______________________________________________________________________________________ 1 T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project REQUEST FOR TENDER/QUOTE T-2018-49 St. Francis Xavier SS Heat Pump & MAU Replacement Project Closing: May, 11 2018 on or before 2:00 p.m. Local Time Table of Contents Section 1 General Instructions Instruction to Bidders Scope Requirement List Appendix A –Contract Documents Appendix B – Drawings Appendix C – Hot Works Permit Section 2 Terms & Conditions Form of Tender Signing Authority Sub-Contractors Documents Bonding Note: Documents in this section are a preview only of the information entered in the bidding system.

Upload: hoanganh

Post on 24-Aug-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

______________________________________________________________________________________

1

T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

REQUEST FOR TENDER/QUOTE

T-2018-49

St. Francis Xavier SS Heat Pump & MAU Replacement Project

Closing: May, 11 2018 on or before 2:00 p.m. Local Time

Table of Contents

Section 1

General Instructions Instruction to Bidders Scope Requirement List Appendix A –Contract Documents Appendix B – Drawings Appendix C – Hot Works Permit Section 2

Terms & Conditions Form of Tender Signing Authority Sub-Contractors Documents Bonding Note: Documents in this section are a preview only of the information entered in the bidding system.

______________________________________________________________________________________

2

T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

Section 1

______________________________________________________________________________________

3

T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

GENERAL INSTRUCTIONS:

All bidders have the opportunity via pdf file, to download, print, complete, sign and return all documentation (as stated below).

• It is the sole responsibility of each potential vendor, past or present, to register with https://dpcdsb.bidsandtenders.ca. The Board is not responsible for any potential vendor, past or present, not being aware of any or all business opportunities.

NOTE: All QUESTIONS & ANSWERS will be posted as an AMENDMENT. All questions

should be submitted through the bidding system portal by clicking on the submit question button at https://dpcdsb.bidsandtenders.ca.

______________________________________________________________________________________

4

T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SUBMISSION INSTRUCTIONS

1. Please read “Terms and Conditions” of this Bid and all other documents carefully.

2. All information asked, and all prices, must be shown on the original Bid documentation and become part of this Bid.

3. ELECTRONIC BID SUBMISSIONS ONLY shall be received by the Bidding System on the

closing date, no later than 2:00:00 p.m. (14:00:00 hours) local time. All Bidders shall have a Bidding System Vendor Account and be registered as a Plan Taker for this Bid opportunity, which will enable the Bidder to download the Bid Call Document, to receive Addenda/Addendum email notifications, download Addendums and to submit their Bid electronically through the Bidding System.

4. The Bidding System will send a confirmation email to the Bidder advising that their Bid

was submitted successfully. If you do not receive a confirmation email, contact technical support at Bids&Tenders via email: [email protected].

5. Late Bids shall not be accepted by the Board’s Bidding System. To ensure receipt of the

latest information and updates via email regarding this bid or if a Bidder has obtained this Bid Document from a third party, the onus is on the Bidder to create a Bidding System Vendor Account and register as a Plan Taker for the bid opportunity at https://dpcdsb.bidsandtenders.ca.

6. ADDENDUM/ADDENDA

Bidders shall acknowledge receipt of any addenda when submitting their Bid through the Bidding System. Bidders shall check a box for each addendum/addenda and any applicable attachments that have been issued before a Bidder can submit their Bid Submission online.

Addendum/Addenda will typically be issued through the Bidding System up to forty-eight (48) hours prior to Closing Time and Date.

In the event an Addendum is issued within forty-eight (48) hours prior to Closing Date and Time, it may include an extension of the Closing Date and Time. It is the responsibility of the Bidder to have received all Addendum/Addenda that have been issued. Bidders should check online at https://dpcdsb.bidsandtenders.ca prior to submitting their Bid and up until Bid Closing Date and Time in the event additional Addendums are issued.

The Board encourages Bidders not to submit their Bid prior to forty-eight (48) hours before the Bid Closing Date and Time, in the event that an Addendum is issued. If a Bidder submits their Bid at any time prior to the Bid Closing and an Addendum/Addenda is issued by the Board, the Bidding System shall WITHDRAW their Bid Submission and change the status to INCOMPLETE (NOT accepted by the Board). The Withdrawn Bid can be viewed and re-submitted by the Bidder in the “MY BIDS” section of the Bidding System (see also instruction # 7).

7. WITHRDAW/EDIT BIDS

Bidders may edit or withdraw their Bid Submission prior to the Closing Date and Time. However, the Bidder is solely responsible to:

i) make any required adjustments to their Bid; and

______________________________________________________________________________________

5

T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

ii) acknowledge the Addendum/Addenda; and iii) ensure the re-submitted Bid is RECEIVED by the Bidding System no later

than 2:00:00 p.m. (14:00:00 hours) local time, on the Bid Closing Date.

8. COMPANY CONTACTS Additional company contacts are recommended for the reasons outlined below: You are strongly urged when creating or updating a Bidding System Vendor Account to add additional company contacts to create their own login to the Bidding System. This will permit your invited contacts that have created their own login to manage (register, submit, edit and withdraw) Bids which your Company is a Registered Plan Taker for. In the event you are on vacation, or due to illness, etc. these additional contacts may act on your Company’s behalf and have the authority to receive addendum notifications from the Bidding System, and where permitted by the terms and conditions of the Bid Call Document, to submit Bids electronically through the Bidding System and/or withdraw and/or edit and/or acknowledge Addendum/Addenda, on your behalf.

Notwithstanding the above, it is recommended that you do not invite any additional contacts that you do not want to have access to view, edit, submit and/or withdraw or who may be in direct competition (for example, a company may have two divisions that could compete for the same Bid Opportunity). If you are an invited company contact it is imperative that you create your login from the link contained in the email invitation. Do NOT go directly to https://dpcdsb.bidsandtenders.ca website and create a separate vendor account.

9. BID CLOSING DATE AND TIME

All Bidders shall have a Bidding System Vendor Account and be registered as a Plan Taker for this Bid opportunity, which will enable the Bidder to download the Bid Call Document, to receive Addenda/Addendum email notifications, download Addendums and to submit their Bid electronically through the Bidding System. Bid Submissions shall be received by the Board’s Bidding System not later than (14:00:00 hours) 2:00:00 p.m. Eastern local time, on the specified Closing Date. The Closing Time shall be determined by the Bidding System web clock. Bidders are cautioned that the timing of Bid Submission is based on when the Bid is RECEIVED by the Bidding System, not when a Bid is submitted by a Bidder, as Bid transmission can be delayed in an “Internet Traffic Jam” due to file transfer size, transmission speed, and other electronic considerations. For the above reasons, the Board recommends that Bidders allow sufficient time to upload their Bid Submission and attachment(s) (if applicable) and to resolve any issues that may arise. The Closing Date and Time shall be determined by the Board’s Bidding System web clock.

10. Original Bid forms not completed in the prescribed manner may be considered INVALID.

It is the sole responsibility of the Bidder to ensure a Bid is delivered on time. Late bids will not be accepted by the Board’s bidding system.

______________________________________________________________________________________

6

T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SCOPE

The Dufferin-Peel Catholic District School Board invites bids for the purpose of acquiring Heat Pump & Make up Air Unit Replacement at St. Francis Xavier SS. INTRODUCTION The Dufferin-Peel Catholic District School Board is one of largest and most diverse school districts in Ontario. The Board currently operates 149 Catholic schools (123 elementary and 26 secondary) throughout Mississauga, Brampton, Caledon and Orangeville, with a student enrolment of approximately 81,000. In addition, approximately 40,000 students are enrolled in the Board’s Adult and Continuing Education Programs each year. With over 11,000 employees, the Board is also one of the largest employers in the Region. It is the goal of the Board to provide quality education to students in a setting which fosters Catholic values and beliefs. MANDATORY REQUIREMENTS/GENERAL REQUIREMENTS See Requirement List BID EVALUATION CRITERIA Subject to the Board’s Reserved Rights and provided that all Requirements and Conditions of Bid have been met, the Board will evaluate bids solely on the basis of the costing structure being proposed. Accordingly, a bid with the lowest overall costing structure submitted to the Board which complies with all Requirements and Conditions of Bid will prevail. Submissions that do not meet the mandatory criteria will be disqualified. Individual interviews or presentations may be required, at the Vendor’s expense. KEY PERSONNEL It is essential that the Vendor provide adequate experienced personnel, capable of and devoted to the successful accomplishment of objective work to be performed under this contract. The Vendor must agree to assign specific individuals to the key positions.

A. The Vendor agrees that, once assigned to work under this contract, key personnel shall not be removed or replaced without prior written notice to the Board.

B. If key personnel are not available for work under this contact for a continuous period exceeding thirty calendar days, or are expected to devote substantially less effort to the work than initially anticipated, the Vendor shall immediately notify the Board, and shall, subject to the concurrence of the Board, replace such personnel with personnel of substantially equal ability and qualifications.

PRICE PROTECTION Prices must be firm or fixed for the entire term. Any decreases in prices must be provided to the Dufferin-Peel Catholic District School Board immediately. All prices to be quoted in Canadian dollars, further all bid submissions must be responded to in English. CONTRACT TERM: June 1, 2018 to December 31, 2018

______________________________________________________________________________________

7

T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SERVICE The Dufferin-Peel Catholic District School Board reserves the right to terminate the contract immediately should the Vendor fail to provide sufficient skilled forces to satisfy the expectations of the Board. The Board remains the final judge of these expectations. DELIVERY Time is of the essence for the delivery or provision of the goods and services requested herein. Failure to comply with the time schedule herein may result in the Board taking further action to obtain an alternative supply, in which event the cost incurred shall be charged to the Vendor, up to the time that the goods or services are delivered or provided. If such cost is not paid by the Vendor, it shall be deducted from the balance of the purchase price owing. Where it is not possible to obtain the goods or services by the specific time, the Board reserves the right to cancel the contract and charge back the difference between the contracted bid price and the acquisition cost of the alternate goods or services. MATERIAL SAFETY DATA SHEETS The Workplace Hazardous Material Information System (WHMIS) Regulation made under the Ontario Occupational Health and Safety Act requires that the Board obtain current material safety data sheets on products as indicated within the attached bid.

Please forward all Material Safety Data Sheets to:

Dufferin-Peel Catholic District School Board 40 Matheson Blvd. West Mississauga, ON, L5R 1C5

Attention: Health and Safety Department GUARANTEE Upon project completion and final Board acceptance, the Vendor shall issue the Dufferin-Peel Catholic District School Board a guarantee against defective workmanship and materials. The Vendor guarantees to save the Board, its agents or employees, harmless from liability of any kind for the use of any composition, secret process, invention, article or appliance furnished or used in the performance of the contract of which the Vendor is not the patentee, assignee, or licensee. The Vendor guarantees to furnish adequate protection from damage for all work and to repair damage of any kind for which the Vendor or his workers are responsible, to the premises or equipment, to the Vendor’s own work or the work of other vendors. DEFECTIVE MATERIAL Items purchased in this bid which are later found to be defective or unsuitable for their intended use shall be returned to the Vendor. Such products will be subject to replacement or upgrading at no additional charge or 100% refund of the purchase price, and shall not be subject to any restocking charges.

______________________________________________________________________________________

8

T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

WORKPLACE SAFETY INSURANCE BOARD

1. Workplace Safety Insurance (WSIB) coverage shall be provided by the Vendor for all employees who are employed under the contract.

2. Proof of this coverage (Clearance Certificate) shall be presented to the Board by the successful Vendor upon award.

INDEMNIFICATION AND INSURANCE Notwithstanding anything else in the bid, any express or implied reference to the Board providing an indemnity or any other form of indebtedness or contingent liability that would directly or indirectly increase the indebtedness or contingent liabilities of the Board, whether at the time of execution of the bid or at any time during the Term, shall be void and of no legal effect. The Vendor hereby agrees to indemnify and hold harmless the Board, it’s Directors, Officers, Trustees, employees and Agents (the “Indemnified Parties”) from and against all liability, loss, costs, damages and expenses (including legal, expert and consultant fees), causes of actions, actions, claims, demands, lawsuits or other proceedings, by whomever made, sustained, incurred, brought or prosecuted, including for third party bodily injury (including death), personal injury and property damage, arising out of, or in any way connected with the negligent acts or omissions of the Vendor, its permitted subcontractors or their respective Directors, Officers, Agents, employees, partners, affiliates, volunteers or independent contractors, under or otherwise in connection with this bid or a subsequent contract arising hereunder. The Vendor hereby agrees to put in effect and maintain insurance for the Term of any contract awarded, at its own cost and expense, with insurers having a secure A.M. Best rating of B+ or greater, or the equivalent, all the necessary and appropriate insurance that a prudent person in the business of the Vendor would maintain including, but not limited to, the following:

a) Commercial general liability insurance on an occurrence basis for third party bodily injury, personal injury and property damage, to an inclusive limit of not less than $2,000,000 (Two Million Dollars) per occurrence. The policy is to include the following:

• Indemnified Parties as additional insured with respect to liability arising in

the course of performance of the Vendors obligations under, or otherwise in connection with the Contract;

• Contractual liability coverage; • Cross-liability coverage; • Employers liability and Voluntary Compensation coverage (or the

Contractor shall provide a valid clearance certificate of Workplace Safety and Insurance Act coverage);

• Product and completed operations coverage; • 30-day written notice of cancellation, termination or material change.

______________________________________________________________________________________

9

T-2018-49 St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

b) Automobile Insurance – Two Million Dollars ($2,000,000.00) of business

automobile liability insurance and, if necessary, umbrella liability insurance for owned, hired and non-owned vehicles covering bodily injury and property damage.

The Vendor will provide the Board on or before the award of a contract pursuant to this bid, with a valid Certificate of Insurance (and a renewal replacement as may be necessary), referencing this bid, confirming the above insurance requirements and stating any pertinent exclusions as applicable, contained by the policy(ies). SCHEDULE OF EVENTS The Board, in its sole discretion, reserves the right to alter any date in the schedule. CONCLUSION Enquiries regarding the bid must be submitted electronically through the bidding system by clicking on the “Submit Question” button by the time and date specified.

Inquiries received after this date may not be addressed.

1 of 2

T-2018-49 St. Francis Xavier SS - Heat Pump & Make up Air Unit Replacement Project Requirement List

1

The Bidder will include a Bid Bond in the sum of $25,000 (Twenty-Five Thousand CAD Dollars) made out in the names of the Dufferin-Peel Catholic District School Board, as well as an Agreement to bond from an approved Bonding Company stating that the Bonding Company will issue a 50% Performance Bond and a 50% Labour and Material Payment Bond, if the submitted bid price is successful and the Board awards the Contract to bidder

1

Items to be supplied and constructed in this bid are requested by the Plant Department designate as per specified drawings and details provided within this package, Document 00200- Instruction to Bidders, Document 00410- Form of Tender, Document 00431- Supplementary Information Form, Document 00810- Supplementary Conditions and all Specifications, Drawings - Appendix A and B and any addendums issued. During the tender process the Bidder is required to perform all the work and supply all items listed within this bid in the General Specifications, Drawings and Details. No partial bids will be accepted.

2The awarded Bidder acknowledges and accepts that the Board may, through the Consultant services of a Project Management Firm, act on the Board's behalf as an authorized agent, for the purposes of monitoring, supervising, quality oversight and project completion as per the contract documents.

3The construction sites address is as follows:St. Francis Xavier SS 50 Bristal Road West, Mississagua, ON L5R 3K3

4 All work will be assigned by a Board authorized designate.

5 The contract is intended to be awarded to one (1) Pre-Qualified General Contractor who is a Vendor of Record only.

6The Board reserves the right to add or delete items within this bid as it feels is necessary. Credits and extras will be determined by the Board authorized designate and the successful bidder. It also reserves the right to cancel the bid if the project is greater than the anticipated budget cost.

7The Bidder should factor all pricing of items to include, but not limited to the following: labour (crew), trucks, equipment, travel time, mileage, tolls and materials. No mobilization costs will be charged to the Board.

8 The Bidder shall follow all safe industry practices in regards to commercial construction standards.

9 Please review carefully all drawings, specification documents, and addendums for detailed requirements.

10The Bidder will be responsible for co-ordinating and paying of all locates for all major utilities and private utilities, prior to commencing any digging at the site(if required). All building inspections or additional permits (ESA or TSSA) will be the responsibility of the Bidder. (no costs will be carried forward to the Board)

11

The Bidder is to comply with “Hot works permit process” for any work or process potentially generates high heat, spark, or open flame. This includes tools used in order to complete the installation of anything within the specifications. The permits will be provided to by the Board for the Bidders to complete. Completed forms should be submitted with any invoices. See Appendix C

12The successful Bidder is required to check the designated substances binder located in the main office of facility before any work commences. Should anything be of concern, it is to be brought to the attention of the Board designate immediately and no further work is to be carried out.

MANDATORY REQUIREMENTS

GENERAL REQUIREMENTS

PLEASE NOTE: IF THE ABOVE DOCUMENTATION IS NOT INCLUDED WITH BID SUBMISSION VENDORS BID WILL BE DISQUALIFIED.

2 of 2

T-2018-49 St. Francis Xavier SS - Heat Pump & Make up Air Unit Replacement Project Requirement List

13

It is the successful Bidder’s responsibility to properly confirm all voltages and specifications prior to ordering and receiving any specified units and is also the Bidder’s responsibility to bring to the attention of the Board’s Designate and Board’s Prime Consultant any discrepancies immediately. Once the Board designate and/or Board’s Consultant receive the signed shop drawings and specifications the Bidder is full responsible for the installation of the unit and any further modifications if required and no additional costs will be levied from the Board for such modifications.

14All quoted quantities are to be made upon the Document 00410 Form of Tender provided and is to be signed by the Bidder and witnessed. The Bidder is to provide the sum for the work in figures.

15The Bidder acknowledges and is to comply with all the terms and conditions of the amendments as outlined in the Supplementary Conditions to the Canadian Construction Document, CCDC 2-2008 -Document 00810.

16The Bidder acknowledges that they are familiar with the site and all site conditions. All interested bidders are welcome to a scheduled site visit with the Board's Consultant on May 1, 2018 at 3:00PM, main entrance at the noted project site.

APPENDIX A

CONTRACT DOCUMENTS

00100 Instructions to Bidders 00300 Form of Tender 00400 Mechanical Supplementary Form 00500 Electrical Supplementary Form 01010 General Instructions 01030 Supplementary General Conditions

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 1 of 13 2017-222

1. INSTRUCTIONS TO BIDDERS

Instructions for submitting a Bid must be followed implicitly. Any Bid Submission that does not comply with the Instructions to Bidders, CCDC 2 – 2008 Stipulated Price Contract, Supplementary General Conditions to CCDC 2 – 2008 and other pertinent sections of the Bidding Documents may be declared informal and might not be considered.

All Contractors have the opportunity via .PDF file to download, print, complete, sign and return all documentation (as stated below), with the exception of returning the Supplementary Information Form, the Mechanical Supplementary Bid Submission Form, and the Electrical Supplementary Bid Submission Form, which are to be returned directly to the Consultant by the low Bidder.

It is the responsibility of each Contractor to be registered with https://dpcdsb.bidsandtenders.ca. The Board is not responsible for any Contractor not being aware of any or all business opportunities.

NOTE: ALL QUESTIONS & ANSWERS will be posted as an AMENDMENT. All questions should be submitted through the Bidding System portal by clicking on the “submit question” button at https://dpcdsb.bidsandtenders.ca. Questions must be received on the Bidding System no later than 2:00:00 p.m. (14:00:00 hours) local time on May 1, 2018

1.1. DEFINITIONS

1.1.1. The words “Bidder” & “Contractor” and “Bids” or “Bid Submissions” & “Tenders” are interchangeable in the Contract Documents and their meanings are identical.

1.1.2. The words “Owner” & “Board” are interchangeable in the Contract Documents and their meanings are identical.

1.2. DESCRIPTION

1.2.1. Work under this Contract covers the construction of the Project as identified in the Contract Documents.

1.2.2. Work not included in Contract comprises of a list of items as identified in the General Instructions and other pertinent sections of the Contract Documents.

1.3. CONTRACT DOCUMENTS

1.3.1. Consult the Documents consisting of the following:

1.3.1.1. Form of Tender Document 00300 1.3.1.2. Not Applicable 1.3.1.3. Instructions to Bidders Document 00100

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 2 of 13 2017-222

1.3.1.4. Supplementary General Conditions to CCDC-2 2008 and CCDC-2 2008 Document 01030

1.3.1.5. General Instructions Document 01010 And

1.3.1.6. Mechanical Supplementary Bid Submission Form Document 00400* 1.3.1.7. Electrical Supplementary Bid Submission Form Document 00500*

Above Mechanical and Electrical Supplementary Bid Submission Forms (marked by asterisk) are to be signed and executed by each of the prequalified Sub-Contractors named by the low Bidder in the Form of Tender.

And 1.3.1.8. Specifications as listed in the Specification Table of Contents

prepared by the Architect and Sub-Consultants. 1.3.1.9. Drawings as listed in the Drawing Index and Detail Sheets as listed

in the Detail Sheet Index and as applicable - prepared by the Architects and Sub-Consultants.

1.3.1.10. Any Addenda issued prior to the closing of Bid Submissions.

1.4. BID SUBMISSION (TENDER)

1.4.1. The Bid Submission is to be submitted on the Form of Tender in the bidding system, Document 00300 and shall be known as the Bid Submission. All information asked, and all prices, must be entered in the bidding system.

1.4.2. The Contractor must note that the Bid Submission (Form of Tender) requires the inclusion of the Contractor’s Bid Bond and Agreement to Bond.

1.4.3. ELECTRONIC BID SUBMISSIONS ONLY must be received by the Bidding System on or before May 11, 2018 no later than 2:00:00 p.m. (14:00:00 hours) local time. All Contractors shall have a Bidding System Vendor Account and be registered as a Plan Taker for this Request for Tender, which will enable the Contractor to download the documents required for the Bid Submission, to receive Addenda / Addendum email notifications, download Addenda and to submit a Bid Submission electronically through the Bidding System.

