sr 167 extension comprehensive tolling study round 1 ...€¦ · sr 167 extension comprehensive...

42
SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary Results Stakeholder Committee Meeting September 27, 2011 Paula Hammond Secretary of Transportation Steve Reinmuth Chief of Staff David Dye Deputy Secretary WSDOT SR 167 Tolling Study Team

Upload: trannhi

Post on 15-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

SR 167 Extension Comprehensive Tolling Study

Round 1 Preliminary Results

Stakeholder Committee Meeting

September 27, 2011

Paula HammondSecretary of Transportation

Steve ReinmuthChief of Staff

David Dye Deputy Secretary

WSDOT SR 167 Tolling Study Team

Page 2: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

What We Did at the Last Meeting

• Reviewed the 2010 Toll Feasibility Study

• Reviewed 19 different phasing options

• Selected three options for further analysis• Selected three options for further analysis

• Endorsed the evaluation criteria

• Reviewed the Public Opinion Survey

Page 3: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

What We Are Doing Today

• Review first round analysis results

• Discuss and decide what to analyze next

• Discuss the public outreach plan• Discuss the public outreach plan

Page 4: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Full Build (formerly Option 1)

Page 5: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Option A (formerly Option 2)

Page 6: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Option B (Formerly Option 9A)

Page 7: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Basic Toll Concepts

• Single point tolling (TNB)

• Segmental tolling

• Fixed rate tolling (TNB)

• Variable tolling (SR 167 HOT lane, SR 520)• Variable tolling (SR 167 HOT lane, SR 520)

For this study:

• Segmental tolling

• Variable tolling

Page 8: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Full Build (formerly Option 1)

Page 9: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Option A (formerly Option 2)

Page 10: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Option B (Formerly Option 9A)

Page 11: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Option C (Option B plus toll existing SR 167)

Page 12: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Analysis Assumptions

• All vehicles except transit pay tolls

• Toll rates vary by time of day based on level of congestion

• Trucks pay higher tolls

• Toll rates are set toward revenue generation

• Traffic model was adjusted for downward trend in regional job and population forecasts by 3% and 1% respectively to reflect recent economic downturn.

Page 13: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Value of Time (VOT)

• People’s willingness to pay a toll depends on:

• Perception of what their time is worth

• Available options to avoid/reduce toll

• Trip type/destination

• Updated VOT drawn from SR 520 Investment Grade • Updated VOT drawn from SR 520 Investment Grade study:

• Average work trip: reduced from $26.25/hour to $14.70/hour, nearly 50% reduction.

• Non-work trip: reduced from 19.00/hour to $13.25/hour, a 30% reduction.

Page 14: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Nexus between Tolling and Traffic

Page 15: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Relationship between Toll Rate, Traffic and Revenue

Tra

ffic

Vo

lum

e

Revenue

Toll rate

Tra

ffic

Vo

lum

e

Traffic

Max revenue toll

0

Page 16: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Full Build, Option A & B Toll Rates by Segment

Page 17: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

$1.50

$2.00

$2.50

$3.00

Peak

Option C Toll Rates Tested

$-

$0.50

$1.00

$1.50

West of I-5 I-5 to SR 161 East of SR 161

Peak

Off Peak

Page 18: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Estimated 2030 Weekday Gross Toll Revenue

$60,000

$80,000

$100,000

$-

$20,000

$40,000

Full Build Option A Option B Option C

Page 19: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Performance of Alternatives

• Vehicle Miles of Travel (VMT)

– Number of Vehicles on a road way link multiplied by the length of that link

– Sum this for all roadway links in the study area

• Delay

– Congested Travel time on a roadway link is one of the output from – Congested Travel time on a roadway link is one of the output from Travel Demand Model.

