STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267 nd MEETING 15 th January 2016 1 The 267 th meeting of the State Expert Appraisal Committee (SEAC) was held on 15 th January, 2016 under the Chairmanship of Dr R.B. Lal for discussion on the query responses submitted by the PP and the projects / issues received from SEIAA. The following members attended the meeting- 1. Dr. Mohini Saxena, Member 2. Dr. Alok Mittal, Member. 3. Shri. A. A. Mishra, Member The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations. 1. Case No. - 3986/15 Shri Madan Lal Grover R/o Civil Lines, P.O. & District-Katni (MP)-483501 Prior Environment Clearance for approval of Limestone & Dolomite Mine in an area of 9.84 ha. (50,000 TPA) at khasra No.-79/1, 79/2, 81, 82, 83, 88, 91, 93, 95, 103, Vill.-Salaiya Paharhai, Tehsil-Vijayraghogarh, District-Katni (MP) The case was scheduled for presentation today but PP had requested for postponement of presentation. The case was deferred for considered 16/01/2015 if time permits after all the scheduled presentation. 2. Case No. - 4006/15 Shri Dilip Jain R/o Paras Colony, P.O. & District-Satna (MP)- 485001 Parasrampur White Earth Mine in an area of 4.995 ha. (10,000 cum/year) at Khasra No.-512/2, Vill.-Parasrampur, Tehsil-Maihar, District-Satna (MP) Neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Committee decided to call the PP in subsequent meetings after hearing from PP. A request has to be made by the PP for scheduling the case in coming meetings within a month’s time after which the case shall be returned to SEIAA assuming that PP is not interested to continue with the project. 3. Case No. - 4038/15 M/s Mahaveer Bricks Industries, Smt. Ashadevi Shitlani, Thakur Baba Road, Tehsil-Dabra, District-Gwalior (MP)-474001 Magroura Soil Quarry Lease Area - 2.560 ha., Capacity - 4800 cum/year, at Khasra No.- 1146, 1147, 1148, Vill.- Magroura, Tehsil-Dabra, District-Gwalior (MP)

Upload: truongthu

Post on 20-May-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

1

The 267th meeting of the State Expert Appraisal Committee (SEAC) was held on 15th January, 2016 under the Chairmanship of Dr R.B. Lal for discussion on the query responses submitted by the PP and the projects / issues received from SEIAA. The following members attended the meeting-

1. Dr. Mohini Saxena, Member 2. Dr. Alok Mittal, Member. 3. Shri. A. A. Mishra, Member

The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations.

1. Case No. - 3986/15 Shri Madan Lal Grover R/o Civil Lines, P.O. & District-Katni (MP)-483501 Prior Environment Clearance for approval of Limestone & Dolomite Mine in an area of 9.84 ha. (50,000 TPA) at khasra No.-79/1, 79/2, 81, 82, 83, 88, 91, 93, 95, 103, Vill.-Salaiya Paharhai, Tehsil-Vijayraghogarh, District-Katni (MP) The case was scheduled for presentation today but PP had requested for postponement of presentation. The case was deferred for considered 16/01/2015 if time permits after all the scheduled presentation.

2. Case No. - 4006/15 Shri Dilip Jain R/o Paras Colony, P.O. & District-Satna (MP)-485001 Parasrampur White Earth Mine in an area of 4.995 ha. (10,000 cum/year) at Khasra No.-512/2, Vill.-Parasrampur, Tehsil-Maihar, District-Satna (MP) Neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Committee decided to call the PP in subsequent meetings after hearing from PP. A request has to be made by the PP for scheduling the case in coming meetings within a month’s time after which the case shall be returned to SEIAA assuming that PP is not interested to continue with the project.

3. Case No. - 4038/15 M/s Mahaveer Bricks Industries, Smt. Ashadevi Shitlani, Thakur Baba Road, Tehsil-Dabra, District-Gwalior (MP)-474001 Magroura Soil Quarry Lease Area - 2.560 ha., Capacity - 4800 cum/year, at Khasra No.- 1146, 1147, 1148, Vill.- Magroura, Tehsil-Dabra, District-Gwalior (MP)

Page 2: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

2

This is case of Soil quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No. - 1146, 1147, 1148, Vill. - Magroura, Tehsil-Dabra, District-Gwalior (M.P.) 2.560 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. Q2-02/13 dated: 12/08/2015 has reported that there is 01 more mine operating or proposed within 500 meters around the said mine with total area of 3.467 ha including this mine. The case was presented by the PP and their consultant wherein it was observed that National highway is at a distance of 20 meters it being a soil quarry, the case was considered. The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Soil as per mine plan with quantity not exceeding 4,800 cum/year. • National highway is approx. 20 meters away from the ML area thus additional row

of plantation should be provided towards roads side.

