© 2020 Cognizant

21st National Award for Excellence in Energy Management Cognizant Technology Solutions (I) Private Limited Chennai-Siruseri STPI

Ramesh Dasarathan (Senior Manager)

L Naresh Kumar (Assistant Facility Manager)

N Selvia (Senior Executive)

Page 2: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant2

Agenda

• Company Profile

• Energy consumption overview

• Specific Energy consumption in last 3 years (2017-2019)

• Information on Internal, External, National & Global Benchmark

• List of Major Energy conservation project planned in 2020

• Energy Savings project implemented in last 3 years

• Innovative Project implemented details (2017-2020)

• Utilization of renewable Energy sources

• Waste utilization & management

• GHG Inventorisation

• Green Supply chain management & Implemented project through green purchase policy

• Team work, Employee involvement & monitoring

• Other Innovative technologies implemented

• Awards & Certification

Page 3: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

Cognizant Overview

© 2020 Cognizant

Cognizant is a multinational corporation that provides IT

services, including digital, technology, consulting, and

operations services. It is headquartered in Teaneck, New

Jersey, United States.

159 delivery and operation centers globally and spread

across 39 countries

• Global foot print of 24 million+ built up in which 13.6 million

SFT of these Owned Facility

• Majority of these operations are in hot and humid climate and

significant percentage support 24x7 operations

• More than 80% of the space is air-conditioned

• The company has more than 291,700 employees globally, of

which 100,000 are women employees. Over 150,000 are in

India.

3

Page 4: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant4

SDB Cafeteria

Academy

Siruseri Campus (SRI) Facility Overview

Year of Start : 2004

Seating Capacity : 4000 Present Head Count : 2600 FTE & 250 CWR

Software Block : SDB1(G+3) Academy(G+3) &

Cafeteria (G+1) Total area of Facility : 9 Acres

Total Built-up area : 312,000 Sq. ft EB Sanctioned Demand : 3250 KVA

HVAC Higher Side : 1610 TR(SDB - 3x350 TR & Academy – 2x280 TR)

Power Back ups:

Transformer : 2 x 2500 KVA ( HT - 11 kV/433V)

DG capacity : 3 x 1500 KVA UPS Capacity : 2 x180 KVA, 2x120 KVA

1 x 40 KVAUtilities:

Fire Sumps : 200 KL Raw Water Sump : 650 KL

Sewage Treatment Plants : 200 KLD HSD Yards : 2 x 15 KL

Page 5: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant5

Year Total Consumption

EPIEnergy

Consumption Reduction (%)

Per Capita (kWh/Month/Associate)

RemarkskWh/Annum/SFT) (kWh/Annum/SQM)

2017 57,28,490 18.36 198.3 10 % 194 Base line 2016-60,42,250 kWh

2018 43,54,955 13.96 150.2 24 % 134 Chiller Retrofit

2019 36,66,892 11.75 126.5 16 % 113 EC Based AHU

1.53

1.16

0.98

0.90

1.10

1.30

1.50

1.70

2017 2018 2019

EPI Comparison in 2017 to 2019 (kWh/Month/SFT)

Energy Consumption Overview - 2017 to 2019

Overall Energy Reduction from 2016 - 39 %

Page 6: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant6

1.591.501.69

1.851.791.761.54

1.72

1.281.171.231.24

1.101.151.201.321.24

1.371.201.181.141.121.04

0.890.841.000.96

1.131.011.03

0.931.010.970.881.10

0.88

0.00

0.50

1.00

1.50

2.00

J a n Fe b Ma r Apr Ma y J un J u l Aug Se p Oc t Nov De c J a n Fe b Ma r Apr Ma y J un J u l Aug Se p Oc t Nov De c J a n Fe b Ma r Apr Ma y J un J u l Aug Se p Oc t Nov De c