1.4.4. The Bidding System will send a confirmation email to the Contractor advising that the Bid Submission was submitted successfully. If the Contractor does not receive a confirmation email, the Contractor must contact technical support at Bids & Tenders via email: [email protected]

1.4.5. Late Bid Submissions shall not be accepted by the Board’s Bidding System. Bid Submissions must be received by the Board’s Bidding System not later than 2:00:00 p.m. (14:00:00 hours) local time, on the specified Closing Date. The Closing Time shall be determined by the Bidding System web clock. Contractors are cautioned that the timing of the Bid Submission is based on when the Bid Submission is RECEIVED by the Bidding System, not when a Bid Submission is submitted by a Contractor, as Bid Submission transmission can

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 3 of 13 2017-222

be delayed in an “Internet Traffic Jam” due to consideration such as file transfer size and transmission speed and other electronic considerations. For the above reasons, the Board recommends that Contractors allow sufficient time to upload Bid Submissions including all attachments thereto and to resolve any issues that may arise.

1.4.6. As a pre-qualified Contractor, it is imperative that the Contractor create a login from the link contained in the email invitation requesting a Bid Submission. DO NOT go directly to https://dpcdsb.bidsandtenders.ca website and create a separate vendor account. Notwithstanding the foregoing, it is recommended that when creating or updating a Bidding System Vendor Account, a Contractor add qualified additional Contractor contacts to create additional logins to the Bidding System. This will permit a Contractor’s invited contacts with logins to manage (register, submit, edit and withdraw) Requests for Tender for which the Contractor is a pre-qualified Registered Plan Taker. In the event the primary contact of a Contractor is unavailable at critical times, additional contacts may act on the Contractor’s behalf and will have authority to submit Bid Submissions electronically through the Bidding System, edit or withdraw Bid Submissions, or acknowledge any Addenda on the Contractor’s behalf.

1.4.7. The bid shall be fully completed in the bidding system or the Bid Submission may be invalidated and may, at the discretion of the Board, be rejected.

1.4.8. The Supplementary Information Form must be signed by the appropriate officers of the Contractor's firm.

1.4.9. Drawings and Specifications shall be returned to the Consultants within ten (10) days of closing as identified in the bidding system.

1.4.10. Bid Submissions shall be valid and irrevocable for sixty (60) calendar days from the date of closing as identified in the bidding system.

1.5. ADDENDA

1.5.1. Contractors must acknowledge receipt of any Addenda when submitting a Bid Submission through the Bidding System. Contractors must check a box for each Addendum and any applicable attachments that have been issued before a Contractor can submit a Bid Submission online.

1.5.2. Addenda will typically be issued through the Bidding System up to seven (7) days prior to the Closing Date and Time.

1.5.3. In the event an Addendum is issued within seven (7) days prior to the Closing Date and Time, it may include an extension of the Closing Date and Time. It is the responsibility of the Contractor to have received all Addenda that have been issued. The Contractor must check online at https://dpcdsb.bidsandtenders.ca prior to submitting a Bid Submission and up until the Bid Closing Date and Time in the event that additional Addenda are issued.

1.5.4. The Board recommends Contractors not submit a Bid Submission prior to seven (7) days before the Bid Closing Date and Time, in the event that an Addendum

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 4 of 13 2017-222

is issued thereafter by the Board, the Bidding System will automatically WITHDRAW previously submitted Bid Submissions and change the status thereof to INCOMPLETE (Not accepted by the Board). The Withdrawn Bid Submission can be viewed and re-submitted by the Contractor in the “MY BIDS” section of the Bidding System.

1.6. WITHDRAW / EDIT BIDS

1.6.1. Contractor may edit or withdraw a Bid Submission prior to the Closing Date and Time. In such case, the Contractor is solely responsible to:

1.6.1.1. make any required adjustments to the Bid Submission;

1.6.1.2. acknowledge any addenda, if applicable; and

1.6.1.3. ensure the re-submitted Bid Submission is RECEIVED by the Bidding System no later than 2:00:00 p.m. (14:00:00 hours) local time on the Closing Date.

1.7. MECHANICAL AND ELECTRICAL SUB-CONTRACT BIDS

1.7.1. Mechanical and Electrical bids are to be submitted directly to the Contractor Bidders.

1.7.2. Each of the Mechanical and Electrical Sub-Contract Bidders must submit an Agreement to Bond directly to the Bidder with their bids.

1.8. SUPPLEMENTARY INFORMATION FORM & SUPPLEMENTARY CONDITIONS FORM

1.8.1. Only the two (2) LOW BIDDERS will be required to submit the following documents to the offices of Regal Consulting Engineers Inc. 2828 Kingsway Drive, Suite 201, Oakville, ON L6J 7M2 Attention: Mohammed K. Ahmed Email: [email protected] Tel: (905)829-3010, on or before, 2:00p.m. local time on the day following the close of Bid Submissions,

Mechanical Supplementary Bid Submission Form Document 00400 Electrical Supplementary Bid Submission Form Document 00500

Electronic or hand delivered.

1.8.2. The Supplementary Information Form and the Mechanical/Electrical Bid Submission Forms must be signed by the appropriate officers of the General Contractor's firm and each of the Sub-Contractors’ Firms.

1.8.2.1. The two (2) LOW BIDDERS must complete IN FULL the requirements of the Supplementary Information Form.

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 5 of 13 2017-222

1.9. MECHANICAL AND ELECTRICAL SUPPLEMENTARY BID SUBMISSION FORMS

1.9.1. Mechanical and Electrical Supplementary Bid Submission Forms are to be filled out in their entirety by the Mechanical and Electrical Sub-Contractors named in the Form of Tender by the Bidders, and submitted directly to the Contractor Bidders.

Electronic or hand delivered.

1.10. BOARD

1.10.1. The “Owner” of the project is:

Dufferin-Peel Catholic District School Board 40 Matheson Boulevard West Mississauga ON L5R 1C5

1.10.2. The Contractor should note that after the Tender Award, all correspondence between the Contractor and the Consultants shall be copied to the Board’s “Construction Department”, at the following address:

Dufferin-Peel Catholic District School Board Keaton Centre 5685 Keaton Crescent Mississauga ON L5R 3H5

1.11. ARCHITECT

1.11.1. The Prime Consultant (Architect) on this project is identified in the Contract Documents.

1.12. CONSULTANTS

1.12.1. The Sub-Consultants on this project are identified in the Contract Documents.

1.13. BID SUBMISSION ACCEPTANCE AND OPENING

1.13.1. Upon review of all Bid Submissions immediately after the Closing Time, the Bid Price and any Alternative, Separate or Unit Prices that are being considered in the evaluation of Bid Submissions shall be posted on-line at https://dpcdsb.bidsandtenders.ca as unofficial results under the heading “Bids Submitted” within thirty (30) minutes of the Closing Time. Thereafter, official results will be posted on-line under the heading “Awarded Results” as soon as they are available.

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 6 of 13 2017-222

1.14. RESERVED RIGHTS

1.14.1. The Board reserves the right to reject any or all Bid Submissions submitted, without explanations, and to waive any informality or minor irregularity in same. The lowest or any Bid Submission shall not necessarily be accepted.

1.14.2. In addition, the Board reserves the right to:

1.14.2.1. make public the names of any or all Contractors;

1.14.2.2. verify with a Contractor that it satisfies the conditions for participation and is capable of fulfilling the terms of the contract, where in the sole discretion of the Board, it receives a Bid Submission from a Contractor with a price that is abnormally lower than prices in other Bid Submissions;

1.14.2.3. afford an opportunity to a Contractor to correct unintentional errors of form between the opening of Bid Submissions and the awarding of a contract and, if it does so, the Board shall afford the same opportunity to all participating Contractors;

1.14.2.4. where there is supporting evidence, to exclude a Contractor from participating in this Request for Tender on such grounds as:

• bankruptcy or insolvency;

• false declarations;

• significant or persistent deficiencies in performance of any substantive requirement or obligation under a prior contract or contracts;

• final judgments in respect of serious crimes or other serious offences;

• professional misconduct or acts or omissions that adversely reflect on the commercial integrity of the Contractor; or

• failure to pay taxes.

1.14.2.5. to negotiate or terminate negotiations of a contract with any Contractor at any time and for any reason without liability to such Contractor; or

1.14.2.6. cancel this procurement process at any stage and issue a new procurement process for the same or similar deliverables.

1.14.3. These reserved rights are in addition to any other rights which may be implied in the circumstances, and the Board shall not be liable for any expenses, costs, losses or any direct or indirect damages incurred or suffered by any Contractor or any party resulting from the Board exercising any of its express or implied rights hereunder.

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 7 of 13 2017-222

1.15. SUB-CONTRACTORS

1.15.1. The Contractor Bidders are required to submit, on the Form of Tender, the names of the Mechanical and Electrical Sub-Contractors.

1.15.1.1. On the Supplementary Information Form, the bid amount of each of the named Mechanical and Electrical Sub-Contractors must be identified. The bid amounts are to be exclusive of Value Added Taxes (HST).

1.15.2. The two (2) low Bidders are also required to submit, on the Supplementary Information Form, a further list of Sub-Contractors. The Bidders shall name in this list the Sub-Contractors proposed to perform the Work under the Contract. No substitutions to these lists shall be made without the written approval of the Consultants and Owner.

1.15.3. Other than the Mechanical/Electrical Sub-Contractors, the selection of all other Sub-Contractors must be acceptable to the Board and to the Consultants. If the required substitution of a Sub-Contractor affects the sub- tender price, an adjustment will be made in the amount of the Bid Price only by the amount of the difference in sub-prices, without additional overhead or profit to the Bidder.

1.15.4. If the Bidder proposes to do Work with persons directly in the Contractor’s employ, and not sub-contract the Work, then the Bidder shall insert the words "Contractor" provided that the Bidder can submit proof that his forces have had extensive experience in this field of endeavour.

1.15.5. Sub-Contractors shall be actually engaged as their own recognized business, in the line of Work including Labour and Materials required by the specifications and shall carry out themselves the Work which they are awarded by subcontract. They shall not be permitted to re-subcontract their Work or portions thereof, to other contractors. THIS INCLUDES SHOP DRAWINGS.

1.16. UNIT PRICES

1.16.1. Refer to Supplementary Information Form for specific requirements. The Bidder should be aware, however, that Unit Prices for additional Work shall not exceed Unit Prices for deducted Work by more than twenty percent (20%); that the Board reserves the right to accept or reject any or all of the Unit Prices prior to entering into a contract; and that the Board reserves the right to negotiate any of all of the Unit Prices with the Contractor prior to the signing of the Contract.

1.16.2. Should the Board and the Contractor be unable to mutually agree on the amounts of the unit prices, the Bidder agrees that the Board has the right to hire outside contractors to perform the pertinent Work under a separate contract, without any financial penalty whatever to the Board and without additional overhead and profit to the Contractor.

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 8 of 13 2017-222

1.17. COMPLETION DATE

1.17.1. Bid Submissions must include all costs involved in having the Contract “Substantially Complete" by the date specified in the Form of Tender.

1.17.2. Work must continue during all adverse weather conditions as necessary to ensure completion by dates listed on the Form of Tender.

1.18. OCCUPANCY REQUIREMENTS

1.18.1. The building(s) shall be deemed to be ready for occupancy when the Contract meets the requirements of OAA/OGCA Document 100, Construction Lien Act (Latest Amendments) and occupancy approval of all Authorities Having Jurisdiction.

1.18.2. Refer to Supplementary General Conditions to CCDC 2, 2008 for “Board Occupancy” and “Occupancy prior to Substantial Completion”.

1.19. BID BOND, PERFORMANCE BOND, LABOUR & MATERIAL BOND / MAINTENANCE BOND

1.19.1. The undersigned encloses a Bid Bond in the amount of twenty-five thousand dollars ($25,000.00) made out in the name of the Dufferin-Peel Catholic District School Board, as well as an Agreement to Bond from an approved Bonding Company stating that the Bonding Company will issue a 50% Performance Bond and a 50% Labour and Material Payment Bond, if the undersigned’s submitted Bid Price is successful and the Board awards the Contract to the undersigned.

1.19.2. This Bid Bond shall be forfeited if the Bidder declines to enter into a Formal Contract in the amount tendered, or as adjusted according to the separate prices included in the Bid Submission, and to furnish, when called upon to do so, a Performance Bond. This Bid Bond shall be accompanied by an Agreement from the Surety Company that a 50% Performance Bond and a 50% Labour and Material Payment Bond will be issued to the Bidder if he/she is awarded the Contract. The cost of the Bonds shall be included in the amount of the Bid Submission.

1.19.2.1. The Bid Bond must be valid for a minimum of sixty (60) calendar days from the closing date of Tender.

1.19.3. Retention and use of the Bid Bond, as outlined above, shall not be deemed a penalty, but a consideration to the Board for inviting and considering the Bid Submission and as part payment for sustained damages and costs incurred by the Board, which shall be deemed to be the difference between the bid price of this Bidder and the bid price of the next lowest Bidder acceptable to the Board.

1.19.4. A Performance Bond, equal to 50% of the Bid Price, shall be furnished through a Surety Company or Insurance Company approved by the Consultant and the Board according to terms and conditions acceptable to the Board and the Consultant.

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 9 of 13 2017-222

1.19.5. Labour and Material Payment Bond, equal to 50% of the Contract is to be provided within ten (10) Working Days upon request, stating that Board will not be held responsible if payment to Sub-Contractors, as certified due by the Consultant, is not made by the Contractor when due.

1.19.6. On completion of the Work, the Performance Bond shall remain in force as a MAINTENANCE BOND for a period of one (1) year from the date of final completion as certified by the Architect. It shall form a Guarantee of Workmanship and Materials for the one (1) year period.

1.19.7. The Bidder to whom the Contract is awarded must properly sign the Contract and furnish a satisfactory Performance Bond, Labour and Material Payment Bond, Insurance Certificate and Workers' Compensation Board Certificate within ten (10) Working Days of acceptance of the Bid Submission by the Board, or forfeit the Bid Bond.

1.19.8. In addition, the Bidder shall require from the following Sub-Contractors a performance bond, issued by a duly licenced surety company authorized to transact a business of suretyship in the Province of Ontario, and which shall be maintained in good standing until the fulfilment of the Contract. The form of such bond shall be in accordance with the latest edition of the CCDC Bond forms. Performance Bond is to be in the amount of 50% of the Sub-Contractors' tendered sum.

1.20. LIST OF SUB-CONTRACTORS REQUIRING BONDS

* The Mechanical and Electrical Sub-Contractors carried by the Contractor must submit their Agreement to Bond with their Bids directly to the Bidder.

1.21. PREQUALIFIED BIDDERS

1.21.1. Bid Submissions will only be accepted from the following prequalified General Contractors.

1.21.2. Not Applicable

1.21.3. Not Applicable

1.21.4. Bid Submissions will only be accepted from the following CONTROLS Sub-Contractors:

ESC Automation (Delta Controls) (Base Building Controls Contractor)

1.22. BIDDERS

1.22.1. The Bidder submitting Bid Submission proposals shall be actually engaged as their recognized business in the lines of Work required by the specifications, and shall be able to refer to Work of a similar character which has been satisfactorily performed by them.

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 10 of 13 2017-222

1.23. FAIR WAGE AND LABOUR

1.23.1. Rate of wages, hours and conditions of Work shall be in accordance with Provincial Codes and as generally recognized and accepted in the locality. Building mechanics and labourers resident in the district are to be employed where suitable.

1.23.2. Labour forces employed on the site may have compatible affiliation with any labour organization. Union contract itself is not a prerequisite.

1.24. DISCREPANCIES AND OMISSIONS

1.24.1. All Bidders finding specified items unavailable, finding discrepancies in, or omissions from, the drawings or specifications or other Contract Documents, or having any doubt as to the intent or meaning of any part thereof, shall at once notify the Consultants.

1.24.2. Corrections of such discrepancies, and/or omissions, further explanations, definitions or additional information as necessary will be issued by the Consultant(s) during the time of bidding in the form of Addenda to all prequalified Bidders. These shall become part of the Contract Documents and the number of Addenda included in the Bid Price must be shown on the Form of Tender.

1.24.3. Minor typographical or spelling mistakes in the Contract Documents may not necessarily be corrected by Addenda if they do not significantly affect the meaning of the sentence or phrase in which they occur, or alter the intent of the Work.

1.24.4. NO ORAL INSTRUCTIONS WILL BE VALID.

1.25. BIDDING ASSUMPTIONS

1.25.1. All bids submitted, including bids by Sub-Contractors, are assumed to be based upon the complete set of Contract Documents. No alterations in prices for items of Work will be considered even if it is determined by the Consultants and/or Bidder that sub-bids were not based on the complete set of documents (e.g. bids based upon Specifications but not on drawings and vice-versa, omitted addenda etc.).

1.26. ERRORS IN BID SUBMISSION

1.26.1. The Board shall not entertain requests for gratuitous payments arising from errors or omissions alleged to have been made by the Bidder in a Bid Submission that the Board has accepted.

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 11 of 13 2017-222

1.27. INQUIRY AND INSTRUCTION

1.27.1. All correspondence, inquiries, instructions, etc. in connection with the Work, after award of tender, shall be made through the office of the Architect (Prime Consultant) whose name address and telephone number appear below:

Regal Consulting Engineers Inc. - Mohammed K. Ahmed 2828 Kingsway Drive, Suite 201, Oakville, ON L6J 7M2 Email: [email protected] Tel: (905)829-3010

1.28. EXAMINATION OF THE PLACE OF WORK

1.28.1. Before submitting the Bid, it is recommended that the Bidder and their qualified sub-trades submitting bids examine the Place of Work, and the Geotechnical and/or Environmental Soils Investigation Reports as may be included in the Bid Documents. The Bidder shall ascertain the extent and nature of the materials it may be necessary to remove or add in order to reach, or provide the depths, levels and grades required and shall be sure that the Bidder’s determinations are made in accordance with the drawings and specifications and the Soils Investigations.

1.28.2. Bids shall include the cost imposed by existing conditions and limitations of site and the accepted bid shall be held to have included such costs. NO ALLOWANCE WILL BE MADE FOR FAILURE TO EXAMINE THE EXISTING SITE.

1.28.3. The levels and other information shown on the drawings are furnished in good faith for the guidance of the Bidders. This information, however, shall in no way relieve the Bidder and sub-trades of the responsibility in ascertaining to his/her own satisfaction the nature of all conditions at the site.

1.29. BUILDING PERMIT

1.29.1. Building Permit is not required for this project.

1.29.2. Not Applicable

1.29.3. The Contractor must, however, pay all other necessary fees, deposit and charges related to Municipal, Provincial and Federal requirements. The Contractor is responsible for determining the amounts of these permits, fees, etc.

1.30. CONTRACT DOCUMENTS

1.30.1. The Contract shall be subject to the Canadian Standard Construction Document CCDC – 2 2008 for Stipulated Price Contract all Supplementary Conditions thereto and Contract Documents as prepared by the Consultants. Successful Bidder must sign a Contract within ten (10) Working Days of notification of award. The Contractor shall not be entitled to any payment until the Contract is signed.

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 12 of 13 2017-222

1.30.2. All Bidders will be held to have examined and made themselves familiar with the various articles of these Standard Documents and shall be as binding for all sections of the following specifications as though written in full therein.

1.31. SECTION RESERVED

1.31.1. Not Applicable

1.31.2. Not Applicable

1.32. FINAL ACCEPTANCE

1.32.1. It must be clearly understood that final acceptance of this Tender is subject to approvals of the Board and other Authorities and these may delay final approval. There will be no adjustments in the tendered price for a period Sixty (60) calendar days from tender closing date. Submissions due to delays resulting from obtaining necessary approvals.

1.33. TAXES

1.33.1. The Bid Submission amount shall include all applicable excise taxes, custom duties, freight, exchange and all other charges in effect and known to come into effect during the construction of the building described in this Contract. The Bid Submission (Form of Tender) shall exclude Value Added Taxes (HST).

1.33.2. The successful Bidder must provide the Bidder’s HST Registration Number and each request for payment must show this number.

1.34. INSURANCE COVERAGE ON EXISTING SCHOOLS VACATED DURING CONSTRUCTION

1.34.1. Not Applicable

1.34.2. The Architect has determined that the value of the Board’s building and property is $2,000,000.00

1.35. WORK HOURS

1.35.1. Work in all schools occupied by students or staff, (including summer school) whether additions, renovations or for deficiency corrections in new schools, should be specified as follows:

1.35.1.1. As per Board policy, the normal work hours in, or access to, occupied school buildings are from 4:00 pm. to approximately 11:00 pm., Monday to Friday.

1.35.1.2. Weekend work may be arranged with 72 hours’ notice directly with the Board’s Construction Department.

CONTRACT DOCUMENTS - 00100

INSTRUCTIONS TO BIDDERS

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 13 of 13 2017-222

1.35.1.3. The Board does not allow any painting (other than minor touch-ups), gluing (resilient flooring), welding or any other activity that produces noxious smells on Monday through Friday.

1.35.1.4. Any asphalt paving or roofing work must be arranged for weekends and holidays.

1.35.2. There will be no interruption of utilities and life safety systems (fire alarm, emergency lighting and sprinklers) during occupied hours of the school. Where utilities must be interrupted, during unoccupied hours, the existing school and its equipment and/or contents must be protected and operation made good by qualified personnel.

1.35.3. All trades/ personnel must check in with the office and advise the Custodian the nature and location of their business. For emergency work, required during regular school hours, trades/personnel must report to the office and be accompanied at all times by school staff.

1.35.4. Criminal reference checks are required where personnel are required to access the occupied school, on a regular basis.