4. Case No. -4045/15 Smt. Rukmani Devi Shukla R/o Kunjanpura, Tehsil-Datia, District-Datia (MP)-475335 Prior Environment Clearance for approval of Stone Quarry in an area of 2.50 ha. (30,000 cum/year) at Khasra no.-80/3, Village-Pachara, Tehsil-Datia, District-Datia (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-80/3, Village-Pachara, Tehsil-Datia, District-Datia (MP) 2.50 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 394 dated: 31/07/2015 has reported that there are 15 more mines operating

Page 3: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

3

or proposed within 500 meters around the said mine with total area of 40.850 ha including this mine. The case was presented by the PP and their consultant. It being a case of cluster where the total area is > 25 ha it was decided to consider this case as B-1 category and committee recommended to issue standard TOR prescribed by the MoEF&CC for conducting the EIA.

5. Case No. -4046/15 Smt. Mahadevi Shivhare R/o Sharma Farm Road, Shivaji Colony, Char Sahar ka Naka, Tehsil-Dabra, District-Gwalior (MP)-474001 Prior Environment Clearance for approval of Stone Quarry in an area of 1.563 ha. (30,000 cum/year) at Khasra no.-234/3, Village-Gangapur, Tehsil-Dabra, District-Gwalior (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-234/3, Village-Gangapur, Tehsil-Dabra, District-Gwalior (MP) 1.563 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. Q2-93/10 dated: 14/07/2015 has reported that there are 01 more mines operating or proposed within 500 meters around the said mine with total area of 3.549 ha including this mine. The case was presented by the PP and their consultant. During presentation it was observed that the site is just (approx.100 meters) away from the existing Billaua cluster as per the co-ordinates provided by the PP. The committee after deliberations decided to issue TOR for which PP also agreed. PP has also given a written commitment for this at the time of presentation and also agrees to become the member of Billaua Stone Crusher’s Association. The PP should submit the necessary association’s letter for the same.

6. Case No. 4070/15 Shri Om Prakash Rai R/o P.O. Maihar, District-Satna (MP)-485771 Prior Environment Clearance for approval of Barahiya Limestone Mine in

Page 4: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

4

an area of 2.017 ha. (17,600 MTPA) at Khasra no.-206, 128, 204, 214, 133, 134, 126, 127, 205, 212, 213, Village-Barahiya, Tehsil-Maihar, District-Satna (M.P.) (TOR)

The case was presented by the PP and their consultant. It being a case of major mineral, it was decided to consider this case as B-1 category and committee recommended to issue standard TOR prescribed by the MoEF&CC for conducting the EIA along with following additional TOR’s:-

1. Inventory of operating / proposed mines within 2 Km around the said mine. 2. Inventory of all sensitive receptors in 2 Km & 5 Km around the mine. 3. Evacuation Plan on a map to be provided with transport route, required

infrastructure and man-power. 4. Any alternate route avoiding the nearby habitations.

7. Case No. 4087/15 Shri Ramdayal Patidar R/o Village-Takrawad, Tehsil-Malhargarh, District-Mandsaur (MP)-458339 Prior Environment Clearance for approval of Stone Quarry in an area of 2.00 ha. (5,000 cum/year) at Khasra no.-2 & 7, Village-Sokadi, Tehsil-Malhargarh, District-Mandsaur (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-2 & 7, Village-Sokadi, Tehsil-Malhargarh, District-Mandsaur (MP) 2.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 1457 dated: 8/9/2015 has reported that there are 02 more mines operating or proposed within 500 meters around the said mine with total area of 12.0 ha. including this mine The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Stone as per mine plan with quantity not exceeding 5,000 cum/year.

