st francis de sales parish€¦ · a new chapter begins july 2017 fr. sizemore appointed pastor of...
TRANSCRIPT
St Francis de SalesParish
TOWNHALL MEETING
St. Francis de Sales Parish
What began humbly with a small church built in
honor of St. Francis de Sales by Fr. Jean Baptiste
Lamy has grown into a vibrant, dedicated,
community of faith that would make our founding
members proud. As those that came before us
were able to address the needs of our growing
parish to continue its mission to “Make Disciples,
and Disciple Makers”, we cannot forget to
remember that it is our responsibility and privilege
to continue this mission of St. Francis de Sales for
generations to come.
O ALMIGHTY AND ETERNAL GOD
WHO ENTRUSTED ST. FRANCIS DE SALES CATHOLIC CHURCH WITH THE MISSION
OF “MAKING DISCIPLES AND DISCIPLE MAKERS,”
WE TURN TO YOU WITH GRATEFUL HEARTS FOR WHAT YOU HAVE GIVEN US
AND WITH GREAT ANTICIPATION FOR WHAT IS YET TO BE.
BLESS US AS WE WORK TO STRENGTHEN THE FOUNDATIONS OF FAITH
INSPIRED BY YOUR HOLY SPIRIT IN OUR PARISH.
PLEASE GUIDE US, STRENGTHEN US, AND BLESS US WITH YOUR PRESENCE DURING THIS TIME OF GROWTH.
GIVE US EACH A SENSE OF MISSION,
A SPIRIT OF COOPERATION,
AND A GENEROUS HEART,
AS WE WORK TO GROW AND PRESERVE OUR PARISH FOR OUR IMMEDIATE NEEDS
AND THE NEEDS OF THE FUTURE GENERATIONS TO COME.
AMEN
Our Prayer
A New Chapter BeginsFather David W. Sizemore, Pastor &Maggie Wright, Director of Accounting and Development
A New Chapter Begins
July 2017 Fr. Sizemore appointed Pastor of our Parish
A building audit is performed by the Diocese of Columbus
Diocese identifies issues of immediate concern. The Rectory- and other maintenance concerns with parish faculties
Based on the results of the building audit a Townhall Meeting is called to address the rectory as the first priority.
Rectory is Renovated
Fr. meets in homes of parishioners to discuss their desires for St. Francis de Sales Parish and assesses needs.
Maintenance Committee formed Sept 2017 and performs its own building audit, followed by needs assessment evaluations over several months.
A New Chapter Begins
Over 300 additional people attending Mass regularly
132 new families registering
School adds 59 new students
Preschool is busting at the seams due to the Montessori Approach
Staff increased from 9 to 24
Adult Faith Formation Increases with Seeds of Faith, Alpha, Grandparents Ministry, Ask, Walking with Purpose, Signposts, Vanguard, and more.
Youth Ministry increases by 50%
First ever Young Adult Ministry begins
Speakers: Scott Hahn, Dcn. Harold Burke Sivers, and Chris Stefanick
Making Disciples and Disciple Makers
A New Chapter Begins
Results
Need more Adult Faith Formation opportunities
More spaces for Adult Faith Formation & Ministries – large, medium and
smaller
More offices for staff
Additional classrooms
Cafeteria, kitchen, art & music, atrium, air conditioning for school
Catch up on deferred maintenance of buildings
Maintenance reserve fund
Scout Ministry meeting space
A New Chapter Begins
BAA Matching Campaign – parking lots and roof on both Slattery and
School completed
A Donor comes forward with a large gift
3 sets of plans were presented overtime and the final was chosen to be
the best one to meet our needs and was most cost effective.
Answering the Need: Phase INew Build – Faith and Family CenterDavid B. Meleca, FAIA, NCARBDavid B. Meleca Architects LLC`
Answering the Need: Phase INew Build – Faith and Family Center
Answering the Need: Phase INew Build – Faith and Family Center
Answering the Need: Phase IIRenovation – School and Lamy Center
St. Francis de Sales
School and Lamy Ctr.
Existing Main Floor
Answering the Need: Phase INew Build – Faith and Family Center
6,580 sq. ft.
