standards report - ieeegrouper.ieee.org/groups/transformers/.../f16-standardsreport.pdfstandards...

23
- Page 1 of 25- IEEE / PES /TRANSFORMERS COMMITTEE Standards Report To: Members of Transformers Committee September 24, 2016 From: Jim Graham Standards Coordinator Executive Summary This report covers Transformers Committee Standards activity from March 1, 2016 to September 22, 2016. During this time three new Standards and no Revisions were approved by the Standards Board. In this same period, the Standards Board approved four PAR Extensions; no PAR modifications; one PAR for new standards; six PARs for Revisions; and two PARs for Corrigenda. In this Report: I. Standards approved .......................................................................pg 1 II. PARs approved ...............................................................................pg 1-2 III. Standards Board 2017 Meeting Schedule......................................pg 2 IV. Transformer Committee Ballot Status ..........................................pg 3-4 V. Transformers Committee PAR Status ............................................pg 4-9 VI. Transformer Stds Status e .............................................................pg 10- 21 VII. Transformer Stds Org Chart ..........................................................pg 22-23 I. Standards approved since Mar 1, 2016 New Transformer Standards Approved (All expire 31 Dec 2026) 60076-57-1202 International Standard Requirements for Liquid-Immersed Phase-Shifting Transformers C57.156 Guide for Tank Rupture Mitigation of Liquid-Immersed Power Transformers and Reactors C57.159 Guide on Transformers for Application in Distributed Photovoltaic (DPV) Power Generation Systems REVISIONS to Transformer Standards approved None II. PARs approved since Mar 1, 2016 PAR Extensions approved (All extended until December 2018 unless noted) P60076-16 Power Transformers - Part 16: Transformers for Wind Turbine Application C57.12.40 Standard for Network, Three-Phase Transformers, 2500 kVA and Smaller; High Voltage, 34 500 V and Below; Low Voltage, 600 V and Below; Subway and Vault Types (Liquid Immersed) (until Dec 2017) C57.93 Guide for Installation and Maintenance of Liquid-Immersed Power Transformers C57.147 Guide for Acceptance and Maintenance of Natural Ester Insulating Liquid in Transformers PAR Modifcations approved None (PAR Modifications do not change the Expiration Date)

Upload: dinhdung

Post on 23-Apr-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

- Page 1 of 25-

IEEE / PES /TRANSFORMERS COMMITTEE

Standards Report

To: Members of Transformers Committee September 24, 2016

From: Jim Graham Standards Coordinator

Executive Summary This report covers Transformers Committee Standards activity from March 1, 2016 to September 22, 2016. During this time three new Standards and no Revisions were approved by the Standards Board. In this same period, the Standards Board approved four PAR Extensions; no PAR modifications; one PAR for new standards; six PARs for Revisions; and two PARs for Corrigenda.

In this Report:

I. Standards approved .......................................................................pg 1

II. PARs approved ...............................................................................pg 1-2

III. Standards Board 2017 Meeting Schedule ......................................pg 2

IV. Transformer Committee Ballot Status ..........................................pg 3-4

V. Transformers Committee PAR Status ............................................pg 4-9

VI. Transformer Stds Status e .............................................................pg 10- 21

VII. Transformer Stds Org Chart ..........................................................pg 22-23

I. Standards approved since Mar 1, 2016

New Transformer Standards Approved (All expire 31 Dec 2026)

60076-57-1202 International Standard Requirements for Liquid-Immersed Phase-Shifting Transformers

C57.156 Guide for Tank Rupture Mitigation of Liquid-Immersed Power Transformers and Reactors

C57.159 Guide on Transformers for Application in Distributed Photovoltaic (DPV) Power Generation

Systems

REVISIONS to Transformer Standards approved None

II. PARs approved since Mar 1, 2016

PAR Extensions approved (All extended until December 2018 unless noted)

P60076-16 Power Transformers - Part 16: Transformers for Wind Turbine Application

C57.12.40 Standard for Network, Three-Phase Transformers, 2500 kVA and Smaller; High Voltage, 34 500 V

and Below; Low Voltage, 600 V and Below; Subway and Vault Types (Liquid Immersed)

(until Dec 2017)

C57.93 Guide for Installation and Maintenance of Liquid-Immersed Power Transformers

C57.147 Guide for Acceptance and Maintenance of Natural Ester Insulating Liquid in Transformers

PAR Modifcations approved None

(PAR Modifications do not change the Expiration Date)

Fall 2016 Standards Report Page 2 of 23

New Projects approved Approved until December 2020)

PC57.164 Guide for Establishing Short Circuit Withstand Capabilities of Liquid Immersed Power

Transformers

PAR Requests for Revision of Standards (Approved until December 2020)

PC57.12.01 Standard for General Requirements for Dry-Type Distribution and Power Transformers

PC57.12.34 Standard Requirements for Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase

Distribution Transformers, 10 MVA and Smaller; High-Voltage, 34.5 kV Nominal System

Voltage and Below; Low-Voltage, 15 kV Nominal System Voltage and Below

C57.12.91 Standard Test Code for Dry-Type Distribution and Power Transformers

PC57.13.5 Standard of Performance and Test Requirements for Instrument Transformers of a Nominal

System Voltage of 115 kV and Above

PC57.18.10 Standard Practices and Requirements for Semiconductor Power Rectifier Transformers

PC57.148 Standard for Control Cabinets for Power Transformers

PARs for Corrigenda approved (Approved until December 2020)

PC57.12.90-2015 Cor 1 Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating

Transformers (2020)

PC57.163-2015 Cor 1 Guide for Establishing Power Transformer Capability while under Geomagnetic

Disturbances (2020)

III. 2016 IEEE Standards Board Meeting Schedule

Starting in 2015, the Standards Board has only three physical board meetings per year. But they

supplement this with three (3) teleconference meetings. The full list of 2017 meetings is shown in

the calendar on the next page.