1.36. SECTION RESERSVED

1.37. SECTION RESERVED

— END OF INSTRUCTIONS TO BIDDERS —

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS - 00300

FORM OF TENDER

Regal Consulting Engineers Inc. Page 1 of 5 2017-222

1. FORM OF TENDER 1.1. TENDER INFORMATION

NAME OF PROJECT: St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

50 Bristol Road Wes Mississauga, ON L5R 3K3

1.2. EXAMINATION OF TENDER DOCUMENTS

Having carefully examined all of the drawings (architectural, landscaping, [if included] structural, mechanical, sprinkler, [if included] and electrical), and having carefully examined the Instructions to Bidders, the CCDC - 2 2008 Stipulated Price Contract, General Instructions and Supplementary General Conditions to CCDC - 2 2008 and all of the attached Specifications; including Addenda.

and

Having had the opportunity to visit the Place of Work, investigated and examined all conditions affecting the Work, including Geotechnical and Environmental Soil Reports and Surveys;

1.3. BID PRICE

The bidder, hereby offers to furnish all materials, labour, plant and equipment and to perform all duties and services called for by the ENTIRE WORK INCLUDING ALL TRADES for the project named above bid price to be submitted in the bidding system. The results will be posted in the bidding system. All bids are carefully reviewed for compliance prior to making any recommendation for an award. The bid results posted are considered unofficial until compliance is confirmed and the award is posted on the electronic bidding system.

Bid price to be in lawful money of Canada, excluding Value Added Taxes (HST), but including all other applicable excise taxes, custom duties, Insurances, freight exchange and all other charges.

1.4. CONTINGENCY AND CASH ALLOWANCES

The Bid Price does not include Contingency Allowance.

The Bid Price does include a Total Cash Allowance ten thousand $10,000.00 as identified in the Contract Documents.

Value Added Taxes (HST) on the Total Cash Allowance are NOT TO BE INCLUDED in the Tender Amount.

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS - 00300

FORM OF TENDER

Regal Consulting Engineers Inc. Page 2 of 5 2017-222

1.5. MECHANICAL AND ELECTRICAL SUB-CONTRACTORS

The Bid Price includes the Bid of the Mechanical and Electrical Sub-Contractors, whose Bids have been received directly by the bidder and with whom the bidder is prepared to execute formal agreements to perform the mechanical and electrical Work on this project. Name of the subcontractors to be included in the bidding system

1.5.1. Mechanical Bid (Includes “Controls”)

Name of Mech. Sub-Contractor: To be named in the bidding system. 1.5.2 Electrical Bid

Name of Elec. Sub-Contractor: To be named in the bidding system.

The bidder acknowledges that each Sub-Contractor named in the bidding system is an independent Sub-Contractor. The bidder also warrants that the bidder has received Agreement to Bond from each of the Sub-Contractors named in the bidding system and will be made available to the Owner upon request.

1.6. BID VALIDITY

1.6.1. The bidder is submitting a valid tender and will enter into a formal contract if the bidder is notified upon award of the acceptance of the bidders Bid Price by THE BOARD within sixty (60) calendar days from the closing of the tender.

1.7. BID BOND AND AGREEMENT TO BOND

1.7.1. The bidder encloses a Bid Bond in the amount of one hundred and fifty thousand $ 25,000.00 made out in the name of the Dufferin-Peel Catholic District School Board, as well as an Agreement to Bond from an approved Bonding Company stating that the Bonding Company will issue a 50% Performance Bond and a 50% Labour and Material Payment Bond, if the bidder submitted Bid Price is successful and the Board awards the Contract to the bidder.

1.7.2. The bidder acknowledges and will comply with the special provisions specified with respect to the wording and/or conditions under which the Performance Bond may be invoked and remain in force as a Maintenance Bond. The special conditions are specified in the enclosed Instructions to Bidders and documented in the enclosed Supplementary General Conditions to CCDC-2 2008.

1.7.3. The bidder acknowledges and will comply with the terms and conditions of the Occupancy Requirements as outlined in the enclosed Supplementary General Conditions to CCDC 2 2008 Board Occupancy and Instruction to Bidders.

1.7.4. The bidder acknowledges and will comply with all the terms and conditions of the Stipulated Price Contract, CCDC-2 2008 and the amendments as outlined in the Supplementary General Conditions to CCDC-2 2008. The bidder further

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS - 00300

FORM OF TENDER

Regal Consulting Engineers Inc. Page 3 of 5 2017-222

agrees that The Schedule of Values shall provide for the establishment of a RESERVE FUND which shall be in addition to any required construction lien holdback, and accrued funds shall be subject to claims by the Board.

1.7.5. The bidder agrees and acknowledges the Bid Submission Deadline Time(s) as set forth in Document 00100 - Instructions to Bidders. The bidder agrees to provide, as required, all submissions, in the bidding system.

1.7.6. The bidder has included an Agreement to Bond, from an approved Bonding Company stating that the Bonding Company will provide a Performance Bond and Labour and Material Payment Bonds, as specified in the Instructions to Bidders.

1.8. UNDERTAKING

1.8.1. The bidder solemnly undertakes, as an integral part of the bidder’s bid and Bid Submission to: 1.8.1.1. Have the building substantially complete to meet requirements of

OAA/OGCA Document 100, Construction Lien Act (Latest Amendments) and occupancy approval of all Authorities Having Jurisdiction by August 31st, 2018.

1.8.1.2. Have the entire building totally complete by September 14th, 2018.

1.8.2. The bidder confirms that all appropriate costs, such as but not limited to winter heat, frost breaking, inclement weather protection, and all overtime costs for all trades to meet the aforementioned schedule, have been included in the Bid Price to achieve these dates.

1.9. COMMENCEMENT OF WORK

1.9.1. The bidder, if notified of the acceptance of this Bid Submission, via a Purchase Order issued by the Board, will proceed with construction of the Work within two (2) weeks of receiving instructions to commence Work.

1.10. DECLARATION OF NO-CONFLICT

1.10.1 “The Contractor represents and warrants that in tendering for the Work, and in entering into a Contract with the Owner for the performance of the Work that the Contractor’s Tender submission was made in good faith and without any connection, knowledge, comparison of figures, or arrangements with any other company, firm, or person making a Tender for the same work and is, in all respects, fair and without collusion with any other bidder for this Contract, and without fraud. The bidder also represents and warrants that, to the best of the bidders knowledge and belief, no actual or potential conflict of interest exists with respect to the submission of the Tender or performance of the Contract other than those disclosed hereunder. The bidder confirms that, where the Board discovers that the bidder has failed to disclose all actual or potential conflicts of interest, the Board may disqualify the bidder or terminate any Contract awarded to the bidder pursuant to this Tender process. The bidder understands that, for the purposes hereof, “conflict of interest” also includes:

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS - 00300

FORM OF TENDER

Regal Consulting Engineers Inc. Page 4 of 5 2017-222

.1 in relation to the Tender process, the bidder has an unfair

advantage or engages in conduct, directly or indirectly, that may give the bidder an unfair advantage, including: .1 having or having access to information in the preparation

of the bidder proposal that is confidential to the Board and not available to other bidders;

.2 communicating with any person with a view to influencing preferred treatment in the Tender process; or,

.3 engaging in conduct that compromises or could be seen to compromise the integrity of the open and competitive process and render that process non-competitive and unfair; or,

.2 in relation to the performance of its contractual obligations in a

Board contract, the bidders other commitments, relationships or financial interests: .1 could or could be perceived to exercise an improper influence

over the objective, unbiased and impartial exercise of the Board’s independent judgment; or,

.2 could or could be perceived to compromise, impair or be incompatible with the effective performance of the undersigned’s contractual obligations.”

1.11. MUNICIPAL FREEDOM OF INFORMATION AND PROTECTION OF PRIVACY ACT

1.11.1. The Contractor agrees that in tendering for the work, and in entering into a Contract with the Owner for this performance of the work that the Contractor’s Tender and supporting documentation shall become the property of the Board. Information in a Tender is subject to potential disclosure to third parties after the award, in accordance with the provisions of the Municipal Freedom of Information and Protection of Privacy Act, R.S.O. 1990 (“MFOIPOP”).

1.11.2. The bidder acknowledges that any personal or confidential information which the Bidders provide is being collected and will be used exclusively for the purposes of analyzing, evaluating and assessing the Bid Submission.

1.11.3. Any information a Bidder wishes to identify as propriety and have maintained as confidential, excluding unit pricing information as well as the total dollar value of the Bid Submission, must be clearly identified as such, and any proposed restrictions on disclosures specified.

1.11.4. For the purposes of a report to the Trustees of the Board, pricing information as well as the total dollar value of the Bid Submission may be reported in a public report and will not be considered confidential.

1.11.5. In addition, the Board may be ordered by the Information and Privacy Commissioner under the provisions of MFOIPOP to disclose additional information identified by a Bidder as proprietary and confidential.

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS - 00300

FORM OF TENDER

Regal Consulting Engineers Inc. Page 5 of 5 2017-222

1.12. SIGNING OF TENDER

The bidder is submitting this Bid Price Tender, name, and title of signing officer in the bidding system

I HAVE THE AUTHORITY TO BIND THE COMPANY

END OF FORM OF TENDER

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS 00400

Mechanical Supplementary Bid Submission Form

Regal Consulting Engineers Inc. Page 1 of 5 2017-22

1. MECHANICAL SUPPLEMENTARY BID SUBMISSION FORM

1.1. NAME OF PROJECT: St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

1.2. SUBMISSION REQUIREMENT

NOTE THAT THIS MECHANICAL SUPPLEMENTARY BID SUBMISSION FORM IS TO BE SUBMITTED IN ITS ENTIRETY BY THE PREQUALIFIED MECHANICAL BIDDERS DIRECTLY TO ANY OR ALL OF THE PREQUALIFIED GENERAL CONTRACT BIDDERS.

THIS MECHANICAL SUPPLEMENTARY BID SUBMISSION FORM IS TO BE INCLUDED WITH THE SUPPLEMENTARY INFORMATION FORM SUBMITTED BY THE TWO (2) LOW GENERAL CONTRACT BIDDERS,

NO LATER THAN TWENTY-FOUR (24) HOURS AFTER THE TIME OF TENDER CLOSING.

ELECTRONIC OR HAND DELIVERED.

1.3. PRINT MECHANICAL CONTRACT BIDDER’S NAME, PHONE, FAX & E-MAIL

Name:

Phone Number: Fax Number:

E-Mail Address

1.4. LIST OF SUB-CONTRACTORS

1.4.1. The Undersigned, proposes to have the following Sub-Contractors to the Mechanical Building Services perform the Work on this project, w h i c h are an integral part of this Bid. The Undersigned has investigated their reliability, bonding abilities where required, and competence to carry out the Work as specified. The Undersigned agrees that no changes to this list will be made without the express written approval of the Consultants and the Board.

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS 00400

Mechanical Supplementary Bid Submission Form

Regal Consulting Engineers Inc. Page 2 of 5 2017-22

1.4.2. The Undersigned confirms that the division of Work among all the subcontractors

and suppliers/installers is the Undersigned’s responsibility and covenants that neither the Consultants, nor the Board, will be requested to act as an arbiter to establish sub-contract limits between Sections or Division of Work.

Section of Work:

Piping (HVAC) Name:

Sheet Metal Name:

Insulation Name:

Plumbing and Drainage Name:

Building Management System Name:

1.5. LIST OF MANUFACTURERS AND SUPPLIERS

1.5.1. The Undersigned acknowledges that the Undersigned’s Bid Price is based on the

completed List of Manufacturers/Suppliers below. 1.5.1.1. The Undersigned agrees that if no name is circled, in the “Acceptable

Alternate” Column, the name identified in the column entitled BASIS OF SUBMISSION shall be used.

1.5.1.2. Where more than one name is indicated in the ACCEPTABLE ALTERNATE column, and the Undersigned elects NOT to base the Bid on the BASIS OF SUBMISSION, the Undersigned has CIRCLED the one on which the Bid Price is based.

1.5.1.3. The Undersigned agrees that the Board reserves the right to accept or reject any of the proposed alternates listed in the “Acceptable Alternate” Column.

1.5.1.4. By circling a manufacturer/supplier from the “Acceptable Alternate” Column, the Undersigned assumes full responsibility for ensuring that all space, weight, connections, power and wiring requirements etc. are considered. The Undersigned understands that all costs incurred for additional components, changes to service, structural and space requirements, layouts and plans, etc. are included in the Undersigned’s Bid.

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS

Mechanical Supplementary Bid Submission Form

Regal Consulting Engineers Inc. Page 3 of 5 2017-22

MECHANICAL EQUIPMENT LIST

BASIS OF SUBMISSION

ACCEPTABLE ALTERNATE

1. Heat Pumps Dakin

Carrier Cold Climate

2. Make-up Air Unit Engineered Air Ingenia Scouts Springfield

3. BAS ESC Automation – Delta (only)

1.6. UNIT PRICES

1.6.1. The Undersigned encloses herein Unit Prices which are an integral part of the

Bid. The Undersigned agrees that Unit Prices shall be in effect for the duration of this Project’s Work.

1.6.2. The Undersigned further agrees that the Unit Prices will be used for additions and deletions and that the credit rate for deletions shall be at (80%) eighty percent.

1.7. LABOUR RATES

1.7.1. The Undersigned encloses herein the Labour Rates which are an integral part of

the Undersigned’s Bid. The Undersigned confirms that the Labour Rates shall be in effect for the duration of the Project Work. The Undersigned further stipulates that the Board is not obliged to accept any Labour Rates indicated.

1.7.2. The Undersigned warrants that the cost of labour at the following rates shall be applied for additions or deletions to the work not covered by Unit Prices. The Undersigned acknowledges that the Labour Rates quoted below represent the net cost exclusive of overhead and profit but including salary, and all agreed upon local union benefits, etc. (Refer to allowable percentages on “Overhead and Profit” in Supplementary General Conditions to CCDC 2, - 2008.)

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS

Mechanical Supplementary Bid Submission Form

Regal Consulting Engineers Inc. Page 4 of 5 2017-22

Plumbing & Drainage Trade Person $ Per Hour

HVAC Piping Trade Person $ Per Hour

Insulation Trade Person $ Per Hour

Sheet Metal Trade Person (Shop) $ Per Hour

(Field) $ Per Hour

Refrigeration Trade Person $ Per Hour

1.8. SECTION RESERVED

1.9. SECTION RESERVED

St. Francis Xavier SS Heat Pump & Make up Air Unit Replacement Project

CONTRACT DOCUMENTS

Mechanical Supplementary Bid Submission Form

Regal Consulting Engineers Inc. Page 5 of 5 2017-22

1.10. SIGNATURE OF THE MECHANICAL CONTRACT BIDDER

The Undersigned is submitting this Mechanical Supplementary Bid Submission Form by duly signing same below and in accordance with the Instructions to Bidders.

NAME OF BIDDER

PRINT NAME OF SIGNING OFFICER

PRINT TITLE OF SIGNING OFFICER

SIGNATURE OF AUTHORIZED SIGNING OFFICER I HAVE THE AUTHORITY TO BIND THE BIDDER

DATED AT THIS DAY OF 200-

END OF MECHANICAL SUPPLEMENTARY BID SUBMISSION FORM

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project

CONTRACT DOCUMENTS 00500

Electrical Supplementary Bid Submission Form

Regal Consulting Engineers Inc. Page 1 of 3 2017-222

1. ELECTRICAL SUPPLEMENTARY BID SUBMISSION FORM

1.1. NAME OF PROJECT: St. Francis Xavier SS – Heat Pump & Make-up Air Unit Replacement Project

1.2. SUBMISSION REQUIREMENT

NOTE THAT THIS ELECTRICAL SUPPLEMENTARY BID SUBMISSION FORM IS TO BE SUBMITTED IN ITS ENTIRETY BY THE PREQUALIFIED ELECTRICAL BIDDERS DIRECTLY TO ANY OR ALL OF THE PREQUALIFIED GENERAL CONTRACT BIDDERS.

THIS ELECTRICAL SUPPLEMENTARY BID SUBMISSION FORM IS TO BE INCLUDED WITH THE SUPPLEMENTARY INFORMATION FORM SUBMITTED BY THE TWO (2) LOW GENERAL CONTRACT BIDDERS,

NO LATER THAN TWENTY-FOUR (24) HOURS AFTER THE TIME OF TENDER CLOSING.

ELECTRONIC OR HAND DELIVERED.

1.3. PRINT ELECTRICAL CONTRACT BIDDER’S NAME, PHONE, FAX & E-MAIL

Name:

Phone Number: Fax Number:

E-Mail Address

1.4. SECTION RESERVED

1.5. SECTION RESERVED

1.6. SECTION RESERVED

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project

CONTRACT DOCUMENTS

Electrical Supplementary Bid Submission Form

Regal Consulting Engineers Inc. Page 2 of 3 2017-222

1.7. LABOUR RATES

1.7.1. The Undersigned encloses herein the Labour Rates which are an integral part of the Bid. The Undersigned confirms that the Labour Rates shall be in effect for the duration of the Project Work. The Undersigned further stipulates that the Board is not obliged to accept any Labour Rates indicated.

1.7.2. The Undersigned warrants that the cost of labour at the following rates shall be applied for additions or deletions to the work not covered by Unit Prices. The Undersigned acknowledges that the Labour Rates quoted below represent the net cost exclusive of overhead and profit but including salary, and all agreed local union benefits, etc. (Refer to allowable percentages on “Overhead and Profit” in Supplementary General Conditions to CCDC 2, - 2008.)

Journeyperson $

Foreperson $

1.8. SECTION RESERVED 1.9. SECTION RESERVED

CONTRACT DOCUMENTS

Electrical Supplementary Bid Submission Form

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project

Regal Consulting Engineers Inc. Page 3 of 3 2017-222

1.10. SIGNATURE OF ELECTRICAL SUPPLEMENTARY BID SUBMISSION FORM

The Undersigned is submitting this Electrical Supplementary Bid Submission Form by duly signing same below and in accordance with the Instructions to Bidders.

NAME OF BIDDER

PRINT NAME OF SIGNING OFFICER

PRINT TITLE OF SIGNING OFFICER

SIGNATURE OF AUTHORIZED SIGNING OFFICER I HAVE THE AUTHORITY TO BIND THE BIDDER

DATED AT THIS DAY OF 201-

END OF ELECTRICAL SUPPLEMENTARY BID SUBMISSION FORM

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project Contract Documents 01010

GENERAL INSTRUCTIONS _____________________________________________________________________________

Regal Consulting Engineers Inc. Page 1 of 9 Project No: 2017-222

PART 1 - GENERAL 1.1 The successful Contractor shall pay for all inspections as required by Jurisdictional

Authorities. The costs for these inspections shall be included in the Tender Price. .1 All work shall be carried out in strict accordance with all existing applicable by-laws

and amendments thereto, the Ontario Building Code, Ontario Fire Code and all requirements of the Ontario Fire Marshall's Office, and/or all other Jurisdictional Authorities and save harmless, in all respects the Owner. Provide certificate from ESA for final Inspection of the installation.

1.2 Additional Requirements

.1 Contractor shall register with the Director of the Occupational Health and Safety Division prior to commencement of work on the Project.

.2 File a ‘Notice of Project’ and commencement of the Project. .3 Establish a Joint Health and Safety and/or Worker Trades Committee. .4 Ensure that all activities arising out of the above are recorded and that minutes are available to an Inspector of the Ontario Ministry of Labour. .5 Contractor shall be responsible for all construction safety requirements, procedures,

facilities and inspection of all work performed by the Contractor, Sub-contractors/ sub-trades and other Contractors engaged on the Project.

.6 In the event of a conflict between any of the provisions of the above authorities, the

most stringent provisions will be applied. .7 Material Safety Data Sheets (MSDS) must be available at the Project site for any

product designated ‘hazardous’ or containing ‘hazardous’ ingredients prior to being used, installed or applied inside the building.

.8 Contractor is responsible for taking all necessary steps to protect personnel

(workers, visitors and general public) and property from any harm throughout the duration of the contract.

.9 Contractor shall supply competent personnel to implement the Health and Safety

program and ensure compliance with the company’s standards and those of the Occupational Health and Safety Act of Ontario.

.10 All the above provisions shall be included in any agreement with sub-contractors or

trades and the Contractor shall monitor compliance.

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project Contract Documents 01010

GENERAL INSTRUCTIONS _____________________________________________________________________________

Regal Consulting Engineers Inc. Page 2 of 9 Project No: 2017-222

1.3 Award of Contract and Essential Date of Completion .1 The Owner anticipates an on-site start date of first week of July 9, 2018 or earlier,

for the Project.

.2 The work shall commence as soon as possible after this date. The Contract shall be substantially completed by August 31, 2018 and Total Completion by September 14, 2018 or earlier.

1.4 Contractor on Site .1 The Contractor shall ensure the procurement of all required materials prior to the

commencement of work. .2 The Contractor shall organize his work at the site in co-operation with the Board’s

Project Supervisor. .3 Certain work may have to be done after hours and on weekends.

.4 Ensure safety of personnel at the job site. .5 Smoking is NOT permitted in any of the Owner’s building or on any of the Owner’s

properties. All smoking must be done off premises. 1.5 Protection and Making Good .1 Provide proper and adequate protection for all property and equipment. Ensure that

dust is contained within the area of work. .2 The Contractor shall be responsible for moving all equipment as required and

replacing same at the completion of the work all as directed by the custodian. .3 Make good, at no additional cost to the Owner, all surfaces disturbed by the

execution of this contract whether such surfaces are located within the area of work or not. Make good to new condition matching surrounding surfaces.

1.6 Public Utilities .1 Verify limitations imposed on project work by presence of utilities and services and

ensure that no damage occurs to them. 1.7 Construction Safety

.1 The Contractor shall be solely responsible for construction safety at the Place of the Work and for compliance with the rules, regulations, and practices required by the applicable construction health and safety precautions and programs in connection with the performance of the Work.

.2 Provide all safety requirements and protection necessary or as required by local

by-laws, governing authorities, and the Board Designee including but not limited to: guard rails, barriers, night lights, sidewalk and curb protection, warning notices and hoarded entrance protection.

