state estimator redaction task force
DESCRIPTION
State Estimator Redaction Task Force. Progress Report to WMS/ROS 6/15/2011. Draft Comments on NPRR 327. Group met twice since the last WMS to finalize the comments for NPRR 327 and the methodology NDSWG has been involved in developing comments - PowerPoint PPT PresentationTRANSCRIPT
State Estimator Redaction Task Force
Progress Report to WMS/ROS6/15/2011
Draft Comments on NPRR 327
• Group met twice since the last WMS to finalize the comments for NPRR 327 and the methodology
• NDSWG has been involved in developing comments• Developed methodology to redact confidential
information for generation resources and load stations.
• Protocol is consistent with language in PUCT Rule in which “resource-specific output levels or offer curves could not continually and systematically be derived.”
• Protocol allows TSPs and DSP access all State Estimator date real-time (not redacted version)
WMS Decision in June
• Endorse submitting the comments for NPRR 327 with following decision points:– ERCOT shall post redacted version of State
Estimator data every 5 minutes, 12 hours, 24 hours OR 48 hours
– If ERCOT validates a request to remove a data element, ERCOT will have X hours to remove the element or turn off the report
• Withdraw NPRR 373, because better addressed in our comments in NPRR 327