Deadlines for 2016-2017 Standards Board Submissions:

Please Note: Anything that expires at the end of 2017 must be submitted to Standards

Board (either NESCOM or REVCOM) by October 16, 2017

Standards Board Meeting Submission Deadline

Jan 2017 (teleconference) December 20, 2016

March 2017 February 10, 2017

May 2017 (teleconference) March 24, 2017

June 2017 May 5, 2017

September 2017 (teleconference) July 28, 2017

December 2017 October 16, 2017

Fall 2016 Standards Report Page 3 of 23

IV. Transformers Committee Ballot Status (as of Sep 24, 2016)

PAR Number Title Ballot

Close Date Status

Dielectric Test

PC57.138 Recommended Practice for Routine Impulse Test for Distribution Transformers

9/9/2016 Sponsor Ballot:

Comment Resolution

Distribution Transformers

PC57.12.39 Standard Requirements for Distribution Transformer Tank Pressure Coordination

7/14/2016 Sponsor Ballot:

Comment Resolution

PC57.12.20

Standard for Overhead-Type Distribution Transformers 500 kVA and Smaller: High Voltage, 34 500 V and Below; Low Voltage, 7970/13 800Y V and Below

4/8/2016 Sponsor Ballot:

Comment Resolution

PC57.12.38-2014 /Cor 1

Standard for Pad-Mounted-Type, Self-Cooled, Single-Phase Distribution Transformers 250 kVA and Smaller: High Voltage, 34 500 GrdY/19 920 V and Below; Low Voltage, 480/240 V and Below - Corrigendum 1: Correct an omission in the label of Figure 1.

8/11/2016 RevCom Agenda 06-

Dec-2016

PC57.12.36 Standard Requirements for Liquid-Immersed Distribution Substation Transformers

10/5/2016 Sponsor Ballot: Ballot

PC57.15 Standard Requirements, Terminology, and Test Code for Step-Voltage Regulators

10/23/2016 Sponsor Ballot: Ballot

Dry Type Transformers

PC57.12.58 Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil

Sponsor Ballot:

PreBallot

HVDC Converter Xfmrs & Smoothing Reactors

P60076-57-129 Converter Transformers for HVDC Applications 9/23/2016 Sponsor Ballot:

Comment Resolution

Insulating Fluids

PC57.147 Guide for Acceptance and Maintenance of Natural Ester Insulating Liquid in Transformers

3/31/2016 Sponsor Ballot:

Comment Resolution

Insulation Life

PC57.119

Recommended Practice for Performing Temperature Rise Tests on Oil-Immersed Power Transformers at Loads Beyond Nameplate Ratings

3/18/2015 Sponsor Ballot:

Comment Resolution

Instrument Transformers

PC57.13.7 Standard for Current Transformers with a Maximum mA Secondary Current of 250 mA

Sponsor Ballot:

Invitation

Fall 2016 Standards Report Page 4 of 23

PAR Number Title Ballot

Close Date Status

Performance Characteristics

PC57.120 Guide for Loss Evaluation of Distribution and Power Transformers and Reactors

8/3/2016 Sponsor Ballot: Comment Resolution

PC57.158 Guide for the Application of Tertiary and Stabilizing Windings in Power Transformers

Sponsor Ballot: PreBallot

Power Transformers

PC57.140 Guide for Evaluation and Reconditioning of Liquid Immersed Power Transformers

8/31/2016 Sponsor Ballot: Comment Resolution

P60076-16 Power Transformers - Part 16: Transformers for Wind Turbine Application

6/20/2016 Sponsor Ballot: Comment Resolution

Standards

PC57.163-2015 /Cor 1

Guide for Establishing Power Transformer Capability while under Geomagnetic Disturbances - Corrigendum 1

10/14/2016 Sponsor Ballot: Ballot

Underground & Network Protectors

PC57.12.24

Standard for Submersible, Three-Phase Transformers, 3750 kVA and Smaller: High Voltage, 34 500 GrdY/19 920 Volts and Below; Low Voltage, 600 Volts and Below

8/29/2016 Sponsor Ballot: Comment Resolution

PC57.12.40

Standard for Network, Three-Phase Transformers, 2500 kVA and Smaller; High Voltage, 34 500 V and Below; Low Voltage, 600 V and Below; Subway and Vault Types (Liquid Immersed)

10/13/2016 Sponsor Ballot: Ballot

V. Transformer Committee PAR Status (as of Sep 24, 2016)

Bushings

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.19.01 Revision Standard Performance Characteristics and Dimensions for Outdoor Apparatus Bushings

8-Dec-2010 12/31/2017

PC57.19.02 New Standard for the Design and Performance Requirements of Bushings Applied to Liquid Immersed Distribution Transformers

5-Feb-2016 12/31/2020

PC57.19.04 New

Standard Performance Characteristics and Dimensions for High Current Power Transformer Bushings with Rated Continuous Current in Excess of 5000 A in Bus Enclosures

16-Jun-11 12/31/2017

Fall 2016 Standards Report Page 5 of 23

Dielectric Test

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.127 Revision

Guide for the Detection, Location and Interpretation of Sources of Acoustic Emissions from Electrical Discharges in Power Transformers and Power Reactors

16-Feb-15 12/31/2019

PC57.138 Revision Recommended Practice for Routine Impulse Test for Distribution Transformers

2-Feb-2011 12/31/2016

PC57.160 New Guide for the Electrical Measurement of Partial Discharges in High Voltage Bushings and Instrument Transformers

6-Mar-2013 12/31/2017

PC57.161 New Guide for Dielectric Frequency Response Test 23-Aug-13 12/31/2017

Distribution Transformers

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.12.39 New Standard Requirements for Distribution Transformer Tank Pressure Coordination

5-Feb-2016 12/31/2016

PC57.12.20 Revision

Standard for Overhead-Type Distribution Transformers 500 kVA and Smaller: High Voltage, 34 500 V and Below; Low Voltage, 7970/13 800Y V and Below

8-Jun-2012 12/31/2016

PC57.12.38-2014/Cor 1

Corrigendum

Standard for Pad-Mounted-Type, Self-Cooled, Single-Phase Distribution Transformers 250 kVA and Smaller: High Voltage, 34 500 GrdY/19 920 V and Below; Low Voltage, 480/240 V and Below - Corrigendum 1: Correct an omission in the label of Figure 1.