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project Contract Documents 01010

GENERAL INSTRUCTIONS _____________________________________________________________________________

Regal Consulting Engineers Inc. Page 3 of 9 Project No: 2017-222

.3 Take all precautions and provide all required protection to ensure the safety of the

general public and the workers in accordance with but not limited to the latest editions of the Occupational Health and Safety Act and Regulations for Construction Projects.

.4 Do not bring to the site any flammable liquids having a flashpoint lower than 43

degrees Celsius (except when in use as fuel in operating equipment) without permission of the Board or designee. All flammable liquids shall be confined in safety containers approved by Underwriter’s Laboratories of Canada, and stored in locked storage areas.

.5 Assume complete responsibility for construction strength, placing, anchoring and

operation of derricks, cranes, hoists and other equipment used for work; and ensure that loads carried thereon can be safely supported and be free from accidents to all persons.

.6 Provide and maintain, on site, suitable fire extinguishers in sufficient quantities, as

required by the Safety Code. 1.8 Workmanship and Material .1 The Contractor shall employ workmen skilled in each phase of the work as their

recognized trade. .2 Manufactured articles, material and equipment shall be applied, installed,

connected, erected, cleaned and conditioned in strict accordance with the applicable manufacturer’s instructions and directions.

.3 No deviations from the Tender Documents shall be made by the Contractor without

written approval of the Owner. .4 Materials shall be new, of Canadian manufacture where available, first quality and

uniform throughout. Submit tender based on the use of materials and equipment specified, or on the listed acceptable alternate equipment as further detailed.

.5 Electrical materials shall be C.S.A. approved and be so labeled. Material not C.S.A.

approved shall receive acceptance for installation by Ontario Hydro Special Inspections Branch before delivery, and modifications and charges required for such acceptance shall be included in work of this Section. Material shall not be installed or connected to the source of electrical power until approval is obtained.

1.9 Shop Drawings .1 Submit three (3) copies of shop drawings for all equipment for review and approval

by the Consultant, prior to ordering equipment. 1.10 Final Cleaning .1 In addition to housekeeping required by Jurisdictional Authorities, work includes final

cleaning.

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project Contract Documents 01010

GENERAL INSTRUCTIONS _____________________________________________________________________________

Regal Consulting Engineers Inc. Page 4 of 9 Project No: 2017-222

.2 Remove grease, dust dirt, stains, fingerprints, and other foreign materials from

interior and exterior surfaces. .3 Clean finish hardware, mechanical fixtures, light fixtures, cover plates and

equipment. .4 Prior to calling for a final inspection the Contractor shall remove all excess material,

equipment and debris and the site shall be left in a clean and tidy condition. 1.11 Guarantee .1 All material and workmanship on this project shall be guaranteed for a period of one

(1) year from the date of final acceptance of the work by the Owner. 1.12 Codes and Standards to Meet or Exceed

.1 Current Ontario Building Code, including all amendments up to project date. .2 Current National Building Code, Part 8: Safety Measures at Construction and

Demolition Sites. .3 The Workers’ Compensation Act, including all revisions and amendments up to

project date. .4 Current Ontario Fire Code, including all amendments up to project date. .5 Occupational Health and Safety Act and related Regulations for Construction

projects, latest edition. .6 Canadian Construction Safety Code. .7 Ministry of Labour, Health and Safety Guidelines. .8 Rules and regulations of authorities having jurisdiction.

. .9 CSA S350-M1980, Code of Practice of Safety in Demolition of Structures. Adhere to the most stringent requirement when above noted codes and standards conflict. Review with the Owner and Board Designee situations which are ambiguous, before proceeding with work.

1.13 Examination of Documents and Site

.1 Contractor shall examine the Tender Documents and must also examine the site before submitting their Tender. They must satisfy themselves by personal examination as to specific conditions to be met with during the project. They shall make their own estimates of the facilities and difficulties to be encountered in completing the work under this Contract. They shall not claim at any time after submission of this Tender, that there was any misunderstanding of the terms and conditions relating to the site conditions. It is the Contractor’s responsibility to understand all aspects of the bid and to obtain clarification from the Owner and/or Consultant before submitting the bid.

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project Contract Documents 01010

GENERAL INSTRUCTIONS _____________________________________________________________________________

Regal Consulting Engineers Inc. Page 5 of 9 Project No: 2017-222

.2 No plea of ignorance of conditions that exist or that may be encountered in the execution of the work under this Contract as a result of the failure to make the necessary examinations and investigations will be accepted as an excuse for any failure or omission on the part of the Contractor to fulfill in every detail all requirements of said Contract Documents, or will be accepted as a basis for any claims whatsoever for extra compensation or any extension of time.

.3 The Specifications shall be considered as an integral part of the accompanying

drawings. Any item or subject omitted from either the Specifications or the Drawings, but which is mentioned or reasonably implied in the other shall be considered as properly and sufficiently specified and must therefore be provided by the Contractor.

1.16 Contractor’s Schedule

.1 Coordinate all schedules with Owner and Consultant to suit the Board requirements. Scheduling of the work shall be subject to the approval of the Owner and Consultant.

.2 Submit to the Consultant the initial schedule within five (5) working days after

Contract award and prior to commencing work. .3 Execute work with the least possible interference or disturbance to occupants,

public and normal use of premises. Normal building routine will continue while work of this contract is being performed. Do not block fire exits.

.4 Regular inspection of work progress will be conducted as decided by the

Consultant. Schedules are to be updated by Contractor in conjunction with, and to the approval of, the Consultant.

1.17 Documents Required At Job Site

.1 Specifications and Drawings.

.2 Addenda.

.3 Change Orders.

.4 Copy of approved work schedule. .5 Inspection Certificates.

.6 Material Safety Data Sheets for all Controlled Products to be used at the facility.

1.18 Project Meetings .1 Attend project meetings as requested by the Owner and/or the Consultant.

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project Contract Documents 01010

GENERAL INSTRUCTIONS _____________________________________________________________________________

Regal Consulting Engineers Inc. Page 6 of 9 Project No: 2017-222

1.19 Site Supervision

.1 Provide on the project site at all times during construction hours a competent Supervisor, who shall be empowered to act on behalf of the Contractor in the execution of this Contract. .

1.20 Fair Wages and Labour

.1 The successful Contractor to provide fair wages and work conditions or their employees applicable to "Field Work". If this policy is violated, the Owner will not consider letting further contracts to said Contractor. In all cases of dispute the decision of the Owner is final.

.2 Provide a competent person on duty at all times for emergency calls after regular

construction hours and on weekends. This person shall be named and approved by the Consultant and Owner prior to starting work. Supply Consultant and Owner with the name and telephone number of the approved person to be contacted during these periods.

1.21 Additional Costs

.1 Any additional costs requested by the Contractor, above the contracted price agreement, shall be presented to the Owner and accepted in writing prior to the commencement of additional work.

.2 A fully executed Change Order issued by the Consultant and signed by the Owner

will signify acceptance of additional costs. Existing Services

.1 Where work involves breaking into or connecting to existing services, carry out work at times directed by governing authorities, with minimum disturbance to staff, pedestrian, and vehicular traffic.

.2 Before commencing work, establish location and extent of services in the area of

work and notify Board Designee of findings. .3 Submit schedule for and obtain approval from the Owners’ representative for any

shut-down or closure of active service or facility. Adhere to approved schedule and provide notice to affected parties.

.4 Where unknown services are encountered immediately advise Board Designee in

writing. .5 Record locations of maintained, re-routed and abandoned services. .6 Existing water and electricity are available for contractors’ use. Modification to

systems will not be permitted and use will be given on an as-is basis. Owner reserves the right to disallow the use of services at any time.

1.23 Alterations and Making Good

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project Contract Documents 01010

GENERAL INSTRUCTIONS _____________________________________________________________________________

Regal Consulting Engineers Inc. Page 7 of 9 Project No: 2017-222

.1 Where new work affects existing conditions and where existing conditions are

altered, carry out all necessary cutting and fitting to make satisfactory connections with the work under this contract.

.2 Where necessary, existing services shall be disconnected, relocated, and

reconnected as required to complete the work. This work shall include, but not be limited to: plumbing, heating, ventilating, air conditioning, electrical, and gas services.

1.24 Concealed or Unknown Conditions

.1 If the Owner or the Contractor discovers conditions at the Place of the Work which are:

.1 Subsurface or otherwise concealed physical conditions which existed

before the commencement of the Work which differ materially from those indicated in the contract documents, or

.2 Physical conditions of nature, which, differ materially from those ordinarily

found to exist and generally recognized as inherent in construction activities of the character provided in the contract documents;

.3 Then the observing party shall notify the other party in writing before

conditions are disturbed and in no event later than 5 Working Days after the observance of the conditions.

.2 The Owner will promptly investigate such conditions and make a finding. If the

finding is that the conditions differ materially and this would cause an increase or decrease in the contractor’s cost or time to perform the work, the Owner shall issue appropriate instructions for a change in the Work.

.3 If the Owner finds that the conditions at the Place of the Work are not materially

different or that no change in the contract price or the contract time is justified, the Owner Designee shall report the reasons for this finding to the Owner and the contractor in writing.

1.25 Garbage Disposal .1 At all times, maintain work area and site, free of accumulated waste and rubbish. .2 Dispose of debris and garbage from the job site on a daily basis with minimum

disturbance to Owner and occupants, and in accordance with authorities having jurisdiction.

.3 Provide garbage bins and chutes required for daily disposal of debris and garbage.

Obtain approval from the Owner for the bin location prior to commencement of the work.

.4 Remove full garbage bins immediately. Do not stockpile debris or garbage on

project site.

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project Contract Documents 01010

GENERAL INSTRUCTIONS _____________________________________________________________________________

Regal Consulting Engineers Inc. Page 8 of 9 Project No: 2017-222

.5 During and upon completion of the work, the Contractor shall remove from the

premises all surplus materials, equipment and debris. 1.26 Working Hours

.1 Work in School/Site, while unoccupied, may be carried out as follows:

4:00 pm. to 11:00 pm., Monday to Friday (After School) The Board does not allow any painting, welding or any other activity that produces noxious smells, Monday through Friday. There shall be no interruption of utilities and life safety systems such as fire alarm, emergency lighting and sprinklers during occupied hours of the School. Where utilities must be interrupted, during unoccupied hours, the existing School and its equipment and/or contents shall be protected. All trades/ personnel shall check in with the Main Office and advise the Staff, nature and location of their business. They may be required to be accompanied by a School Staff. .2 Protect building areas from the intrusion of dust, smoke or any other debris resulting from the work of the Contract.

1.27 As-Built Drawings

.1 Provide one (1) set of as-built drawings indicating all changes made during the course of Installation. Mark the revisions with a red pencil. Also provide as-built drawings on CAD disk.

.2 Provide two (2) sets of Manuals. Include the names of suppliers, contact name,

telephone and fax numbers.

1.28 Building Permit .1 Building Permit is not required for the Heat Pump & MAU Replacement Project. PART 2 – SCOPE OF WORK .1 The “Work” shall consist of the following:

• Provide and install heat pumps as shown on the mechanical plans and specifications. • Electrical contractor to provide and install, electrical disconnect switches, electrical

panels and all the electrical equipment as shown on the electrical drawings. Provide power to the heat pumps and the new make-up air unit installed on the roof as shown on the electrical drawings and specifications.

• All the electrical wiring for the project is to be done in conduits. • General Contractor must provide and install adequately sized exterior storage bin for

the storage of mechanical and electrical equipment. Location of the storage bin to be coordinated and confirmed by the school board.

• Electrical Contractor to work carefully in running power to the heat pumps units without disturbing the existing life safety devices in the ceiling. If by mistake the existing life

St. Francis Xavier SS Heat Pump & Make-up Air Unit Replacement Project Contract Documents 01010

GENERAL INSTRUCTIONS _____________________________________________________________________________

Regal Consulting Engineers Inc. Page 9 of 9 Project No: 2017-222

safety devices in the ceiling are damaged, then make good the existing life safety devices and also allow for testing and verification of the same.

• All control related work to be done by the base building controls contractor. • ESC Automation is the base building controls contractor. • A Cash Allowance of $10,000.00 (Ten Thousand Dollars) to be carried for the

unknowns. • Provide all necessary turn over documents i.e. certificates (ESA, alarm verifications,

commissioning documents) • Provide training to DPCDSB staff, training shall be provided by the controls contractor

with a minimum of two sessions of 4 hours each to the building operating staff of the board.

• Demolition / removal of existing Roof Top Units, Exhaust Fans from site and dispose. • Electrical Contractor to remove Power and all other related electrical wiring from the

RTU’s & Exhaust Fans being removed. • Electrical Contractor to remove power to the existing controls attached to the existing

Roof Top Units and also the existing Exhaust Fans. • Electrical contractor to mark the existing circuits to re-connect power to the new Roof

Top Units, Exhaust Fans as shown on the contract documents. • Mechanical Contractor to provide and install new curb adaptors for all the roof top units

and exhaust fans being replaced. • Allow for fire stops if any fire wall is penetrated with pipes, electrical conduits etc. • Provide necessary caulking, seals etc. to prevent roof leaks

Refer to the following documents, attached herewith, for details of Work to be performed:

A. Mechanical, Electrical Drawings & Specifications.

END OF SECTION

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 1 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SUPPLEMENTARY GENERAL CONDITIONS to CCDC 2, 2008 Stipulated Price Contract for St. Francis Xavier Catholic Secondary School

SC1 GENERAL

1.0 Where a General Condition or paragraph of the General Conditions of the Contract is deleted by the Supplementary General Conditions, the numbering of the remaining General Conditions or paragraph shall remain unchanged, unless stated otherwise herein, and the numbering of the deleted item will be retained, unused.

1.1 The General Conditions for Canadian Standard Construction Document, CCDC No. 2, 2008 edition for the construction of the ST. FRANCIS XAVIER CATHOLIC SECONDARY SCHOOL project, in Mississauga, Ontario are hereby amended, including Articles A-1 through A-8, the Definitions and the General Conditions GC 1.1 to GC 12.3 inclusive. These Supplementary General Conditions supersede, replace or amend the Contract Document clauses, as noted in each item. Supplementary General Conditions are indicated in this Document 00810 as "SC 1" (for Supplementary Condition No. 1), "SC 2", etc. General Conditions stated in the Contract Document are referred to in this Document 00810 as "GC 1.1" (for General Condition No. 1.1 of CCDC No. 2, 2008), "GC 2.1", etc.

1.2 Throughout the Contract Documents references to the "General Conditions of the Contract" or "General Conditions" shall include the Supplementary General Conditions listed in this Document 00810.

1.3 These Supplementary General Conditions shall apply to all Work.

1.4 Where any article, paragraph or sub-paragraph in the General Conditions is supplemented by one of the following paragraphs, the provisions of such article, paragraph or sub-paragraph shall remain in effect and the supplemental provisions shall be considered as added thereto.

1.5 Where any article, paragraph, or sub-paragraph in the General Conditions is amended, voided, or superseded by any of the following paragraphs, the provisions of such article, paragraph, or sub-paragraph not so amended, voided or superseded shall remain in effect.

AGREEMENT BETWEEN OWNER AND CONTRACTOR

SC2 ARTICLE A-3 – CONTRACT DOCUMENTS

SC 2.1 Add the following to the list of Contract Documents in paragraph 3.1: “- Supplementary General Conditions to CCDC 2 – 2008 (this Document) - Drawings and Specifications - Bid Documents, including Instructions to Bidders, Form of Tender, and Tender

addenda, if applicable - Performance Bond - Labour and Material Payment Bond”

SC3 ARTICLE A-5 – PAYMENT

SC 3.1 Amend the first sentence of paragraph 5.1, to read: “5.1 Subject to the provisions of the Contract Documents and in accordance with

legislation and statutory regulations respecting holdback percentages and, where

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 2 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

such legislation does not exist or apply, subject to a lien holdback of Ten percent (10%) PLUS a Reserve Fund of One percent (1%), the Board shall:”

SC 3.2 Delete paragraph 5.3.1 in its entirety and replace it with the following:

“5.3 Interest .1 Should either party fail to make payments as they become due under the terms

of the Contract or in an award by arbitration or court, interest shall also become due and payable on such unpaid amounts at 2% above the prime rate. Such interest shall be compounded on a monthly basis. The prime rate shall be the rate of interest quoted by the Bank of Canada for prime business loans, as it may change from time to time.”

SC4 ARTICLE A-9 – CONFLICT OF INTEREST

SC 4.1 Add new Article A-9 – CONFLICT OF INTEREST as follows:

“ARTICLE A-9 CONFLICT OF INTEREST

9.1 The Contractor, all of the Subcontractors and Suppliers and any of their respective advisors, partners, directors, officers, employees, agents, and volunteers shall not engage in any activity or provide any services where such activity or the provision of such services creates a conflict of interest (actually or potentially, in the sole opinion of the Owner) with the provision of the Work pursuant to the Contract. The Contractor acknowledges and agrees that a conflict of interest, as described in this Article A-9, includes, but is not limited to, the use of Confidential Information where the Owner has not specifically authorized such use.

9.2 The Contractor shall disclose to the Owner, in writing, without delay, any actual or potential situation that may be reasonably interpreted as either a conflict of interest or a potential conflict of interest, including the retention of any Subcontractor or Supplier that is directly or indirectly affiliated with or related to the Contractor.

9.3 The Contractor covenants and agrees that it will not hire or retain the services of any employee or previous employee of the Owner where to do so constitutes a breach by such employee or previous employee of the Owner’s conflict of interest policy, as it may be amended from time to time, until after completion of the Work under the Contract.

9.4 It is of the essence of the Contract that the Owner shall not have direct or indirect liability to any Subcontractor or Supplier, and that the Owner relies on the maintenance of an arm's-length relationship between the Contractor and its Subcontractors and Suppliers. Consistent with this fundamental term of the Contract, the Contractor will not enter into any agreement or understanding with any Subcontractor or Supplier, whether as part of any contract or any written or oral collateral agreement, pursuant to which the parties thereto agree to cooperate in the presentation of a claim for payment against the Owner, directly or through the Contractor, where such claim is, in whole or in part, in respect of a disputed claim by the Subcontractor or Supplier against the Contractor, where the payment to the Subcontractor or Supplier by the Contractor is agreed to be conditional or contingent on the ability to recover those amounts or a portion thereof from the Owner, failing which the Contractor shall be saved harmless from all or a portion of

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 3 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

those claims. The Contractor acknowledges that any such agreement would undermine the required arm's-length relationship and constitute a conflict of interest. For greater certainty, the Contractor shall only be entitled to advance claims against the Owner for amounts pertaining to Subcontractor or Supplier claims where the Contractor has actually paid or unconditionally acknowledged liability for those claims or where those claims are the subject of litigation or binding arbitration between the Subcontractor or Supplier and the Contractor has been found liable for those claims.

9.5 Notwithstanding paragraph 7.1.2 of GC 7.1 - OWNER’S RIGHT TO PERFORM THE WORK, TERMINATE THE CONTRACTOR’S RIGHT TO CONTINUE WITH THE WORK, SUSPEND THE WORK OR TERMINATE THE CONTRACT, a breach of this Article by the Contractor, any of the Subcontractors, or any of their respective advisors, partners, directors, officers, employees, agents, and volunteers shall entitle the Owner to terminate the Contract, in addition to any other rights and remedies that the Owner has in the Contract, in law, or in equity.”

SC5 ARTICLE A-10 CONSTRUCTION SAFETY

SC5.1 Add new Article A-10 – CONSTRUCTION SAFETY as follows:

“ARTICLE A-10 CONSTRUCTION SAFETY

10.1 The Contractor represents and warrants that in tendering for the Work, and in entering into a Contract with the Owner for the performance of the Work that the Contractor will comply with all applicable statutory obligations, including without limitation, the obligations imposed by the Occupational Health and Safety Act (Ontario) and all Regulations thereto, and all amending and successor legislation, including without limitation, Bill 208 (the “Act”), in connection with all Work performed by either the Contractor, Subcontractors, or any other contractor on, or in connection with the Project.”

10.2 The Contractor further declares and agrees that if awarded the Contract, the undersigned shall abide by all of the items identified under Construction Safety in the General Instructions of the Contract Documents and, for the purposes of the Project, the undersigned specifically agrees to be the “constructor” of the Project within the meaning of the Act, and as such, shall assume all the obligations and responsibilities, and observe all construction safety requirements and procedures and duties of inspection imposed by the Act on the “constructor”, as defined in the General Instructions of the Contract Documents, for all work and services performed by the undersigned, the Subcontractors or other contractors on or in connection with the Project.”

SC6 ARTICLE A-11 DECLARATION OF NO CONFLICT SC6.1 Add new Article A-11 – DECLARATION OF NO CONFILCT as follows:

“ARTICLE A-11 DECLARATION OF NO CONFILCT

11.1 “The Contractor represents and warrants that in tendering for the Work, and in entering into a Contract with the Owner for the performance of the Work that the Contractor’s Tender submission was made in good faith and without any

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 4 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

connection, knowledge, comparison of figures, or arrangements with any other company, firm, or person making a Tender for the same Work and is, in all respects, fair and without collusion with any other bidder for this Contract, and without fraud. The undersigned also represents and warrants that, to the best of the undersigned’s knowledge and belief, no actual or potential conflict of interest exists with respect to the submission of the Tender or performance of the Contract other than those disclosed hereunder. The undersigned confirms that, where the Board discovers that the undersigned has failed to disclose all actual or potential conflicts of interest, the Board may disqualify the undersigned or terminate any Contract awarded to the undersigned pursuant to this Tender process. The undersigned understands that, for the purposes hereof, “conflict of interest” also includes:

.1 in relation to the Tender process, the undersigned has an unfair advantage or engages in conduct, directly or indirectly, that may give the undersigned an unfair advantage, including: .1 having or having access to information in the preparation of the

undersigned’s proposal that is confidential to the Board and not available to other bidders;

.2 communicating with any person with a view to influencing preferred treatment in the Tender process; or,

.3 engaging in conduct that compromises or could be seen to compromise the integrity of the open and competitive process and render that process non-competitive and unfair; or,

.2 in relation to the performance of its contractual obligations in a Board contract, the undersigned’s other commitments, relationships or financial interests: .1 could or could be perceived to exercise an improper influence over the

objective, unbiased and impartial exercise of the Board’s independent judgment; or,

.2 could or could be perceived to compromise, impair or be incompatible with the effective performance of the undersigned’s contractual obligations.”

