Page 1: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

Minutes of 13th SOAP Meeting held on 28.01.2016 Page 1

SSLLDDCC

MMIINNUUTTEESS OOFF 1133TTHH MMEEEETTIINNGG OOFF SSOOAAPP HHEELLDD OONN 2288..0011..22001166

Page 2: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

Minutes of 13th SOAP Meeting held on 28.01.2016 Page 2

Minutes of 13th

meeting of Sub Committee for Operation and Protection

(SOAP) held at SLDC, Raipur on 28.01.2016

The 13th meeting of Chhattisgarh State Operation and Protection Sub

Committee of SGCC was held on 28th January 2016 at SLDC Conference Hall.

The list of participants is enclosed in Annexure-I.

Shri. W.R Wankhede, Chief Engineer (SLDC) welcomed all the

participants of 13th

SOAP meeting. He further congratulated all the participants,

on successful completion of first year of SOAP Meetings.

Item no. 1 Confirmation of minutes:-

No comments have been received from any office. Therefore

minutes of 12th SOAP meeting are hereby confirmed.

Sub Committee agreed and noted.

Item no. 2 Review of system operation during the month of December

2015:-

Presentation and the performance of Thermal Stations and

Transmission System by SLDC is enclosed in Annexure-II.

Sub Committee noted.

Item no.3 State Energy Audit (SEA) Data:-

The data related to SEA report were already submitted by the

concern offices before the meeting was held.

Sub Committee noted.

Item no. 4 Outage planning for the month of February 2016 & March

2016:-

Outage planning of Transmission feeders, Power transformers for

the month February 2016 & March 2016 submitted by O/o CE

(T&C) is enclosed in Annexure III.

Once again the representatives were requested to submit the

planned outages for next 2 months by 26th of every month so that

Page 3: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

Minutes of 13th SOAP Meeting held on 28.01.2016 Page 3

the intra-state outages are discussed & finalize in the SOAP

meeting on 28th

of every month.

Sub Committee agreed and noted.

Item no.5 Real Time Telemetry:

As intimated by the representative of CE (T&C) CSPTCL, the Real

Time Telemetry of 220 KV Churi & Bishrampur is not available

due to non availability of communication and could not give any

time line for its availability. Representative of CE (T&C) has been

once again asked to look into this issue on priority. The committee

felt that the telemetry of 220KV Churi & Bishrampur cannot be

ignored more from the point of view of secured grid operation.

As per the requirement of Grid Code the Voltages of Most

of the 220 KV substations are out from long time hence its

complete Voltage profile report could not be submitted to CSERC

& STU. Both the offices of CE(T&C),CSPTCL & ED(O&M:Gen)

CSPGCL are requested to arrange the telemetry of Bus voltages on

priority.

Further the MVAR telemetry of 400 KV & 220 KV needs

to be verified & made available to SLDC for maintaining the

Voltages in limits in day to day operation and system study

purpose.

This issue is being intimated to the representative from

O/o CE(T&C), in all previous meetings but there is no change in

the status of Real Time Telemetry as mentioned above.

Sub Committee agreed and noted.

ACTION: CE (O&M: Gen), CSPGCL, Raipur & CE (T&C) CSPTCL,

Raipur

Page 4: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

Minutes of 13th SOAP Meeting held on 28.01.2016 Page 4

Item no. 6 Status of FGMO {Free Govern Mode Operation } in thermal

units as on 28.01.2016:

The representative of CSPGCL has been requested to submit

detailed status of FGMO/RGMO specifically including the status of

Bango Hydel.

Korba West Unit No.1,2,& 4 and DSPM Unit 1&2- FGMO in

service with manual intervention.

Korba West Unit No 3 - OUT

Korba West Unit No 5 - RGMO

Bango HPS -: OUT

The committee has recommended the Generation representatives to

obtain the approval of competent Regulatory Authorities.

ACTION: CE (O&M: Gen), CSPGCL Raipur

Item no. 7 Status of AUFLS and df/dt relays as on 28.01.2016:

The representative of C.E. (T&C) has intimated that there is no

addition in AUFLS and the status is unchanged.

Sub Committee noted.

Item no.8A Details of new generating units scheduled to be synchronized in

Feb 2016 & March 2016:

The representatives of Generation Company intimated that Marwa

TPP unit # 1 will start functioning in March 2016.

Sub Committee agreed and noted.

Item no.8B Details of new transmission lines transformer or any other

transmission elements to be charged in Feb 2016 & March

2016:

The representative of T&C has intimated that (i) 132 KV M/s

ACME feeder bay charged on 08.01.2016.(ii) 40 MVA Xmer-iv

charged at 220 KV S/s Siltara on 22.01.16.