Page 5: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

5

8. Case No. 4090/15 Shri Arun Kumar Agrawal S/o Shri Shayamsundar Agrawal R/o Village-Bamhni Banjar, Tehsil-Nainpur, District-Mandla (MP)-481776 Prior Environment Clearance for approval of Stone Quarry in an area of 1.00 ha. (expansion in production capacity from 5,000 to 6,000 cum/year) at Khasra no.-564, Village-Kajarwada, Tehsil-Nainpur, District-Mandla (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-564, Village-Kajarwada, Tehsil-Nainpur, District-Mandla (MP) 1.0 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 910 dated: 4/09/2015 has reported that there are 05 more mines operating or proposed within 500 meters around the said mine with total area of 6.30 ha including this mine. The case was presented by the PP and their consultant. During presentation it was observed that a water body is located approximately 500 meters away from the QL area. After presentation, PP was asked to provide:

• Compliance report of M.P. Pollution Control Board consent conditions from regional officer, as the case is off expansion in production capacity.

• The “cumulative and degradation” details at the end of 05 years are mentioned as 0.54 ha in EMP which is not according to lease area of 1.00 ha. PP was asked to submit revised details duly approved by competent authority.

• No maps attached with the mine plan are signed by the competent authority. PP was asked to submit production map duly signed by the competent authority.

9. Case No. 4091/15 Smt. Sangeeta Agrawal C/o Shri Arun Agrawal, Village-Bamhni Banjar, Tehsil-Nainpur, District-Mandla (MP)-481776 Prior Environment Clearance for approval of Stone Quarry in an area of 4.00 ha. (expansion in production capacity from 7,500 to 25,000 cum/year) at Khasra no.-8/2, 8/3, & 10, Village-Chandiyamal, Tehsil-Nainpur, District-Mandla (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-8/2, 8/3, & 10, Village-

Page 6: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

6

Chandiyamal, Tehsil-Nainpur, District-Mandla (MP) 4.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vides letter no. 906 dated: 4/09/2015 has reported that there are no more mines operating or proposed within 500 meters around the said mine. The case was presented by the PP and their consultant. During presentation it was observed that a village road is only 05 meters away from the QL area and thus committee decide that a setback of 25 meters be left from the QL area excluding the 7.5 meters mandatory buffer zone. After presentation, PP was asked to provide:

• Compliance report of M.P. Pollution Control Board consent conditions from regional officer, as the case is of expansion in production capacity.

• The “cumulative and degradation” details at the end of 05 years are mentioned as 0.67 ha in EMP which is not according to lease area of 4.00 ha. PP was asked to submit revised details duly approved by competent authority.

10. Case No. 4093/15 Shri Ram Singh S/o Shri Tej Singh Thakur R/o R-8, Nikhil Kunj Sundar Nagar, Tehsil-Burhanpur, District-Burhanpur (MP)-450331 Prior Environment Clearance for approval of Stone Quarry in an area of 2.00 ha. (expansion in production capacity from 2,000 to 11,520 cum/year) at Khasra no.-655, 656, Village-Bahadarpur, Tehsil-Burhanpur, District-Burhanpur (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-655, 656, Village-Bahadarpur, Tehsil-Burhanpur, District-Burhanpur (MP) 2.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 5014 dated: 25/07/2015 has reported that there is 01 more mine operating

Page 7: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

7

or proposed within 500 meters around the said mine with total area of 3.0 ha including this mine.

The case was presented by the PP and their consultant. During presentation it was observed that a hostel is only 200 meters away from the QL area and thus committee decide an additional row of plantation be provided towards hostel side and no blasting be allowed as submitted by the PP. It was also observed as per the Google image based on the co-ordinates provided by the PP that the QL area is only 04 kms away from Maharashtra State. Since the cumulative area within 500 radius of this mine is <5.00 ha (As per Mining Officer vide letter no.-1443, dated: 14/08/2015) the general conditions are not applicable in this project as per GOI Notification No. S.O. 2731 (E) dated 09/09/2013 and thus the case was considered as B-2 category.

After presentation, PP was asked to provide:

• Compliance report of M.P. Pollution Control Board consent conditions from regional officer, as the case is of expansion in production capacity.