SC7 DEFINITIONS

SC 7.1 Amend Definition 4 (Consultant) by adding the following to the end of the Definition:

“For the purposes of the Contract, the terms “Consultant”, “Architect” and “Engineer” shall be considered synonymous.”

SC 7.2 Amend Definition 6 (Contract Documents) by adding “in writing” to the end of the Definition.

SC 7.3 Amend Definition 12 (Owner) by adding the following to the end of the Definition:

“The words “Owner” and “Board” shall be considered synonymous.”

SC 7.4 Delete Definition 16 (Provide) in its entirety and replace with the following:

“Provide, when used in conjunction with Products, means to supply, install and put into service. Provide has this meaning whether or not the first letter is capitalized.”

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 5 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC 7.4 Add the following new definitions 27 through 34:

27. Confidential Information Confidential Information means all the information or material of the Owner that is of a proprietary or confidential nature, whether it is identified as proprietary or confidential or not, including but not limited to information and material of every kind and description (such as drawings and move-lists) which is communicated to or comes into the possession or control of the Contractor at any time, but Confidential Information shall not include information that: 1) is or becomes generally available to the public without fault or breach on the

part of the Contractor, including without limitation breach of any duty of confidentiality owed by the Contractor to the Owner or to any third party, but only after that information becomes generally available to the public;

2) the Contractor can demonstrate to have been rightfully obtained by the Contractor from a third party who had the right to transfer or disclose it to the Contractor free of any obligation of confidence;

3) the Contractor can demonstrate to have been rightfully known to or in the possession of the Contractor at the time of disclosure, free of any obligation of confidence; or

4) is independently developed by the Contractor without use of any Confidential Information.

28. Construction Schedule Construction Schedule means the schedule for the performance of the Work provided by the Contractor pursuant to GC 3.5, including any amendments to the Construction Schedule made pursuant to the Contract Documents.

29. Force Majeure Force Majeure means any cause, beyond the Contractor’s control, other than a lack of funds, which prevents the performance by the Contractor of any of its obligations under the Contract and the event of Force Majeure was not caused by the Contractor’s default or active commission or omission and could not be avoided or mitigated by the exercise of reasonable effort or foresight by the Contractor. Force Majeure includes Labour Disputes, fire, unusual delay by common carriers or unavoidable casualties, civil disturbance, acts, orders, legislation, regulations or directives of any government or other public authority, acts of a public enemy, war, riot, sabotage, blockage, embargo, lightning, earthquake, or acts of God.

30. Install Install means install and connect. Install has this meaning whether or not the first letter is capitalized.

31. Labour Dispute Labour Dispute means any lawful or unlawful labour problems, work stoppage, labour disruption, strike, job action, slow down, lock-outs, picketing, refusal to work or continue to work, refusal to supply materials, cessation of work or other labour controversy which does, or might, affect the Work.

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 6 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

32. Overhead Overhead means all site and head office operations and facilities, all site and head office administration and supervision; all duties and taxes for permits and licenses required by the authorities having jurisdiction at the Place of the Work; all requirements of Division 1, including but not limited to Submittals, warranty, quality control, insurance and bonding; calculations, testing and inspections; meals and accommodations; and, tools, expendables and clean-up costs.

33. Request for Information (RFI) Request for Information or RFI means written documentation sent by the Contractor to the Owner or to the Owner’s representative or the Consultant requesting written clarification(s) and/or interpretation(s) of the Drawings and/or Specifications, Contract requirements and/or other pertinent information required to complete the Work of the Contract without applying for a change or changes to the Work.

34. Submittals Submittals are documents or items required by the Contract Documents to be provided by the Contractor, such as: - Shop Drawings, samples, models, mock-ups to indicate details or

characteristics, before the portion of the Work that they represent can be incorporated into the Work; and

- As-built drawings and manuals to provide instructions to the operation and maintenance of the Work.

SC8 GC 1.1 CONTRACT DOCUMENTS

SC8.1 Add the following sub-paragraphs to the end of paragraph 1.1.6:

“.1 The Specifications are divided into divisions and sections for convenience but shall be read as a whole and neither such division nor anything else contained in the Contract Documents will be construed to place responsibility on the Owner or the Consultant to settle disputes among the Subcontractors and Suppliers with respect to such divisions.

.2 The Drawings are divided into groups, types and sets for convenience but shall be read as a whole and neither such grouping, nor separation of information from Drawing to Drawing nor anything else contained in the Contract Documents will be construed to place responsibility on the Owner or the Consultant to divide or control the Work, nor to settle disputes among the Subcontractors and Suppliers with respect to such divisions.

.3 The Drawings are, in part, diagrammatic and are intended to convey the scope of the Work and indicate general and appropriate locations, arrangements and sizes of fixtures, equipment and outlets. The Contractor shall obtain more accurate information about the locations, arrangements and sizes from study and coordination of the Drawings, including Shop Drawings, and shall become familiar with conditions and spaces affecting those matters before proceeding with the Work.

.4 Where site conditions require reasonable minor changes in indicated locations and arrangements, the Contractor shall make such changes at no additional cost to the Owner. Similarly, where known conditions or existing conditions interfere with new

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 7 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

installation and require relocation, the Contractor shall include such relocation in the Work.

.5 The Contractor shall arrange and install fixtures and equipment in such a way as to conserve as much headroom and space as possible.

.6 The Schedules are those portions of the Contract Documents, wherever located and whenever issued, which compile information of similar content and may consist of drawings, tables, charts and/or lists.”

SC8.2 Add new paragraphs 1.1.7.5, 1.1.7.6, 1.1.7.7, 1.1.7.8 and 1.1.7.9 as follows:

“1.1.7.5 Noted materials and annotations on the Drawings shall govern over the graphic representation of the Drawings.

1.1.7.6 Finishes in the Room Finish Schedules shall govern over those shown on the Drawings.

1.1.7.7 Items, Procedures and Requirements as specified in the Sections of Division 01 – General Requirements of the Specifications shall form part of and be read in conjunction with the technical specification Sections found elsewhere in the (overall) Specifications.

1.1.7.8 Architectural Drawings shall have precedence over structural, plumbing, mechanical, electrical and landscape Drawings insofar as outlining, determining and interpreting conflicts over the required design intent of all architectural layouts and architectural elements of construction, it being understood that the integrity and installation of the systems designed by the Consultant or its sub-Consultants are to remain with each of the applicable Drawing disciplines.

1.1.7.9 Should reference standards and Specifications conflict with each other or if certain requirements of the Specifications conflict with other requirements of the Specifications, the more stringent requirements shall govern.”

SC9 GC 1.4 ASSIGNMENT

SC9.1 Delete paragraph 1.4.1 in its entirety and replace with the following:

“1.4.1 The Contractor shall not assign the Contract or any portion thereof, without the prior written consent of the Owner, which consent may be unreasonably withheld. The Owner shall be entitled to assign the Contract to a corporation, partnership or other entity (the “Assignee”). Upon the assumption by the Assignee of the Owner’s obligations under the Contract, the Owner shall be released from its obligations under the Contract“.

SC10 GC 1.5 EXAMINATION OF DOCUMENTS AND SITE

SC10.1 Add new GC 1.5 – EXAMINATION OF DOCUMENTS AND SITE as follows:

“GC1.5 EXAMINATION OF DOCUMENTS AND SITE

1.5.1 The Contractor declares and represents that in tendering for the Work, and in entering into a Contract with the Owner for the performance of the Work, it has

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 8 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

either investigated for itself the character of the Work to be done and all local conditions, including the location of any utility which can be determined from the records or other information available at the offices of any person, partnership, corporation, including a municipal corporation and any Board or commission thereof having jurisdiction or control over the utility that might affect its tender or its acceptance of the Work, or that, not having so investigated, the Contractor has assumed and does hereby assume all risk of conditions now existing or arising in the course of the Work which might or could make the Work, or any items thereof more expensive in character, or more onerous to fulfil, than was contemplated or known when the tender was made or the Contract signed.

1.5.2 “The Contractor also declares that in tendering for the Work and in entering into this Contract, the Contractor did not and does not rely upon information furnished by the Owner or any of its agents or servants respecting the nature or confirmation of the ground at the site of the Work, or the location, character, quality or quantity of the materials to be removed or to be employed in the construction of Work, or the character of the construction machinery and equipment or facilities needed to perform the Work, or the general and local performance of the Work under the Contract and expressly waives and releases the Owner from all claims with respect to the said information with respect to the Work.”

SC11 GC 2.2 ROLE OF THE CONSULTANT

SC11.1 In paragraph 2.2.7, delete the words “Except with respect to GC 5.1 – FINANCING INFORMATION REQUIRED OF THE OWNER”.

SC11.2 Amend paragraph 2.2.13 by adding the following to the end of that paragraph:

“If, in the opinion of the Contractor, the Supplemental Instruction involves an adjustment in the Contract Price or in the Contract Time, it shall, within ten (10) Working Days of receipt of a Supplemental Instruction, provide the Consultant with a notice in writing to that effect. Failure to provide written notification within the time stipulated in this paragraph 2.2.13 shall be deemed an acceptance of the Supplemental Instruction by the Contractor, without any adjustment in the Contract Price or Contract Time.”

SC11.3 Add new paragraph 2.2.19 as follows:

“The Consultant or the Owner, acting reasonably, may from time to time require the Contractor to remove from the Project any personnel of the Contractor, including project managers, superintendents or Subcontractors. Such persons shall be replaced by the Contractor in a timely fashion to the satisfaction of the Consultant and the Owner, at no cost to the Owner.”

SC12 GC 2.3 REVIEW AND INSPECTION OF THE WORK

SC12.1 Amend paragraph 2.3.2 by adding the words “and Owner” after the words “Consultant” in the second and third lines.

SC12.2 In the first and second lines of paragraph 2.3.4. insert the word “review” after the word “inspections”.

SC12.3 Paragraph 2.3.5: In the first line after “Consultant”, add “or the Owner”.

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 9 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC12.4 Add a new paragraph 2.3.8 as follows:

“2.3.8 The Owner shall have access to the Work at all times. The Contractor shall provide sufficient, safe, and proper facilities at all time for the review of the Work by the Owner and the inspection of the Work by authorized agencies.”

SC13 GC 2.4 DEFECTIVE WORK

SC13.1 Amend GC 2.4.1 by inserting “or the Owner” in the first sentence following “rejected by the Consultant”.

SC13.2 Add new paragraphs 2.4.1.1 and 2.4.1.2 as follows:

“2.4.1.1 The Contractor shall rectify, in a manner acceptable to the Owner and the Consultant, all defective work and deficiencies discovered throughout the Work, whether or not they are specifically identified by the Consultant.

2.4.1.2 The Contractor shall prioritize the correction of any defective work, which, in the sole discretion of the Owner, adversely affects the day to day operations of the Owner or which, in the sole discretion of the Consultant, adversely affects the progress of the Work.”

SC13.3 Add new paragraph 2.4.4 as follows:

“2.4.4 Neither acceptance of the Work by the Consultant or the Owner, nor any failure by the Consultant or the Owner to identify, observe or warn of defective Work or any deficiency in the Work shall relieve the Contractor from the Contractor’s responsibility for rectifying such defects or deficiencies at the Contractor’s sole cost.”

SC14 GC 3.1 CONTROL OF THE WORK

SC14.1 Add a new paragraph 3.1.3 as follows:

“3.1.3 Prior to or concurrent with individual procurement, fabrication and construction activities, the Contractor shall verify at the Place of the Work, all relevant measurements and levels necessary for proper and complete fabrication, assembly and installation of the Work and shall carefully compare such field measurements and conditions with the requirements of the Contract Documents. Where dimensions are not included or exact locations are not apparent, and the Contractor requires additional information in order to proceed with Work, the Contractor shall immediately notify the Consultant in writing and obtain written instructions from the Consultant before proceeding with the affected Work.”

SC15 GC 3.2 CONSTRUCTION BY OWNER OR OTHER CONTRACTORS

SC15.1 Delete paragraphs 3.2.2.1, 3.2.2.2 and 3.2.2.4 in their entirety.

SC15.2 Add new paragraph 3.2.3.4 as follows:

“3.2.3.4 Subject to GC 9.4 CONSTRUCTION SAFETY, for the Owner’s own forces and for other contractors, assume overall responsibility for compliance with all

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 10 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

aspects of the applicable health and safety legislation in force at the Place of the Work, including all of the responsibilities of the “Constructor”, pursuant to the Occupational Health and Safety Act (Ontario).”

SC16 GC 3.5 CONSTRUCTION SCHEDULE

SC16.1 Delete paragraph 3.5.1 in its entirety and replace with the following:

“3.5.1 The Contractor shall: .1 Within five (5) calendar days of receiving written confirmation of the award

of the Contract, prepare and submit to the Owner and the Consultant for their review and acceptance, a construction schedule in the format indicated below that indicates the timing of the activities of the Work and provides sufficient detail of the critical events and their inter-relationship to demonstrate the Work will be performed in conformity with the Contract Time and in accordance with the Contract Documents. .1 Such schedule is to include a delivery schedule for Products whose

delivery is critical to the schedule for the Work or are required by the Contract to be included in a Products delivery schedule; and,

.2 The Contractor shall employ construction scheduling software, being the latest version of “Microsoft Project”, that permits the progress of the Work to be monitored in relation to the critical path established in the schedule; and,

.3 The Contractor shall provide the schedule and any successor or revised schedules in both electronic format and hard copy; and,

.4 Once accepted by the Owner and the Consultant, the construction schedule submitted by the Contractor shall become the baseline construction schedule.

.2 Monitor the progress of the Work and report to the Consultant and Owner in writing on a weekly basis relative to the baseline construction schedule, or any revised schedule previously accepted by the Owner. Report on any variation from the baseline or slippage in the schedule.

.3 Update and submit to the Consultant and Owner the electronic and hard copy schedule on a monthly basis, at a minimum, or as required by the Consultant.”

SC16.2 Add new paragraphs 3.5.2 and 3.5.3 as follows:

“3.5.2 If, at any time, it should appear to the Owner or the Consultant that the actual progress of the Work is behind schedule or is likely to become behind schedule, or if the Contractor has given notice of such to the Owner or the Consultant pursuant to subparagraph 3.5.1.3, the Contractor shall, either at the request of the Owner or the Consultant, or following giving notice pursuant to subparagraph 3.5.1.3, take appropriate steps to cause the actual progress of the Work to conform to the schedule or minimize the resulting delay. Within five (5) calendar days of the request by the Owner or the Consultant or the notice being given pursuant to subparagraph 3.5.1.3, the Contractor shall produce and present to the Owner and the Consultant a plan demonstrating how the Contractor will achieve the recovery of the last accepted schedule.

3.5.3 The Contractor is responsible for performing the Work within the Contract Time. Any schedule submissions revised from the accepted baseline construction

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 11 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

schedule or revised schedule accepted by the Owner pursuant to GC 3.5 CONSTRUCTION SCHEDULE, during construction are not deemed to be approved extensions to the Contract Time. All extensions to the Contract Time must be made in accordance with the Contract Documents.”

SC17 GC 3.6 SUPERVISION

SC17.1 In paragraphs 3.6.1 and 3.6.2 replace the word “representative” with “superintendent”.

SC17.2 Add new paragraph 3.6.3, 3.6.4, 3.6.5 and 3.6.6 as follows:

“3.6.3 The superintendent for the Project shall be acceptable to the Owner and Consultant, and shall be in full time attendance at the Place of Work while the Work is being performed. The Contractor shall provide the Owner and the Consultant with the names, addresses and telephone numbers of the superintendent referred to in this paragraph 3.6.1 and other responsible persons who may be contacted for emergency and other reasons during non-working hours.

3.6.4 The superintendent shall not be changed by the Contractor without valid reason, which reason shall be provided in writing. The superintendent shall not be changed without prior consultation with and agreement by the Owner and the Consultant.

3.6.5 The Contractor shall replace the superintendent within 7 Working Days of the Owner’s written notification, if the superintendent’s performance is not acceptable to the Owner.

3.6.6 The superintendent must remain assigned to the Project and present at the Place of the Work from the start of the Work, through the lien period, and shall remain at the Place of the Work until all deficiencies are completed and accepted, unless otherwise authorized by the Consultant or the Owner.”

SC18 GC 3.7 SUBCONTRACTORS AND SUPPLIERS

SC18.1 In paragraph 3.7.1.1 add to the end of the second line “including any warranties and service agreements which extend beyond the term of the Contract.”

SC18.2 In subparagraph 3.7.1.2 after the words “the Contract Documents” insert the words “including any required surety bonding”.

SC18.3 Add to the end of paragraph 3.7.2 the following sentences:

“Substitution of any Subcontractor and/or Suppliers after submission of the Contractor’s bid will not be accepted unless a valid reason is given in writing to and approved by the Owner, whose approval may be arbitrarily withheld. The reason for substitution must be provided to the Owner and to the original Subcontractor and/or Supplier and the Subcontractor and/or Supplier shall be given the opportunity to reply to the Contractor and Owner. The Contractor shall be fully aware of the capability of each Subcontractor and/or Supplier included in its bid, including but not limited to technical ability, financial stability and ability to maintain the proposed construction schedule.”

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 12 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC18.4 In paragraph 3.7.4, change the word “shall” to “may” in the second line.

SC18.5 Add new paragraphs 3.7.7 and 3.7.8 as follows:

“3.7.7 Where provided in the Contract, the Owner may assign to the Contractor, and the Contractor agrees to accept, any contract procured by the Owner for Work or services required on the Project that has been pre-tendered or pre-negotiated by the Owner.

3.7.8 The Contractor covenants that each subcontract or supply contract which the Contractor enters into for the purpose of performing the Work shall expressly provide for the assignment thereof to the Owner (at the option of the Owner) and the assumption by the Owner of the obligations of the Contractor thereunder, upon the termination of the Contract and upon written notice by the Owner to the other parties to such subcontracts or supply contracts, without the imposition of further terms or conditions; provided, however, that until the Owner has given such notice, nothing herein contained shall be deemed to create any contractual or other liability upon the Owner for the performance of obligations under such subcontracts or supply contracts.”

SC19 GC 3.8 LABOUR AND PRODUCTS

SC19.1 Add new paragraphs 3.8.4 and 3.8.5 as follows:

“3.8.4 All manufactured Products which are identified by their proprietary names or by part or catalogue number in the Specifications shall be used by the Contractor. No substitutes for such specified Products shall be used without the written approval of the Owner and the Consultant. Substitutes will only be considered by the Consultant when submitted in sufficient time to permit proper review and investigation. When requesting approval for the use of substitutes, the Contractor shall include in its submission any proposed change in the Contract Price. The Contractor shall use all proprietary Products in strict accordance with the manufacturer’s directions.

3.8.5 Materials, appliances, equipment and other Products are sometimes specified by reference to brand names, proprietary names, trademarks or symbols. In such cases, the name of a manufacturer, distributor, Supplier or dealer is sometimes given to assist the Contractor to find a source Supplier. This shall not relieve the Contractor from its responsibility from finding its own source of supply even if the source names no longer supplies the Product specified. If the Contractor is unable to obtain the specified Product, the Contractor shall supply a substitute product equivalent to or better than the specified Product, as approved by the Consultant, with no extra compensation. Should the Contractor be unable to obtain a substitute Product equivalent to or superior to the specified Product and the Owner accepts a different Product, the Contract Price shall be adjusted accordingly, as approved by the Consultant.”

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 13 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC20 GC 3.10 SHOP DRAWINGS

SC20.1 Add new paragraph 3.10.13 as follows:

“3.10.13 Reviewed Shop Drawings, including comments and/or instructions marked thereon, shall not authorize a change in the Contract Price and/or the Contract Time.”

SC21 GC 3.13 CLEAN UP

SC21.1 Add new paragraph 3.13.4 as follows:

“3.13.4 In the event that the Contractor fails to remove waste and debris as provided in this GC 3.13, then the Owner or the Consultant may give the Contractor twenty-four (24) hours written notice to meet its obligations respecting clean up. Should the Contractor fail to meet its obligations pursuant to this GC 3.13 within the twenty-four (24) hour period next following delivery of the notice, the Owner may remove such waste and debris and deduct from payments otherwise due to the Contractor, the Owner’s costs for such clean up, including a reasonable mark-up for administration costs.”

SC22 GC 3.14 BOARD OCCUPANCY

SC22.1 Add a new General Condition 3.14 – BOARD OCCUPANCY as follows:

“GC 3.14 BOARD OCCUPANCY

3.14.1 The Board and other contractors as assigned by the Board shall have the right to enter, use and occupy the Place of the Work, in whole or in part, and place fittings and equipment at or within the Work before completion of the Contract. The Contractor shall observe and protect the right of other contractors and persons authorized by the Board or Consultant to use the Place of the Work.

3.14.2 The Contractor shall provide free and safe access to the building should the Board require occupation prior to completion of the Contract. The Contractor shall not be entitled to an indemnity for any interference with the Contractor’s operations and any Work still to be performed by the Contractor shall be performed at times other than when the building is occupied. Board costs for Board staff required to be present during Work being carried out by the Contractor and/or by any of the Subcontractors on weekends and after hours shall be paid by the Contractor.

3.14.3 Such entry and occupancy by the Board shall not be considered as acceptance of the Work or relieve the Contractor of the Contractor’s responsibility to complete the Project in an acceptable manner, to an acceptable level of quality, within the agreed Construction Schedule.”

SC23 GC 4.1 CASH ALLOWANCES

SC23.1 Delete and replace the last sentence in paragraph 4.1.4 with the following sentence:

“4.1.4 Multiple cash allowances, if more than one exists, may be combined for the purpose of calculating the foregoing.”

