    ScarboroughRapidTransit(SRT)PresentationtoCouncillors

    February26,2010February26,2010

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    2/34

    SRT Transit Project Assessment

    Extension

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    3/34

    SRT Transit Project Assessment

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    4/34

    Existing SRT

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    5/34

    Existing SRT

    Kennedy to McCowan

    Existing StationAt rade

    Tunnel

    Elevated

    N.T.S

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    6/34

    Scope

    New trains will operate with 3 car consist (approx 95m) Existing trains are 60m

    Stations

    Extend platforms approx 35m

    Raise track/lower platform

    Raise roof

    Tunnel raise roof

    Running structure

    Strengthen for added vehicle load

    Clearance/safety walkway requirements

    Traction ower re lace 3rd rail with overhead catenar

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    7/34

    LRT Track and Existing Station Modification

    Option 1 Option 2

    Raised Track Level and Raised Station Ceiling Lowered Platform Level and Raised Station Ceiling

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    8/34

    Lawrence East

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    9/34

    Scarborough CentreScarborough Centre

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    10/34

    Shut Down Service

    Replacement bus service required

    , ,

    Temporary bus terminals required at Scarborough Town

    Centre and Kennedy Plans being developed

    Temporary full closure of Kennedy will be considered

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    11/34

    SRT Transit Project Assessment

    Extension

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    12/34

    Public Consultation to Date

    ,

    - Identified alternative corridors

    PIC #2 June 4/5 2008

    - Recommended corridor for extension of SRT to Malvern Town

    Centre

    -

    Special Community Meeting July 31, 2008

    - Discussed local concerns with Alignment N3

    PIC #3 June 2, 2009- Presented preferred alignment

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    13/34

    N

    Alignment

    As Presented

    June 2009

    SRT stationlocations

    LEGEND

    Elevated

    At grade

    Below grade

    Possible future extension

    13N.T.S

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    14/34

    Changes Since June 2, 2009

    SRT will use LRT technology

    facility

    Centennial College Station has been relocated to theeast side of Progress, improving access to the campus

    Bellamy Station will be constructed in the future, when

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    15/34

    Phased Construction

    alignment Phase 1

    SRT will be extended from McCowan to Sheppard Ave.

    The station at Sheppard will include a bus terminal and Passenger

    Pick Up and Drop Off (PPUDO)

    Phase 2

    SRT will be extended from Sheppard to Malvern Town Centre,

    when funding becomes available

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    16/34

    Preferred

    Alignment

    Phase 2

    SRT station locations

    LEGEND

    Elevated

    At grade

    Below grade

    Sheppard LRT

    Future Station

    Phase 1

    Potential Future Yard

    16N.T.S

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    17/34

    Sheppard Bus Terminal

    ndCreekN

    H

    ighl

    Sheppard AveNorth Bus Terminal Location

    Prog

    Chinese

    Cultural

    Center

    South Bus

    Terminal

    Location

    essAve.

    With Phase 1 terminating at Sheppard, a bus terminal is required to provide a fast and convenient connection

    N.T.S

    . .

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    18/34

    Sheppard Station

    Substation

    Noise Wall

    N

    u

    Secondary

    EntranceSheppard LRT Platform

    Portal

    ChineseCultural

    Center

    Passenger Pick-Up and Drop Off

    N.T.SGraphical Representation Only

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    19/34

    Vehicle Technology

    It has been determined that the SRT will be converted to LRT technology, using the

    same vehicles as the other Transit City LRT lines.

    Preferred Technology

    Existing Mark I vehicles to be replaced with LRT vehicles. SRT trains will be 3 cars in length (approximately

    95m)

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    20/34

    Maintenance Facility

    As a result of the decision to use LRT technology:

    SRT vehicles will be maintained at the Sheppard/Conlins Maintenance Facility, to save on operating and capital

    costs.

    This requires a connection between the SRT and Sheppard LRT lines.

    Until such time as all Transit City lines are constructed, the maintenance yard off Bellamy is not needed.

