2/16/2001 2/16/2001 ACC Energy Workshop – Summer Preparedness ACC Energy Workshop – Summer Preparedness 2001 and 2002 2001 and 2002 000752SS- 000752SS-1 SRP SRP Summer Preparedness Summer Preparedness 2001 and 2002 2001 and 2002 Presented to the Presented to the Arizona Corporation Arizona Corporation Commission Commission February 16, 2001 February 16, 2001

Upload: linnea

Post on 10-Jan-2016

45 views

Category:

Documents


3 download

DESCRIPTION

SRP Summer Preparedness 2001 and 2002. Presented to the Arizona Corporation Commission February 16, 2001. David Areghini. Associate General Manager Power, Construction & Engineering Services. Agenda. SRP system & load growth Summary of year 2001 and 2002 projected readiness - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-11

SRPSRPSummer PreparednessSummer Preparedness

2001 and 20022001 and 2002

Presented to thePresented to the

Arizona Corporation Arizona Corporation CommissionCommission

February 16, 2001February 16, 2001

Page 2: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-22

David AreghiniDavid Areghini

Associate General ManagerAssociate General ManagerPower, Construction & Power, Construction &

EngineeringEngineeringServicesServices

Page 3: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-33

AgendaAgenda

SRP system & load growthSRP system & load growth

Summary of year 2001 and Summary of year 2001 and 20022002projected readinessprojected readiness

Resources and reservesResources and reserves

SRP system readinessSRP system readiness

Page 4: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-44

SRP Electric Service TerritorySRP Electric Service Territory

Eastern Mining Area

Phoenix

Peoria

Glendale

Scottsdale

Mesa

Tempe

Gilbert

Chandler

Tolleson

LitchfieldPark

Surprise

Goodyear

Avondale

ApacheJunction

QueenCreek

FountainHills

ParadiseValley

Page 5: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-55

Expected Load GrowthExpected Load Growth

Phoenix

Peoria

Glendale

Scottsdale

Mesa

Tempe

Gilbert

Chandler

Tolleson

LitchfieldPark

Youngtown

Surprise

Goodyear

Avondale

ApacheJunction

QueenCreek

FountainHills

ParadiseValley

4.5%

18%

3.8%

2.7%

4.2%

Page 6: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-66

Summary of Year 2001 Summary of Year 2001 and 2002 Projected and 2002 Projected

ConditionsConditions

Transmission, SRP generation and Transmission, SRP generation and planned energy purchases areplanned energy purchases areadequate to serve the forecastedadequate to serve the forecastedyear 2001 and 2002 demandyear 2001 and 2002 demand

Contingency plans are in place toContingency plans are in place tohandle emergency eventshandle emergency events

Page 7: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-77

John CogginsJohn Coggins

ManagerManager

Supply and TradingSupply and Trading

Page 8: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-88

Operating ReservesOperating Reserves

Protect against loss of generationProtect against loss of generationor transmission resources usedor transmission resources usedto deliver energy to firm load to deliver energy to firm load

Targeted reserve levels based on:Targeted reserve levels based on:•Amount of firm loadAmount of firm load•Largest single hazardLargest single hazard

Page 9: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-99

20012001

System ReservesSystem Reserves

Page 10: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-1010

Summer 2001 ReservesSummer 2001 Reserves

Load (MW)Load (MW)

Actual reserves*Actual reserves*

ReservesReserves

ValleyValley

StrandedStranded

53305330

635635

421421

214214

JulJul

53305330

636636

421421

215215

AugAug

48404840

841841

841841

00

SepSep

49804980

627627

627627

00

JunJun

** Meets WSCC and NERC Criteria Meets WSCC and NERC Criteria Meets Southwest Reserve Sharing Group CriteriaMeets Southwest Reserve Sharing Group Criteria

Page 11: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-1111

West WingWest Wing

LibertyLiberty

Kyrene/Browning/SilverkingKyrene/Browning/Silverking

MeadMead

NavajoNavajo

Pinnacle PeakPinnacle Peak

Four Corners/Craig/HaydenFour Corners/Craig/Hayden

CoronadoCoronado

SRP Distribution SRP Distribution

TerritoryTerritory

Valley ReservesValley Reserves421 MW421 MW

Available Import Available Import Capability 0 MWCapability 0 MW

Valley Reserve Shortfall – August 2001Valley Reserve Shortfall – August 2001

Palo Palo VerdeVerde

Outside ValleyOutside ValleyReserves 215 MWReserves 215 MW

Page 12: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 000752SS-000752SS-1212

SRP Resources - 2001SRP Resources - 2001

SRPSRPOwnedOwned

GenerationGeneration

PurchasedPurchasedPowerPower

SRPSRPForecastForecast

Peak LoadPeak Load

ReservesReserves

4064 MW4064 MW

1902 MW1902 MW

Total 5966 MWTotal 5966 MW

5330 MW5330 MW

636 MW636 MW

Page 13: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-1313

SRP Owned Generation – SRP Owned Generation – 20012001

(Capacity)(Capacity)

Coal1915 MW

Nuclear 660 MW

Oil & Gas1260 MW

Hydro 229 MW

Total 4064 MW

Page 14: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-1414

Fuel StatusFuel Status Nuclear – Full requirements under contractNuclear – Full requirements under contract

Coal Coal • All plants currently at or above target All plants currently at or above target

inventoriesinventories

• Full requirements under contractFull requirements under contract

Natural gasNatural gas• Full transportation requirements under contractFull transportation requirements under contract

• Retail commodity requirements securedRetail commodity requirements secured

• Pipeline curtailments anticipatedPipeline curtailments anticipated• Fuel oil back-upFuel oil back-up