5-Feb-2016 12/31/2020

PC57.12.32 Revision Standard for Submersible Equipment - Enclosure Integrity

11-Jun-15 12/31/2019

Distribution Transformers

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.12.34 Revision

Standard Requirements for Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers, 10 MVA and Smaller; High-Voltage, 34.5 kV Nominal System Voltage and Below; Low-Voltage, 15 kV Nominal System Voltage and Below

22-Sep-16 12/31/2020

PC57.12.36 Revision Standard Requirements for Liquid-Immersed Distribution Substation Transformers

7-Dec-2011 12/31/2017

PC57.15 Revision Standard Requirements, Terminology, and Test Code for Step-Voltage Regulators

5-Feb-2016 12/31/2018

Fall 2016 Standards Report Page 6 of 23

Dry Type Transformers

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.12.01 Revision Standard for General Requirements for Dry-Type Distribution and Power Transformers

12-May-16 12/31/2020

PC57.12.51 Revision

Standard for Ventilated Dry-Type Power Transformers, 501 kVA and Larger, Three-Phase, with High-Voltage 601 V to 34 500 V; Low-Voltage 208Y/120 V to 4160 V- General Requirements

21-Aug-14 12/31/2018

PC57.12.58 Revision Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil

3-Sep-2015 12/31/2019

PC57.12.60 Revision Standard Test Procedure for Thermal Evaluation of Insulation Systems for Dry-Type Power and Distribution Transformers

11-Jun-15 12/31/2019

PC57.12.91 Revision Standard Test Code for Dry-Type Distribution and Power Transformers

3-Mar-2016 12/31/2020

PC57.16 Revision Standard for Requirements, Terminology, and Test Code for Dry-Type Air-Core Series-Connected Reactors

5-Feb-2016 12/31/2020

HVDC Converter Xfmrs & Smoothing Reactors

PAR Number Project Type Title

Approval Date

PAR Expiration

P60076-57-129 Revision Converter Transformers for HVDC Applications 10-Dec-14 12/31/2018

Insulating Fluids

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.104 Revision Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers

5-Feb-2010 12/31/2017

PC57.147 Revision Guide for Acceptance and Maintenance of Natural Ester Insulating Liquid in Transformers

5-Feb-2016 12/31/2018

Insulation Life

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.162 New Guide for the Interpretation of Moisture Related Parameters in Dry, Gas Insulated and Liquid Immersed Transformers and Reactors

23-Aug-13 12/31/2017

P1276 Revision Guide for the Application of High-Temperature Insulation Materials in Liquid-Immersed Distribution, Power and Regulating Transformers

27-Mar-14 12/31/2016

Fall 2016 Standards Report Page 7 of 23

Insulation Life

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.119 Revision Recommended Practice for Performing Temperature Rise Tests on Oil-Immersed Power Transformers at Loads Beyond Nameplate Ratings

27-Oct-14 12/31/2018

Instrument Transformer s

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.13.5 Revision Standard of Performance and Test Requirements for Instrument Transformers of a Nominal System Voltage of 115 kV and Above

3-Mar-2016 12/31/2020

PC57.13.7 New Standard for Current Transformers with a Maximum mA Secondary Current of 250 mA

30-Sep-10 12/31/2016

PC57.13.8 New Standard Requirements for Station Service Voltage Transformers

11-Dec-13 12/31/2017

Performance Characteristics

PAR Number Project Type Title Approval

Date PAR

Expiration

P60076-16 New Power Transformers - Part 16: Transformers for Wind Turbine Application

10-Dec-14 12/31/2018

PC57.164 New Guide for Establishing Short Circuit Withstand Capabilities of Liquid Immersed Power Transformers, Regulators, and Reactors

30-Jun-16 12/31/2020

PC57.105 Revision Guide for Application of Transformer Connections in Three-Phase Electrical Systems

26-Mar-15 12/31/2019

PC57.109 Revision Guide for Liquid-Immersed Transformers Through-Fault-Current Duration

26-Mar-15 12/31/2019

PC57.110 Revision

Recommended Practice for Establishing Liquid-Immersed and Dry-Type Power and Distribution Transformer Capability When Supplying Nonsinusoidal Load Currents

12-Jun-14 12/31/2018

PC57.120 Revision Guide for Loss Evaluation of Distribution and Power Transformers and Reactors

25-Mar-10 12/31/2016

PC57.158 New Guide for the Application of Tertiary and Stabilizing Windings in Power Transformers

15-May-12 12/31/2016

PC57.18.10 Revision Standard Practices and Requirements for Semiconductor Power Rectifier Transformers

30-Jun-16 12/31/2020

PC57.21 Revision Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVA

21-Aug-14 12/31/2018

Fall 2016 Standards Report Page 8 of 23

Power Transformers

PAR Number Project Type Title Approval

Date PAR

Expiration

P60214-2 New Tap-Changers - Part 2: Application Guide 12-Jun-14 12/31/2018

PC57.12.10 Revision Standard Requirements for Liquid-Immersed Power Transformers

26-Mar-15 12/31/2019

PC57.140 Revision Guide for Evaluation and Reconditioning of Liquid Immersed Power Transformers

31-Mar-11 12/31/2017

PC57.148 Revision Standard for Control Cabinets for Power Transformers

30-Jun-16 12/31/2020

PC57.93 Revision Guide for Installation and Maintenance of Liquid-Immersed Power Transformers

29-Mar-12 12/31/2018

P60214-2 New Tap-Changers - Part 2: Application Guide 12-Jun-14 12/31/2018

Standards

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.12.90-2015 /Cor 1

Corrigendum

Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers - Corrigendum 1: Editorial and Technical Corrections

