state of connecticut core-ct project april and may 2007

22
STATE OF CONNECTICUT STATE OF CONNECTICUT Core-CT Project Core-CT Project April and May 2007

Upload: jadyn-longmire

Post on 14-Dec-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: STATE OF CONNECTICUT Core-CT Project April and May 2007

STATE OF CONNECTICUT STATE OF CONNECTICUT

Core-CT ProjectCore-CT Project

April and May 2007

Page 2: STATE OF CONNECTICUT Core-CT Project April and May 2007

GL Reporting AgendaGL Reporting Agenda

Objectives for Today

Catalog of On-Line Reports

General Ledger vs. Commitment Control

Tips for Troubleshooting

Featured Reports

Questions

Open Lab

Page 3: STATE OF CONNECTICUT Core-CT Project April and May 2007

Objectives

• Review Key GL and KK Reports

• Tips for Troubleshooting Reports

• Set up Run Controls

Page 4: STATE OF CONNECTICUT Core-CT Project April and May 2007

GL Reporting AgendaGL Reporting Agenda

• Objectives for Today

Catalog of On-Line Reports

Page 5: STATE OF CONNECTICUT Core-CT Project April and May 2007

Catalog of On-Line Reports

Select a report entry

Catalog of General Ledger Reports

Catalog of On-Line ReportsCatalog of On-Line Reports

Page 6: STATE OF CONNECTICUT Core-CT Project April and May 2007

GL Reporting AgendaGL Reporting Agenda

• Objectives for Today

• Catalog of On-Line Reports

General Ledger vs. Commitment Control

Page 7: STATE OF CONNECTICUT Core-CT Project April and May 2007

General Ledger vs. Commitment Control

Commitment Control (KK)

• Ledgers: KK_%

• Encumbrances

• Roll-up Account and DeptIDs

• Budget Journals

General Ledger (GL)

• MOD_ACCRL / MOD_CASH

• No Encumbrance

• Detail Account and DeptIDs

• SSJs, ONLs, DCs, PCs

Page 8: STATE OF CONNECTICUT Core-CT Project April and May 2007

KK to GL Reconciliation Items

• Documents Budget Checked but not Posted.

• Timing – EPM vs. Financials

• Preferable if GL Period is Closed.

• Budget Structures (i.e. DeptID roll-up)

• MOD_CASH Ledger Balances

Page 9: STATE OF CONNECTICUT Core-CT Project April and May 2007

GL Reporting AgendaGL Reporting Agenda

• Objectives for Today

• Catalog of On-Line Reports

• General Ledger vs. Commitment Control

Tips for Troubleshooting

Page 10: STATE OF CONNECTICUT Core-CT Project April and May 2007

Run Controls

• User ID specific (except CFSRs)

• Use Report Titles vs. Initials for IDs

• Include Ledger for KK Run Control IDs

• More detail = More Efficient Processing

• Language – English

• Flexible Ledger Analysis (Tree Levels)

Page 11: STATE OF CONNECTICUT Core-CT Project April and May 2007

Report Parameters

• Use the Budgets Overview Inquiry to confirm Budget Report Parameters such as DeptID and Account.

Navigation:

Commitment Control> Review Budget Activities> Budgets Overview

Page 12: STATE OF CONNECTICUT Core-CT Project April and May 2007

Report Parameters

1. Ledger Group

2. Budget Period

3. Fully range DeptIDs

4. Fund

5. SID

Page 13: STATE OF CONNECTICUT Core-CT Project April and May 2007

Report Parameters

This will provide the appropriate parameters for your reports.

Page 14: STATE OF CONNECTICUT Core-CT Project April and May 2007

Canceling a Report• Fin PeopleTools> Process Scheduler> Process Monitor

Page 15: STATE OF CONNECTICUT Core-CT Project April and May 2007

Canceling a Report

Page 16: STATE OF CONNECTICUT Core-CT Project April and May 2007

GL Reporting AgendaGL Reporting Agenda

• Objectives for Today

• Catalog of On-Line Reports

• General Ledger vs. Commitment Control

• Tips for Troubleshooting

Featured Reports

Page 17: STATE OF CONNECTICUT Core-CT Project April and May 2007

Featured Commitment Control Reports

Commitment Control>Budget Reports• Budget Status Report• Budget Transaction Details• Trial Balance of Appropriation• Negative Balance Report

Reporting Tools> PS/nVision> Define Report Request• CFSR: A through D

Page 18: STATE OF CONNECTICUT Core-CT Project April and May 2007

Featured General Ledger Reports

General Ledger> General Reports• Flexible Ledger Analysis• Ledger Activity

Page 19: STATE OF CONNECTICUT Core-CT Project April and May 2007

GL Reporting AgendaGL Reporting Agenda

Objectives for Today

Catalog of On-Line Reports

General Ledger vs. Commitment Control

Tips for Troubleshooting

Featured Reports

Questions and Open Lab

Page 20: STATE OF CONNECTICUT Core-CT Project April and May 2007

Questions ??Questions ??

Page 21: STATE OF CONNECTICUT Core-CT Project April and May 2007

CustomerCustomer SupportSupport

Users can call the HelpDesk@ 860-622-2300,

Ext. 1

For complex issues, send

email to [email protected]

Page 22: STATE OF CONNECTICUT Core-CT Project April and May 2007

Thank You for your participation

today. We hope this information proved helpful…

ClosingClosing