11. Case No. 4094/15 Shri Som Prakash, Director, M/s Som Projects Pvt. Ltd., D-09,

HIG Colony, Indore (MP)-452008 Prior Environment Clearance for approval of Stone Quarry in an area of 4.00 ha. (Stone-66,229 & Murrum-14,677 cum/year) at Khasra No. 131/1/1/2 at Village-Rangwasa, Tehsil-Depalpur, District-Indore (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No. 131/1/1/2 at Village-Rangwasa, Tehsil-Depalpur, District-Indore (MP) 4.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 1820 dated: 19/8/2015 has reported that there are no more mines operating or proposed within 500 meters around the said mine.

The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

Page 8: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

8

• Production as per mine plan with quantity not exceeding for Stone 66,229 & and for Murram 14,677 cum/year.

• A village road is about 40 meters away from the QL area thus a setback of 10 meters be left from the ML area in addition to the 7.5 meters mandatory buffer zone and additional row of plantation should be provided towards roads side.

12. Case No. 4095/15 Shri Rakhab Chand Jain, R/o Village-Agar Malwa, Tehsil & District-Agar Malwa (MP)-465001 Prior Environment Clearance for approval of Stone Quarry in an area of 4.00 ha. (30,000 cum/year) at Khasra No. 581 at Village-Majania, Tehsil-Shajapur, District-Shajapur. This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No. 581 at Village-Majania, Tehsil-Shajapur, District-Shajapur (MP) 4.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 1071 dated: 31/8/2015 has reported that there are 09 more mines operating or proposed within 500 meters around the said mine with total area of 15.550 ha including this mine The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Stone as per mine plan with quantity not exceeding 30,000 cum/year. • National Highway is about 200 meters away from the QL area thus PP may erect a

barrier wall of 03 meter height of suitable material.

13. Case No. 4096/15 Shri Jitendra Sharma S/o Shri Kailash Narayan Sharma, R/o Birghanpura, Tehsil-Bhind, District-Bhind (MP)-477001 Prior Environment Clearance for approval of Soil Quarry in an area of 1.62 ha. (1,760 cum/year) at Khasra no.-59, 60, 61, Village-Chandrapura, Tehsil-Bhind, District-Bhind.

Page 9: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

9

This is case of Soil quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-59, 60, 61, Village-Chandrapura, Tehsil-Bhind, District-Bhind (MP) 1.62 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 8409 dated: 18/8/2015 has reported that no more mines operating or proposed within 500 meters around the said mine.

The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Soil as per mine plan with quantity not exceeding 1,760 cum/year

14. Case No. 4097/15 Shri Nirmal Kumar Naredi S/o Shri Ramesh Naredi, 1, Ashta Road, Tehsil-Kannod, District-Dewas (MP) Prior Environment Clearance for approval of Stone Quarry in an area of 1.00 ha. (1,000 cum/year) at Khasra no.-756, Village-Nanasa, Tehsil-Kannod, District-Dewas (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-756, Village-Nanasa, Tehsil-Kannod, District-Dewas (MP) 1.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 1185 dated: 7/7/2015 has reported that there are 05 more mines operating or proposed within 500 meters around the said mine with total area of 7.6 ha including this mine. The case was presented by the PP and their consultant. During presentation it was observed that as per the Google image based on co-ordination provided by PP, the site

Page 10: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

10

location is not matching with PP’s actual site and PP denied that the site belongs to him. Thus PP was asked to provide revised co-ordinates duly authenticated by the competent authority for appraisal.

15. Case No. 4098/15 Shri Rahul Preetnani S/o Shri Dilip Preetnani, B-94, Vijay Nagar, Lalghati, Bhopal (MP)-462030 Prior Environment Clearance for approval of Stone Quarry in an area of 1.00 ha. (15,000 cum/year) at Khasra No. 610 at Village-Parvaliya, Tehsil-Huzur, District-Bhopal (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No. 610 at Village-Parvaliya, Tehsil-Huzur, District-Bhopal (MP) 1.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 2482 dated: 15/9/2015 has reported that there is 01 more mine operating or proposed within 500 meters around the said mine with total area of 5.0 ha including this mine. The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Stone as per mine plan with quantity not exceeding 15,000 cum/year.