Auxiliary “Worship” & Conference Room with an attached warming kitchen. This 100
person capacity space will be ideal for multiple faith formation gatherings for adults and
youth, community activities, funeral luncheons, and receptions.
A medium size 40 person capacity meeting space ideal for larger gatherings.
A smaller 20 person capacity meeting space ideal for discipleship groups and small
meetings.
4 full size offices
One large office with 4 additional staff work stations and a receptionist work station.
One large storage space equivalent in size to a six car garage for our storage needs.
Answering the Need: Phase IIRenovation – School and Lamy Center
St. Francis de Sales
School and Lamy Ctr.
Proposed Main Floor
Answering the Need: Phase IIRenovation – School and Lamy Center
Answering the Need: Phase IIRenovation – School and Lamy Center
Johnson Hall, Conference Room A, and the Faith Formation Offices will be
renovated to include:
Large 250 person capacity hall with a commercial kitchen to serve as a
school cafeteria during the day and a large social Hall for the Parish and
its many faith formation and community activities during the evening and
weekends with additional storage spaces for the Parish.
Answering the Need: Phase IIRenovation – School and Lamy Center
St. Francis de Sales
School and Lamy Ctr.
Existing Lower Level
Answering the Need: Phase IIRenovation – School and Lamy Center
St. Francis de Sales
School and Lamy Ctr.
Proposed Lower Level
Answering the Need: Phase IIRenovation – School and Lamy Center
The lower level of the Lamy Center and School will be fully renovated to include:
4 new classrooms and 1 existing
Boy Scout Room with an attached Storage
Larger Music room
Larger Art room with an attached room for the kiln and a storage closet
Catechesis of the Good Shepherd Atrium and meeting space.
Air Conditioning in ALL existing and renovated classrooms throughout school.
Answering the Need: Phase IIIShannon Karrenbauer, Business ManagerDeferred Maintenance Needs
Maintenance and Facilities Needs
Exterior Restoration: Washing, Painting, Tuckpointing of brick, wood replacement, and Roof Patching
Lightening Protection for all buildings
Exterior Lighting
Replace Air Conditioning Units in Church (2 out of 4 working at present)
Replace Storm Windows Ground Level
Replace and seal windows to offices and classrooms in Lamy Center
Asbestos remediation
Air Conditioning in Preschool and Gym
Answering the Need: Phase IIIDeferred Maintenance Needs
Maintenance and Facilities Needs
Address and/or replace old Plumbing in School Building
Replace Plumbing in Lamy Center mechanical room
Church Hot Water Tank
Lamy Hot Water Tank
LED lighting for the Lamy Center and School
Remove old showers in the Gym
Gym Floor and stage repainting and refurbishing
Sanctuary, Chapel and Sacristy carpeting replaced with hard flooring
The Cost of Great ThingsMaggie Wright, Director of Accounting and Development
The Cost of Great Things
Phase I—St. Francis Family Center
Phase II—School Lamy Renovation
$ 2,000,000.00 Combined
Phase III — Deferred Maintenance Needs $ 700,000.00
Phase III — Maintenance Reserve Fund $ 300,000.00
Total of All Projected Cost $3,000,000.00
The Cost of Great Things
The total cost of all three Phases is $3 million dollars. We want to start Phase I
in the winter and Phase II in the spring using the generous gift of our
anonymous donor and conduct a capital campaign in winter through spring
for Phase III. Parish building projects rarely receive gifts like we have received.
We are so BLESSED. We pray that this gift inspires all of us as parishioners to
make our own gifts so we can fund our growth for the present, future and
preserve the past.
The generations of faithful Catholics before us provided a Church and Parish we can be proud of —-now it is our turn.
Capital Campaign: 12 Month TimelineSarah Moore
1 2 3 4 5 6 7 8 9 10 11 12
Townhall
meetings
Leadership Gifts Request
Construction
Begins
Major Gifts Request
Parish-wide Campaign Wrap
up
It is indeed a great time to be a part of St. Francis de Sales Parish and School!
“Making Disciples and Disciple
Makers”