Page 5: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

Minutes of 13th SOAP Meeting held on 28.01.2016 Page 5

132 KV Traction Bay at 220 KV S/s Parswani is likely to be

charged during February 2016.

Sub Committee agreed and noted.

Item no. 9 DR/SER status of 400 KV substations:

The DR/SER status of 400 KV S/s of Korba West was received too

late to this office i.e on 7.01.2016 hence it could not be submitted

to WRPC. It is requested to send the status by all 400 KV s/s by 3rd

day of every month either by e-mail or FAX, so that the same can

be submitted to WRPC timely.

Sub Committee agreed and noted.

The 14th

SOAP meeting is proposed to be held on 29th

February 2016 at SLDC Raipur.

Chief Engineer

SLDC, CSPTCL, Raipur

Page 6: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

Annexure-I

S.No. Participants Designation Office Name Mobile No E-mail ID

1 Shri W.R Wankhede CE (LD) SLDC, CSPTCL 9425562412 [email protected]

2 Shri.R.K.Awasthi Addl CE O/o ED(Commercial), CSPDCL 9826116738 [email protected]

3 Shri H.K Deota SE (LD) O/o CE(SLDC), CSPTCL 9893150920 [email protected]

4 Shri.D.K.Khicharya SE (LD) O/o CE(SLDC), CSPTCL 9827117925 [email protected]

5 Shri. Vivekanand Pandey SE (O&M) O/o CE(O&M), CSPDCL 9425204352 [email protected]

6 Shri.J.K Vaidya SE O/o ED(O&M), CSPGCL 9425382836 [email protected]

7 Shri.Vinod Agrawal EE(LD) O/o CE(SLDC), CSPTCL 9300040007 --

8 Shri Girish Gupta EE(LD) O/o CE(SLDC), CSPTCL 9827115065 [email protected]

9 Shri.S.K.Chouhan EE(LD) O/o CE(SLDC), CSPTCL 9981368646 [email protected]

10 Shri.B.C.Biswas EE O/o CE(O&M), CSPDCL 9425566124 --

11 Shri.S.G.Mairal EE(LD) O/o CE(SLDC), CSPTCL 9826129175 [email protected]

12 Shri.S.Lonhare EE O/o CE(T&C), CSPTCL 9406011507 [email protected]

13 Shri.Santosh Soni AE(Testing) O/o SE (ET&I),DSPTPS 9827461184 [email protected]

14 Shri.k.k.Bajaj AE(GCC) O/o ED(O&M), CSPGCL 9424228869 [email protected]

15 Smt.Reena Panda AE O/o CE(T&C), CSPTCL 9826170680 [email protected]

16 Shri.S.Surya Prakash AE (LD) O/o CE(SLDC), CSPTCL 9329012913 [email protected]

17 Ms.Pratibha Khunte AE (LD) O/o CE(SLDC), CSPTCL 8305447363 [email protected]

18 Smt. Roshani Verma AE (LD) O/o CE(SLDC), CSPTCL 9691680505 [email protected]

19 Ms. Namita Vibha Lakra AE (LD) O/o CE(SLDC), CSPTCL 9406122692 [email protected]

20 Rajni Thakur JE (LD) O/o CE(SLDC), CSPTCL 7828290477 [email protected]

21 Ms.Aakansha Gajpal JE (LD) O/o CE(SLDC), CSPTCL 7587365200 [email protected]

List of participants attended the 13th SOAP (Sub-committee of Operation & Protection) Meeting.

Page 7: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

19/02/2016

1

2.1 PERFORMANCE OF CSPGCL & CSPTCL• THERMAL & HYDEL Power Plant :

Contd...

*Approved by CSERC in MYT:15-16 for Generating Thermal & Hydel Units during FY: 2015-16

Generation (in MU) PAF (in %) PLF (in %)

DEC-15Progressive from Apr-15

Gross Generati

on Target*

DEC-15Progressive from Apr-15

Normative

Target *

DEC-15Progressive from Apr-15

KTPS 192.26 1627.06 --- 57.20 54.91 78.50 58.73 56.02

DSPM 278.71 3030.81 --- 75.23 93.44 85.00 74.92 91.84

HTPS 501.25 4216.53 --- 79.78 75.74 83.00 80.20 76.05

KWB

Extn210.15 2352.07 --- 57.61 72.59 85.00 56.49 71.27

Thermal 1182.36 11226.48 --- --- --- --- 69.70 74.60

Bango

HPS3.78 271.66 --- --- --- --- --- ---

2.2 PERFORMANCE OF CSPGCL & CSPTCL

Generating

StationAuxiliary Consumption (in %) No. of Forced Outage

DEC-15Progressive from

Apr-15

Target*DEC-15

Progressive from

Apr-15

KTPS 12.81 12.62 11.25 11 72

DSPM 8.12 7.83 9.00 01 17

HTPS 9.46 9.82 9.70 04 26

KWB Extn. 6.25 5.31 6.00 01 09

Thermal 9.12 8.74 --- 17 124

Bango 1.46 0.24 1.00 --- ---

2.3 PERFORMANCE OF CSPGCL & CSPTCL

Performance of CSPTCL : Transmission Loss(%) as per data provided by O/o of

CSPGCL, CSPTCL & CSPDCL.