16. Case No. 4099/15 Shri Akhtar Ali S/o Shri Waheed Ali, 16/10, Mahaveer Nagar, Ratlam (MP)-457222 Prior Environment Clearance for approval of Stone Quarry in an area of 3.50 ha. (50,000 cum/year) at Village-Naamli, Tehsil-Ratlam, District-Ratlam (MP). Neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Committee decided to call the PP in subsequent meetings after hearing from PP. A request has to be made by the PP for scheduling the

Page 11: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

11

case in coming meetings within a month’s time after which the case shall be returned to SEIAA assuming that PP is not interested to continue with the project.

17. Case No. 4100/15 Smt. Premlata Devi Agarwal W/o Shri Murarilal Agarwal, Resi-Tilak Ward, Town & Tehsil-Multai, District-Betul (MP)-455012 Prior Environment Clearance for approval of Stone Quarry in an area of 1.70 ha. (12,500 cum/year) at Khasra No-347/5, Village-Malegaon, Tehsil-Multai, District-Betul (MP). This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No-347/5, Village-Malegaon, Tehsil-Multai, District-Betul (MP) 1.70 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vides letter no. 970 dated: 9/7/2015 has reported that there is 01 more mine operating or proposed within 500 meters around the said mine with total area of 1.475 ha including this mine. The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Stone as per mine plan with quantity not exceeding 12,500 cum/year. • No blasting be allowed as per mine plan. Only manual mining is permitted with the

help of rock breaking machine. • National Highway and shades like structures are about 100 meters away from the QL

area thus PP may erect a barrier wall of 03 meter height of suitable material.

18. Case No. 4101/15 Smt. Teena Kuwar W/o Shri Jitendra Singh, Village-Jabardi, Tehsil-Pachore, District-Rajgarh (MP) Prior Environment Clearance for approval of Stone Quarry in an area of 1.00 ha. (2,940 cum/year) at Khasra No-277/19, Village-Jabardi, Tehsil-Pachore, District-Rajgarh (MP). This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No-277/19, Village-Jabardi, Tehsil-

Page 12: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

12

Pachore, District-Rajgarh (MP) 1.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 716 dated: 27/08/2015 has reported that there is 01 more mine operating or proposed within 500 meters around the said mine with total area of 3.0 ha including this mine. The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Stone as per mine plan with quantity not exceeding 2,940 cum/year. • A river is about 400 meters away from the site thus garland drain with settling tank of

suitable capacity be provided all around the ML area.

19. Case No. 4102/15 Shri Satyendra Singh Keer, Partner, M/s Amrik Singh & Company, Lalbagh Road, Burhanpur (MP)-450331 Prior Environment Clearance for approval of Stone Quarry in an area of 0.85 ha. (20,000 cum/year) at Khasra No. 635/3 at Village-Emagird, Tehsil-Burhanpur, District-Burhanpur (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No. 635/3 at Village-Emagird, Tehsil-Burhanpur, District-Burhanpur 0.85 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 5015 dated: 25/7/2015 has reported that there are no more mines operating or proposed within 500 meters around the said mine. The case was presented by the PP and their consultant and during presentation it was observed that the shape of QL area is awkward and a natural drain is also passing very

Page 13: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

13

near (approx 80 meters) from then OL area and if the space for garland drain and buffer zone is deducted, the production of 20,000 cum/year will not be sustainable in an area of 0.85 ha. Thus the case is not recommended for grant of Environmental Clearance.

20. Case No. 4103/15 Shri Sudheer Junankar, Shastri Ward, Padhurna, Chhindwara

(MP)-480041 Prior Environment Clearance for approval of Stone Quarry in an area of 1.00 ha. (3,513 cum/year) at Khasra no.-1376, Village-Badchicholi, Tehsil-Pandhurna, District-Chhindwara (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-1376, Village-Badchicholi, Tehsil-Pandhurna, District-Chhindwara (MP) 1.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 1947 dated: 10/9/2015 has reported that there are no more mines operating or proposed within 500 meters around the said mine.