30-Jun-16 12/31/2020

PC57.12.70-201 1/Cor 1

Corrigendum Standard Terminal Markings and Connections for Distribution and Power Transformers - Corrigendum 1: Correction of Annex A

5-Feb-2016 12/31/2019

PC57.163-2015 /Cor 1

Corrigendum Guide for Establishing Power Transformer Capability while under Geomagnetic Disturbances - Corrigendum 1

30-Jun-16 12/31/2020

Underground & Network Protectors

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.12.23 Revision

Standard for Submersible Single-Phase Transformers: 250 kVA and Smaller; High Voltage 34 500GrdY/19 920V and Below; Low Voltage 600 V and Below

21-Aug-14 12/31/2018

PC57.12.24 Revision

Standard for Submersible, Three-Phase Transformers, 3750 kVA and Smaller: High Voltage, 34 500 GrdY/19 920 Volts and Below; Low Voltage, 600 Volts and Below

9-Nov-2011 12/31/2017

PC57.12.40 Revision

Standard for Network, Three-Phase Transformers, 2500 kVA and Smaller; High Voltage, 34 500 V and Below; Low Voltage, 600 V and Below; Subway and Vault Types (Liquid Immersed)

30-Aug-12 12/31/2017

Fall 2016 Standards Report Page 9 of 23

Underground & Network Protectors

PAR Number Project Type Title Approval

Date PAR

Expiration

PC57.12.44 Revision Standard Requirements for Secondary Network Protectors

26-Mar-15 12/31/2019

P60076-16 New Power Transformers - Part 16: Transformers for Wind Turbine Application

10-Dec-14 12/31/2018

- Page 10 of 25-

VI. Transformers Standards Status (as of Sep 24, 2016)

Bushings Subcommittee

SC Chair: Peter Zhao email: [email protected] phone: (417) 345-5926

Standard Number

Working Group Chair Title Published Yr Expiration Yr

Status PAR

Expiration

C57.19.00 see organization chart IEEE Standard General Requirements and Test Procedure for Power Apparatus Bushings

2004 2020

Complete

C57.19.01 see organization chart IEEE Standard Performance Characteristics and Dimensions for Outdoor Apparatus Bushings

2000 2018

2017

65700-19-03 see organization chart IEC/IEEE International Standard -- Bushings for DC application 2014 2024

Complete

C57.19.100 see organization chart IEEE Guide for Application of Power Apparatus Bushings 2012 2022

Complete

Dielectric Test SC Chair: Ajith Varghese email: [email protected] phone: (262) 442-7197

Standard Number

Working Group Chair Title Published Yr Expiration Yr

Status PAR

Expiration

C57.113 see organization chart IEEE Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

2010 2020

Complete

C57.127 see organization chart IEEE Guide for the Detection and Location of Acoustic Emissions from Partial Discharges in Oil-Immersed Power Transformers and Reactors

2007 2018

Draft Stage 2019

C57.138 see organization chart IEEE Recommended Practice for Routine Impulse Test for Distribution Transformers

1998 2018

Complete

C57.98 see organization chart IEEE Guide for Transformer Impulse Tests 2011 2021

Complete

Fall 2016 Standards Report Page 11 of 23

Distribution Transformers SC Chair: Steve Shullemail: [email protected]: (417) 625-6110

Standard Number

Working Group Chair Title Published Yr Expiration Yr

Status PAR

Expiration

C57.12.20 see organization chart IEEE Standard for Overhead-Type Distribution Transformers 500 kVA and Smaller: High Voltage, 34 500 V and Below; Low Voltage, 7970/13 800Y V and Below

2011 2021

Comment Res

2016

C57.12.37 see organization chart IEEE Standard for the Electronic Reporting of Distribution Transformer Test Data

2015 2025

Complete

C57.12.38 see organization chart IEEE Standard for Pad-Mounted-Type, Self-Cooled, Single-Phase Distribution Transformers 250 kVA and Smaller: High Voltage, 34 500 GrdY/19 920 V and Below; Low Voltage, 480/240 V and Below

2014 2024

Complete

C57.12.28 see organization chart IEEE Standard for Pad-Mounted Equipment--Enclosure Integrity 2014 2024

Complete

C57.12.29 see organization chart IEEE Standard for Pad-Mounted Equipment--Enclosure Integrity for Coastal Environments

2014 2024

Complete

C57.12.30 see organization chart IEEE Standard for Pole-Mounted Equipment--Enclosure Integrity for Coastal Environments

2010 2020

Complete

C57.12.31 see organization chart IEEE Standard for Pole-Mounted Equipment--Enclosure Integrity 2010 2020

Complete

C57.12.31-2010 /Cor 1

see organization chart IEEE Standard for Pole-Mounted Equipment--Enclosure Integrity - Corrigendum 1: Correction to the SCAB Corrosion Test in 4.5.6

2014 2024

Complete

C57.12.32 see organization chart IEEE Standard for Submersible Equipment - Enclosure Integrity 2002 2018

Draft Stage 2019

C57.12.34 see organization chart

IEEE Standard Requirements for Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers, 10 MVA and Smaller; High-Voltage, 34.5 kV Nominal System Voltage and Below; Low-Voltage, 15 kV Nominal System Voltage and Below

2015 2025

Complete

Fall 2016 Standards Report Page 12 of 23

Distribution Transformers SC Chair: Steve Shullemail: [email protected]: (417) 625-6110

Standard Number

Working Group Chair Title Published Yr Expiration Yr

Status PAR

Expiration

C57.12.35 see organization chart IEEE Standard Bar Coding for Distribution Transformers and Step-Voltage Regulators

2013 2023

Complete

C57.12.36 see organization chart IEEE Standard Requirements for Liquid-Immersed Distribution Substation Transformers

2007 2018

Complete

C57.15 see organization chart IEEE Standard Requirements, Terminology, and Test Code for Step-Voltage Regulators

2009 2019

Ballot 2017

Dry Type Transformers SC Chair: Chuck Johnsonemail: [email protected]: (276) 688-3325