EPI TREND - 2017 TO 2019

0

100000

200000

300000

400000

500000

600000

Jan

Feb

Mar

Ap

r

May Jun

Jul

Au

g

Sep

Oct

No

v

Dec Jan

Feb

Mar

Ap

r

May Jun

Jul

Au

g

Sep

Oct

No

v

Dec Jan

Feb

Mar

Ap

r

May Jun

Jul

Au

g

Sep

Oct

No

v

Dec

49

48

50

46

70

20

52

74

60

57

65

20

55

92

20

54

95

50

48

02

60

53

68

00

40

07

50

36

60

30

38

42

20

38

56

10

34

43

90

36

00

10

37

48

80

41

15

40

38

77

10

42

66

30

37

58

90

36

85

75

35

54

60

34

81

10

32

37

40

27

80

20

26

35

20

31

33

80

30

03

50

35

24

00

31

52

70

32

18

50

29

14

20

31

51

50

30

10

90

27

44

40

34

36

15

27

44

07

M ONTHLY KWH TREND - 2017 TO 2019

Energy Consumption Overview - 2017 to 2019

Page 7: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

Comparison of SEC with Internal & National Benchmark

© 2020 Cognizant7

Code 001

Load Pattern Study

EMP year-wise Goal

Setting

Prioritized Focus Areas

Implementation Plan & Tracking

Training + R&R

Monitoring and Review

Efficiency – One Unit per square foot per month

Downtime of Equipment – Zero

Complaints relating to comfort – Zero

BEE-National Benchmark

EPI in kWh/Sq. M. / Year

Star RatingWarm and

HumidComposite Hot and Dry

1 Star 200-175 190-165 180-155

2 Star 175-150 165-140 155-130

3 Star 150-125 140-115 130-105

4 Star 125-100 115-90 105-80

5 Star Below 100 Below 90 Below 80

Code 001

Page 8: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant8

Lift Retrofit

8 Nos 18.5 kW – 9

kW

Rooftop

Solar

PV Power

Plant

422 kWp

Additional

Wind

Energy

Quantum

45 % - 60 %

LED

Retrofit

500 Nos

2*36W -

24W

Energy Saving & Renewable Energy Utilization Initiatives 2020

Page 9: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant9

2017

•No of initiatives - 6

•Energy Saving - 1.21 L kWh

•Cost Savings - INR 12. 1

Lakhs

• Investments – INR 10.06

Lakhs

•ROI – 10 Months

2018

•No of initiatives - 6

•Energy Saving - 8.4 L kWh

•Cost Savings - INR 84 Lakhs

• Investments – INR 490 Lakhs

•ROI – 70 Months

2019

•No of initiatives - 4

•Energy Saving - 0.92 L kWh

•Cost Savings - INR 9.2 Lakhs

• Investments – INR 8.7 Lakhs

•ROI – 11 Months

Energy Saving projects implemented in 2017 to 2019

Page 10: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant10

Energy saving projects implemented in 2017 to 2019

Sl No Project Details YearInvestments

(Rs million)

Savings

(Rs million)

Payback

(Months)

1 Replacing of 250W MH to 24W LED in peripheral areas ( 51 Nos) 2017 0.7 0.25 31

2 Lighting circuit modif ication in dining hall area at cafeteria block 2017 0 0.06 0

3 Retrofit of 36W tube Light to 18W LED Tube 4 feet across campus 2017 0.23 0.15 7

4 AC Duct Modif ication activities from Cafeteria GF AHU to Medical center 2017 0.13 0.05 5

5 High Mast Light Circuit Modif ication - 2 Nos 2017 0 0.07 0

6 Motion Control Sensor for rest room lighting (20 Nos) 2017 0.047 0.63 1

7Retrofit of conventional ACC w as replaced w ith Energy Efficient ACC chiller (

Academy -280TR * 2Nos & SDB - 350 TR * 3 Nos)2018 37.75 6.30 71.91

8 Existing AHU replaced w ith EC Fan based AHU in SDB & Cafeteria (19 Nos) 2018 9.83 1.27 93

9 Replacing of Conventional 250W MH Street Light to Solar f ixtures (4 Nos) 2018 0.14 0.03 50

10Existing 2X18 w atts light f itting has been replaced w ith 15 * 12 w atts LED

fitting (583 Nos)2018 0.42 0.21 24

11 Replacing of Conventional 250W MH Street Light to Solar f ixtures (7 Nos) 2018 0.14 0.03 50

12 Effective operation of chiller through CPM (Chiller Plant Manager) 2018 0.76 0.55 17

13 Timer based AHU Operations in SDB & Cafeteria AHUs ( 19 Nos) 2019 0.038 0.050 9

14AHU & CSU schedule timing has to be revised based on project operation

timings2019 0 0.05472 0

15 Pull Cord sw itches in all blocks 2019 0.022 0.035 8

16 Existing 2*36 w atts light f itting has been replaced w ith LED 30S (500 Nos) 2019 0.83 0.82 12

Page 11: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant11

IP 1 – ACC Chiller Retrofit (Academy 280TRx2Nos & SDB-350TRx3Nos)