It was noticed that the QL area is only 400 meters away from Maharashtra State as per the Google image based on the co-ordinates provided by the PP. Since the cumulative area within 500 radius of this mine is <5.00 ha (As per Mining Officer vide letter no.-1947 dated: 10/09/2015) the general conditions are not applicable in this project as per GOI Notification No. S.O. 2731 (E) dated 09/09/2013 and thus the case was considered as B-2 category. The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Stone as per mine plan with quantity not exceeding 3,513 cum/year

Page 14: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

14

21. Case No. 4104/15 M/s Vasudha Minerals & Chemicals, Pooja Residency, D.G. 4, Opposite Vishal Sabhagrah, Koradi Road, Mankapur, Nagpura (Maharashtra)-440030 Prior Environment Clearance for approval of Dolomite Mine in an area of 8.094 ha. (30,000 TPA) at Khasra no.-200, Village-Malegaon, Tehsil-Saunsar, District-Chhindwara (MP) This is case of Dolomite mining. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-200, Village-Malegaon, Tehsil-Saunsar, District-Chhindwara MP) 8.094 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 8195 dated: 27/08/2015 has reported that there are 03 more mines operating or proposed within 500 meters around the said mine with total area of 21.817 ha including this mine.

It was noticed that the QL area is only 1.3 Kms away from Maharashtra State as per the Google image based on the co-ordinates provided by the PP. Since the cumulative area within 500 radius of this mine is >5.00 ha (As per Mining Officer vide letter no.-8195 dated: 27/08/2015) the general conditions are applicable in this project and becomes Category –A project. The committee decided that the case may be sent back to SEIAA for necessary action.

22. Case No. 4105/15 General Manager, M.P. Gramin Sadak Vikas Pradhikaran,

Project Implementation Unit, Indore (MP)-452007 Prior Environment Clearance for approval of Stone & Murram Quarry in an area of 4.00 ha. (Stone-27,987 & Murrum-13,994 cum/year) at Khasra No. 227 & 229 at Village-Chittora, Tehsil-Sanwer, District-Indore (MP) This is case of Stone & Murram quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Village-Chittora, Tehsil-Sanwer, District-Indore (MP) 4.00 ha. The project requires prior EC before commencement of any activity at site.

Page 15: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

15

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vides letter no. 512 dated: 11/06/2015 has reported that there is 01 more mine operating or proposed within 500 meters around the said mine. The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production as per mine plan with quantity not exceeding for Stone 27,987 & and for Murram 13,994 cum/year.

• Being a Temporary Permit (TP) validity of EC should be only up to the validity of TP.

• A natural drain is about 150 meters away from the site thus garland drain with settling tank of suitable capacity be provided all around the ML area.

• Approach road from site to the main road will be maintained by the PP. • It being a case of TP, PP has to ensure the execution of closure plan.

23. Case No. 4106/15 Shri Ramakant Soni S/o Shri Raghunath Soni, 42, Gandhi Nagar, Tehsil & District-Burhanpur (MP)-450331 Prior Environment Clearance for approval of Stone Quarry in an area of 1.50 ha. (11,400 cum/year) at Khasra no.-16, Village-Rehta, Tehsil-Burhanpur, District-Burhanpur (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-16, Village-Rehta, Tehsil-Burhanpur, District-Burhanpur (M.P.) 1.50 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 5022 dated: 25/07/2015 has reported that there are no more mines operating or proposed within 500 meters around the said mine.

Page 16: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

16

The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Stone as per mine plan with quantity not exceeding 11,400 cum/year.

24. Case No. 4107/15 Shri Samrat Singh R/o Circut House Road, Balaghat (MP)-481001 Prior Environment Clearance for approval of Stone Quarry in an area of 2.428 ha. (41,093 cum/year) at Khasra no.-516, Village-Akola, Tehsil-Kirnapur, District-Balaghat (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra no.-516, Village-Akola, Tehsil-Kirnapur, District-Balaghat (MP) 2.428 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 1131 dated: 14/9/2015 has reported that there are 08 more mines operating or proposed within 500 meters around the said mine with total area of 12.265 ha. including this mine.

The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

• Production of Stone as per mine plan with quantity not exceeding 41,093 cum/year. • As recommended by the District Level Committee, crusher will not be installed in

the QL area and other conditions stipulated by the committee should be complied by the PP.

25. Case No. 4108/15 Shri Rajendra Brehune, Village-Hiwarasenadwar, Tehsil-Pandhurna, District-Chhindwara (MP)-480041 Prior Environment Clearance for approval of Stone Quarry in an area of 4.00 ha. (28,144 cum/year) at Hiwarasenadwar, Tehsil-Pandhurna, District-Chhindwara (MP).