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

259 see organization chart IEEE Standard Test Procedure for Evaluation of Systems of Insulation for Dry-Type Specialty and General-Purpose Transformers

1999 2020

Complete

C57.12.01 see organization chart IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers

2015 2025

Draft Stage 2020

C57.12.51 see organization chart IEEE Standard for Ventilated Dry- Type Power Transformers, 501 kVA and Larger, Three-Phase, with High- Voltage 601 V to 34 500 V; Low- Voltage 208Y/120 V to 4160 V- General Requirements

2008 2018

Complete

C57.12.52 see organization chart IEEE Standard for Sealed Dry-Type Power Transformers, 501 kVA and Higher, Three-Phase, with High-Voltage 601 to 34500 Volts, Low-Voltage 208Y/120 to 4160 Volts--General Requirements

2012 2022

Complete

C57.12.58 see organization chart IEEE Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil

1991 2018

Pre ballot 2019

Fall 2016 Standards Report Page 13 of 23

Dry Type Transformers SC Chair: Chuck Johnsonemail: [email protected]: (276) 688-3325

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.12.59 see organization chart IEEE Guide for Dry-Type Transformer Through-Fault Current Duration 2015 2025

Complete

C57.12.60 see organization chart IEEE Standard Test Procedure for Thermal Evaluation of Insulation Systems for Dry-Type Power and Distribution Transformers, Including Open-Wound, Solid-Cast, and Resin-Encapsulated Transformers

2009 2019

Draft Stage 2019

C57.12.60-2009 /Cor 1

see organization chart IEEE Standard Test Procedure for Thermal Evaluation of Insulation Systems for Dry-Type Power and Distribution Transformers, Including Open-Wound, Solid-Cast, and Resin-Encapsulated Transformers

2013 2023

Complete

C57.12.91 see organization chart IEEE Standard Test Code for Dry-Type Distribution and Power Transformers

2011 2021

Draft Stage 2020

C57.124 see organization chart IEEE Recommended Practice for the Detection of Partial Discharge and the Measurement of Apparent Charge in Dry-Type Transformers

1991 2019

Complete

C57.134 see organization chart IEEE Guide for Determination of Hottest-Spot Temperature in Dry-Type Transformers

2013 2023

Complete

C57.16 see organization chart IEEE Standard for Requirements, Terminology, and Test Code for Dry-Type Air-Core Series-Connected Reactors

2011 2021

Draft Stage 2020

C57.94 see organization chart IEEE Recommended Practice for Installation, Application, Operation, and Maintenance of Dry-Type Distribution and Power Transformers

20152025 Complete

C57.96 see organization chart IEEE Guide for Loading Dry-Type Distribution and Power Transformers 2013 2023

Complete

Fall 2016 Standards Report Page 14 of 23

HVDC Converter Xfmrs & Smoothing Reactors

SC Chair: Mike Sharp email: [email protected] phone: (416) 298-8108 x237

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

1277 see organization chart IEEE Standard General Requirements and Test Code for Dry-Type and Oil-Immersed Smoothing Reactors for DC Power Transmission

2010 2020

Complete

Instrument Transformers SC Chair: Ross McTaggart email: [email protected] phone: (416) 751-8570 x127

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.13 see organization chart IEEE Standard Requirements for Instrument Transformers 2016 2026

Complete

C57.13.2 see organization chart IEEE Standard for Conformance Test Procedure for Instrument Transformers

2005 2020

Complete

C57.13.5 see organization chart IEEE Standard of Performance and Test Requirements for Instrument Transformers of a Nominal System Voltage of 115 kV and Above

2009 2019

Draft Stage 2020

C57.13.6 see organization chart IEEE Standard for High Accuracy Instrument Transformers 2005 2020

Complete

60076-C57.129 see organization chart Standard for General Requirements and Test Code for Oil-Immersed HVDC Converter Transformers

2007 2018

Comment Res

2018

Fall 2016 Standards Report Page 15 of 23

Insulating Fluids SC Chair: Dave Wallach email: [email protected] phone: (980) 373-4167

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.104 see organization chart IEEE Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers

2008 2018

Draft Stage 2017

C57.106 see organization chart IEEE Guide for Acceptance and Maintenance of Insulating Mineral Oil in Electrical Equipment

2015 2025

Complete

C57.111 see organization chart IEEE Guide for Acceptance of Silicone Insulating Fluid and Its Maintenance in Transformers

19892019 Complete

C57.121 see organization chart IEEE Guide for Acceptance and Maintenance of Less-Flammable Hydrocarbon Fluid in Transformers

1998 2019

Complete

C57.130 see organization chart IEEE Guide for the Use of Dissolved Gas Analysis Applied to Factory Temperature Rise Tests for the Evaluation of Mineral Oil-Immersed Transformers and Reactors

2015 2025

Complete

C57.139 see organization chart IEEE Guide for Dissolved Gas Analysis in Transformer Load Tap Changers

2015 2025

Complete

C57.146 see organization chart IEEE Guide for Interpretation of Gasses Generated in Silicone-Immersed Transformers

2005 2021

Complete

C57.147 see organization chart IEEE Guide for Acceptance and Maintenance of Natural Ester Fluids in Transformers

2008 2018

Comment Res

2018

C57.155 see organization chart IEEE Guide for Interpretation of Gases Generated in Natural Ester and Synthetic Ester-Immersed Transformers

2014 2024

Complete

C57.637 see organization chart IEEE Guide for the Reclamation of Mineral Insulating Oil and Criteria for Its Use

2015 2025

Complete

Fall 2016 Standards Report Page 16 of 23

Insulation Life SC Chair: Sheldon Kennedy email: [email protected] phone: (716) 896-6500 X105

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

1276 see organization chart IEEE Guide for the Application of High-Temperature Insulation Materials in Liquid-Immersed Power Transformers

