 83 / 2011
11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00
220
230
240
250
260
220
230
240
250
-L-
5W-5706B
13+0012+0011+00
230
240
250
260
-Y-
5/28/99
SHEET NO.PROJECT REFERENCE NO.
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
Proj\
W-5706
B_
Rdy_P
FL_5.d
gn
$$$$
US
ER
NA
ME$$$$
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
-L- STA 23+55.00 ELEV = 242.20'
END TIP PROJECT W-5706B
-L- STA 12+15.00 ELEV = 244.84'
BEGIN TIP PROJECT W-5706B
ELEV = 238.73'
-Y- STA 11+50.00
BEGIN CONSTRUCTION
ELEV = 242.67'
-Y- STA 12+04.48
END CONSTRUCTION
230
240
250
260
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
XS
C\
W-5706
B_
Rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
245 245
250 250
240 24011+00.00
245 245
250 250
240 24011+50.00
245 245
250 250
240 24012+00.00
245 245
250 250
12+50.00
240 240
245 245
250 250
13+00.00
240 240
245 245
250 250
255 255
13+50.00
X-1W-5706B
-L-
2.5 5
244.68
244.77
244.82
244.84
3:13:1MATCH EXISTING SLOPE
S.S. 242.69
244.67
3:1 3:1
S.S. 242.26
244.50
DRIVE
3:13:1
240.86
MATCH EXISTING SLOPE
10'
S.S. 241.68
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
XS
C\
W-5706
B_
Rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
240 240
245 245
250 250
235 23514+00.00
235 235
240 240
245 245
250 250
14+50.00
235 235
240 240
245 245
250 250
230 230
15+00.00
230 230
235 235
240 240
245 245
250 250
15+50.00
X-2W-5706B
-L-
2.5 5
244.323:1
3:13:1
239.97
MATCH EXISTING SLOPE
12'
S.S. 238.96
S.S. 240.88
244.143:1
239.83
3:1
2.5:1
12'
S.S. 236.04
S.S. 240.56
244.062:1
3:1
S.S. 234.55
S.S. 238.73
243.98
2:1
2.5:1
MATCH EXISTING SLOPE
S.S. 230.73
S.S. 238.16
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
XS
C\
W-5706
B_
Rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
230 230
235 235
240 240
245 245
250 250
225 225
16+00.00
230 230
235 235
240 240
245 245
250 250
16+50.00
230 230
235 235
240 240
245 245
250 250
17+00.00
X-3W-5706B
-L-
2.5 5
243.90 2:1
2:1
MATCH EXISTING SLOPE
S.S. 229.35
S.S. 235.23
243.82
2:1
2.5:1
S.S. 228.64
S.S. 235.92
243.72
2:1
2.5:1
MATCH EXISTING SLOPE
S.S. 228.80
S.S. 236.77
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
XS
C\
W-5706
B_
Rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
230 230
235 235
240 240
245 245
250 250
225 225
17+50.00
235 235
240 240
245 245
250 250
230 230
18+00.00
235 235
240 240
245 245
250 250
18+50.00
240 240
245 245
250 250
235 23519+00.00
X-4W-5706B
-L-
2.5 5
243.52
2:1
2.5:1
MATCH EXISTING SLOPE
S.S. 230.74
S.S. 237.54
243.32
2:1
3:1
S.S. 232.85
S.S. 238.41
243.222:1
3:1
S.S. 235.14
S.S. 239.01
243.15
3:1
2:1
MATCH EXISTING SLOPE
S.S. 237.26
S.S. 239.46
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
XS
C\
W-5706
B_
Rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
240 240
245 245
250 250
235 235
19+50.00
240 240
245 245
250 250
235 235
20+00.00
240 240
245 245
250 250
235 23520+50.00
240 240
245 245
250 250
235 23521+00.00
240 240
245 245
250 250
21+50.00
X-5W-5706B
-L-
2.5 5
243.08
-Y-
3:1
PROP 18" RCP CL IV
MATCH EXISTING SLOPE
S.S. 240.09
237.52
243.00
-Y-
3:1
S.S. 240.83
237.79PROP 18" RCP CL IV
242.93
3:12:1 3:1
239.32
9'
S.S. 241.72
241.20
242.85
3:1
239.53
2.5:1
8'
S.S. 242.90
242.71
3:1
3:1
MATCH EXISTING SLOPE
239.77
3:1
7'
S.S. 243.67
240.92
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
XS
C\
W-5706
B_
Rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
240 240
245 245
250 250
235 235
22+00.00
240 240
245 245
22+50.00
240 240
245 245
250 250
255 255
235 23523+00.00
240 240
245 245
235 235
23+50.00
235 235
240 240
245 245
250 250
24+00.00
X-6W-5706B
-L-
2.5 5
242.56
3:13:1
MATCH EXISTING SLOPE
239.95 239.81
242.44
3:13:1
239.48
242.33
DRIVE
3:1
239.07
242.21
3:13:1MATCH EXISTING SLOPE
238.53
242.09
EXISTING
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
23-J
UL-2018 10:4
9H:\
DD
C\
Projects\
W-5706
B
US 401 (R
amsey St) at
Bienville\
Road
way\
XS
C\
W-5706
B_
Rdy_xpl_
Y.d
gn
$$$$
US
ER
NA
ME$$$$
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
235 235
240 240
245 245
230 230
11+40.00
235 235
240 240
245 245
11+50.00
240 240
245 245
235 23511+60.00
240 240
245 245
235 23511+70.00
240 240
245 245
235 23511+80.00
X-7W-5706B
-Y-
2.5 5
238.19
238.73
EXISTING
239.34
MATCH EXIST SLOPE
239.94
3:1
240.55
MATCH EXIST SLOPE3:1