ST. JOSEPH LANE SIDEWALK PROJECT city of park hills - caucus meeting january 25, 2021

Upload: others

Post on 18-Aug-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ST. JOSEPH LANE SIDEWALK PROJECT - Park Hills, Kentucky · 2021. 1. 26. · 2' CLASS 3 ASPHALT SURFACE COURSE 0 50 PG 64-22 ... 4+82.88 Begin Project Sta. 0+57.62 San'tcry Sign LSA

ST. JOSEPH LANESIDEWALK PROJECT

city of park hills - caucus meetingjanuary 25, 2021

Page 2: ST. JOSEPH LANE SIDEWALK PROJECT - Park Hills, Kentucky · 2021. 1. 26. · 2' CLASS 3 ASPHALT SURFACE COURSE 0 50 PG 64-22 ... 4+82.88 Begin Project Sta. 0+57.62 San'tcry Sign LSA

project descriptionThe scope of work to be performed under this improvement shall consist of the construction of a sidewalk along the west side of St. Joseph Lane, beginning at Dixie Highway and ending at the south terminus of the roadway.

Page 3: ST. JOSEPH LANE SIDEWALK PROJECT - Park Hills, Kentucky · 2021. 1. 26. · 2' CLASS 3 ASPHALT SURFACE COURSE 0 50 PG 64-22 ... 4+82.88 Begin Project Sta. 0+57.62 San'tcry Sign LSA
Page 4: ST. JOSEPH LANE SIDEWALK PROJECT - Park Hills, Kentucky · 2021. 1. 26. · 2' CLASS 3 ASPHALT SURFACE COURSE 0 50 PG 64-22 ... 4+82.88 Begin Project Sta. 0+57.62 San'tcry Sign LSA
Page 5: ST. JOSEPH LANE SIDEWALK PROJECT - Park Hills, Kentucky · 2021. 1. 26. · 2' CLASS 3 ASPHALT SURFACE COURSE 0 50 PG 64-22 ... 4+82.88 Begin Project Sta. 0+57.62 San'tcry Sign LSA

project schedule to dateJuly 14, 2020

September 10, 2020

October 16, 2020

October 20, 2020

November 13, 2020

January 20, 2021

Notice to Proceed from KYTC

Preliminary Plan Submittal to KYTC

KYTC State Historic Preservation Communication

KYTC Environmental Clearance (CE-M)

KYTC Preliminary Plan Review Complete

Updated Plan Submittal to KYTC

Page 6: ST. JOSEPH LANE SIDEWALK PROJECT - Park Hills, Kentucky · 2021. 1. 26. · 2' CLASS 3 ASPHALT SURFACE COURSE 0 50 PG 64-22 ... 4+82.88 Begin Project Sta. 0+57.62 San'tcry Sign LSA

Public Input

Plan Approval from KYTC

Advertise for Bids for Construction

Bid Review & Contractor Selection / Award Contract

Construction

Project Coordination - Water Main Replacement

next steps