standard work making the new way become the standard way prepared by: raution jaiswal & michael...

14
Standard Work Making the “new way” become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Upload: kenny-jopp

Post on 28-Mar-2015

245 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Standard Work

Making the “new way” become the standard way

Prepared by: Raution Jaiswal & Michael Anderson

Page 2: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

What is Standard Work? A simple written description of the safest, highest

quality, and most efficient way known to perform a particular process or task

The only acceptable way to do the process it describes

Expected to be continually improved Includes the amount of time needed for each task Reduces variation, increases consistency Needed in all work areas

When correctly applied, standard work will not only sustain kaizen improvements, but also expose and eliminate previously unseen

waste.

Page 3: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Standard work supports the lean system of continuously improving capacities and efficiencies by defining 5 critical elements for every person doing the work.

1. The customer demand2. The most efficient work routine (steps)3. The cycle times required to complete work

elements4. All process quality checks required to minimize

defects/errors5. The exact amount of work in process required

Standard Work

Page 4: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Steps for Creating Standard Work

1. Define the extent of the process for which you are creating standard work (e.g. starts at… ends at…)

Standard work for each function in a multi-function process

People doing the same job will use the same standard work

The end point will be the starting point for the next standard work sequence

Page 5: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Steps for Creating Standard Work

2. Determine the appropriate standard work requirements:

Title Work area Author Revision date Takt time, cycle time Work sequence Approvals Document location and ownership

Page 6: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Steps for Creating Standard Work

3. Gather the required information:Whenever information is collected for standard work, it is important to search for best practices. Observing multiple people doing the same work is a good way to let everyone see how much variation there is from unit to unit and from person to person.

4. Create the standard work documents:Now that you have gathered the required information, you are ready to create the standard work document (s).

Page 7: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Steps for Creating Standard Work

5. Train the supervisor on the standard work: This is an essential step. The supervisor is the owner of the standard work and must understand it perfectly and train others to do it perfectly.

6. Train the employees to do the standard work: Once trained, each employee must be able to demonstrate their ability to perform the standard work perfectly.

Page 8: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Steps for Creating Standard Work

7. Run the process and observe the results:

Once standard work has been created and everyone is trained, it is time to start the process and make observations. This is the time to look for improvements.

Look for: Training needs Inadequate processes Waste in any of the 7 forms

Page 9: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Steps for Creating Standard Work

8. Make adjustments and modifications to the standard work:

Standard work should be a document subject to change; however, a process should be implemented for making changes to the standard work. Revision levels should be recorded each time standard work is changed and old standard work should be filed for future reference.

Page 10: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Steps for Creating Standard Work

DO: Keep standard work simple Make it accessible Include all info on one, easy-to-read document Create one standard work document for each part of

the process Always look for ways to improve the process

DON’T: Put standard work in a desk drawer Change processes without changing standard work Make standard work difficult to change Give up on standard work – it can be tough, but it’s

very important

Page 11: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

The supervisor must ask the following 4 questions for every personwho will perform standard work:

Do you understand why you must follow the standard work? Are you willing to follow the standard work? What are the consequences for choosing not to follow standard

work? What is the process for changing standard work?

Role of the Supervisor

The supervisor must approve all changes to the standard work and ensure that all employees are fully trained at the time the new standard work

implemented.

Page 12: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Spaghetti Chart is used to detail the actual physical flow and distances involved in a work process. Processes that have not been streamlined frequently are poorly laid out with work/product taking a path through the work area that looks like a mass of cooked spaghetti.

To create a spaghetti chart you:

1. Create a scale map of a work station or work process2. Draw a line from the initial point of work to the next step3. Continue until the work/product exits the work area

Examination of this resulting chart will show where improvements are to be made

Spaghetti Chart

Page 13: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Spaghetti Chart

Page 14: Standard Work Making the new way become the standard way Prepared by: Raution Jaiswal & Michael Anderson

Questions?