Page 17: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

17

This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Hiwarasenadwar, Tehsil-Pandhurna, District-Chhindwara (MP) 4.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 1346 dated: 10/09/2015 has reported that there is 01 more mine operating or proposed within 500 meters around the said mine with total area of 8.0 ha including this mine.

Neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Committee decided to call the PP in subsequent meetings after hearing from PP. A request has to be made by the PP for scheduling the case in coming meetings within a month’s time after which the case shall be returned to SEIAA assuming that PP is not interested to continue with the project.

26. Case No. 4109/15 Shri Prem Kumar Padole, Owner, M/s D. Thakkar Construction Pvt. Ltd., 1105, Universal Majestic, Behind R.B.K. School, Lokhande Marg, Chembur (W), Mumbai (MH)-400043 Prior Environment Clearance for approval of Stone Quarry in an area of 4.00 ha. (28,144 cum/year) at Village-Hiwarasenadwar, Tehsil-Pandhurna, District-Chhindwara (MP) . This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Village-Hiwarasenadwar, Tehsil-Pandhurna, District-Chhindwara (MP) 4.0 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 1945 dated: 10/09/2015 has reported that there is 01 more mine operating

Page 18: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

18

or proposed within 500 meters around the said mine with total area of 8.0 ha including this mine.

Neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Committee decided to call the PP in subsequent meetings after hearing from PP. A request has to be made by the PP for scheduling the case in coming meetings within a month’s time after which the case shall be returned to SEIAA assuming that PP is not interested to continue with the project.

27. Case No. 3576/15 Shri Rajesh Medtwal S/o Shri Poonamchandra Ji Medtwal, Soyatkla, Teh.-Susner, District-Shajapur (MP)-465447 Prior Environment Clearance for approval of Stone Quarry in an area of 2.00 ha. (2,850 cum/year) at Khasra No.-884, Vill.-Dongargaon, Teh.-Susner, District-Shajapur (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No.-884, Vill.-Dongargaon, Teh.-Susner, District-Shajapur (M.P.) 2.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vides letter no. 243 dated: 22/06/2015 has reported that there are no more mines operating or proposed within 500 meters around the said mine.

It was noticed that the ML area is only 05 kms away from Rajasthan State as per the Google image based on the co-ordinates provided by the PP. Since the cumulative area within 500 radius of this mine is <5.00 ha (As per Mining Officer vide letter no.-243, dated: 22/06/2015) the general conditions are not applicable in this project as per GOI Notification No. S.O. 2731 (E) dated 09/09/2013 and thus the case was considered as B-2 category.

The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

Page 19: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

19

• Production of Stone as per mine plan with quantity not exceeding 2,850 cum/year.

28. Case No. - 1497/13 Shri Ram Prasad Patidar, S/o Ram Banch Patidar, Vill.- Ganga Khedi, Th.-Daluda, Dist-Mandsaur (M.P.). Bad CD Environmental Clearance for approval of 2.00 ha (Capacity – 5000 Cum/Year) Stone quarry at Khasra No.-26, Vill.- Daluda Rail, Th.-Daluda, Dist-Mandsaur (M.P.). This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No.-26, Vill.- Daluda Rail, Th.-Daluda, Dist-Mandsaur (M.P.) 2.00 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 500 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vide letter no. 2395 dated: 17/11/2014 has reported that there is 01 more mine operating or proposed within 500 meters around the said mine with total area of 4.0 ha including this mine

The case was presented by the PP and their consultant and during deliberations it was observed that details of “existing Land Use” and “Land Use after Lease” are mismatched. Thus PP was asked to submit revised details duly approved by the competent authority.

29. Case No. - 3920/15 Shri Kanhaiya Lal Gandhi R/o Jamunia Rawaji, Tehsil-Manasa, District-Neemuch (MP)-458441 Prior Environment Clearance for approval of Stone Quarry in an area of 1.193 ha. (18,518 cum/year) at Khasra No.-846, Vill.-Alhed, Tehsil-Manasa, District-Neemuch (MP) This is case of Stone quarry. The application was forwarded by SEIAA to SEAC for appraisal. The proposed site is located at Khasra No.-846, Vill.-Alhed, Tehsil-Manasa, District-Neemuch (MP) 1.193 ha. The project requires prior EC before commencement of any activity at site.

