sr 916/nw/ne 135 street public hearing · sr 916/nw/ne 135 street public hearing resurfacing,...

27
Florida Department of TRANSPORTATION 1 SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project From NW 6 Avenue to west of SR 5/Biscayne Boulevard FM #429346-1-52-01 Date: June 1 st , 2017 Time: 6:00 P.M. Location: City of North Miami Public Library 835 NE 132 Street North Miami, FL 33161

Upload: others

Post on 29-May-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department ofTRANSPORTATION

1

SR 916/NW/NE 135 Street Public HearingResurfacing, Restoration, and Rehabilitation (RRR) Project

From NW 6 Avenue to west of SR 5/Biscayne BoulevardFM #429346-1-52-01

Date: June 1st, 2017Time: 6:00 P.M.Location: City of North Miami Public Library835 NE 132 StreetNorth Miami, FL 33161

Page 2: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 2

Nathan Pulido Project Manager with the Florida Department of Transportation (FDOT)

Ken Jeffries Transportation Planner with the Florida Department of Transportation (FDOT)

Jesus Mustafa Project Design Consultant with BMA Consulting Engineering, Inc.

Charesse Chester Public Information Specialist with Creativision MEDIA

Constanza Suarez Design Engineer with Kittelson & Associates, Inc.

John Paul Weesner Landscape Architect with Kittelson & Associates, Inc.

Project Team

Page 3: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

Share proposed improvements along SR 916/NW/NE 135 Street Official forum to express your opinions and concerns

Public input is critical to the success of this project! After the presentation

Open floor for public comments Verbatim transcript will be made of all oral proceedings All written and oral materials will be part of the project public record

3

Meeting Purpose

Page 4: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

In accordance with: Federal-Aid Highway Act of 1968, as Amended Title 23 of the United States Code, Section 128 Title 40 of the Code of Federal Regulations, Parts 1500 through 1508 Title 23 of the Code of Federal Regulations, Part 771 Title VI of the Civil Rights Act of 1964 Section 339.155 of the Florida Statutes Executive Order 11988, Floodplain Management Executive Order 11990, Protection of Wetlands of the Constitution of

the United States of America

4

Public Hearing Held

Page 5: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

Hearing advertised consistent with: Federal and State

Requirements

Hearing conducted consistent with: Americans with

Disabilities Act of 1990

5

Hearing was Advertised in: Diario Las Americas Le Floridien Florida Administrative Register Direct Mail outs Press Releases FDOT’s Public Notices Website

Public Hearing

Page 6: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

Title VI of the Civil Rights Act of 1964 Prohibits discrimination in programs and activities receiving Federal

Financial Assistance on the basis of:RaceColorNational Origin

Public participation encouraged and solicited without regard to: Age Sex Religion Disability Family Status

6

Public Hearing

Page 7: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

Three primary components for tonight include: Open house prior this presentation

Invited to view project displays and to speak directly with the project team Presentation

Explaining project background and proposed improvements Formal comment period

Opportunity to provide oral statements

7

Public Hearing Process

Page 8: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

FDOT Projects FDOT has a Resurfacing, Restoration, and Rehabilitation

Project (RRR) From NW 6 Avenue to west of SR 5/Biscayne Boulevard

What is a RRR? Extend the life of an existing highway Enhance safety by returning the roadway to adequate

conditions

8

Background Information

Page 9: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 9

Project Limits

Page 10: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 10

Project Limits

Page 11: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

The RRR Project Consists of: Repaving and Restriping the

Roadway Replacing Substandard Curb

Ramps at Intersections Upgrading Pedestrian Signals Upgrading Pavement Markings

Proposed by Complete Streets Concept Enhancing Landscaping Installing Medians

11

Picture of pedestrian crosswalk at study area intersection

Project Elements

Page 12: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

Complete Streets concepts (i.e., landscaping and pedestrian related treatments) were included in the RRR for several reasons: Request initiated from the Mayor’s Office

of North Miami Improvements align with the

community’s vision for the corridor Provides neighborhood feeling Feedback from your Elected Officials