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 14 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC23.2 Delete and replace paragraph 4.1.5 with the following sentence:

“4.1.5 Where costs exceed the total amount of all Cash Allowances, the Contract Price shall be adjusted by Change Order. Overhead and Profit charges may only be charged to overruns on the sum total of the Cash Allowances. The maximum mark up on the authorized overrun on Cash Allowances shall be 5%.”

SC23.3 Add new paragraphs 4.1.8 and 4.1.9 as follows:

“4.1.8 The Owner reserves the right to call, or to have the Contractor call, for competitive bids for portions of the Work, which are to be paid for from cash allowances.”

4.1.9 Cash allowances cover the net cost to the Contractor of services, Products, Construction Equipment, freight, unloading, handling, storage, installation, and other authorized expenses incurred in performing any Work stipulated under the cash allowances but does not include any Value Added Taxes payable by the Owner and the Contractor.”

SC24 GC 4.2 CONTINGENCY ALLOWANCE

SC24.1 Delete existing paragraph 4.2.1 and replace with the following:

“4.2.1 No contingency allowance is included in the Contract.

SC24.2 Delete existing paragraphs 4.2.2, 4.2.3 and 4.2.4 in their entirety.

SC25 GC 5.1 FINANCING INFORMATION REQUIRED OF THE OWNER

SC25.1 Delete GC 5.1, including paragraphs 5.1.1 and 5.1.2 in their entirety.

SC26 GC 5.2 APPLICATIONS FOR PROGRESS PAYMENT

SC26.1 Delete and replace paragraph 5.2.3 with the following:

“5.2.3 The amount claimed shall be for the value, proportionate to the amount of the Contract, of Work performed and Products delivered and incorporated into the Work as of the last day of the payment period. No amount claimed shall include Products not incorporated into the Work (whether delivered to the Place of the Work or not) except when prior financial and/or security arrangements are made and agreed to by the Contractor, Owner and Consultant.“

SC26.2 Add the following additional sentence to the end of paragraph 5.2.7:

“Such Products not incorporated shall, prior to any such consideration for payment, be free and clear of all security interests, liens and other claims of third parties.”

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 15 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC26.3 Add new paragraph 5.2.8 as follows:

“5.2.8 Each application for payment, except the first, shall include a statutory declaration, in the CCDC 9A – 2001 form, up to the date of the application for payment, in a form approved by the Consultant. Each application for payment (including the first), shall also include: .1 A certificate, issued by an agency or firm providing workers’ compensation

insurance to the Contractor, verifying that coverage is in force at the time of making the application for payment, and that coverage will remain in force for at least sixty (60) days thereafter.

.2 A declaration by the Contractor, in a form approved by the Consultant, verifying that the performance of the Work is in compliance with all applicable regulatory requirements respecting environmental protection, fire safety, public safety and occupational health and safety.

.3 A pre-approved schedule of values, supplied by the Contractor, for Divisions 1 through 14 of the Work, aggregating the total amount of the Contract Price.

.4 A separate pre-approved schedule of values, supplied by each Subcontractor, for each of Division 15 (Mechanical) and 16 (Electrical) of the Work, aggregating the total amount of the Contract Price for those divisions of Work.

.5 Invoices to support all claims against the cash allowance.

.6 An acceptable construction schedule pursuant to GC 3.5.”

SC27 GC 5.3 PROGRESS PAYMENT

SC27.1 In the first sentence, after the words “after the receipt by the Consultant” add the word “complete”.

SC27.2 Delete subparagraph 5.3.1.3 in its entirety and substitute as follows:

“.3 The Owner shall make payment to the Contractor on account as provided in Article A-5 of the Agreement – PAYMENT no later than 30 calendar days after the date of a complete certificate of payment is issued by the Consultant”

SC27.3 Add new paragraphs 5.3.4 and 5.3.5 as follows:

“5.3.4 The schedule of values required by paragraph 5.2.4, shall provide for the establishment of a Reserve Fund equivalent to the value of One percent (1%) of the Work performed, which fund shall be held in an interest-bearing trust account in the name of the Owner and paid to the Contractor at the time of final completion of the Work. This Reserve Fund shall be in addition to any required Construction Lien Holdback. The funds shall be subject to claims by the Owner and others as provided for under the terms of the Contract Documents.

5.3.5 In the event of construction lien action affecting the Project, the Contractor agrees to indemnify and compensate the Owner for any expenses incurred. The Owner reserves the right to secure the possible cost of construction liens by retaining from the amount of the next payment certificate a sum equal to the amount of any lien claim plus an additional amount of 25% of any such lien amount. Funds so retained and not so expended, shall be released to the

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 16 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

Contractor upon the full discharge of all liens and dismissal of all actions against the Owner.”

SC28 GC 5.4 SUBSTANTIAL PERFORMANCE OF THE WORK

SC28.1 Add new paragraphs 5.4.4, 5.4.5 and 5.4.6 as follows:

“5.4.4 Following the issuance of a certificate of Substantial Performance of the Work, the Consultant will review the Work and prepare a list of deficiencies and incomplete Work items. .1 The Consultant will assign a monetary value to each item. .2 Values assigned shall be those estimated to be required to have

deficiencies corrected by an outside contractor, not currently engaged in the Work of the Contract.

.3 The total of such amounts will be withheld from payments form a portion of the Deficiency Holdback, conditions for which are listed in GC 5.10 – DEFICIENCY HOLDBACK.

.4 Re-review of deficiencies and incomplete Work items shall be in accordance with provisions and procedures as detailed in the Specifications, including payment and/or withholding of payment provisions and procedures.

5.4.5 Within the time prescribed by the construction/builder’s lien legislation in force at the Place of the Work, or where there is no legislation or no time prescribed, within a reasonable time of receiving a copy of the certificate of Substantial Performance of the Work signed by the Consultant, the Contractor shall take whatever steps are required to publish or post a signed copy of the certificate, as is required by such legislation. If the Contractor fails to comply with this provision, the Owner may take the required steps pursuant to the legislation and charge the Contractor for any costs so incurred.

5.4.6 Following the issuance of the certificate of Substantial Performance of the Work, the following shall apply to completing the Work: .1 Contractor is to complete the Work within sixty (60) calendar days, or such

shorter time period as is established under paragraph 5.4.3. .2 No payments will be processed following Substantial Performance of the

Work and prior to the Work being classified as Total Performance. .3 The Owner reserves the right to contract out any or all unfinished Work if it

has not been completed within sixty (60) days of Substantial Performance of the Work without prejudice to any other right or remedy and without affecting the warranty period. The cost of completing the Work shall be deducted from the Contract Price.

SC29 GC 5.5 PAYMENT OF HOLDBACK UPON SUBSTANTIAL PERFORMANCE OF THE WORK

SC29.1 Amend paragraph 5.5.2 by adding the following sentence to the end of that paragraph:

“In addition to a Reserve Fund noted in SC27.3, paragraph 5.3.4, a Deficiency Holdback may also be retained by the Owner to secure the correction of deficiencies and/or warranty claims. Included in these amounts would be all Consultant and Owner costs related to the correction of deficiencies and/or warranty claims.”

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 17 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC29.2 Delete paragraphs 5.5.3 and 5.5.5 in their entirety.

SC29.3 Add new replacement subparagraph 5.5.3 as follows:

“5.5.3 Failure by the Contractor to publish the certificate of Substantial Performance of the Work places no onus on the Consultant or Owner to do so. If the Certificate is not published, the Owner shall release the holdback to the Contractor 45 days after the contract is deemed complete, again having satisfied themselves as above.”

SC30 GC 5.6 PROGRESSIVE RELEASE OF HOLDBACK

SC30.1 Delete paragraphs 5.6.1, 5.6.2 and 5.6.3 in their entirety and replace with the following paragraph 5.6.1:

“5.6.1 No progressive release of holdback on separate sub-contracts will be made. After Substantial Performance of the Work and until Deemed Complete, no payments will be made on the Contract with the exception of release of holdback.”

SC31 GC 5.7 FINAL PAYMENT

SC31.1 Add to the end of paragraph 5.7.2 the following:

“The Work shall be deemed not to be completed until all of the documents listed in the Contract Documents have been delivered and confirmed as being satisfactory. The Owner may withhold payment in respect of the delivery of any documents in an amount determined by the Consultant in accordance with the provisions of GC 5.8 - WITHHOLDING OF PAYMENT.”

SC31.2 Delete from the second line of paragraph 5.7.4 the words, “5 calendar days after the issuance” and substitute the words “30 calendar days after receipt of”.

SC32 GC 5.10 DEFICIENCY HOLDBACK

SC32.1 Add a new General Condition 5.10 – DEFICIENCY HOLDBACK as follows:

“GC 5.10 DEFICIENCY HOLDBACK

5.10.1 Notwithstanding any provisions contained in the Contract Documents concerning certification and release of monies to the Contractor, the Owner reserves the right to establish a Deficiency Holdback, in addition to a Reserve Fund, at the time of the review for Substantial Performance of the Work.

5.10.2 Amount of the Deficiency Holdback shall be based upon one or more of the following: .1 The total of the values assigned to Deficiency List items, as described in

GC 5.4, Item 5.4.4.1; .2 A premium to be determined, based upon individual Project completion

circumstances present at the time of the deficiency review, up to a total of 100% of the dollar value of the deficiencies listed by the Consultant.

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 18 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

5.10.3 The Owner shall retain the entire Deficiency Holdback amount until completion of all of the deficiencies listed by the Consultant to the satisfaction of the Consultant and Owner.”

SC33 GC 6.1 OWNER’S RIGHT TO MAKE CHANGES

SC33.1 Add new paragraphs 6.1.3 and 6.1.4 as follows:

“6.1.3 The Contractor agrees that changes resulting from construction coordination, including but not limited to, site surface conditions, site coordination, and Subcontractor and Supplier coordination are included in the Contract Price and the Contractor shall be precluded from making any claim for a change in the Contract Price as a result of such changes.

6.1.4 Labour costs shall be actual, prevailing rates at the Place of the Work paid to workers, plus statutory charges on labour including WSIB, unemployment insurance, Canada pension, vacation pay, hospitalization and medical insurance. The Contractor shall provide proof of these rates, when requested by the Consultant, for review and/or agreement.”

SC34 GC 6.2 CHANGE ORDER

SC34.1 Add new paragraph 6.2.3 as follows:

“6.2.3 The value of a change shall be determined in one or more of the following methods as directed by the Consultant: .1 by estimate and acceptance of a lump sum, such estimate including a

detailed breakdown of all labour and materials involved in executing the change to the Work;

.2 by negotiated unit prices which include the Contractor’s overhead and profit, as noted in paragraph 6.2.4, or;

.3 by negotiated and accepted lump sum amount, including the Contractor’s overhead and profit, as noted in paragraph 6.2.4.”

SC34.2 Add new paragraph 6.2.4 as follows:

“6.2.4 Overhead and profit charged on Changes, resulting in extra costs, shall be calculated as follows: .1 Combined overhead and profit mark up on Work performed by the

Contractor’s own forces shall not exceed 10%. .2 Overhead and profit shall not be charged on credits to the Contract.

Where a change includes both credits and extras, overhead and profit shall apply only to the net extra amount.

.3 Contractor’s combined overhead and profit mark up on subcontract Work shall not exceed 5%.

.4 Combined overhead and profit mark up charged by Subcontractors on their own Work, shall not exceed 10%.”

.5 Subcontractor’s combined overhead and profit mark up on subcontract Work shall not exceed 5%”.

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 19 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC34.3 Add new paragraph 6.2.5 as follows:

“6.2.5 All quotations will be submitted in a complete manner listing: .1 quantity of each material, .2 unit cost of each material, .3 man hours involved for each type of labour, .4 cost per hour for each type of labour, .5 overhead and profit (markup), .6 Subcontractor quotations submitted listing items .1 to .5 above.”

SC34.4 Add new paragraph 6.2.6 as follows:

“6.2.6 Allowances for overhead and profit shall cover all of the Contractor’s and Subcontractor’s administrative and incidental costs relating to a change including, without limitation, costs relating to project managers, superintendents, assistants, watchpersons and administrative personnel, Shop Drawing production, head office and site office expenses, worker tools, temporary facilities, bonds, insurance, transportation, record drawings, cleanup and disposal of waste materials”.

SC35 GC 6.3 CHANGE DIRECTIVE

SC35.1 Delete and replace paragraph 6.3.6.1 with the following:

“6.3.6.1 Overhead and profit charged on Change Directive items shall be calculated as follows: .1 Combined overhead and profit mark up on Work performed by the

Contractor’s own forces shall not exceed 10%. .2 Overhead and profit shall not be charged on credits to the Contract.

Where a change includes both credits and extras, overhead and profit shall apply only to the net extra amount.

.3 Contractor’s combined overhead and profit mark up on subcontract Work shall not exceed 5%.

.4 Combined overhead and profit mark up charged by Subcontractors on their own Work, shall not exceed 10%.”

.5 Subcontractor’s combined overhead and profit mark up on subcontract Work shall not exceed 5%.

SC35.2 In subparagraph 6.3.7.1 insert “while directly engaged in the Work attributable to the change” after the words “in the direct employ of the Contractor”.

SC36 GC 6.4 CONCEALED OR UNKNOWN CONDITIONS

SC36.1 Add new paragraph 6.4.5 as follows:

“6.4.5 Prior to the submission of the bid on which the Contract was awarded, the Contractor confirms that it carefully investigated the Place of the Work and carried out such tests as it deemed appropriate and, in doing so, applied to that investigation an appropriate degree of care and skill. .1 The Contractor is deemed to assume all risk of conditions or

circumstances now existing or arising in the course of the Work which could make the Work more expensive or more difficult to perform than was

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 20 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

contemplated at the time the Contract was executed. No claim by the Contractor will be considered by the Owner or the Consultant in connection with conditions which could reasonably have been ascertained by such investigation or other due diligence undertaken prior to the execution of the Contract.”

SC36.2 Add new paragraph 6.4.6 as follows:

“6.4.6 Having regard to paragraph 6.4.5, if the Contractor believes that the conditions of the Place of the Work differ materially from those indicated in the Contract Documents, from those reasonably anticipated, or conditions which were reasonably concealed from discovery notwithstanding the conduct of the investigation described in paragraph 6.4.5, it shall provide the Owner and the Consultant with Notice in Writing no later than five (5) Working Days after the first observation of such conditions.” If the Contractor does not provide Notice in Writing within five (5) Working Days, it will be understood by the Owner and Contractor that the conditions at the Place of the Work are as per Contract Drawings and Specifications.”

SC37 GC 6.5 DELAYS

SC37.1 Delete paragraph 6.5.3 in its entirety and replace with the following:

“6.5.3 If the Contractor is delayed in the performance of the Work by Force Majeure, then the Contract Time shall be extended for such reasonable time as the Consultant may recommend in consultation with the Contractor. The extension of time shall not be less than the time lost as a result of the event causing the delay, unless the Contractor agrees to a shorter extension. The Contractor shall not be entitled to payment for costs incurred by such delays unless such delays result from the actions of the Owner.”

SC37.2 Add new paragraphs 6.5.6, 6.5.7 and 6.5.8 as follows:

“6.5.6 If the Contractor is delayed in the performance of the Work by an act or omission of the Contractor or anyone directly or indirectly employed or engaged by the Contractor, or by any cause within the Contractor’s control, then the Contract Time may be extended for such reasonable time as the Owner may decide in consultation with the Consultant and the Contractor. The Owner shall be reimbursed by the Contractor for all reasonable costs incurred by the Owner as the result of such delay, including, but not limited to, the cost of all additional services required by the Owner from the Consultant or any sub-Consultants, project managers, or others employed or engaged by the Owner, and in particular, the costs of the Consultant’s services during the period between the date of Substantial Performance of the Work stated in Article A-1 herein, as the same may be extended through the provision of these General Conditions, and any later or actual date of Substantial Performance of the Work achieved by the Contractor.

6.5.7 No claim for delay shall be made and the Contract Time shall not be extended due to climatic conditions which are within normal or expected statistical maximums and minimums, within a ten year time period, or arising from the Contractor’s efforts to maintain the Construction Schedule.

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 21 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

6.5.8 The parties acknowledge the construction of the Work is designed to accommodate the requirements of the Owner and failure to attain Substantial Performance of the Work by the date stipulated in the Agreement shall result in inconvenience and expense to the Owner and its teachers, students, and others – the exact extent of which is virtually impossible to calculate. Consequently, the parties agree that their best estimate of costs involved in delay beyond the stipulated date for Substantial Performance of the Work is $ 0 ( None Dollars) per day and said sum shall be paid by the Contractor to the Owner for each Working Day of the delay, and shall be deemed for all purposes as reasonable compensation to the Owner for delay costs only. This amount is not, and shall not be deemed to be a penalty, but is a fair estimate of the actual costs resulting from the delay, and shall be charged in addition to all other cost provided for in the Contract Documents.

SC38 GC 6.6 CLAIMS FOR A CHANGE IN THE CONTRACT PRICE

SC38.1 Delete GC 6.6 in its entirety.

SC39 GC 7.1 OWNER’S RIGHT TO PERFORM THE WORK, TERMINATE THE CONTRACTOR’S RIGHT TO CONTINUE WITH THE WORK OR TERMINATE THE CONTRACT

SC39.1 Add a new subparagraph 7.1.3.4 as follows:

“7.1.3.4 An “acceptable schedule” as referred to in subparagraph 7.1.3.2. means a schedule approved by the Consultant and the Owner wherein the default can be corrected within the balance of the Contract Time and shall not cause delay to any other aspect of the Work or the Work of other contractors, and in no event shall it be deemed to give a right to extend the Contract Time.”

SC39.2 Add new paragraph 7.1.7 as follows:

“7.1.7 In addition to any changes certified by the Consultant, pursuant to the provisions of item 7.1.5.3 of the General Conditions, the Contractor shall: .1 pay an allowance for the additional time and services required by the

Board’s representative and other employees equivalent to the relevant payroll costs, plus 150%.

.2 be responsible for all legal costs incurred by the Board with respect to liens arising out of this Contract. This includes all costs to perform more than one search per payment such that it includes the costs of all searches discovering liens registered against the Board’s property, arising out of the Contract.”

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 22 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC40 GC 7.2 CONTRACTOR’S RIGHT TO SUSPEND THE WORK OR TERMINATE THE CONTRACT

SC40.1 Delete paragraph 7.2.2, in its entirety.

SC40.2 Delete subparagraphs 7.2.3.1, 7.2.3.2 and 7.2.3.3 in their entirety.

SC40.3 In subparagraph 7.2.3.4, delete the words "except for GC 5.1 - FINANCING INFORMATION REQUIRED OF THE OWNER".

SC40.4 Renumber paragraph 7.2.5 as paragraph 7.2.6. Add a new paragraph 7.2.5 as follows:

“7.2.5 If the default cannot be corrected within the 5 Working Days specified in paragraph 7.2.4, the Owner shall be deemed to have cured the default if it: .1 commences correction of the default within the specified time; .2 provides the Contractor with an acceptable schedule for such correction;

and, .3 completes the correction in accordance with such schedule.”

SC40.5 Delete paragraph 7.2.6 (previous 7.2.5) entirely and replace with the following:

“7.2.6 If the Contractor terminates the Contract under the conditions described in GC 7.2 – CONTRACTOR’S RIGHT TO SUSPEND THE WORK OR TERMINATE THE CONTRACT, the Contractor shall be entitled to be paid for all Work performed to the date of termination, as determined by the Consultant. The Contractor shall also be entitled to recover the direct costs associated with termination, including the costs of demobilization and losses sustained on Products and Construction Equipment. The Contractor shall not be entitled to any recovery for any special, indirect or consequential losses, including loss of profit.”

SC40.6 Add new paragraph 7.2.7 as follows:

“7.2.7 The Contractor shall not be entitled to give Notice in Writing of the Owner’s default or terminate the Contract in the event the Owner withholds certificates or payment or both in accordance with the Contract because of: .1 the Contractor’s failure to pay all legitimate claims promptly, or .2 the Contractor’s failure to correct deficiencies and incomplete Work in

accordance with timelines set out elsewhere in the Contract Documents, or .3 the failure of the Contractor to discharge construction liens which are

registered against the title to the Place of the Work.”

SC41 GC 8.2 NEGOTIATION, MEDIATION AND ARBITRATION

SC41.1 Delete paragraph 8.2.1 and substitute the following therefor:

“8.2.1 Subject to the consent of each of the Owner and Contractor, the parties may appoint a Project Mediator in accordance with the Rules for Mediation of Construction Disputes as provided in CCDC 40 in effect at the time of bid closing, within 20 Working Days after Notice in Writing is given by one party to another of a dispute which the parties have been unable to resolve amicably with the assistance of the Consultant”.

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 23 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

SC41.2 Amend paragraph 8.2.4 by changing part of the second line from “the parties shall request the Project Mediator” to “and subject to paragraph 8.2.1 the parties may request the Project Mediator”.

SC41.3 Delete paragraphs 8.2.6, 8.2.7 and 8.2.8 in their entirety.

SC41.4 Add new paragraph 8.2.6 as follows:

“8.2.6 The dispute may be finally resolved by arbitration under the Rules of Arbitration of Construction Disputes, as provided in CCDC 40 in effect at the time of bid closing, provided that both the Contractor and the Owner agree. If the Contractor and the Owner agree to resolve the dispute by arbitration, the arbitration shall be conducted in the jurisdiction of the Place of the Work.”

SC42 GC 9.1 PROTECTION OF WORK AND PROPERTY

SC42.1 Delete subparagraph 9.1.1.1 in its entirety and substitute the following therefor:

“.1 Errors in the Contract Documents which the Contractor could not reasonably have discovered applying the proper level of care and diligence;”

SC43 GC 9.2 TOXIC AND HAZARDOUS SUBSTANCES

SC43.1 Add a new subparagraph 9.2.5.5 as follows:

“.5 In addition to the steps described in subparagraph 9.2.5.3, take any further steps it deems necessary to mitigate or stabilize any conditions resulting from encountering toxic or hazardous substances or materials.”