– Vehicle of hours of Travel (VHT) in the study area is calculated as:

• Congested travel time multiplied by number of vehicles on that road way section gives us the vehicles hours of travel for that roadway

• Sum this for all roadway links in the study area

– Delay Reduction in the study area is calculated as follows:

• No Build alternative VHT minus a given Alternative VHT

Page 20: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Study Area Defined for the Analysis

Page 21: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

2030 PM Peak Period Vehicle Miles of Travel in the Study Area

Page 22: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

2030 PM Peak Delay Reduction in the Study Area compared to No Build Option

Page 23: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Assessing Extension Usage: Volume to Capacity Ratio

• Typically a freeway lane is able to carry 2000 vehicles/hour

• Utilization = Volume / Capacity x 100%

• Traffic engineers use peak hour volume to capacity ratio • Traffic engineers use peak hour volume to capacity ratio (V/C) to assess how fully a corridor is used and how congested it might be.

• A V/C of 0.9 or higher indicates potential congestion.

Page 24: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Full Build Extension Utilization 2030 PM Peak Percentage of Volume to Capacity Ratio

Page 25: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Option A Extension Utilization 2030 PM Peak Percentage of Volume to Capacity Ratio

Page 26: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Option B Extension Utilization2030 PM Peak Percentage of Volume to Capacity Ratio

Page 27: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Option C Extension Utilization2030 PM Peak Percentage of Volume to Capacity Ratio

Page 28: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

What Did We Find from V/C Analysis?

• By 2030, the Full Build option would approach congestion if it is not tolled.

• Tolling is expected to reduce the extension usage

– The segment west of I-5 is more sensitive to tolling than the east segment

– For the Full Build and Option A, with the toll rate as tested, less than half of the capacity is expected to be used by 2030 east of I-5, while half of the capacity is expected to be used by 2030 east of I-5, while less than one fifth of capacity utilization is expected west of I-5

– For Option B and C, about three quarter of the capacity is expected to be used east of I-5, while the usage is expected to approach one fifth west of I-5

– Spreading a portion of the toll to the existing SR 167 just east of SR 161 would help balance the flow and increase revenue generation. But it introduces potential equity issue

Page 29: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

2030 Full Build – Truck Volume per Hour(pickup trucks included)

Page 30: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

2030 Option A – Truck Volume per Hour

Page 31: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Corridor Performance Analysis

Page 32: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Port of Tacoma to Sumner Corridor Travel Time Comparison – 2030 PM Peak Period

Page 33: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Downtown Tacoma to Puyallup Corridor Travel Time Comparison – 2030 PM Peak Period

Page 34: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

I-90Corridor to Port of Tacoma via SR 18 - Travel Time Comparison – 2030 PM Peak Period

Page 35: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Port of Tacoma to Frederickson Corridor Travel Time Comparison – 2030 PM Peak Period

Page 36: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Bellevue to Puyallup via SR 167 - Corridor Travel Time Comparison – 2030 PM Peak Period

Page 37: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Summary Findings

• Tolling is expected to reduce demand by about half

• For the sections with more than 1 lane each direction, model analysis indicates surplus capacity

• Adding a toll point on the existing SR 167 just east of SR 161 would161 would

– Increase toll revenue

– Increase the extension usage

– Balance traffic flow

• With the updated assumptions, daily gross revenue is expected to be less compared to the 2010 Toll Feasibility Study

Page 38: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Developing/Endorsing Options for Second-Round analysisfor Second-Round analysis

Page 39: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Questions to Keep in Mind in Developing 2nd Round Options

• How do we leverage on the findings from the first round analysis?

• How can we get the analysis done most efficiently? most efficiently?

• How to fit phased approach with the ultimate vision of the corridor and the system as a whole?

Page 40: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Specific Things to Focus On

• Number of lanes:

Which option/s analyzed in Round 1 provide reasonable capacity? Are there any other configurations do you want staff to test?

• Toll locations:

Which tolling option shows the most promise? Are there different ways of tolling that you would like to test?

• Toll Rates:

Toll for maximum revenue or system performance?

• Anything else?

Page 41: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Overall Schedule & Next Meeting

Page 42: SR 167 Extension Comprehensive Tolling Study Round 1 ...€¦ · SR 167 Extension Comprehensive Tolling Study Round 1 Preliminary ... • Selected three options for further analysis

Study Schedule & Milestones