Conventional Air cooled chillers at our facility are 13+ years old, facing frequent breakdown & cooling issues. These

chillers are beyond economical repairs and currently OEM is extending service at premium cost which excludes life cycle

replacement parts. Due to the technological obsolescence of these chillers, utility costs have also high

No Changes in the capacity of chillers

Integrated Variable frequency drives to improve part load efficiencies and reduce inrush current

The performance of chillers is enabled with Enterprise level software with integrated Chiller plant manager

Best in Co-efficient of performance with an annual average Electrical consumption less than 1kW/TR

New EC fans, Patented flooded evaporator & Adaptive Frequency Drive

Specific Power Consumption

1.4 kW/TR

Specific Power Consumption

1.17 kW/TR

Specific Power Optimization

0.25 kW/TR (18 %)

Conventional Chiller New Chiller Specific Power

Page 12: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant12

Innovative Project 1 - Chiller Retrofit

After

Chiller Performance Agreement

Before

Page 13: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant13

Innovative Project 1 - Chiller Retrofit

SL.No Description Value Unit

1 Chiller and accessories cost 484 INR Lakhs

2 Civil work Modification cost ( Base Structure) 53 INR Lakhs

3 Total Investment Cost ( Chiller + Civil work ) 537 INR Lakhs

4 Old Chiller AMC cost for 5 Years 113 INR Lakhs

5 Old Chiller scrap cost 36 INR Lakhs

6 Total Savings(AMC & Scrap disposal) 149 INR Lakhs

7 Net Investment Cost 378 INR Lakhs

8 Avg. Energy consumption reduction 57564 kWh/Month

9 Achieved Annual Energy Saving 6.9 L kWh/Annum

10 Average Energy Cost 10 INR/kWh

11 Achieved Annual Cost Saving 69 INR Lakhs/Annum

12 Pay Back period 5 Years

Summary of

Savings

Energy Saving - 6.9 L

kWh

Cost Savings - INR 69

Lakhs

Investments - INR 378

Lakhs

ROI - 5 Years

Page 14: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant14

Innovative Project 2 - AHU Retrofit

Existing AHU replaced with EC Fan based AHU in SDB & Cafeteria

Conventional AHU in our facility are 13+ years old

Conventional AHU Capacity - 352 kW (19 Nos x 18.5 kW )

EC Fan installed Capacity - 287 kW ( 82 Nos x 3.5 kW)

Total Capacity Optimization – 65 kW(18 %)

EC fan Standalone operation to reduce the energy based on return air temperature

Specific Power Consumption

1.03 Watts/CFM Specific Power Consumption

0.62 Watts/CFM

Conventional AHU EC Fan

Specific Power Optimization

40 %

Specific Power

Page 15: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant15

Innovative Project 2 - AHU Retrofit New EC fan based AHU

Page 16: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant16

Innovative Project 2 - AHU Retrofit

SL.No Description Value Unit

1 AHU & Accessories cost 168 INR Lakhs

2 EC Fan & Accessories cost 45 INR Lakhs

3 Total Investment Cost ( AHU + EC Fan ) 213 INR Lakhs

4 Old AHU AMC cost 4 INR Lakhs

5 Old AHU Scrap cost 2 INR Lakhs

6 Total Savings (AMC & Scrap disposal) 5 INR Lakhs

7 Net Investment Cost 208 INR Lakhs

8 Avg. Energy consumption reduction 20670 kWh

9 Achieved Annual Energy Saving 2.5 L kWh/Annum

10 Average Energy Cost 10 INR/kWh

11 Achieved Annual Cost Saving 25 INR Lakhs/Annum

12 Pay Back period 8 Years

Summary of

Savings Energy

Saving - 2.5 L kWh

Cost Savings - INR 69

Lakhs

Investments - INR 25

Lakhs

ROI - 8 Years

Page 17: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant17

Innovative Project 3 - Timer Based AHU Operation Control

Manual operations of AHUs ( 19 Nos)