1997 2018

Draft Res 2016

1538 see organization chart IEEE Guide for Determination of Maximum Winding Temperature Rise in Liquid-Filled Transformers

2000 2024

Complete

1538a see organization chart IEEE Guide for Determination of Maximum Winding-Temperature Rise in Liquid Immersed Transformers -- Amendment 1

2015 2025

Complete

C57.100 see organization chart IEEE Standard Test Procedure for Thermal Evaluation of Insulation Systems for Liquid-Immersed Distribution and Power Transformers

2011 2021

Complete

C57.119 see organization chart IEEE Recommended Practice for Performing Temperature Rise Tests on Oil-Immersed Power Transformers at Loads Beyond Nameplate Ratings

2001 2018

Comment Res

2018

C57.154 see organization chart

IEEE Standard for the Design, Testing, and Application of Liquid-Immersed Distribution, Power, and Regulating Transformers Using High-Temperature Insulation Systems and Operating at Elevated Temperatures

20122022 Complete

C57.91 see organization chart IEEE Guide for Loading Mineral-Oil-Immersed Transformers and Step-Voltage Regulators

2011 2021

Complete

C57.91-1995 /Cor 1

see organization chart IEEE Guide for Loading Mineral-Oil-Immersed Transformers - Corrigendum 1

2002 2018

Complete

Fall 2016 Standards Report Page 17 of 23

Performance Characteristics SC Chair: Ed teNyenhuis email: [email protected] phone: (905) 460-3210

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.21 see organization chart IEEE Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVA

2008 2018

Draft Dev 2018

C57.32 see organization chart IEEE Standard for Requirements, Terminology, and Test Procedures for Neutral Grounding Devices

2015 2025

Complete

C57.105 see organization chart IEEE Guide for Application of Transformer Connections in Three-Phase Distribution Systems

1978 2018

Draft Stage 2019

C57.109 see organization chart IEEE Guide for Liquid-Immersed Transformers Through-Fault-Current Duration

1993 2018

Draft Stage 2019

C57.110 see organization chart IEEE Recommended Practice for Establishing Liquid-Filled and Dry-Type Power and Distribution Transformer Capability When Supplying Nonsinusoidal Load Currents

2008 2018

Draft Stage 2018

C57.120 see organization chart IEEE Loss Evaluation Guide for Power Transformers and Reactors 1991 2018

Comment Res

2016

C57.123 see organization chart IEEE Guide for Transformer Loss Measurement 2010 2020

Complete

C57.136 see organization chart IEEE Guide for Sound Level Abatement and Determination for Liquid-Immersed Power Transformers and Shunt Reactors Rated Over 500 kVA

2000 2018

Complete

C57.142 see organization chart IEEE Guide to Describe the Occurrence and Mitigation of Switching Transients Induced by Transformers, Switching Device, and System Interaction

2010 2020

Complete

C57.149 see organization chart IEEE Guide for the Application and Interpretation of Frequency Response Analysis for Oil-Immersed Transformers

2012 2022

Complete

Fall 2016 Standards Report Page 18 of 23

Performance Characteristics SC Chair: Ed teNyenhuis email: [email protected] phone: (905) 460-3210

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.159 see organization chart IEEE Approved Draft Guide on Transformers for Application in Distributed Photovoltaic (DPV) Power Generation Systems

20162026 Complete

C57.18.10 see organization chart IEEE Standard Practices and Requirements for Semiconductor Power Rectifier Transformers

1998 2019

Draft Dev 2020

C57.18.10a see organization chart IEEE Standard for Practices and Requirements for Semiconductor Power Rectifier Transformers Amendment 1: Added Technical and Editorial Corrections

2008 2018

Complete

Power Transformers SC Chair: Bill Griesacker email: [email protected] phone: (412) 264-3266

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

638 see organization chart IEEE Standard for Qualification of Class 1E Transformers for Nuclear Power Generating Stations

2013 2023

Complete

60076-57-1202 see organization chart IEC/IEEE Approved Draft International Standard Requirements for Liquid Immersed Phase-Shifting Transformers

2016 2026

Complete

C57.131 see organization chart IEEE Standard Requirements for Tap Changers 2012 2022

Complete

C57.116 see organization chart IEEE Guide for Transformers Directly Connected to Generators 2014 2024

Complete

C57.12.10 see organization chart IEEE Standard Requirements for Liquid-Immersed Power Transformers 2010 2020

Draft Dev 2019

Fall 2016 Standards Report Page 19 of 23

Power Transformers SC Chair: Bill Griesacker email: [email protected] phone: (412) 264-3266

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.12.10-2010 /Cor 1

see organization chart IEEE Standard Requirements for Liquid-Immersed Power Transformers--Corrigendum 1: Correction of 5.1.9--Sudden Pressure Relay

2012 2022

Complete

C57.12.10-2010 /Cor 2

see organization chart IEEE Standard Requirements for Liquid-Immersed Power Transformers -- Corrigendum 2: Correction of A.3.2.13 Autotransformer LTC application considerations

2013 2023

Complete

C57.93 see organization chart IEEE Guide for Installation and Maintenance of Liquid-Immersed Power Transformers

2007 2018

Draft Dev 2018

C57.125 see organization chart IEEE Guide for Failure Investigation, Documentation, Analysis, and Reporting for Power Transformers and Shunt Reactors

2015 2025

Complete

62032 see organization chart IEC 62032 Ed.1 (IEEE Std C57.135(TM)-2001): Guide for the Application, Specification and Testing of Phase-Shifting Transformers

2005

C57.135 see organization chart IEEE Guide for the Application, Specification, and Testing of Phase-Shifting Transformers

20112021 Complete

C57.140 see organization chart IEEE Guide for Evaluation and reconditioning of Liquid Immersed Power Transformers

2006 2018

Comment Res

2017

C57.143 see organization chart IEEE Guide for Application for Monitoring Equipment to Liquid-Immersed Transformers and Components

2012 2022

Complete

C57.148 see organization chart IEEE Standard for Control Cabinets for Power Transformers 2011 2021