YR Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15Progr

essive

% % % % % % % % % %

2015

-16 2.86 3.26 2.46 3.35 2.90 2.65 2.66 3.99 3.06 3.01 (Up to

Dec15)

2014

-15 3.69 3.14 3.85 3.33 3.31 2.91 3.23 3.17 2.89 3.28

2.4 FREQUENCY PARTICULARSFrequency status during NOV-15 & DEC-15 and DEC-14 (As per WRLDC)

Other Frequency parameters during the month of DEC- 2015.

Frequency Status NOV-15 DEC-15 DEC-14

% of time % of time % of time

Between

49.90 & 50.05 Hz67.06 66.07 49.43

< 49.90 Hz 11.48 16.38 19.09

> 50.05 Hz 21.46 17.55 31.49

Frequency Status Frequency

{Hz}

Time

{ h:mm}

Date

Average Freq. 49.98 --- ---

Max Instantaneous Freq. 50.32 06:02 06 DEC 2015

Min Instantaneous Freq. 49.59 07:47 30 DEC 2015

Page 8: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

19/02/2016

2

2.5 DEMAND & ENERGY PATTERNMax. Demand Met & Max. Unrestricted Demand (in MW) and Supply &

Requirement (in MU)

NOV-15 DEC-15 DEC-14

% Increase

compared to

previous year

Max. Demand Met

3333 MW

03-11-15

18:00

3478 MW

25-12-15

18:00

3249 MW

25-12-15

18:007.05 %

Min. Demand Met1918 MW

12-11-15

14:00

2098 MW

16-12-15

14:00

2033 MW

13-12-15

14:00

3.20 %

Max. Unrestricted

Demand

3423 MW

03-11-15

18:00

3730 MW

28-12-15

18:00

3307 MW

26-12-15

18:00

12.79 %

Supply (MU) 1686.58 1776.35 1705.00 4.18 %

Requirement ( MU) 1686.72 1789.19 1719.70 4.03 %

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

MW

Date

Daily Max Demand met in the month of NOV-15, DEC-15 & DEC-14. MAX 3478 MW on 25.12.2015 at 18:00 hrs.

Average growth of 7.05 % compared to last year

Dec-

2014

Dec-2015

Nov-2015

3005

3293

2327

2098

1800

1900

2000

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

MW

Date

Daywise Min and Max Demand met in the month of Dec-15, [ Difference : Max 1195 MW on 16 Dec 15 & Min 678 MW on 11 Dec 15 ] MAX MIN

678

MW

1195

MW

BREAK-UP OF GENERATION / INJECTION AT THE TIME OF

MONTHLY PEAK DEMAND :

3478 MW ON 25-12-15 AT18:00 HRS)

MW %

CSPGCL Thermal

(Ex Bus) 1479 43%

CSPGCL Hydel 41 1%CPP/IPP's

(STOA +PPA) Inj 178 5%

Other Injection 105 3%

CS Share 1074 31%Net Import /

Export+BSP SCH 431 12%

OD(+) / UD(-) 170 5%

Demand Met (MW) 3478

Page 9: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

19/02/2016

3

1,479

41

178 105

1,074

431

170

0

200

400

600

800

1000

1200

1400

1600

CSPGCL Thermal

CSPGCL Hydel

CPP/IPP's (STOA +PPA)

Inj incl. JSPL& JPL

Other Injection

CS Share + URS

Net Import / Export+BSP

SCH

OD(+) / UD(-)

Max. Demand Met (3478 MW)

on 25-12-15 at 18:00 Hrs.

Contribution

MW

2.6- PERCENTAGE OF BDI COMPLIANCEPercentage Status of Compliances of Backing Down Instruction issued

by SLDC to Generating Stations of CSPGCL from APR 2015 – DEC

2015.

MonthTotal no of

BDI issued

by SLDC

Compliance % by Generators/Generating Stations

Total Non

Compliance< 25% 25 to 50% 50 to 90% > 90%

Apr-15 57 0 1 4 44 8

May-15 48 0 0 3 35 10

Jun-15 85 0 3 5 57 20

Jul-15 30 0 0 5 22 3

Aug-15 11 0 1 3 7 0

Sep-15 16 1 1 4 9 1

Oct-15 16 0 0 6 7 3

Nov-15 46 0 1 11 28 6

Dec-15 6 0 0 1 3 2

2.7 LOAD SHEDDING

Load Shedding during December-15:

Load

Shedding

Duration

(in HH:MM)

Equivalent Load

Relief

(in MU/Day)

Max Load

Shedding Done.