    TTC will continue to protect the Bellamy site for possible use in the future.

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    21/34

    N

    Potential

    Future

    Maintenance

    FacilityProposed EA Alignment

    SRT stationlocations

    LEGEND

    Elevated

    At grade

    Below gradeJune 2009 Alignment

    Future Station

    21N.T.S

    Future BellamyStation

    Potential futu re

    Bellamy yard

    N.T.S

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    22/34

    Property

    N

    Preferred

    Alignment

    LEGEND

    Progress Ave..

    Bellam

    yRd.

    Potential

    Future Yard

    Properties

    required for

    hamR

    d.

    Mar

    . .

    22

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    23/34

    Sheppard AveSheppard Ave

    N

    Service Track

    ConnectionMcCowan Option

    Progress Option

    Markham Option Sheppard Option

    Milner Ave.

    Prog

    401

    401

    MressAve.

    McCowanRoad

    arkhamRoad

    LEGEND

    Sheppard LRT

    Proposed EA Alignment

    McCowan O tionProgress Ave.

    Progress Option

    Markham Option

    Sheppard Option

    ropose gnmen

    N.T.S

    Graphical Representation Only

    23

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    24/34

    Sheppard Properties

    North

    South

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    25/34

    Centennial College Station

    June 2009 Centennial College Station on west side of Progress Current Centennial College Station on east side of Progress

    by virtue of westerly realignment of Progress Ave, north o f 401

    N N

    New Road

    AlignmentRealigned

    Progress

    Centennial College StationCentennial College Station

    Ave

    Centennial CollegeCentennial College

    N.T.S. .

    Graphical Representation Only Graphical Representation Only

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    26/34

    Highlights

    Existing Kennedy to McCowan 6.5 km

    Phase 1Extension

    McCowan to Sheppard 3.4 km

    Line Length

    Malvern

    (1.7 KM)

    Phase 2

    ExtensionSheppard to Malvern Town Centre 1.7 km

    TOTAL 11.6 km

    Travel Time Existing (6.5KM)

    Centre

    Existing SRT Scarborough Centre to Kennedy 8min

    Bus Malvern TC to Scarborough Centre 23min

    TOTAL 31 min

    Extension SRT Scarborough Centre to Kennedy 8min

    SRT Malvern TC to Scarborou h Centre 8minExtension (5.1KM)

    .

    TOTAL 16 min

    Per Hour in Peak Direction

    (pphpd)Daily Total Year

    Existin Ca acit 3 800

    Ridership

    ,

    Existing Demand - South to Kennedy 5,000 45,000 2010

    Future Demand - South to Kennedy 10,000 90,000 2031

    Future Demand - South to McCowan

    Station4,500 40,000 2031 Kennedy

    N.T.S tat on

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    27/34

    SRT Transit Project Assessment

    Conversion

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    28/34

    Kennedy Station

    Modify station to accommodate new SRT vehicles

    ,

    SRT and subway

    Accommodate new Eglinton and S-M LRT lines

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    29/34

    Background

    Existing Future

    Subway 3 3

    SRT 3 3

    Bus 3 3

    Passenger Pickup 3 3

    Pedestrian 3 3

    GO 3 3

    Parking 3 3

    Eglinton LRT 3

    Scar-Malvern LRT 3

    Bounded by GO (east), CN (south), Eglinton (north) and

    Kennedy (west)

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    30/34

    Work to Date

    Developed upwards of 70 alignments

    - -

    - Eglinton - Below Grade

    - SM - Below Grade Agreed with Metrolinx February 16, 2010

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    31/34

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    32/34

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    33/34

    Next Steps

    Proceed with preliminary design

  • 7/27/2019 SRT Presentation to Councillors - February 26 2010 Compatibility Mode

    34/34

    Schedule

    -

    March 2 - Mayors Briefing

    -

    April 1 - Notice of Commencement

    A ril 5-7 - PICs May 6 - Commission

    June 8 - Council