Complete

C57.150 see organization chart IEEE Guide for the Transportation of Transformers and Reactors Rated 10 000 kVA or Higher

2012 2022

Complete

C57.153 see organization chart IEEE Guide for Paralleling Regulating Transformers 2015 2025

Complete

Fall 2016 Standards Report Page 20 of 23

Power Transformers SC Chair: Bill Griesacker email: [email protected] phone: (412) 264-3266

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.156 see organization chart IEEE Approved Draft Guide for Tank Rupture Mitigation of Liquid-Immersed Power Transformers and Reactors

2016 2026

Complete

C57.157 see organization chart IEEE Guide for Conducting Functional Life Tests on Switch Contacts Used in Insulating Liquid--Immersed Transformers

2015 2025

Complete

C57.17 see organization chart IEEE Standard Requirements for Arc Furnace Transformers 2012 2022

Complete

Standards SC Chair: Jerry Murphy email: [email protected] phone: (407) 824-4194

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.12.00 see organization chart IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers

2015 2025

Complete

C57.12.90 see organization chart 2015 2025

Complete

C57.12.70 see organization chart IEEE Standard for Standard Terminal Markings and Connections for Distribution and Power Transformers

2011 2021

Complete

C57.12.80 see organization chart IEEE Standard Terminology for Power and Distribution Transformers 2010 2020

Complete

C57.144 see organization chart IEEE Guide for Metric Conversion of Transformer Standards 2004 2020

Complete

C57.152 see organization chart IEEE Guide for Diagnostic Field Testing of Fluid-Filled Power Transformers, Regulators, andReactors

20132023 Complete

Fall 2016 Standards Report Page 21 of 23

Standards SC Chair: Jerry Murphy email: [email protected] phone: (407) 824-4194

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.163 see organization chart IEEE Guide for Establishing Power Transformer Capability while under Geomagnetic Disturbances

2015 2025

Complete

Underground & Network Protectors SC Chair: Dan Mulkey email: [email protected] phone: (707) 776-7346

Standard Number

Working Group Chair Title Published Yr Expiration Yr

PAR Approval

PAR Expiration

C57.12.23 see organization chart IEEE Standard for Submersible Single-Phase Transformers: 167 kVA and Smaller; High Voltage 25 000 V and Below; Low Voltage 600 V and Below

2009 2019

Draft Dev 2018

C57.12.24 see organization chart IEEE Standard for Submersible, Three-Phase Transformers, 3750 kVA and Smaller: High Voltage, 34 500 GrdY/19 920 Volts and Below; Low Voltage, 600 Volts and Below

2009 2019

Comment Res

2017

C57.12.40 see organization chart IEEE Standard for Network, Three-Phase Transformers, 2500 kVA and Smaller; High Voltage, 34 500 GrdY/19 920 and Below; Low Voltage, 600 V and Below; Subway and Vault Types (Liquid Immersed)

2011 2021

Ballot 2017

C57.12.44 see organization chart IEEE Standard Requirements for Secondary Network Protectors 2014 2024

Draft Dev 2019

IEEE/PES Transformers Committee

Chair: Stephen Antosz

Vice Chair: Susan McNelly Secretary: Bruce Forsyth Treas: Greg Anderson

Past Chair: Donald Platts Std. Coordinator: Jim Graham

Instrument

Ross McTaggart

HVDC Converter Xfmrs &

Smoothing Reactors

Michael Sharp

Dry Type

Chuck W. Johnson

Distribution

Steve Shull

Bushing

Peter Zhao

Power

Bill Griesacker

UG & NW Protector

Dan Mulkey

Gen. Req. of Bushings

Rev of C57.19.00

K. Ellis

Bushing App. Guide

C57.19.100

T. Spitzer

OH Dist. Xfmrs

C57.12.20

A. Traut

Eqp Encl. Integrity

C57.12.28, 12.29,

12.30, 12.31, & 12.32

R. Olen

Elec Rpt of Test Data

IEEE 1388/C57.12.37

T. Callsen

General Req.

C57.12.01

R. Ballard

Req. & Test Code for

HVDC Con. Xfmr

C57.129

R. Dudley

Req. & Test Code for

HVDC Smoothing

Reactors IEEE 1277

U. Radbrandt

Step Volt. Regulator

C57.15

C. Colopy

Req for Inst. Xfmrs

C57.13

R. McTaggart

Test Proc. For Inst.

Xfmrs

C57.13.2

J.E. Smith

Test Req. for >= 115kV

PC57.13.5

P. Riffon

Req. for Elect. Rev.

Metering

C57.13.6

J.E. Smith

Guide for Monitoring

C57.143

D. Chu

Directly Connected

GSU C57.116

G. Hoffman

Req. for L.I. Power

Xfmrs C57.12.10

G. Hoffman

Std. Req. for Sec.

Network Xfmrs

C57.12.40

B. Kaplonski

UG 3ph Dist Xfmr

< 2500KVA

C57.12.24

G. Termini

Dry Type Air-Core

Reactors

C57.16

A. Del Rio

Performance

Characteristics

C57.19.01

S. Zhang

Req. & Testing of DC

Bushings

C57.19.03

L. Recksiedler

Req.for Vent. >500KVA

PC57.12.51

S. Som

Req. for Sealed

>500kVA

PC57.12.52

S. Kennedy

Thermal Eval. for Dry-Type

C57.12.60

R. Wicks

Transient Analysis

C57.12.58

R. Wicks

Dry-Type Through Fault

Current Duration

C57.12.59

P/ Payne

Test Code

C57.12.91

D. Foster

IEEE 638 – Std for 1E

Tx at Nuc Gen Stations

C. Swinderman

Guide for Phase-Shift

Xfmrs

C57.135

(Open)

Eval & Reconditioning

C57.140

P.Boman

Std for Control Cabinet

C57.148

J. Watson

Arc Furnace Xfmr

C57.17

R. Ganser

Installation & Maint

Guide C57.93

M. Lau

Req. for 3ph Pad Mount

C57.12.34

S. Schull

UG Self-Cool 1-ph

C57.12.23

A. Traut

Pad-Mount 1ph Self-

Cool <2500kVA

C57.12.38

A. Ghafourian

Bar Coding

C57.12.35

L. Matthews

Perf Characteristics for Distr Xfmr Bushings

PC57.19.02 S. Shull

Transportation Guide

PC57.150

G. Anderson

Tank Rupture

Mitigation C57.156

P. Zhao

Requirements for LTC

C57.131

C. Colopy

Dry-Type Hottest Spot

C57.134

P. Payne

Dry Type Op & Maint.