SC43.2 Add new paragraphs 9.2.10, 9.2.11 and 9.2.12 as follows:

“9.2.10 The Contractor, Subcontractors and Suppliers shall not bring on to the Place of the Work any toxic or hazardous substances and materials except as required in order to perform the Work. If such toxic or hazardous substances or materials are required, storage in quantities sufficient to allow Work to proceed to the end of any current Work week only shall be permitted. All such toxic and hazardous materials and substances shall be handled and disposed of only in accordance with all laws and regulations that are applicable at the Place of the Work.

9.2.11 The Contractor shall indemnify and hold harmless the Owner, the Consultant and their respective directors, officers, trustees, agents and employees, from and against any and all liabilities, costs, expenses, and claims resulting from bodily injury, including death, and damage to property of any person, corporation or other body politic, that arises from the use by the Contractor, Subcontractors and Suppliers of any toxic or hazardous substances or materials at the Place of the Work.

9.2.12 Renovation and/or Alterations Projects: Asbestos containing materials may have been used during the original construction or previous alteration of School Board facilities. If asbestos containing materials are discovered during

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 24 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

the course of the Project, stop Work and immediately notify the Owner and the Consultant. Do not remove existing material containing asbestos fibres.”

SC44 GC 9.4 CONSTRUCTION HEALTH AND SAFETY

SC44.1 Rename General Condition 9.4 to read: CONSTRUCTION HEALTH AND SAFETY

SC44.2 Delete paragraph 9.4.1 in its entirety and substitute as follows:

“9.4.1 The Contractor shall be solely responsible for construction safety at the Place of the Work and for compliance with the rules, regulations, and practices required by the applicable construction health and safety legislation and shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of the Work.”

SC44.3 Add new paragraphs 9.4.2 to 9.4.14 as follows:

“9.4.2 Observe and enforce construction safety measures required by the National Building Code (2010) Division B, Part 8; the Provincial Government; Workplace Safety and Insurance Board; and, Municipal authorities. In particular, the Occupational Health and Safety Act (Ont. Reg. 213/91), the Ontario Construction Safety Act, WHMIS, the regulations of the Ontario Ministry of Labour and Ontario Hydro Safety Requirements shall be strictly enforced.

9.4.3 The Board reserves the right to engage in separate contracts, beyond those of the Contractor, as part of the total construction of the Project. These separate contracts shall include, but need not be limited to, the supply and installation of plug-in/plug-out units; supply and installation of draperies, stage equipment, projection equipment and storage shelving units; the supply and installation of telephone, communication, computer and surveillance systems, equipment, wiring and components; the supply and placement of furnishings; and graphic art services.

9.4.4 The Contractor, hereafter called the "Constructor" as defined by the Occupational Health and Safety Act of Ontario, shall be responsible for supervising and directing any such contractors as the Board may choose to perform work at the Place of the Work. The “Constructor” shall ensure that all contractors conform to the requirements of Health and Safety legislation and site policies while performing their work at the Place of the Work.

9.4.5 “Constructor” shall ensure that copies of all applicable construction safety regulations, codes and standards are available at the Place of the Work throughout the period of construction. All workers are to be informed that these documents are available for reference at any time.

9.4.6 The “Constructor” shall ensure that all supervisory personnel at the Place of the Work are fully aware of the contents of the Occupational Health and Safety Act (Ontario Regulation 213/91 - Construction Projects), as amended, and the "Workers' Compensation Act" and that they comply with all requirements and procedures prescribed therein including, but not limited to, the following construction safety requirements:

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 25 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

.1 “Constructor” to file “Registration of Constructors and Employers Engaged in Construction” (Form 1000) with the Director of the Occupational Health and Safety Division prior to commencement of Work on the Project, and (O. Reg. 213/91, sec 5).

.2 File a “Notice of Project” (Form 1075) with the Ontario Ministry of Labour, (O. Reg. 213/91, sec 6).

.3 Notification prior to trenching deeper than 1.2 m, (O. Reg. 213/91, sec 7).

.4 Establish a Joint Health and Safety and/or Worker Trades Committee, as required.

.5 Ensure that all activities arising out of the above are recorded and that minutes are available to an inspector of the Ontario Ministry of Labour.

.6 The Contractor shall be considered as the "Constructor" in consideration of the rights and responsibilities for all construction safety requirements, procedures, facilities and inspection of all Work performed by the Contractor, Subcontractors/sub-trades and other contractors engaged on this Project.

.7 In the event of a conflict between any of the provisions of the above authorities, the most stringent provisions are to be applied.”

9.4.7 Material Safety Data Sheets (MSDS) must be available at the at the Place of the Work for any Product designated hazardous or containing hazardous ingredients prior to being used, installed or applied inside the building.

9.4.8 The “Constructor” must provide a job introduction or safety indoctrination session for all personnel and trades working, inspecting and/or supervising at the Place of the Work.

9.4.9 The “Constructor” will be responsible for taking all necessary steps to protect personnel (Workers, visitors, general public, etc.) and property from any harm throughout the duration of the Contract.

9.4.10 The “Constructor” shall supply competent personnel to implement the Health and Safety program and ensure compliance with the company's standards and those of the Occupational Health and Safety Act of Ontario.

9.4.11 The “Constructor” will include these provisions in any agreement with Subcontractors or trades and Suppliers and shall monitor compliance.

9.4.12 The “Constructor” is responsible for any delays in the progress of Work due to an infraction of legislated or site Health and Safety requirements. .1 If, in the opinion of the Consultant, additional Work and steps to recover

such delays are necessary to meet dates set in the Contract, the “Constructor” shall provide all such services without any additional cost to the Board.

9.4.13 During the course of the Project, if the Health and Safety policies of the “Constructor” are found to be deficient and/or the CAD-7 rating by the WSIB has changed adversely, additional full-time accredited safety personnel must be appointed without extra cost to the Board.

9.4.14 The Contractor shall promptly report in writing to the Owner and the Consultant all accidents of any sort arising out of or in connection with the

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 26 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

performance of the Work, whether on or adjacent to the Place of the Work, giving full details and statement of witnesses. If death or serious injuries or damages are caused, the accident shall be promptly reported by the Contractor to the Owner and the Consultant by telephone or messenger in addition to any reporting required under the applicable safety regulations.”

SC45 GC 10.2 LAWS, NOTICES, PERMITS, AND FEES

SC45.1 Amend paragraph 10.2.2 by deleting the words “building permit”.

SC45.2 Delete and replace paragraph 10.2.3 to read:

“10.2.3 The Contractor shall be responsible for the procurement of permits, licenses, inspections, and certificates, which are necessary for the performance of the Work, except those as noted in paragraph 10.2.2 and as described in the Specifications, Section 01001 – Summary of Work and Special Conditions, Item 1.14.3 – Construction Related Fees, Permits, Building Permit.”

SC45.3 Add new paragraph 10.2.8 as follows:

“10.2.8 “The Contractor shall furnish all certificates that are required or given by the appropriate governmental authorities as evidence that the Work as installed conforms with the laws and regulations of authorities having jurisdiction, including certificates of compliance for the Owner’s occupancy or partial occupancy. The certificates are to be final certificates giving complete clearance of the Work, in the event that such governmental authorities furnish such certificates.”

SC46 GC 10.4 WORKERS’ COMPENSATION

SC46.1 Revise paragraph 10.4.1 to read as follows:

“10.4.1 Prior to commencing the Work, and with each and every application for payment thereafter, including the Contractor’s application for payment of the holdback amount following Substantial Performance of the Work and again with the Contractor’s application for final payment, the Contractor shall provide evidence of compliance with workers’ compensation legislation in force at the Place of the Work, including payments due thereunder.”

SC47 GC 12.1 INDEMNIFICATION

SC47.1 Inclusion of indemnification of Consultant by other parties:

Replace the words “Owner and the Contractor” with the words “Owner, the Contractor and the Consultant” in paragraphs 12.1.1, 12.1.2.1, 12.1.2.2, 12.1.4 and 12.1.6.

SC47.2 The provisions of GC 12.1 - INDEMNIFICATION shall survive the termination of the Contract, howsoever caused and no payment or partial payment, no issuance of a final

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 27 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

certificate of payment and no occupancy in whole or in part of the Work shall constitute a waiver or release of any of the provisions of GC 12.1.

SC48 GC 12.2 WAIVER OF CLAIMS

SC48.1 Delete GC 12.2 – WAIVER OF CLAIMS, in its entirety.

SC49 GC 12.3 WARRANTY

SC49.1 Add new paragraphs 12.3.7 to 12.3.10 as follows:

“12..3.7 Where required by the Contract Documents, the Contractor shall provide a maintenance bond as security for the performance of the Contractor’s obligations as set out in GC 12.3 WARRANTY.

12.3.8 The Contractor shall provide fully and properly completed and signed copies of all warranties and guarantees required by the Contract Documents, containing: .1 the proper name of the Owner; .2 the proper name and address of the Project; .3 the date the warranty commences, which shall be at the “date of Substantial

Performance of the Work” unless otherwise directed by the Consultant in writing.

.4 a clear definition of what is being warranted and/or guaranteed as required by the Contract Documents; and

.5 the signature and seal (if required by the governing law of the Contract) of the company issuing the warranty, countersigned by the Contractor.

12.3.9 Should any Work be repaired or replaced during the time period for which it is covered by the specified warranty, a new warranty shall be provided under the same conditions and for the same period as specified herein before. The new warranty shall commence at the completion of the repair or replacement.

12.3.10 The Contractor shall ensure that its Subcontractors are bound to the requirements of GC 12.3 – WARRANTY for the Subcontractor’s portion of the Work.”

SC50 PART 13 OTHER PROVISIONS

SC50.1 Add new Part 13 OTHER PROVISIONS, including GC13.1 as follows:

SC51 GC 13.1 CONSTRUCTION LIENS

SC51.1 Add new GC 13.1 – CONSTRUCTION LIENS, as follows:

“GC13.1 CONSTRUCTION LIENS

13.1.1 In the event that a claim for lien is registered against the Project by a Subcontractor, sub-Subcontractor or Supplier, and provided the Owner has paid all amounts properly owing under the Contract, the Contractor shall, at its own expense: .1 within 10 calendar days, ensure that any and all claims for lien and

certificates of action are discharged, released, or vacated by the posting of security or otherwise; and

CONTRACT DOCUMENTS – 01030

Supplementary General Conditions to CCDC 2, 2008

PAGE 28 OF 28

St. Francis Xavier SS – Heat Pump & Make up Air Unit Replacement Project

.2 in the case of written notices of lien, ensure that such notices are withdrawn, in writing.

13.1.2 In the event that the Contractor fails to conform with the requirements of paragraph 13.1.1, the Owner may fulfil those requirements and set off and deduct from any amount owing to the Contractor, all costs and associated expenses, including the costs of posting security and all legal fees and disbursements associated with discharging or vacating the claim for lien or certificate of action and defending the action. If there is no amount owing by the Owner to the Contractor, then the Contractor shall reimburse the Owner for all of the said costs and associated expenses.”

End of Document _________ Supplementary General Conditions to CCDC 2, 2008 REVISED MAY 2013

APPENDIX B

DRAWINGS & SPECIFICATIONS

CHECKED BY :

ISSUE OR REVISION

The Contractor shall verify all dimensions prior

to commencement of the work.

All print and specifications are the property of

the Architect and must be returned upon

completion of the work.

DRAWN BY:

SCALE :

DATE :

PROJECT No. :

DWG STATUS :

DRAWING No. : REVISION

PR

OJE

CT

:

DWG TITLE :

PROFESSIONAL SEAL :

20

18

-0

3-0

9 5

:0

6:0

6 P

M

2017-223

MA

DEC 2017

REVIEW

No. Description Date

1 ISSUED FOR REVIEW JAN 04, 2018

2828 Kingsway Drive, Suite 201, Oakville, Ontario L6J 7M2

PHONE: (905)829-3010

www.regal-eng.com

RCEI

ST

. F

RA

NC

IS

X

AV

IE

R

SE

CO

ND

AR

Y S

CH

OO

L H

EA

T

PU

MP

U

NIT

S R

EP

LA

CE

ME

NT

50

B

RIS

TO

L R

OA

D W

., M

IS

SIS

SA

UG

A

2 ISSUED FOR TENDER MAR 08, 2018

N.T.S.

MJ

ME1.0

MECHANICAL LEAD SHEET

AND SEQUENCES OF

OPERATION

CHECKED BY :

ISSUE OR REVISION

The Contractor shall verify all dimensions prior

to commencement of the work.

All print and specifications are the property of

the Architect and must be returned upon

completion of the work.

DRAWN BY:

SCALE :

DATE :

PROJECT No. :

DWG STATUS :

DRAWING No. : REVISION

PR

OJE

CT

:

DWG TITLE :

PROFESSIONAL SEAL :

20

18

-0

3-0

9 5

:0

6:0

9 P

M

2017-223

MA

DEC 2017

REVIEW

No. Description Date

1 ISSUED FOR REVIEW JAN 04, 2018

2828 Kingsway Drive, Suite 201, Oakville, Ontario L6J 7M2

PHONE: (905)829-3010

www.regal-eng.com

RCEI

ST

. F

RA

NC

IS

X

AV

IE

R

SE

CO

ND

AR

Y S

CH

OO

L H

EA

T

PU

MP

U

NIT

S R

EP

LA

CE

ME

NT

50

B

RIS

TO

L R

OA

D W

., M

IS

SIS

SA

UG

A

2 ISSUED FOR TENDER MAR 08, 2018

1:75

MJ

ME2.0

DEMOLITION MECHANICAL

GROUND FLOOR PLAN

CHECKED BY :

ISSUE OR REVISION

The Contractor shall verify all dimensions prior

to commencement of the work.

All print and specifications are the property of

the Architect and must be returned upon

completion of the work.

DRAWN BY:

SCALE :

DATE :

PROJECT No. :

DWG STATUS :

DRAWING No. : REVISION

PR

OJE

CT

:

DWG TITLE :

PROFESSIONAL SEAL :

20

18

-0

3-0

9 5

:0

6:1

1 P

M

2017-223

MA

DEC 2017

REVIEW

No. Description Date

1 ISSUED FOR REVIEW JAN 04, 2018

2828 Kingsway Drive, Suite 201, Oakville, Ontario L6J 7M2

PHONE: (905)829-3010

www.regal-eng.com

RCEI

ST

. F

RA

NC

IS

X

AV

IE

R

SE

CO

ND

AR

Y S

CH

OO

L H

EA

T

PU

MP

U

NIT

S R

EP

LA

CE

ME

NT

50

B

RIS

TO

L R

OA

D W

., M

IS

SIS

SA

UG

A

2 ISSUED FOR TENDER MAR 08, 2018

1:75

MJ

ME3.0

PROPOSED MECHANICAL

GROUND FLOOR PLAN

NOTES:

1. ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL TANDEM

CIRCUIT BREAKER ON PL-56. CONTRACTOR TO ALLOW FOR

DISCONNECTING AND RECONNECTING THE EXISTING LOAD ON

PL-56A.

CHECKED BY :

ISSUE OR REVISION

The Contractor shall verify all dimensions prior

to commencement of the work.

All print and specifications are the property of

the Architect and must be returned upon

completion of the work.

DRAWN BY:

SCALE :

DATE :

PROJECT No. :

DWG STATUS :

DRAWING No. : REVISION

PR

OJE

CT

:

DWG TITLE :

PROFESSIONAL SEAL :

20

18

-0

3-0

7 2

:4

8:0

0 P

M

2017-223

MA

DEC 2017

REVIEW

No. Description Date

1 ISSUED FOR REVIEW JAN 04, 2018

2828 Kingsway Drive, Suite 201, Oakville, Ontario L6J 7M2

PHONE: (905)829-3010

www.regal-eng.com

RCEI

ST

. F

RA

NC

IS

X

AV

IE

R S

EC

ON

DA

RY

SC

HO

OL

M

AK

E U

P A

IR

U

NIT

RE

PL

AC

EM

EN

T

50

B

RIS

TO

L R

OA

D W

., M

IS

SIS

SA

UG

A

2 ISSUED FOR TENDER MAR 08, 2018

N.T.S.

MJ

ME1.0

MECHANICAL LEAD SHEET

AND SEQUENCES OF

OPERATION

BU

RN

ER

S

EC

TIO

N

ELEC PANEL

HEAT EXCHANGER SECTION

LO

UV

ER

S

BLOWER/MOTOR SECTION

INLET AIR DAMPER

FILTER SECTION

INLET HOOD

C/W BIRDSCREEN

CHECKED BY :

ISSUE OR REVISION

The Contractor shall verify all dimensions prior

to commencement of the work.

All print and specifications are the property of

the Architect and must be returned upon

completion of the work.

DRAWN BY:

SCALE :

DATE :

PROJECT No. :

DWG STATUS :

DRAWING No. : REVISION

PR

OJE

CT

:

DWG TITLE :

PROFESSIONAL SEAL :

20

18

-0

3-0

7 2

:4

8:0

2 P

M

2017-223

MA

DEC 2017

REVIEW

No. Description Date

1 ISSUED FOR REVIEW JAN 04, 2018

2828 Kingsway Drive, Suite 201, Oakville, Ontario L6J 7M2

PHONE: (905)829-3010

www.regal-eng.com

RCEI

ST

. F

RA

NC

IS

X

AV

IE

R S

EC

ON

DA

RY

SC

HO

OL

M

AK

E U

P A

IR

U

NIT

RE

PL

AC

EM

EN

T

50

B

RIS

TO

L R

OA

D W

., M

IS

SIS

SA

UG

A

2 ISSUED FOR TENDER MAR 08, 2018

AS NOTED

DH

ME2.0

DEMOLITION AND

PROPOSED HVAC FLOOR

PLANS

1:75

DEMOLITION HVAC THIRD FLOOR PLAN

1

1:75

PROPOSED HVAC THIRD FLOOR PLAN

2

1:75

PROPOSED HVAC ROOF PLAN

3

T-2018-49 - St. Francis Xavier Heat Pump Replacement

Section 2The following documents are a preview only of the information entered into the bidding system

Procurement

Terms and Conditions

Bids are invited for the supply and/or installation of materials, equipment and services as per the attached specifications. All Bids submitted become the property of theBoard, and are subject to the Municipal Freedom of Information and Protection of Privacy Act.

1. Bids must be completed on the forms provided in the Board’s bidding system. Bids not completed as requested may be rejected by the Board acting in itsabsolute discretion.

2. Alternative products of equal quality may be considered (unless otherwise specified), provided that full specifications for these alternatives are included with thebid as well as references to verify your opinion, and taking into consideration end use costs.

3. The Board shall not be obligated to accept the lowest, or any, bid in whole or in part thereof and reserves the right to re-bid or cancel the project in its4. Where applicable, Harmonized Sales Tax must be shown separately as extra in accordance with Canadian and Provincial Government regulations. Please specify

when prices are quoted under Tariff Item5. The life of this contract shall be as specified in the price protection section.6. Bid prices shall remain in effect for the duration of the contract period. However, any decrease in prices must be provided to the Board immediately.7. Electrical equipment on this bid must be S.A. and/or Ontario Hydro approved prior to delivery.8. The bidder shall have satisfactorily fulfilled all relevant obligations as required under the Terms and Conditions of any previous award including, without limitation,

the provision of goods and/or services for the entire term of the contract awarded, in order to be considered as an acceptable bidder.9. Samples, when requested, should be forwarded to an area designated by the Buyer, clearly marked with the name of the bidder and the item number to which it

refers. All samples become the property of the Board.10. The Board will not be responsible for the loss of any samples, nor will the Board be responsible for any damage to samples, including damage incurred while

testing same.11. Warranties shall become effective the day school commences, or when equipment is placed in12. Unless otherwise stated, all shipments are to be DELIVERED PREPAID O.B. DESTINATION.13. Any material received in a damaged condition must be replaced immediately by the vendor. The Board will not bear any portion of the cost of such14. Any material and/or work ordered which, in the opinion of the purchaser, does not completely fulfill the specifications, or is not as sample previously submitted,

must be removed at the expense of the vendor and be replaced immediately with the material and/or work which fulfills the specifications or sample15. The laws of the Province of Ontario shall govern in any dispute occasioned through the performance or non- performance and/or workmanship from this bid.16. The vendor shall indemnify and save harmless the Board, its officers and employees from and against all claims relating to labour and/or materials furnished as a

result of this bid.17. No order will be recognized unless issued on the Board’s official Purchase Order, duly signed by the Supply Chain Manager or a18. If the requested delivery schedule cannot be met, the Board reserves the right to cancel the order.19. This bid will be accepted or rejected by the Board within one hundred and twenty (120) days of the closing date of the bid, unless otherwise specified.20. Payment will be made only to the vendor with whom an order is21. The validity and interpretation of this bid, and of each clause and part thereof, shall be governed by the laws of the Province of In addition, the requirements

outlined in the Board’s Supply Chain Management Policy/Regulation and Procedures, Policy 5.30 shall apply for all procurement processes conducted to securegoods and services as defined therein.

22. In the event of a discrepancy in the price, the unit bid price shall govern.23. Bids not conforming to these conditions may be disqualified on the basis of ambiguity at the sole discretion of the24. The vendor declares that the bid is not made in connection with any other vendor submitting an offer for the same goods or services, and is in all respects fair and

without collusion or25. Alternate terms or conditions submitted by the vendor shall be considered NOT APPLICABLE.26. Any quantities indicated are estimates only and the Board is merely providing a usage established over the past The quantities are furnished without any liability to

the Board.

27. In all cases of misunderstanding and disputes, verbal arrangements will not be considered, but the bidder(s) must produce written authority in support of theircontentions, and shall advance no claim in the absence of such written authority, or use, or attempt to use any conversation with any parties against the Board orin prosecuting any claim against the Board.