Page 15: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-1515

Fuel StatusFuel Status

Fuel OilFuel Oil

•Critical back-up for natural gasCritical back-up for natural gas

•Allows plants to continue toAllows plants to continue tooperate during gas operate during gas curtailmentscurtailments

•Increasing inventory levels toIncreasing inventory levels tomeet anticipated requirementsmeet anticipated requirements

•Adequate storage capabilityAdequate storage capability

Page 16: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-1616

20022002

System ReservesSystem Reserves

Page 17: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-1717

Summer 2002 ReservesSummer 2002 Reserves

Load (MW)Load (MW)

Actual reserves*Actual reserves*

ReservesReserves

Valley Valley

StrandedStranded

55305530

839839

370370

469469

JulJul

55305530

840840

510510

330330

AugAug

49654965

841841

841841

00

SepSep

51475147

831831

749749

8282

JunJun

** Meets WSCC and NERC Criteria Meets WSCC and NERC Criteria Meets Southwest Reserve Sharing Group CriteriaMeets Southwest Reserve Sharing Group Criteria

Page 18: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 000752SS-000752SS-1818

SRP Resources - 2002SRP Resources - 2002

SRPSRPOwnedOwned

GenerationGeneration

PurchasedPurchasedPowerPower

SRPSRPForecastForecast

Peak LoadPeak Load

ReservesReserves

4204 MW4204 MW

2166 MW2166 MW

Total 6370 MWTotal 6370 MW

5530 MW5530 MW

840 MW840 MW

Page 19: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-1919

John UnderhillJohn Underhill

ManagerManagerSystem OperationsSystem Operations

Page 20: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2020

20012001

System ConditionsSystem Conditions

Page 21: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2121

System Improvements 2001System Improvements 2001

Projects increasing import andProjects increasing import andload serving capability load serving capability

• Browning 500/230kV receiving Browning 500/230kV receiving

stationstation

• Four 230/69kV transformer additionsFour 230/69kV transformer additions

• Four new residential substationsFour new residential substations

• Six 69/12kV transformer additionsSix 69/12kV transformer additions

• Seven capacitor additionsSeven capacitor additions

Page 22: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2222

Load Serving Capacity Load Serving Capacity 20012001

N-0 Continuous & Emergency Limit 5831 MWN-0 Continuous & Emergency Limit 5831 MW

N-1 Continuous & Emergency Limit 5553 MW

Forecasted Base Peak 5210 MWForecasted Base Peak 5210 MW

Forecasted Upper Peak 5330 MWForecasted Upper Peak 5330 MW

Page 23: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2323

20022002

System ConditionsSystem Conditions

Page 24: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2424

System Improvements 2002System Improvements 2002

Projects increasing import andProjects increasing import andload serving capability load serving capability

•Kyrene Expansion ProjectKyrene Expansion Project

•Four 230/69kV transformer Four 230/69kV transformer additionsadditions

•Three new residential substationsThree new residential substations

•Seven 69/12kV transformersSeven 69/12kV transformers

•Multiple 230kV & 69kV line Multiple 230kV & 69kV line upgradesupgrades

Page 25: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2525

Load Serving Capacity Load Serving Capacity 20022002

N-0 Continuous & Emergency Limit 6093 MWN-0 Continuous & Emergency Limit 6093 MW

N-1 Continuous & Emergency Limit 5803 MW

Forecasted Base Peak 5410 MWForecasted Base Peak 5410 MW

Forecasted Upper Peak 5530 MWForecasted Upper Peak 5530 MW

Page 26: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2626

System PreparationSystem Preparation

• Major line patrolsMajor line patrols• Preventative Preventative

maintenancemaintenance• Pole work Pole work • Personnel training Personnel training

• Tree trimmingTree trimming• Cable Cable

replacement replacement • Storm planStorm plan

Summer substation and line Summer substation and line maintenancemaintenancewill be complete by summerwill be complete by summer

Page 27: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2727

Emergency Operations Emergency Operations and Load Sheddingand Load Shedding

System NormalSystem Normal

Capacity Critical (Internal)Capacity Critical (Internal)

Capacity Emergency (Stage Capacity Emergency (Stage 1)1)

Pre-load Shedding (Stage 2)Pre-load Shedding (Stage 2)

Rotating Blackouts (Stage 3)Rotating Blackouts (Stage 3)

Page 28: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2828

ConcernsConcerns

WSCC curtailmentsWSCC curtailments

Existing Kyrene units Existing Kyrene units (2002+)(2002+)

Energy exchange at Glen Energy exchange at Glen CanyonCanyon

Double contingenciesDouble contingencies

Voltage collapseVoltage collapse

Page 29: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-2929

Significant Near Term Significant Near Term Major Transmission and Major Transmission and

Generation NeedsGeneration Needs

Southwest Valley 500kV Southwest Valley 500kV Transmission ProjectTransmission Project

(Summer 2003)(Summer 2003)

Santan Expansion ProjectSantan Expansion Project(Summer 2004-2005)(Summer 2004-2005)

Page 30: SRP Summer Preparedness 2001 and 2002

2/16/20012/16/2001 ACC Energy Workshop – Summer Preparedness 2001 and 2002ACC Energy Workshop – Summer Preparedness 2001 and 2002 000752SS-000752SS-3030

Summary Of Year 2001 Summary Of Year 2001 and 2002 Projected and 2002 Projected

ConditionsConditions

Transmission, SRP generation and Transmission, SRP generation and planned energy purchases areplanned energy purchases areadequate to serve the forecastedadequate to serve the forecastedyear 2001 and 2002 demandyear 2001 and 2002 demand

Contingency plans are in place toContingency plans are in place tohandle emergency eventshandle emergency events