Guide

C57.94

D. Stankes

Dist. Sub. Xfmrs

C57.12.36

J. Murphy

Guide for Paralleling

C57.153

E.T. Jauch

Page 22 of 23

Failure Investigations

C57.125

W. Binder

Functional Life Tests

for DETC C57.157

P. Hopkinson

Req. for mA CT

C57.13.7

H. Alton

Tank Pressure

Coordination

C57.12.39

C. Gaytan

Revised by J.Graham

19 Oct, 2016

Std Requirements

Phase Shifters

P60076-57-1202

R. Ahuja

Requirements for

SSVTs

PC57.13.8

D. Wallace

TF to compare req’s of composite vs traditional

bushings

Loading Guide for Dry

Type Xfmrs

C57.96

R. Marek

Dry-Type PD & Apparent

Charge Measurement

C57.124

T. Prevost

Std. Req. for Sec.

Network Protectors

C57.12.44

W. Wimmer

Vent Dry-Type Network

Xfmrs <=2500KVA

C57.12.57

A. Robinson

Perf Characteristics for GSU Bushings PC57.19.04 S. Digby

IEEE/PES Transformers Committee

Chair: Stephen Antosz

Vice Chair: Susan McNelly Secretary: Bruce Forsyth Treas: Greg Anderson

Past Chair: Donald Platts Std. Coordinator: Jim Graham

Insulating Fluids

Dave Wallach

Insulation Life

Sheldon Kennedy

Dielectric Test

Ajith Varghese

Performance Characteristics

Ed teNyenhuis

Standards

Jerry Murphy

Req. & Test Code for

Shunt Reactors

>500kVA C57.21

S.Som

Semicon Rectifier Xfmrs

C57.18.10

S. Kennedy

App. Guide for Xfmr

Connections

C57.105

A. Bromley

Sound Level Abatement

C57.136

(Open)

Impulse Test Guide

for Dist Tx C57.138

A Molden

Rev of Low Freq. Tests

B. Poulin

Guide for Acoustic PD

C57.127

D. Gross

DGA Guide

C57.104

C. Beauchemin

Mineral Oil

C57.106

R. Rasor

Silicone Oil

C57.111

P. Boman

DGA During Thermal

Test C57.130

J. Thompson

Less Fammmable

H-C Fluid C57.121

D. Sundin

Loading Guide

C57.91

Don Duckett

TF Investigate Use of

Furan Testing

S. Xu

Max. Wdg Temp Rise

IEEE 1538

R. Marek

Temp Rise Test Above

NP Rating C57.119

G. Kennedy

Thermal Eval Test

C57.100

R. Wicks

Cont Rev of C57.12.00

S. Snyder

Cont. Rev of C57.12.90

S. Antosz

Metric Conversion

C57.144

P. Balma

Terminology

C57.12.80

J.Graham

Meetings

Greg Anderson

Through-Fault Current

Duration

C57.109

V. Mehrotra

Non-Sinusoidal Load

Current C57.110

R. Marek

Xfmr Loss

Measurement

C57.123

E. teNyenhuis

Short Circuit Testing

PC57.133

M. Fortin

Sw Transients CB/Xfmr

C57.142

R. Degeneff

App. Of High Temp

Insulation IEEE 1276

R. Wicks

DGA in LTC

C57.139

D. Wallach

TF – Moisture in

Insulation

B. Rasor

Oil Reclamation

C57. 637

J. Thompson

DGA in Silicone

C57.146

J. Murphy

Website Development

S. McNelly

Terminal Markings &

Connections

S. Schull C57.12.70

Diagnostic Field Testing

J. Verner

IEEE C57.152 /(62)Neutral Grounding

Devices PC57.32

S. Kennedy

Educational

Development

T. Prevost

WG on Dielectric

Test Table

P. Hopkinson

Sound Level

Measurement

PC57.151

TF - Temp Rise Test -

C57.12.90, Clause 11

P. Powell

IEEE /IEC Cross

Reference TF

V. Mehrotra

Guide to Freq Response

Analysis C57.149

C. Sweetser

PCS Rev to

Test Code- 12.90

M. Perkins

PCS Rev. to

Gen Req - 12.00

T. Ansari

PD Measurement

On Bushings & Inst Tx

C57.160

T. Hochanh

Rev of Transient

Voltage Test

P. Riffon/P. Heinzig

WG- External Dielectric

Test Clearance

E. Davis

Page 23 of 23

WG – Std Req. Hi Temp

Insulation C57.154

R. Marek

DGA in Ester Fluids

C57.155

P. Boman

TF for Particle Count

M. Scarborough

App Guide for Ester

Fluids -C57.147

P. McShane

Windfarm Transformers

P60076-16

D. Buckmaster

TF – Winding Temp

Indicators

P. McClure

Tertiary & Stabilizing

Windings PC57.158

E. Betancourt

Loss Evaluation Guide

PC57.120

R Verdolinm

Revised J.Graham

19 Oct, 2016

Moisture in Insulation

PC57.162

T. Prevost

Committee

History

P. Balma

WG- Guide for DFR

testing PC57.161

A. Naderian

DPV Grid Transformers

PC57.159

H. Shertukde

PD Measurement

C57.113

B. Poulin

Transformer Capability

under GMD J. Verner

IEEE C57.163

TF Consolidation of Fluids Guides

T.Prevost