Stakeholder Advisory GroupMeeting #2
WelcomeIntroductionsRecap: Project Overview & ProcessProject Status Updateo Environmental Agency Coordinationo Engineering Analysis (Traffic & Typical Section)o Environmental AnalysisOpen DiscussionAdjourn
Agenda
2 of 15
What is the Purpose of the Study?Identify the best solution and location for replacement of the existing Brooks Bridge and secure federal approvals
Why is the Project Needed? Structurally deficient Does not meet current design standards Does not meet Americans with Disabilities Act (ADA) pedestrian/bike requirements
Recap: Purpose and Need
3 of 15
Brooks Bridge Replacement Study –Project Location Map
Brooks Bridge Replacement Study –Project Schedule
Alternatives Analysis
AlternativesPublic
WorkshopPublic
Hearing
Environmental & Engineering
Documents
Final FHWA Project
Approval
Environmental Analysis
Jan May Jan Feb Dec
Community Outreach
43 5 76 8Project Initiation
Environmental & Engineering Data Collection
2 0 1 82 0 1 72 0 1 6
Apr
PublicKickoff
Meeting
Feb
2 0 1 521
5 of 20
Jul
Status Update
6 of 20
Completed initial environmental agency coordination (ETDM)Completed Navigation Study Completed traffic modelingBegan alternatives analysisBegan environmental evaluationContinued public outreach activities Determine Recommended
Replacement Alternative
Evaluate Alternatives5S T E P
Develop Alternatives4S T E P
Analyze Typical Sections3S T E P
Analyze Current and Future Traffic2S T E P
Determine Bridge Height1S T E P
Summary Degrees of EffectETDM Review
7
PHYSICAL NATURAL CULTURAL COMMUNITY
Air
Qua
lity
Con
tam
inat
ed S
ites
Infra
stru
ctur
e
Noi
se
Nav
igat
ion
Coa
stal
& M
arin
e
Farm
land
s
Floo
dpla
ins
Spec
ial D
esig
natio
ns
Wat
er Q
ualit
y &
Qua
ntity
Wet
land
s
Wild
life
& H
abita
t
His
toric
Arch
eolo
gica
l Site
s
Rec
reat
ion
Area
s
Sec
tion
4(f)
Pot
entia
l
Aes
thet
ic E
ffect
s
Eco
nom
ic
Land
Use
Mob
ility
Rel
ocat
ion
Soc
ial
2 3 2 2 4 3 N/A 3 3 3 3 4 3 3 3 2 1 2 2 2 3
N/A No Involvement 3 Moderate
1 Enhanced 4 Substantial For additional information on the FDOT Efficient Transportation Decision Making (ETDM) and Environmental Technical Advisory Team (ETAT) process, visit: http://www.dot.state.fl.us/emo/ETDM.shtm(project number 14214).0 None 5 Dispute Resolution
2 Minimal
Summary of Primary ETAT Reviewer ConcernsSocial/Cultural Resourceso Potential right-of-way acquisition of commercial, residential, or recreation propertieso Potential to impact parks and historic properties, considered Section 4(f) resourcesNatural Resourceso Stormwater runoff has potential to impact surface waters and wetlands o Gulf Islands National Seashore is a Florida Outstanding Water requiring high protectiono Valuable habitats including estuarine salt marsh and sea grass beds in project areao Multiple Federal and State threatened and endangered species potentially present and
protection measures must be in place for each o Essential Fish Habitat within project area and will require coordination with NMFSPhysical Resourceso Potentially contaminated sites near the corridor must be evaluated o Bridge must meet required clearances and obtain USCG permit
ETDM Review
8
Determine Bridge HeightUS Coast Guard Required Clearances
1
9 of 20
ADA RequirementsDetermine Bridge Height1
10 of 20
Analyze Current & Future Traffic
2040 Traffic58,700 vehicles per day crossing Brooks Bridge
2
11 of 20
12
Analyze Typical Sections3
12 of 20
13
Analyze Typical Sections3
13 of 20
Bridge Construction Phasing
14
EXISTING CONDITION
14 of 20
Bridge Construction Phasing
15
PHASE I CONSTRUCTION
15 of 20
Bridge Construction Phasing
16
PHASE IIA CONSTRUCTION
16 of 20
Bridge Construction Phasing
17
PHASE IIB CONSTRUCTION
17 of 20
Bridge Construction Phasing
18
FINAL CONDITION
18 of 20
Develop Alternatives
4
19 of 20
Engineeringo Purpose and Needo Alternatives Analysiso Structureso Traffic o Right-of-Wayo Safetyo Bicycles/Pedestrianso Drainageo Utilitieso Cost
Environmentalo Air Qualityo Noiseo Social and Communityo Wetlandso Wildlife and Habitato Visual and Aestheticso Parks and Recreational Facilitieso Water Qualityo Cultural Resourceso Land Useso Economicso Contaminationo Construction
Public Involvemento Public Meetingso Agency and Elected Official
briefingso Stakeholder/Small group meetingso Websiteo Newsletterso Social Media
Evaluate Alternatives5
20 of 20
Okaloosa-Walton TPO Briefings o April 16, 2015; February 18, 2016Efficient Transportation Decision Making (ETDM) Agency Reviewo April 17, 2015 – October 27, 2015Public Kickoff Meeting o April 23, 2015Stakeholder Advisory Group Meetings o September 10, 2015o March 3, 2016
Outreach Activities
21 of 20
Local and agency coordinationo City of Fort Walton Beacho Chamber of Commerceo Okaloosa County (Commissioners, Convention Center, Fire District, Public Works) o Eglin Air Force Baseo National Park Service / Gulf Islands National Seashoreo U.S. Fish and Wildlife Service / National Marine Fisheries Service o Florida Department of Environmental Protection o Coast Guardo Gulf Intracoastal Canal Association / Warrior Tombigee Waterway Association
Outreach Activities
22 of 20
What would you like this project to achieve?o Ex., Less traffic, improved connectivityWhat elements would you like to see incorporated into the project?o Ex., sidewalks, bike lanes, multi-use path, bridge overlooksWhat concerns do you have?o Ex., business impacts, construction, access, safety
Open Discussion
23 of 15
Stay Involved
http://www.nwflroads.com
Date:Tuesday, May 17, 2016
Time:5:30 - 6:30 p.m.
Location:Emerald Coast Convention Center1250 Miracle Strip Pkwy SE,Fort Walton Beach, Florida 32548
Alternatives Public Meeting:
Can’t attend the meeting?
Follow us onStay Involved:[email protected] Us: 24