Stadium in Amiens

TRANSCRIPT

  • Foto: Christian Richters, Mnster

    ba

    ba

    The design for this football stadium was based on two key ideas: it was to form a closed space, yet be open to the sky; and it was to be integrated into the surrounding landscape. The ground is enclosed on all four sides by stands, which provide seating for 12,000 spec-tators and are covered by a glass roof sup-ported by curved steel girders. The sense of lightness thus created is accentuated by con-cealing the lower level of the stands behind a planted embankment. At night, the transparent roof is filled with light from the floodlights fixed to the tops of the girders. The entrances to the stadium are at the four corners, thus ensur-ing an even flow of spectators. Integrated into the western stand is a structure that houses changing rooms, VIP and press boxes, and space for TV teams.

    A Plan B Elevationscale 1:2000Section aa scale 1:500

    Stadion in Amiens

    Stadium in Amiens

    Architekten:Atelier dArchitecture Chaix & Morel et Associs, ParisMitarbeiter: Philippe Chaix, Jean-Paul Morel, Rmy van Niewenhove, Anabel Sergent, Benot Sigros, Emmanuel Laurent, Laurent BievelotTragwerksplanung Beton: Ingrop, CourbevoieTragwerksplanung Stahlbau: AR&C, Paris

    Das neue Fuballstadion im Osten der franzsischen Stadt Amiens wirkt aus der Entfernung wie ein soeben gelandetes Luft-schiff. Zwei Gedanken liegen dem Entwurf zu Grunde: Es sollte ein geschlossener Raum unter freiem Himmel entstehen, und er muss-te sich in die Landschaft einfgen. Vier Tribnen fassen das Spielfeld an den Seiten ein. Die Sitzreihen liegen unter einer Reihe gebogener Stahltrger, die mit auen liegen-den Glasscheiben gedeckt wurden. Zuschauer finden Schutz vor Wind und Regen, ohne den Blickbezug zur Landschaft zu verlieren. Durch das Verbergen des unteren Tribnen-bereichs hinter einem aufgeschtteten Hgel bekommt der Baukrper eine Leichtigkeit, die die Transparenz der Tribnendcher betont. Besonders am Abend wird diese Wirkung deutlich: Das Glasdach erstrahlt im Licht der Scheinwerfer, die oben an der Konstruktion angebracht sind. Der Ver-zicht auf massive Flutlichtmasten und die Integration der Beleuchtung war fr die Geometrie der Stahltrger entscheidend. Auf den steil ansteigenden Tribnen finden 12 000 Besucher Platz; durch den Bau zu-stzlicher Galerien kann die Kapazitt spter auf 20 000 Pltze erweitert werden. Die Ein-gnge zum Stadion liegen in den Ecken so werden die Zuschauer gleichmig verteilt. Der Anbau an der Westtribne beherbergt Garderoben, Ehrenlogen, die Pressetribne und Rumlichkeiten fr Fernsehteams.

    A Grundriss B AnsichtMastab 1:2000Schnitt aa Mastab 1:500

    A

    aa

    B

    1 Institut fr internationale Architektur-Dokumentation GmbH & Co. KG 2000 3

  • 1 lam. safety glass: 2 6 mm with 1 mm film 2 silicone expansion strip 3 EPT sealing gasket 4 aluminium fixing strip 5 EPDM sealing gasket 6 168.3 mm dia. steel tube 4 mm thick 7 aluminium section 8 60 mm dia. steel rod 9 12 mm steel plate10 12 mm steel plate11 welded steel-plate girder 4001400 mm deep, painted

    Details of expansion joint scale 1:5A Minimum expansion of steel structureB Maximum expansion of steel structureC ElevationD Horizontal section

    1 2

    1 23 4 5

    6

    7

    8

    910

    11

    2 3 4

    1 VSG 2 6 mm, dazwischen 1 mm Folie 2 Fugenband, Silikon 3 Dichtungsprofil EPT 4 Pressleiste, Aluminium 5 Dichtungsprofil EPDM 6 Stahlrohr 168,3/4 mm 7 Aluminiumprofil 8 Rundstahl 60 mm 9 Flachstahl 12 mm10 Flachstahl 12 mm11 zusammengesetztes Stahlprofil h = 400 mm bis 1400 mm, aus Flachstahl geschweit, gestrichen

    Details Dehnungsfuge Mastab 1:5A minimale Dehnung StahlbauB maximale Dehnung StahlbauC AnsichtD Horizontalschnitt

    A

    B

    C

    D

    16

    7

    9

    3

    2

    5

    21 3

    8

    4

    1

    2

    3

    5

    6

    7

    A

    B

    C

    2000 3 Stadion in Amiens, Frankreich 2

  • Section bb scale 1:100Sectional details scale 1:10A Head of roofB Glazing abutmentC Foot of glazing

    1 aluminium fixing strip2 EPDM gasket3 lam. safety glass: 2 6 mm with 1 mm film4 355.6 mm dia. steel tube 4 mm thick5 168.3 mm dia. steel tube 4 mm thick6 welded steel-plate girder 4001400 mm deep, painted7 12 mm steel plate8 25/15/1 mm galvanized steel RHS9 2 mm galvanized sheet steel

    9

    4

    3

    5

    6

    Schnitt bb Mastab 1:100Details Mastab 1:10A KopfpunktB Glassto, horizontalC Fupunkt

    1 Pressleiste, Aluminium2 Dichtungsprofil EPDM3 VSG 2 6 mm, dazwischen 1 mm Folie 4 Stahlrohr 355,6/4 mm5 Stahlrohr 168,3/4 mm6 Stahlprofil h = 400 mm bis 1400 mm, aus Flachstahl geschweit, gestrichen7 Flachstahl 12 mm8 Stahlprofil verzinkt, 25/15/1 mm9 Stahlblech verzinkt, 2 mm

    bb

    3 Stadion in Amiens, Frankreich 2000 3