PP has submitted a copy of approved Mining Plan, letter from Mining Officer certifying the leases within 1000 meters radius around the site and requisite information in the prescribed format duly verified by the Tehsildar and DFO. Concerned Mining Officer vides letter no.520 dated: 30/5/2015 has reported that there are 10 more mines operating or proposed within 500 meters around the said mine with total area of 21.537 ha including

Page 20: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

20

this mine. The case was initially scheduled for presentation in 261st SEAC meeting dated 08/01/2016 and was rescheduled on 15/01/2015 on PP’s request.

The case was presented by the PP and their consultant and during presentation it was observed that no co-ordinates are mentioned either in mine plan or in surface plan attached with the mine plan and committee was unable to ascertain the location of QL area. Thus PP was asked to submit the co-ordinates of QL area duly verified by the competent authority.

(A.A. MISHRA) (R. B. LAL) SECRETARY CHAIRMAN

Page 21: STATE EXPERT APPRAISAL COMMITTEE 15 … EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING 15th January 2016 2 This is case of Soil quarry. The application was forwarded by SEIAA

STATE EXPERT APPRAISAL COMMITTEE MINUTES OF 267nd MEETING

15th January 2016

21

Following standard conditions shall be applicable for the mining projects of minor mineral in addition to the specific conditions: Annexure- ‘A’

Standard conditions applicable to Stone/Murram and Soil quarries:

1. The amount towards reclamation of the pit and land in MLA shall be carried out through the mining department. The appropriate amount as estimated for the activity by mining department has to be deposited with the Collector to take up the activity after the mine is exhausted.

2. PP shall be responsible for discrepancy (if any) in the submissions made by the PP to SEAC & SEIAA 3. Transportation of material shall be done in covered vehicles. 4. Necessary consents shall be obtained from MPPCB and the air/water pollution control measures have to be installed as per the

recommendation of MPPCB. 5. Curtaining of site shall be done using appropriate media. 6. The proposed plantation should be carried out along with the mining @45 trees per hectare and PP would maintain the plants

for five years including casualty replacement. 7. Transportation shall not be carried out through forest area. 8. Appropriate activities shall be taken up for social up-liftment of the area. Funds reserved towards the same shall be utilized

through Gram Panchayat. 9. PP will take adequate precautions so as not to cause any damage to the flora and fauna during mining operations. 10. The validity of the EC shall be as per the provisions of EIA Notification subject to the following: Expansion or modernization in

the project, entailing capacity addition with change in process and or technology and any change in product - mix in proposed mining unit shall require a fresh Environment Clearance.

Annexure- ‘B’

Standard conditions applicable for the sand Mine Quarries*

1. The amount towards reclamation of the land in MLA shall be carried out through the mining department; the appropriate amount as estimated for the activity by mining department has to be deposited with the Collector to take up the activity after the mine is exhausted.

2. PP shall be responsible for discrepancy (if any) in the submissions made by the PP to SEAC & SEIAA. 3. Plantation shall be carried out on the banks for stabilization of the banks. 4. The mining activity shall be done manually. 5. Heavy vehicles shall not be allowed on the banks for loading of sand. 6. The sand shall be transported by small trolleys up to the main transport vehicle. 7. Transport vehicles will be covered with taurpoline to minimize dust/sand particle emissions. 8. For carrying out mining in proximity to any bridge and/or embankment, appropriate safety zone on upstream as well as on

downstream from the periphery of the mining site shall be ensured taking into account the structural parameters, location aspects, flow rate, etc., and no mining shall be carried out in the safety zone.

9. No Mining shall be carried out during Monsoon season. 10. The depth of mining shall be restricted to 3m or water level, whichever is less. 11. No in-stream mining shall be allowed. 12. The mining shall be carried out strictly as per the approved mining plan and ensure that the annual replenishment of sand in

the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan. 13. Established water conveyance channels should not be relocated, straightened, or modified. 14. If the stream is dry, the excavation must not proceed beyond the lowest undisturbed elevation of the stream bottom, which is

a function of local hydraulics, hydrology, and geomorphology. 15. After mining is complete, the edge of the pit should be graded to a 2.5:1 slope in the direction of the flow. 16. PP shall take Socio-economic activities in the region through the ‘Gram Panchayat’. 17. EC will be valid for mine lease period subject to a ceiling of 5 years.