28. It is the responsibility of the bidder to obtain clarifications before submitting the bid (i.e. any facts or conditions) which in any way conflict with the spirit of the biddocuments.

29. In the event of Bankruptcy or Receivership by the Bidder, the Board reserves the right to cancel the contract.30. Should the Board fail to appropriate funds to enable continued payment of multi-year contracts/purchase orders, the Board may cancel the contract without

termination charges, provided the successful bidder(s) receive thirty (30) days written notice of such termination from the Board.

31. The Bidder represents and warrants that the Bidder is not a party to any suits, actions, litigation proceedings, or claims by or against or otherwise involving theBoard, and the current Bidder. The Bidder acknowledges that the Board, will reject the bid in view of current, pending or threatened litigation, arbitration,alternative dispute resolution or disputes involving the Board, and the Bidder.

32. In addition to the preceding paragraph, the proponent, by submitting a bid, agrees that it will not claim damages in excess of an amount equivalent to thereasonable costs incurred by the proponent in preparing its bid for matters relating to the agreement or in respect of the competitive process, and the proponent,by submitting a bid waives any claim for loss of profits if no agreement is made with the proponent.

33. The vendor represents and warrants that the goods and/or services supplied pursuant to this bid will be manufactured and/or supplied under such conditionswhich do not contravene the Ontario Human Rights Code or the minimum standards of Ontario workplace legislation and regulations or are otherwise unethical.In the event in the opinion of the Board, the supplier is in breach of the foregoing representation and warranty, the Board may cancel the award or any suchsubsequent contract entered into between the Board and supplier pursuant thereto.

34. The Vendor covenants and agrees to ensure that goods/services provided hereunder during the term of this agreement are consistent with the OntariansDisabilities Act, 2001 and the Accessibility for Ontarians with Disabilities Act, 2005 and their respective regulations.

35. Information provided by a Vendor may be released in accordance with the Municipal Freedom of Information and Protection of Privacy Act, R.S.O. 1990,M.56 as amended. A Vendor should identify any information in its bid or any accompanying documentation for which confidentiality is to be maintained by theBoard, by clearly marking same “CONFIDENTIAL”.

The confidentiality of such information will be maintained by the Board, except where an order by the Information and Privacy Commission or a Court or othergovernmental authority having jurisdiction requires the Board to do otherwise. Notwithstanding the foregoing, prior to the Board’s determination that any parts of thisbid are to be disclosed as required by law, the Vendor shall be provided with written notice of the potential disclosure and accorded all rights that it may have in lawincluding the right to challenge such disclosure.

In addition, Vendors are hereby notified that their bids will, as necessary, be disclosed on a confidential basis to the Board’s advisors retained for the purposes ofevaluating or participating in the evaluation of the bid.

36. All taxes considered extra to this bid.37. The Board, its authorized representatives or an independent auditor identified by the Board may, at its own expense during business hours and upon two (2)

days’ notice to the Vendor, inspect and copy any recorded information in the custody or control of the Vendor, in any form: (i) provided by the Board to theVendor, or provided by the Vendor to the Board; or (ii) created by the Vendor in the performance of its obligations The above-noted audit rights of the Boardshall also apply to any permitted sub-contractors providing goods and/or services hereunder, and it shall be the responsibility of the Vendor to bind any permittedsub-contractors in this regard.

38. The Board’s standard terms are net 45 days from date of invoice.

Where there is a question of non-performance involved, payment in whole, or in part, against which to charge back any adjustment required, will be withheld.

All charges against a Vendor shall be deducted from current obligations that are due or may become due. In the event that collections are not made in this manner, theVendor shall pay the Board on demand, the amount of such charges.

Payment of invoice(s) from the successful Vendor(s) will be settled by Direct Deposit via Electronic Funds Transfer payments into the successful Vendor(s) bankaccount. The Vendor shall provide the Board with the required information to effect such payments.

39. If there is supporting evidence, the Board may exclude a Vendor from participating in this procurement on grounds such as:

bankruptcy or insolvency;false declarations;significant or persistent deficiencies in performance of any substantive requirement or obligation under a prior contract or contracts;final judgments in respect of serious crimes or other serious offences;professional misconduct or acts or omissions that adversely reflect on the commercial integrity of the Vendor; orfailure to pay

40. The Dufferin-Peel Catholic District School Board reserves the right to immediately remove from eligibility to submit bids for an indeterminate period, the name ofany Vendor for failure to accept the contract, or the name of any Vendor for unsatisfactory performance of the contract in the opinion of the Dufferin-PeelCatholic District School.

Further, the Vendor must be prepared, if requested, to present evidence of experience, ability, capacity, objectivity and financial resources and reputation deemednecessary by the Board in the performance of the contract. The Board reserves the right to investigate a Vendor’s claim or background at any time and in any mannerdeemed appropriate by the Board.

41. The Board reserves the right to disqualify and immediately remove from eligibility to submit bids for an indeterminate period, the name of any Vendor, which willinclude the names of such Vendor’s principals, and the names of any other business which may be operated by such principals, for failure to carry out itsobligations for the entire term under any previous award or resulting contract pursuant to a bidding process with the Board, in the sole and unfettered discretion ofthe Board.

42. Notwithstanding anything elsewhere herein set out, in the event that the successful Vendor does not, in the opinion of the Board, comply with the specificationsand terms of this contract at anytime throughout the duration of the contract, or if the Board, in it’s sole and unfettered discretion, determines that either theirservice or the equipment provided by the successful Vendor is unsatisfactory at any time during the term of the contract, the Board reserves the right toimmediately terminate the contract in it’s entirety.

43. The Board is not obligated to award or call on any Vendor (including the Vendor’s principals) whose behaviour is or becomes incompatible with the mandate ofthe Board or which may violate the canons of good morals, manner or In addition, the successful Vendor must follow standard’s that are consistent with theBoard and Schools’ Code of Conduct while on Board/School premises.

44. Delays in or failure of performance by either party under the contract shall not constitute default there under or give rise to any claim for damages if and to theextent caused by occurrences beyond the control of the party affected, including but not limited to decrees of Government, acts of God, strikes or otherconcerted acts by workers, inability to procure materials or labour, fires, floods, explosions, riots, war, rebellion, sabotage and atomic or nuclear incidents, butlack of finances shall in no event be deemed to be a cause beyond a party’s

In the event that performance of the contract in the reasonable opinion of either party is made impossible by force majeure, then either party shall notify the other inwriting and the Board shall either (a) terminate this agreement forthwith and without any further payments being made, or (b) authorize the successful Vendor tocomplete the performance of the contract with such adjustments as required by the existence of the force majeure and agreed upon by both parties.

45. Any quantities indicated are estimates only and the Dufferin-Peel Catholic District School Board is merely providing a usage established over the past year. Thequantities are furnished without any liability to the Dufferin-Peel Catholic District School Board.

46. The Dufferin-Peel Catholic District School Board makes every effort to competitively procure, whenever possible, environmentally appropriate and ecologically

sound products.47. The Vendor agrees not to assign or subcontract any of the work or obligations required hereunder, unless the Vendor obtains the prior written consent from the

Dufferin-Peel Catholic District School Board, which may be withheld for a good In addition, in the event that a Vendor merges with another company or there isa change in voting control of the Vendor, or the Vendor sells its assets to a third party, the merger, change in voting control, or sale of assets as the case may be,will constitute an assignment and the Board will be entitled to cancel the agreement on at least 30 days’ notice from the date of disclosure, or from the effectivedate of merger, change or sale, whichever is sooner.

48. It is the responsibility of the Vendor to understand all aspects of the bid and to obtain clarification from the Board before submitting a However, a bid may berejected or the Board may waive any minor errors.

49. All costs incurred in responding to the bid are to be borne by the Vendor. The Board will not be liable for any costs or damages resulting from preparation orsamples The rejection of any offers or the cancellation shall not render the Board liable for any costs or damages.

50. The Vendor shall not use any insignia or logo of the Board except where required to provide the Deliverables, and only if it has received the prior writtenpermission of the Board to do so.

The Vendor(s) shall not make any news release concerning this bid or awarding of the same or resulting contract(s) without the express consent of the Board.

51. Without limitation, the following action by or circumstances relating to the Vendor shall constitute default on the part of the Vendor:

committing an act of bankruptcyhaving a receiver appointed on account of insolvencymaking a general assignment for the benefit of creditorsfailing to fulfill the work with skill and diligence

Default by the Vendor may result in the Board’s cancellation of the contract. Any action by the Board under the clause shall be without prejudice to the Board’s otherrights or remedies under the contract or law for the performance of the contract by the Vendor.

52. In the event of any dispute or claim arising between the Board and the Vendor (contractor) as to their respective rights and obligations under the contract, eitherparty may give the other written notice of such dispute or The notification of dispute or claim shall be made within fourteen (14) days of the dispute or cause ofaction arising. If the dispute or claim cannot be resolved through negotiation to the satisfaction of both parties, the parties may between themselves agree tosubmit the particular matter to arbitration in accordance with the laws of Ontario. If no agreement is made for arbitration then either party may submit the disputeto such judicial tribunal as the circumstances may require.

53. All services will be performed by the Vendor.

The Vendor is an independent contractor providing services to the Board and neither the Vendor nor the employees or agents of the Vendor will be construed as Boardemployees.

This bid is a contract for a particular service. The Vendor is not and will not hold itself out as an agent, employee or partner of the Board.

As between the Board and the Vendor, the Vendor is solely responsible for all legally required employer and employee contributions and deductions for itself and itsstaff, including Workers’ Compensation, Canada Pension Plan, Unemployment Insurance and federal and provincial income taxes.

54. The Board reserves the right to amend or supplement the bid, giving equal information to all Vendors, by way of an issued addendum.

Bidders shall acknowledge receipt of any addenda when submitting their Bid through the Bidding System. Bidders shall check a box for each addendum/addenda andany applicable attachments that has been issued before a Bidder can submit their Bid submission online.

Addendum/Addenda will typically be issued through the Bidding System, up to seven (7) days prior to Closing Date and Time.

In the event an addendum is issued within seven (7) days prior to Closing Date and, it may include an extension of the Closing Date and Time. It is the responsibility ofthe Bidder to have received all Addendum/Addenda that have been issued. Bidders should check online at https://DPCDSB.bidsandtenders.ca prior to submitting theirBid and up until Bid Closing Date and Time in the event additional addenda are issued.

The Board encourages Bidders not to submit their Bid prior to seven (7) days before the Bid Closing Date and Time, in the event that an addendum is issued. If aBidder submits their bid prior to this or at any time prior to the Bid Closing Date and Time, and an addendum/addenda is issued by the Board, the Bidding System shallWITHDRAW their Bid submission and change their Bid submission to an INCOMPLETE STATUS (NOT accepted by the Board) and the Withdrawn Bid can beviewed by the Bidder in the “MY BIDS” section of the Bidding System. The Bidder is solely responsible to make any required adjustments to their Bid; andacknowledge the addendum/addenda; and ensure the re-submitted Bid is RECEIVED by the Bidding System no later than 2:00:00 p.m. (14:00:00 hours) local time, onthe Bid Closing Date.

NOTE: Additional company contacts are recommended for the reasons outlined below:

You are strongly urged when creating or updating a Bidding System Vendor account to add additional company contacts to create their own login to the BiddingSystem. This will permit your invited contacts that have created their own login to manage (register, submit, edit and withdraw) Bids which your Company is aRegistered Plan Taker for. In the event you are on vacation, or due to illness, etc. these additional contacts may act on your Company’s behalf and have the authorityto; receive addendum notifications from the Bidding System, and where permitted by the terms and conditions of the Bid Call Document, to submit Bids electronicallythrough the Bidding System and/or withdraw and/or edit and/or acknowledge addendum/addenda, on your behalf.

Notwithstanding the above, it is recommended that a Vendor does not invite any additional contacts that you do not want to have access to view, edit, submit and/orwithdraw or who may be in direct competition for example (a company may have two divisions that could compete for the same Bid Opportunity).

If you are an invited company contact it is imperative that you create your login from the link contained in the email invitation. Do NOT go directly tohttps://DPCDSB.bidsandtenders.ca website and create a separate vendor account.

55. Addendum/revisions to this bid will be issued by the Supply Chain Management Department only. No representative of the Board is authorized to amend orwaive the terms of the Bid document in any way unless the amendment or waiver is signed by a representative from the Supply Chain Management Department.

56. The Board reserves the right to:

exercise any of the rights set out in the bid;make public the names of any or all Vendors;request written clarification or the submission of supplementary written information from any Vendor and incorporate a Vendor’s response to that request forclarification into the Vendor’s response;meet with some or all Vendors to discuss aspects of their submissions;verify with any Vendor, or with a third party, any information set out in a submission;verify with a Vendor that it satisfies the conditions for participation and is capable of fulfilling the terms of the contract, where in the sole discretion of the Board, itreceives a submission from a Vendor with a price that is abnormally lower than prices in other submissions;check references other than those provided by any Vendor;disqualify any Vendor whose submission contains misrepresentations or any other inaccurate or misleading information;waive any information or irregularity (whether material or immaterial) at the Board’s discretion (without this bid being considered to be amended);afford an opportunity to a Vendor to correct unintentional errors of form between the opening of bids and the awarding of a contract, and if it does so, the Boardshall afford the same opportunity to all participating Vendors;disqualify any Vendor or the submission of any Vendor who has engaged in conduct prohibited by this bid;disqualify any Vendor whose capacity, integrity, or financial ability is, or whose previous experience with the Board has been unsatisfactory to the Board in itssole and unfettered discretion;make changes, including substantial changes, to this bid in the manner set out herein;cancel this bid process at any stage;cancel this bid process at any stage and issue a new bid for the same or similar deliverables;reject any or all bids at the Board’s sole discretion;select only one Vendor or two or more Vendors as Preferred Vendors;to negotiate;terminate negotiations of a contract with any Preferred Vendor at any time and for any reason without liability to such Vendor.

These reserved rights are in addition to any other rights which may be implied in the circumstances, and the Board shall not be liable for any expenses, costs, losses orany direct or indirect damages incurred or suffered by any Vendor or any party resulting from the Board exercising any of its express or implied rights under this bid.

Schedule of Prices

The Bidder hereby Bids and offers to enter into the Contract referred to and to supply and do all or any part of the Work which is set out orcalled for in this Bid, at the unit prices, and/or lump sums, hereinafter stated. HST is additional.

* Denotes a "MANDATORY" field

Do not enter $0.00 dollars unless you are providing the line item at zero dollars to the Owner.

If the line item and/or table is "NON-MANDATORY" and you are not bidding on it, leave the table and/or line item blank.Do not enter a$0.00 dollar value.

FORM OF TENDER 00300 - BID PRICE

The bidder, hereby offers to furnish all materials, labour, plant and equipment and to perform all duties and services called for by theENTIRE WORK INCLUDING ALL TRADES for the project named above bid price to be submitted in the bidding system.

LineItem

Description Quantity Unit of Measure Unit Price * TOTAL BID PRICE

1 FORM OF TENDER  0300 - BID PRICE 1 LUMP SUM

Subtotal Contract Amount:

Bid price to be in lawful money of Canada, excluding Value Added Taxes (HST), but including all other applicable excise taxes, customduties, Insurances, freight exchange and all other charges.

FORM OF TENDER 00300 - Signing of Tender

1.12. SIGNING OF TENDER

The bidder is submitting this Bid Price Tender, name, and title of signing officer in the bidding system.

1.12 Signing of Tender I have authority to bind the company *

Name of Signing Officer

Title of Signing Officer

Summary Table

The results will be posted in the bidding system. All bids are carefully reviewed for compliance prior to making anyrecommendation for an award. The bid results posted are considered unofficial until compliance is confirmed and the award isposted on the electronic bidding system.

Bid Form Amount

FORM OF TENDER 00300 - BID PRICE

Subtotal Contract Amount:

Sub-Contractors

The Bidder shall state all Subcontractor(s) and type of Work proposed to be used for this project. Bidders shall not indicate “TBD” (To BeDetermined) or “TBA” (To Be Announced) or similar wording and shall not indicate multiple choices of Subcontractor names for anySubcontractor category in their list of Subcontractors.

The Bidder shall state only one (1) subcontractor for each type of work

Bidder(s) shall upon request by the Owner produce a list of references for all or any proposed Subcontractors within three (3) business days.

Supplementary Information Form

Form of Tender 00300

1.5 MECHANICAL AND ELECTRICAL SUB-CONTRACTORS

The Bid Price includes the Bid of the Mechanical and Electrical Sub-Contractors, whose Bids have been received directly by the bidder andwith whom the bidder is prepared to execute formal agreements to perform the mechanical and electrical Work on this project. Name ofthe subcontractors to be included in the bidding system.

Sub-TradeSubcontractor/OwnForces *

Name of Subcontractor

1.5.1 Mechanical Sub-Contractor Select A Value

1.5.2 Electrical Sub-Contractor Select A Value

Documents

It is your responsibility to make sure the uploaded file(s) is/are not defective or corrupted and are able to be opened and viewed by theOwner. If the attached file(s) cannot be opened or viewed, your Bid Call Document may be rejected.

Insurance Certificate (optional)WSIB Certificate (optional)

BONDING UPLOAD SECTION

Bidders shall submit with their on-line bid as specified either a Digital copy (preferred) or Scanned copy of any Bonds required.

Mandatory Requirement #1

The Bidder will include a Bid Bond in the sum of $25,000.00 (Twenty-Five Thousand CAD Dollars) made out in the names of the Dufferin-Peel Catholic District School Board, as well as an Agreement to bond from an approved Bonding Company stating that the BondingCompany will issue a 50% Performance Bond and a 50% Labour and Material Payment Bond.

NOTE: Please be advised that the Bid Bond and Agreement to Bond must be uploaded into the system separately as two separatedocuments.

Mandatory Requirement #1 - Bid Bond (required)Mandatory Requirement #1 - Agreement to Bond (required)

Addenda, Terms and Conditions

I/We do hereby agree to supply and/or install the materials, equipment and services as provided herein in accordance with the Terms andConditions of this bid. No other conditionsshall apply. I/We have read, understood and agree to abide by all Terms and Conditions contained in this document and we are authorizedby the Bidder to bind the firm.

I/We declare that this bid is made without collusion, knowledge, comparison of figures or arrangement with any other company, firm orperson submitting a bid for the same work and is in all respect fair and without collusion or fraud.

I/We declare that to our knowledge no member of the Board of Trustees, and no officer or employee of the Board, is, will be, or has becomeinterested, directly or indirectly, as a contracting party, partner, or in the supplies; work or business in connection with the said Contract, orin any portion thereof, or of any supplies to be used therein, or in any monies to derived therefrom.

AGREEMENT TO ABIDE BY ESTABLISHED PROCESS

The Board is advising the Board's trustees, staff and agents that the integrity of the process requires observance of the following groundrules:

1.All communications, including requests for information, between Bidders and the Board must be between only the representatives of theBoard and each Bidder authorized and designated for that particular purpose.

2.Any attempt on the part of any Bidder, or any of its employees, agents, and contractors or representatives to contact any persons otherthan the designated representatives with respect to the Bids or any action or violation of the above requirements will be grounds fordisqualification, and the Board may, in its discretion, in addition to any other rights or remedies available at law, reject any potential oractual submission submitted by that Bidder.

Bidders must accept and agree to observe the contents of this "Agreement to Abide by the Established Process, " inform their staff thereof,and ensure their compliance therewith.

This agreement must be acknowledged by a person who has the authority to bind the bidder and be submitted with the Bid.

I/WE HAVE READ, UNDERSTAND AND AGREE TO ABIDE BY ALL TERMS, CONDITIONS AND REQUIREMENTS CONTAINED IN THISDOCUMENT AND WE ARE AUTHORIZED BY THE BIDDER TO BIND THE FIRM.

DECLARATION OF DISCLOSURE

THE BIDDER DECLARES that, to the best of the BIDDER’s knowledge and belief, no actual or potential conflict of interest exists with respectto the submission of this Bid or performance of the work, services or contractual obligations requested, other than those disclosedhereunder. The BIDDER confirms that, where the Board discovers that the BIDDER has failed to disclose all actual or potential conflicts ofinterest, the Board may disqualify the BIDDER or terminate any contract awarded to the BIDDER pursuant to this Bid process. The BIDDERunderstands that, for the purpose hereof, “conflict of interest” also includes:

(a) in relation to the Bid process, the BIDDER has an unfair advantage or engaged in conduct, directly or indirectly, that may give theBIDDER an unfair advantage, including

(i) having or having access to information in the preparation of the BIDDER’s Bid that is confidential to the Board and not available to otherbidders;

(ii) communicating with any person with a view to influencing preferred treatment in the Bid process, or

(iii) engaging in conduct that compromises or could be seen to compromise the integrity of the open and competitive process and renderthat process non-competitive and unfair,

or

(b) in relation to the performance of the work, services or contractual obligations, the BIDDER’s other commitments, relationships orfinancial interests;

(i) could or could be perceived to exercise an improper influence over the objective, unbiased and impartial exercise of the BIDDER’sindependent judgements, or

(ii) could or could be perceived to compromise, or impair or be incompatible with the effective performance of the BIDDER’s work, services

or contractual obligations.

THE BIDDER DECLARES that, having read and understood the provisions of this Declaration of Disclosure, the BIDDER hereby confirms, tothe best of the BIDDER’s knowledge and belief: there are no actual or potential conflicts of interest with respect to the work, services orcontractual obligations to be performed by the BIDDER;

The BIDDER further understands that if, subsequent to the signing of this Declaration, a potential or actual, direct or indirect conflict ofinterest arises, the BIDDER must disclose this to the Board.

Do you have any potential or actual conflicts of interest?

Yes No

The Bidder acknowledges and agrees that the addendum/addenda below form part of the Bid Document

Please check the box in the column "I have reviewed this addendum" below to acknowledge each of the addenda.

File Name

I have reviewed thebelow addendum and

attachments (ifapplicable)

Pages

There have not been any addenda issued for this bid.