12

Complete Streets

Page 13: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 13

By incorporating Complete Streets concepts into the programmed RRR project, rework is minimized Project already programmed for construction Design phase almost complete Minimal impact on schedule Completion by January 2020

Complete Streets

Page 14: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

Typical section of the roadway Existing number of lanes will remain Existing lane widths will change

12’ outside 11’ inside lane 10’ continuous left turn lane

Before

14

Existing Conditions

Page 15: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation

Proposed Improvements will have no right-of-way impacts Proposed Typical Section

11’ lanes 12’ raised median

Having restrictive left turn lanes is Safer than continuous left turn lane

After

15

Proposed Improvements

Page 16: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 16

Proposed improvements – Based on the community’s Vision City of North Miami

Transportation Master Plan Curbed (Raised) Median Reduced lane widths encourages

slower speeds Allows for landscape beautification Overall reduction in angle, left turn,

head-on, and sideswipe crashes Installing a raised median will

cause changes in travel patterns for some of the residents

Medians will be similar to those on West Dixie Highway

Goo

gle

Stre

et V

iew

–5/

2017

Proposed Improvements Benefits

Page 17: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 17

Palm Trees (11” Maximum Width)

Goo

gle

Stre

et V

iew

–5/

2017

Evergreen Hedge (Maximum 30” Height)

Flowering Hedge (Maximum 24” Height)

Medians conform to State Standards

Proposed Improvements Benefits

Page 18: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 18

SR 916/NW/NE 135th Street & NW 2nd Avenue – “Before”

Proposed Improvements Benefits

Page 19: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 19

12’ Landscape Median

Enhanced Crossing

Enhanced Crossing

Gateway Signage

Pedestrian Refuge

SR 916/NW/NE 135th Street & NW 2nd Avenue – “After”

Proposed Improvements Benefits

Page 20: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 20

Modifications to current access Access assessment based on

Field collected traffic volumes Safety data FDOT Access Management Standards FDOT 2014 Median Handbook

Access Modifications

Page 21: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 21

Suitable median closure locations Determined based on traffic volumes Analysis of future vehicles lining up in turn lane Existing connectivity in the area

Raised median will limit where left turns can be made to or from SR 916/NW/NE 135 Street Full median openings will be provided at some intersections

Access remains unrestricted (left turn to or from SR 916/NW/NE 135 Street permitted)

Directional median openings allows left turns from NW 135 Street Restricts left turns from the connecting street

Access Modifications

Page 22: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 22

Possible Routes Considered for Diverted Traffic

Diverted Traffic by Proposed Improvements

Page 23: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 23

Possible Routes Considered for Diverted Traffic

Diverted Traffic by Proposed Improvements

Page 24: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 24

Estimated construction schedule Work expected to begin February 2019 Completion date expected January 2020 Schedule is subject to change

Estimated project cost $4.76 Million

Construction completed in phases Lane closures during non-peak hours

Schedule and Cost

Page 25: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 25

Avenues for Those Seeking FDOT Work People First – List jobs available for State of Florida employers On Board 4 Jobs – Construction careers program Florida Department of Transportation, Equal Opportunity Office – DBE

Enterprises Florida Transportation Builders Association (FTBA) – Scholarship Programs

For Further Information visit https://peoplefirst.myflorida.com/peoplefirst(bD1lbiZjPTIzMA==)/logon.htm http://onboard4jobs.com/ http://www.fdot.gov/equalopportunity/ http://www.ftba.com/

Available FDOT Work Resources

Page 26: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 26

Contact Information

Ken JeffriesTransportation Planner FDOT1000 NW 111th Avenue – Room 6111Miami, FL 33172Phone: (305) 470-5445Email: [email protected]

Charesse ChesterPublic Information Specialist 9999 NE 2 Avenue, Suite 215AMiami, FL 33138Phone: (305) 944-7564Email: [email protected]

Page 27: SR 916/NW/NE 135 Street Public Hearing · SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project. From NW 6 Avenue to west of SR 5/Biscayne

Florida Department of Transportation 27

Thank you for your Time and Attention

SR 916/NW/NE 135 Street Public Hearing