In Groups Feeders 169:29:00 0.346 118 MW

for

2:40 HH:MM

On

18-12-2015

In Industrial feeders 35:27:00 0.069

TOTAL 204:56:00 0.414

Page 10: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90

S.No. Name of

Substation

Name of feeder / X-

merDate and Duration Purpose Remarks

1 220 KV S/S Raigarh 160 MVA X-mer -304.02.2016 (from 10:00 hrs

to 16:00 hrs)

For preventive

maintenance

2 132 KV I/C -109.02.2016 (from 10:00 hrs

to 16:00 hrs)

For preventive

maintenance

3 132 KV TRACTION -117.02.2016 (from 10:00 hrs

to 16:00 hrs)

For preventive

maintenance

4 132 KV TRACTION -223.02.2016 (from 10:00 hrs

to 16:00 hrs)

For preventive

maintenance

5132 KV S/S

Patthalgaon132/33 KV 20 MVA X-mer

03.03.2016 (from 10:00 hrs

to 16:00 hrs)

For preventive

maintenance

6 132 KV LINE -115.03.2016 (from 10:00 hrs

to 16:00 hrs)

For preventive

maintenance

7 132 KV LINE-229.03.2016 (from 10:00 hrs

to 16:00 hrs)

For preventive

maintenance

8 132 KV S/S Gharghoda 132 KV Pathalgaon 26.03.2016 (from 10:00 hrs

to 16:00 hrs)

For preventive

maintenance

9 220 KV S/S Kotmikala 220 KV Anooppur-129.01.2016 (from 13:00 hrs

to 16:00 hrs)

Replacemnet of faulty MW

MVAR transducer in RTU

10 132 KV S/S Dallirajhara 12.5-I MVA X-merFrom 05.02.2016, 10:00 hrs

to 12.02.2016, 17:00 hrsFor Oil Filteration.

Load will be

managed by 12.5-II

& 20 MVA X-mer.

11 220 KV S/S Bemetara 40 MVA- II X-mer 03.02.2016 (from 09:00 hrs

to 16:00 hrs)

For Pre monsoon &

General Maintenance

This shutdown will

be taken only if

load is manged by

40 MVA -I

12 132 KV S/S Kawardha 40 MVA X-merFrom 15.02.2016, 10:00 hrs

to 20.02.2016, 17:00 hrsFor Oil Filteration.

Load will be

manged by 63

MVA X-

mer.

13 132 KV S/S Rasmada 40 MVA X-mer22.02.2016 (from 09:30 hrs

to17:00 rs)

Post monsoon & General

Maintenance,33KV CT

replacement for SI work

Load will be

managed by

adjceant EHV S/s.

14 220KV S/s Thelkadih 40 MVA X-mer -II24.02.2016 (from 10:00 hrs

to 16:00 hrs)

For Pre monsoon &

General Maintenance

This shutdown will

be taken only if

load is manged by

40 MVA- II

X-mer.

15 132 KV S/S Dallirajhara 12.5-II MVA X-mer25.02.2016 (from 10:00 hrs

to 17:00 hrs)

For Pre monsoon &

General Maintenance

Load will be

managed by 12.5 -

II & 20 MVA X-mer

& adjacent EHV

S/s.

16 132 KV S/S Nawagarh 40 MVA X-mer27.02.16 (from 10:00 hrs to

17:00 hrs)

For Pre monsoon &

General Maintenance

Load will be

managed by

adjceant EHV S/s.

Sr. No. Name of S/S Name of feeder/X-mer Date & duration Remark

400 KV Seoni (Main Only)

From 19.01.16 time 9:00 hrs

to 20.01.16 time 17:00 hrs on

Continuous basis

For replacement of 400 KV

Y phase CT. Line will

remain in service through

Tie bay.

400 KV Raita-I

From 03.02.16 time 9:00 hrs

to 04.02.16 time 17:00 hrs on

Continuous basis

For replacement of 400 KV

Y&B phase LA.

OUTAGE PLANNING FOR THE MONTH OF FEB AND MARCH-2016

132 KV S/ S Raigarh

132 KV S/S Baramkela

OUTAGE PLANNING OF FEEDERS AND TRANSFORMERS AT 400 KV S/S KHEDAMARA

FOR JAN'16 AND FEB'16

1 400 KV S/s Khedamara

Page 11: SSLLDDCC - 117.239.199.204117.239.199.204/wif-for-website/unifam/293-13thsoapmom28.01.2016... · detailed status of FGMO/RGMO specifically including the status of ... Between 49.90