Total Duration of switching operation - 40 Min. (ON-20 Min & OFF-20 Min)

To minimize to technician daily AC assignment & implemented the energy saving initiatives process timer based AHU

Operations in SDB & Cafeteria

Based on the set time all the AHUs has operated simultaneously & achieved the chiller load with minimum time period

The entire activities completed by our In-House Team with Regular consumables

AHU Operation -Manual AHU Operation – Timer Controller

Page 18: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant18

Day Monday Tuesday Wednesday Thursday Friday

Average AHU kWhBefore 378 372 369 365 363

After 355 351 346 341 340

Savings/Day 23 21 23 24 23

No of weekdays 4 4 4 4 4

Savings/Month92 84 92 96 92

456 kWh

Innovative Project 3 - Timer Based AHU Operation Control

Summary of Savings

Energy Saving - 4565

kWh/Annum

Cost Savings - INR 54720

/Annum

Page 19: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant19

Utilization of Renewable Energy Sources - 2017-2020

0%

10%

20%

30%

40%

50%

60%

TNEB (%) DG (%) Wind (%)

58%

2%

39%

45%

2%

53%54%

3%

43%

2017 2018 2019

Technology(Electrical)

Type of Energy Onsite/OffsiteInstalled Capacity

(MW)Generation

(million kWh)% of overall

electrical energy

Electrical Wind Offsite NA 6.1 45%

Total

Renewable

Energy

61 L kWH

(45 %)

Page 20: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant20

Year Installed Capacity

(MW)

Total wind energy Contracted Quantum

(Lakhs kWh)

Actual suppliedwind energy quantum

(Lakhs kWh)

STPI-Consumption(Lakhs kWh)

Allocation contribution

(%)

2017-18 256.85 325 381 20 5%

2018-19 256.85 525 511 19 4%

2019-20 256.85 525 509 16 3%

• In FY 2018-19 additional quantum of 200 Lakhs kWh purchased with a investment of INR.200 Lakhs

• RPO is complied in FY 2017-18 as Solar – 5% and Non Solar – 9%

Solar REC purchased - 101 No’s

Non Solar REC purchased - 182 No’s

• Allocation contribution reduction for FY 2018-20

Tariff – Industrial with Tax (Normal - INR.6.35/kWh)

Less wind generation during peak seasonal months

Utilization of Renewable Energy Sources - FY 2017-2020

Page 21: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant21

Sl No Year(2019-20) Type of waste generatedQuantity of waste

generated (MT/year)Disposal method

1 2019-2020 Hazardous Waste 0.82Used oil disposed to TNPCB authorized recycler & waste oil disposed to TNWML for Incineration process

2 2019-2020 Non-Hazardous Waste 5.06Carton & Paper waste disposed to Authorized recycler Ms.ITC ltd & Got 142 Reams

3 2019-2020 E Waste 0.38 Disposed to TNPCB authorized recycler

Waste utilization and Management

Page 22: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant22

Scope 1 Intensity : GHG Emission for DG based Electricity Generation (MT of CO2)

Scope 2 Intensity : GHG Emission for EB based Electricity Consumption ( MT of CO2)

GHG Inventorisation Carbon Emission

Description 2017 2018 2019 Remarks

Scope 1 149 111 1096 Scope 1 : TNEB recurrent Power failureScope 2 :

• Overall Energy consumption reduction 40% from year 2017 & Wind Energy allocation

• Renewable Energy utilization increases (2017-39% ; 2018-53% & 2019 – 43%)

Scope 2 2362 1375 1406

Total GHG Emissions 2511 1486 2502

Page 23: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

Green Supply Chain Policy

© 2020 Cognizant23

• Uphold the cause of environment, health and safety management

system through compliance to standards and continual

improvement

• Strong environment friendly culture in terms of water, fuel,

electricity and paper consumption

• Green practices such as usage of ecofriendly, recycled and reused

products in every stages of operations with special emphasis on

packaging of material

Minimize generation of waste to a practical extent and handle

(storage, transportation, disposal and tracking end use) it in an

ecofriendly manner so that no harm is caused to the environment

and society at large

Cognizant is committed to excel its performance with respect to Sustainable Development.

The company shall strive to engage all its vendors in this endeavor through sustainable supply chain management initiatives.

To fulfill this commitment, the company shall promote the following practices at the vendors’ end:

Page 24: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant24

Green Supply Chain ManagementLED Retrofit Chiller Retrofit

Page 25: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

Standardization of Best Practices

© 2020 Cognizant

Personnel Computer Air-Conditioning

Sleep mode enabled for all

personnel computer

Conventional CPU

replacement with compact

CPU

Awareness created to

Associates to Switch off the monitor while leaving the work place

Workplace Temperature policy standardized :

24 ° C to 26 ° C

Maintaining UPS/Battery room Temperature b/n

25 ° C to 26 ° C

Hub room temperature maintained b/n

24 ° C to 26 ° C

Elimination of Electrical Hot plate

Mandatory use of BEE Star rated equipment's

Scheduled operation of Ventilation System

Periodical Cleaning of Heater in Bain-marie

Standard Operation temperature for all Freezer equipment

Weekly deep cleaning for all type of Freezer

Kitchen / Pantry

25

Page 26: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant26

Monthly Energy Performance TrackingDaily Report

FMS – Daily & Monthly Energy Tracking Chiller Monitoring

Measuring,Monitoring Device & Tool

Page 27: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant27

Initiative by In house Team

2*36W tube Light to 18W LED38340 kWh/Annual

AC Duct Modification

16080 kWh/Annual

Pull Cord Switches

3552kWh/AnnualLighting circuit modification

7200 kWh/Annual

Motion Control Sensor for rest

room lighting

250W MH Street

Light to Solar fixtures

Timer based AHU

Operations control 5436 kWh/Annual

Annual

Energy

Saved

113512 kWh/

Annum

Page 28: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant28

Employee Involvement Programs

Page 29: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant29

List of Certifications & Achievement

S.No Name of the Certificate Year of Receipt Given by

1OHSAS 18001:2007 EMS 14001:2004

2017 DNV

2OHSAS 18001:2007

EMS 14001:20042019 DNV

Certifications

Achievement

BYOM Implemented– No Paper Cups across facility

Plastic strips usage stopped across campus

Earth Hour Celebrations

Herbal Garden developed in the campus

Nursery Garden created and Distribution of Plant sapling

Ban on one time plastic

Page 30: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant30

List of Certifications & Achievement

SRI STPI

Page 31: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant31

Technologies Implemented - Chiller Plant Optimizer (CPO)

Web based building automation system

Load determination effectively , chiller Set-Point control and Add

and subtract logic

Rotation & Failure recovery

Match Plant capacity to building load & run few chillers as possible

at optimal efficiency

Customized reports & trends

Soft load/unload at start of chiller prevent a peak in electric

consumption that would happen if all the chiller were started at the

same time

Avoid electrical consumption peaks when start a chiller & avoid

flow discontinuities

Effective operation of chiller through CPO (Chiller Plant Optimizer)

Annual Reduction of Energy Consumption 60,000 kWh/Annum

Page 32: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant32

Energy Efficient Unit 2019 Excellent Energy Efficient Unit 2018

CII award

Page 33: st National Award for Excellence in Energy Management … · 2020. 9. 9. · Sl No Project Details Year Investments (Rs million) Savings (Rs million) Payback (Months) 1 Replacing

© 2020 Cognizant33

Way Forward

Energy Efficiency

IOT & Digital

Green Energy

Three Way

Approach

1.Reduce power consumption through optimization of capacity utilization and validation operational parameters.

2.Technological upgradation with higher efficiency asset replacement through Retrofit projects - LIFTS

1.Deploy data analytics & machine learning tool to improve Energy efficiency of chiller plant.

2. Collaborate with IFM service partners in implementing data analytical tools in energy Efficiency

1.Increase renewable Energy portion from the total Energy requirement through green power procurement.

2. Install rooftop solar panels in owned campuses